HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad...

48
Cosmic Frontier DOE/HEP PI Meeting 2018 Drew Baden, Karen Byrum, Eric Linder, Kathy Turner Experimental Research at the Cosmic Frontier in HEP Office of High Energy Physics

Transcript of HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad...

Page 1: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic FrontierDOE/HEP PI Meeting 2018

Drew Baden, Karen Byrum, Eric Linder, Kathy Turner

Experimental Research at the Cosmic Frontier in HEP

Office of High Energy Physics

Page 2: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic Frontier Experimental Research Program

HEP Program Planning and Budgets

Cosmic Frontier Program Overview

DOE/HEP Comparative Reviews

DOE Early Career and Other Funding Programs

Closing Remarks

This talk will: (1) emphasize the Cosmic Frontier program within the broader context of the overall HEP program;(2) provide an overview of the upcoming FY 2019 comparative review funding opportunity announcement. [please refer to the final announcement once issued and prior to any

submission of an application]

2

DOE/HEP PI Meeting 2018 2

Page 3: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

2

DOE/HEP PI Meeting 2018 3

ResearchFron ers

Par

clePhysicsScienceDrivers

Through ground-based telescopes & arrays, space missions, and deep underground detectors, research at the cosmic frontier aims to explore dark energy and dark matter, which together comprise approximately 95% of the universe.

Program Areas:

• Study the nature of Dark Energy

• Direct Detection searches for Dark Matter particles

• CMB – Inflationary Epoch, Dark Energy, Neutrino Properties

• Cosmic-ray & Gamma-ray studies –indirect searches for dark matter particles

Strong interaction with Theory, Detector R&D, Computational HEP

Cosmic Frontier Experimental Research Program

Page 4: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Overall HEP Budget Trend

P5 strategy continues to define investments in future of the field

FY 2019 House/Senate Marks increase project funding above Request Profiles for high-priority projects recommended by P5 continue to ramp up

Research funding could face pressure even if overall HEP budget rises

DOE/HEP PI Meeting 2018 4

All funding shown in “then-year” U.S. dollars

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 PRESIDENT'S

BUDGET

HEP BUDGET ALLOCATION BY FISCAL YEAR ($ IN K)

Research Facilities Projects SBIR House Mark (1.005B) Senate Mark (1.010B)

Page 5: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

HEP MIE Project Status

DOE/HEP PI Meeting 2018 5

SubprogramTPC ($M)

CD Status

CD Date

INTENSITY FRONTIER

Long Baseline Neutrino Facility / Deep Underground Neutrino Experiment (LBNF/DUNE)

1,300 –1,900

CD-3A September 1, 2016

Proton Improvement Project (PIP-II) 653 - 928 CD-1 July 23, 2018

Muon g-2 46.4 CD-4 January 16, 2018

Muon-to-Electron Conversion Experiment (Mu2e) 273.677 CD-3 July 14, 2016

ENERGY FRONTIER

LHC ATLAS Detector Upgrade 33 CD-3 November 12, 2014

LHC CMS Detector Upgrade 33 CD-4A September 19, 2017

High-Luminosity LHC (HL-LHC) Accelerator Upgrade 208 - 252 CD-1/3A October 13, 2017

High-Luminosity LHC (HL-LHC) ATLAS Detector Upgrade 125-155 CD-0 April 13, 2016

High-Luminosity LHC (HL-LHC) CMS Detector Upgrade 125-155 CD-0 April 13, 2016

COSMIC FRONTIER

LUX-ZEPLIN (LZ) 55.5 CD-3 February 9, 2017

Super Cryogenic Dark Matter Search - SNOLAB (SuperCDMS-SNOLAB) 18.6 CD-2/3 May 2, 2018

Dark Energy Spectroscopic Instrument (DESI) 56.328 CD-3 June 22, 2016

Large Synoptic Survey Telescope Camera (LSSTcam) 168 CD-3 August 27, 2015

ADVANCED TECHNOLOGY R&D

Facility for Advanced Accelerator Experimental Tests II (FACET-II) 25.6 CD-2/3 June 8, 2018

Page 6: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Project Definition Project Execution

Project Closeout

CD-0

Approve

Mission

Need

CD-1

Approve

Alternative

Selection

and Cost Range

CD-2

Approve

Performance

Baseline

CD-3

Approve

Start of

Construction

CD-4

Approve

Start of

Operations(or Project Completion)

Total Project Cost (TPC)Operating

Funds

Operating

Funds

DOE 413.3B:

Critical

Decisions

Initiation(pre-project R&D)

(R&D continues…)

Project has

demonstrated

technical

readiness for

implementation

Project is completed

and ready for

turnover to

program operations

Ensures the

selected alternative

and approach is the

optimum solution

Definitive

cost, scope, and

schedule

baselines have

been developed

Identifies there

is a need that can

only be met thru

material needs

Construction projects and fabrication of large pieces of experimental equipment costing over $10M are managed through a series of “Critical Decision (CD)” milestones

The CD process ensures successful project execution and scientific return on agency investments Successful delivery of construction projects and facilities is a central part of the DOE science mission

• In particular, Office of Science practice (CD process & independent, external reviews) is considered gold-standard with an excellent record in DOE “Failure is not an option”

DOE is committed to the successful execution of projects that have reached CD-2 (establish performance baseline of technical scope, cost & schedule) and to provide the funding profile needed to carry it out.

DOE Project Management Process

6DOE/HEP PI Meeting 2018

Page 7: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

HEP Program Guidance

DOE/HEP PI Meeting 2018 7

FACA panels & subpanels provide official advice:

High Energy Physics Advisory Panel (HEPAP)

Jointly chartered by DOE and NSF to advise both agencies

Provides the primary advice for the program

Subpanels for detailed studies (e.g. Particle Physics Project Prioritization

Panel (“P5”) in 2008, 2014

Astronomy and Astrophysics Advisory Committee (AAAC)

Advises DOE, NASA, and NSF on selected issues in astronomy & astrophysics of overlap,

mutual interest and concern

Formal Advice Also Provided by:

National Academy of Sciences (NAS)

Decadal Surveys in Astronomy & Astrophysics, Elementary Particle Physics

Board on Physics & Astronomy (BPA), Committee on Astronomy & Astrophysics (CAA)

Other: Community science studies and input (e.g. Snowmass, Dark Energy Task Force, DPF input).

CMB-S4 Concept Design Team (CDT), Gemini-Blanco-SOAR Telescopes roles subpanels of AAAC

Astro-Particle International Forum (APIF) – Agency-level international group

Tri-Agency Group (TAG) – DOE, NASA, NSF-AST meetings on LSST, WFIRST, Euclid coordination

Page 8: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

DOE/HEP PI Meeting 2018 8

Cosmic Frontier Program

Page 9: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

P5 Report – Cosmic Frontier

DOE/HEP PI Meeting 2018 9

Dark Energy

Complete LSST as planned

Build DESI as a major step forward in dark energy science

Dark Matter

Proceed immediately with a broad second-generation (G2)

dark matter direct detection program with capabilities described in the text

Invest in this program at a level significantly above that called for in the 2012 joint

agency announcement of opportunity

Support one or more third-generation (G3) direct detection experiments

Guide G3 by the results of the preceding (G1, G2) searches

Seek a globally complementary program and increased international partnership in G3

experiments (DM-G3 is in the P5 plan later in later part of their 10 year plan.)

Cosmic Microwave Background (CMB)

Support CMB experiments as part of the core particle physics program

The multidisciplinary nature of the science warrants continued multi-agency support

(CMB-S4 Project is in P5 plan, starting ~midway through their 10 year plan.)

Explore the Unknown, including through cosmic rays and gamma rays

Dark Matter

Cosmic Acceleration

Explore the Unknown

Neutrino Mass

Page 10: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic Frontier Program

DOE/HEP PI Meeting 2018 10

Study dark energy through staged program of complementary surveys(in partnership with NSF-AST)

Imaging surveys map cosmic structure over vast volumes of space: Dark Energy Survey (DES) operating, Large Synoptic Survey Telescope (LSST) camera in fabrication

Spectroscopic surveys build deep, 3D maps of cosmic structure and growth: eBOSS operating, Dark Energy Spectroscopic Instrument (DESI) in fab

Search for dark matter through direct detection experiments over a wide mass range (in partnership with NSF-PHY)

High- and low-mass WIMP sensitivity: LZ and SuperCDMS-SNOLAB, in fab Axion (ultralow mass) experiment: ADMX-G2 in operation

Study cosmic acceleration (inflation) at energies near the Planck scale and neutrino properties through the cosmic microwave background (CMB) (in partnership with NSF)

New generation South Pole experiment: SPT-3G in operation Next generation array 10x more sensitive: CMB-S4 in planning

Explore the unknown, e.g. through high energy particles from dark matter annihilations in cores of galaxies (in partnership with NSF, NASA)

Cosmic- and gamma-ray detectors on Earth and in space: HAWC, Fermi/GLAST, AMS in operation

Page 11: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic Frontier Experiments

DOE/HEP PI Meeting 2018 11

Activity Location Science Current Status # Collaborators # Institutions # Countries

Extended Baryon Oscillation SpectrosopicSurvey (BOSS)

APO in New Mexico

dark energy stage III (spectroscopic) operations started 2015100 (60 US, 40

HEP)34 (22 US, 10

HEP)10

Dark Energy Survey (DES) CTIO in Chile dark energy stage III (imaging) operations started Sep 2013 500 25 (13 US, 9 HEP) 7

Large Synoptic Survey Telescope (LSST) -Dark Energy Science Collaboration (DESC)

Cerro Pachon in Chile

dark energy stage IV (imaging) science studies, planning269 (195 US, 47

HEP)63 (43 US, 22

HEP)15

Large Synoptic Survey Telescope (LSST) -LSSTcam Project

Cerro Pachon in Chile

dark energy stage IV (imaging) FY14 fab start; CD3 Aug 2015142 (111 US, 111

HEP)17 (11 US, 11

HEP)2

Dark Energy Spectroscopic Instrument (DESI)

KPNO in AZ dark energy stage IV (spectroscopic) FY15 fab start; CD3 June 2016200 (93 US, 74

HEP)55 (21 US, 19

HEP)9

DM-G1: Large Underground Xenon (LUX)SURF in South Dakota

dark matter - WIMP search Operations ended in 2016102 (86 US, 64

HEP)18 (15 US, 13

HEP)3

DM-G1: Super Cryogenic Dark Matter Search (SuperCDMS-Soudan)

Soudan in Minnesota

dark matter - WIMP searchOperations ended in 2016

83 (72 US, 44 HEP) 20 (17 US, 7 HEP) 3

DM-G2: ADMX-G2 Univ Washington dark matter - axion search Operations started Jan. 2017 23 (21 US, 18HEP) 8 (7 US, 4 HEP) 2

DM-G2: SuperCDMS-SNOLAB SNOLab in Canada dark matter - WIMP search FY15 fab start; CD3 May 2018109 (86 US, 57

HEP)22 (16 US, 7 HEP) 5

DM-G2: LZSURF in South Dakota

dark matter - WIMP search FY15 fab start; CD3 Feb. 2017252 (174 US, 161

HEP)38 (26 US, 23

HEP)5

SPT-3G South Pole CMB stage 3 Operations started Feb. 2017 59 9 (7 US,5 HEP) 3

Very Energetic Radiation Imaging Telescope Array System (VERITAS)

FLWO in AZ gamma-ray survey HEP ops completed 2016109 (76 US, 28

HEP)20 (16 US, 5 HEP) 4

Pierre Auger Observatory Argentina cosmic-rayHEP ops completed 2016 436 (61 US, 18

HEP)90 (17 US, 6 HEP) 17

Fermi Gamma-ray Space Telescope (FGST) Large Area Telescope (LAT)

space-based gamma-ray survey June 2008 launch; operating252 (104 US, 18

HEP)109 (37 US, 3

HEP)22

Alpha Magnetic Spectrometer (AMS-02)space-based (on ISS)

cosmic-ray May 2011 launch; operating 250 46 (6 US, 2 HEP) 16

High Altitude Water Cherenkov (HAWC) Mexico gamma-ray survey Operations started Jan. 2015 120 (60 US, 7 HEP) 30 (13 US, 3 HEP) 4

Page 12: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Dark Energy

DOE/HEP PI Meeting 2018 12

Precision measurements to differentiate between: cosmological constant and/or new fields; or modification to General Relativity

Staged, complementary suite of imaging and spectroscopic surveys to determine its nature (in partnership with NSF-AST)

Operating:– eBOSS (spectroscopic) started in 2015, ends Feb 2019, funding extended – DES (imaging) started 5-year survey in late FY13, end Dec 2018, funding extended

In Fabrication phase:– Large Synoptic Survey Telescope (LSST, Stage IV imaging)• HEP and NSF-AST (lead agency) partnership; HEP responsible for LSST camera (SLAC)• LSST is under construction; science operations start FY23• Planning started for LSST Facility Operations phase and Dark Energy Science

Collaboration (DESC) Operations

– Dark Energy Spectroscopic Instrument (DESI, Stage IV spectroscopic)• DESI is an "HEP experiment" in the fabrication phase; commissioning Spring 2019

• Fabricate DESI instrumentation & data management system • HEP coordinating w/NSF-AST to “lease” the Mayall telescope; full support for

dark energy operations starting FY19

Red dots: eBOSS quasars

Yellow dots: BOSS galaxies

DES/DECam

LSSTcam on

telescope

DESI on Mayall

Page 13: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Direct Detection of Dark Matter

DOE/HEP PI Meeting 2018 13

Staged suite of complementary direct detection experiments with multiple technologies to search for dark matter particles

High- and low-mass WIMP sensitivity; Axion (meV mass) search

Operating/Completed:Completed DOE funding for Operations of several current DM-Generation 1 (DM-G1) experiments in FY16/17

In Design, Fabrication:DM-G2’s selected by HEP & NSF-PHY in July 2014 following P5 report:

ADMX-G2 axion search at UWash (HEP); science ops started Jan 2017 • Uses a strong magnetic field to resonantly convert dark-matter halo axions

into detectable photons; currently searching in range 0.1 to 2 GHz• Currently data-taking at design sensitivity

LZ at Homestake Mine in South Dakota (HEP) • WIMP search through dual phase liquid Xe – ~10-1000 GeV mass range• In fabrication; planning for operations phase started

SuperCDMS-SNOLab in Canada (HEP+NSF-PHY partnership)• WIMP search using cryogenic solid-state crystals – ~1-10 GeV mass range• In fabrication; planning for operations phase started

CDMS

LZ

Page 14: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic Microwave Background

DOE/HEP PI Meeting 2018 14

Gain insight into inflationary epoch at the beginning of the universe,dark energy & neutrino properties by studying oldest visible light.

Current Experiments:

• SPT-3G – HEP provided support for major upgrade of the camera to greatly increase sensitivity; operations started Feb 2017 (NSF-led)

CMB-S4 Community-based Collaboration brought together ground based community to plan future- Notional array of several telescopes in Chile & South Pole with on the order of 0.5 M detectors - Needs scale-up of detector fabrication, testing, and readoutCMB-S4 Collaboration Science, Technology Books: https://arxiv.org/abs/1610.02743 ; https://arxiv.org/abs/1706.02464

Future Planning:As recommended by P5, HEP is planning to participate in CMB Stage 4

- HEP labs already heavily involved in R&D to align with P5- HEP will coordinate efforts & roles within HEP program

• Working with NSF to coordinate planning and a path forward• CMB-S4 Concept Definition Taskforce report approved by AAAC• Not yet in CD process

In Atacama: Polarbear/Simons Array

South Pole Telescope (SPT) and BICEP/Keck Array

Page 15: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Exploring the Unknown

DOE/HEP PI Meeting 2018 15

Use ground-based arrays, space telescopes, and an experiment on the International Space Station to explore the unknown, e.g. indirect searches for dark matter

Many significant inter-agency & international partnerships

Operations continuing:

Fermi/GLAST (w/NASA) HEP is supporting the Instrument Science Ops Center at SLAC; In coordination with NASA, HEP is planning to continue support of

critical efforts at SLAC if operations > 10 years

AMS (w/NASA) Operations continuing on ISS

HAWC (w/NSF) 5 year operations started early 2015

Lower program priority for new experiments

AMS on the International Space Station

HAWC full operating array

Fermi/GLAST satellite

Page 16: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic Frontier – Looking to the Future

DOE/HEP PI Meeting 2018 16

HEP “Cosmic Visions (CV)” groups in several areas – 3 groups set up• Allows interactions with small HEP community groups as 2-way line of

communication for HEP-funded efforts and directions recommended by P5

CV-CMB: Coordinate HEP technology R&D & planning efforts for future CMB-S4

CV-DM: Coordinate DM-G2 science optimization/develop DM new initiative for small projects

CV-DE: Investigate future HEP directions in the LSST & DESI era

CMB-S4 Concept Definition Team – AAAC subpanel- Report on science goals & strawman concepts approved in October 2017- Pre-Project Design Group (PPDG) in active planning

Dark Matter Community workshop held March 2017 to

• Update identification of scientifically compelling areas to search; https://arxiv.org/abs/1707.04591

Basic Research Needs (BRN) process started mid 2018, report late 2018• Assess the science landscape for dark matter particle searches, AND• Identify which high impact science areas would be suitable to be pursued with small projects in the HEP program (i.e. that need HEP infrastructure and capabilities).

Dark Energy future directions community workshop held – Investigate optimizing science in DESI/LSST era and/or follow-on projects• Workshops held in 2016 at UChicago; in 2017 at LBNL• White paper on small “enhance” efforts in Jan 2018 arXiv:1802.07216

Page 17: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Other HEP Efforts related to Cosmic Frontier

DOE/HEP PI Meeting 2018 17

Theory program• Vibrant Theory Program supporting all areas including Cosmic Frontier; Support for Theory centers and groups at

several universities and labs.

Advanced Detector Development program Active R&D developing next generation detectors, including CCDs, TES superconducting bolometers, MKIDs,

readout electronics, optics. Key elements for DES, LSST, CMB-S4. Important impact on X-ray detector, medical detectors.

Computational HEP program Coordinates DOE Supercomputer allocations via various ASCR and DOE Competitions

Cosmic Simulations, Emulators, Data Analysis Computational HEP, SCIDAC – focused computational challenges HEP Center for Computational Excellence

High Performance Computing – Comp HEP & ASCR coordination & partnerships on some efforts, including Cosmic Simulation and Data analytics

Manages allocations on NERSC facility for HEP Cosmic Frontier Simulations and Experiments

Data Management- Each Project/Experiment has provided a Data Management Summary to HEP- Used for referencing in research proposals (DMP required!); also to check against AAAC Principles for Access in

Astrophysics and SC Statement on Digital Data Management

Page 18: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

HEP Funding Opportunities

DOE/HEP PI Meeting 2018 18

Page 19: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Research Support - Priorities

DOE/HEP PI Meeting 2018 19

Research budgets: Support scientists on all phases of an experiment

Priority – to support effort to plan and carry out priority science topics on our experiments, i.e. need to make sure the science it was designed for is carried out!• Support research efforts directly in line with program & project priorities, responsibilities &

science goals

• Distribution of efforts across areas will necessarily change to support changing priorities• Sufficiently support the Science Collaborations (HEP model) to carry out experiment in all

phases - project’s design, fabrication and operations & to plan and carry out data analyses to deliver the best science

Priority Areas:Dark Matter :

Complete G1 analysis; construct and plan G2 experiments, modest future R&DDark Energy :

DES operations & analysis; construct and plan LSST and DESICMB: Begin planning for CMB-S4

Not funded in our program: Support for gravitational waves, astronomy, planet searches, ions, AMO, etc.

Page 20: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Research Support – Focus & Method

DOE/HEP PI Meeting 2018 20

DOE is a science mission oriented agency. The projects are selected for the (P5) strategic plan that will provide significant leaps in science. Then we support the community to carry out these projects/experiments.

• Priority is to support experiments in our program, where we have responsibilities

• Therefore, not all Cosmic Frontier-related research will be supported.

“Cosmic Frontier” is Experimental Research at the Cosmic Frontier.

Review panels look to see close engagement within the experimental collaborations, with significant roles. General cosmic research can be proposed to the HEP Theory program.

Research Priorities for funding, aligned with P5 Keep efforts continuing at about current level for operating experiments;

Ramp-down research for ones completing; Ramp-up for the projects in fabrication or planning phase, depending on needs Prepare for the future but need to complete currently operating projects

successfully

Page 21: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Research Support – Activities

DOE/HEP PI Meeting 2018 21

What DOE supports Research efforts (mainly scientists) on R&D, experiment design, fabrication,

data-taking, analysis-related activities Theory, simulations, phenomenology, computational studies Some engineering support may be provided in the Detector R&D subprogram Support depends on merit review process and programmatic factors Funding efforts that are in direct support of our programs

Faculty support Typically, the full research time of the faculty member throughout the whole year is supported

by providing 2 months summer salary and support for the group. Summer support should be adjusted according to % time the faculty is on research effort

Research Scientists Efforts are related towards research; not long-term operations and/or project activities Consider case-by-case on merits: could the research be fulfilled by a postdoc?

× What’s not supported by research grants Any significant operations and/or project-related activities: Engineering, major items of equipment, consumables for prototyping or production Non-HEP related efforts Gravitational waves (LIGO), Astronomy, Heavy Ion (RHIC), AMO Science, etc…

Funding for theory/simulations/phenomenology/computational efforts in direct support of our experiments is in Cosmic – otherwise should be proposed to the Theory program.

Page 22: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

University Grants – working in the program

DOE/HEP PI Meeting 2018 22

Typical HEP researcher: • Has an experimental program that may involve analysis on one experiment while

constructing the next experiment.• Makes long term commitments to our experiment/project/science as a closely integrated

member of the collaboration. • He/she has specific commitments (service work) & responsibilities for our

projects/experiments that may include analyzing data with one experiment while constructing or planning the next one – in addition to the science analysis. These responsibilities may evolve over time as the experiment progresses through phases.

-- Not funded for one particular study or effort here and there

In your proposal: • Explain your long term program (past 3 years), how it progresses over time & how pieces fit together.• Details on what you’re doing the next 3 years, your responsibilities and efforts, why they’re important to the project/experiment and why they’re important and a priority NOW.• Explain what fraction of time you’re working on each effort (whether or not HEP funded)

Page 23: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

University Grants – New Efforts

DOE/HEP PI Meeting 2018 23

Universities: Model for starting to work in the field & get a grant:• Get involved in experiment/science and take on responsibilities for the collaboration and then submit proposal.

•Have involvement in the community so that you are part of the HEP community! (e.g. DPF meetings)

• Lot of science topics may be in dark energy plan or related to dark energy but need to think of what is the priority & main efforts needed and which are needed now!

• Have responsibilities for the experiment – not just your own science simulations & analysis.

•Many people have program working on a series of experiments (e.g.) DES operations/analysis while participating in LSST planning and construction. Not all has to be funded by HEP!

•Show track record and have responsibilities before funding starts.

•Transitioning to a new project/field requires a lot of work to get up to speed.- best for faculty member to take the time to really learn the field and take on responsibility first

Page 24: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Comparative Review

DOE/HEP PI Meeting 2018 24

Comparative Review: head-to-head reviews of PIs working in similar areas

Lots of discussion of relative strengths and weaknesses of individual proposals and PIs

Many factors weigh into final funding decisions Compelling research proposal for next ~3 years

Interesting? Novel? Significant? Plausibly achievable?

Incremental? Implausibly ambitious? Poorly presented?

Significant recent contributions in last ~3 years

Synergy and collaboration within group (as appropriate)

Contributions to the research infrastructure of experiments

Alignment with programmatic priorities

Implicit Bias awareness

Supportive of excellent research, including excellent research by new people, even when times are tough!

Corollary: Some proposals, including some from senior personnel, ranked below average may not be funded. No old history/entitlement.

Page 25: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

FY19 HEP Comparative Review FOA & FAQ

DE-FOA-000xxxx issued TBD

Letter of Intent (strongly encouraged) due: TBD

Final Proposal deadline: TBD

In addition to the FOA, a FAQ is available

Contact your program manager if your question is unanswered

26

Both the FOA and FAQ are planned to be available at: http://science.energy.gov/hep/funding-opportunities/

Please read the FOA carefully to comply with all requirements prior to submitting a proposal.

DOE/HEP PI Meeting 2018 25

Non-compliant proposals submitted to the FOA will not be reviewed!

In recent years, ~10% of incoming proposals are declined without review.

Requirements most often missed or overlooked include: Data management plans, page limits, separate budget sheets (if needed) for each research subprogram or thrust, and inclusion of Personally Identifiable Information (PII)

Page 26: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Recent FOA Changes

All Research proposals to DOE/SC must have a Data Management Plan (DMP) Includes HEP comparative review and Early Career, but not conferences, workshops,

operations, projects

Any research thrust in a proposal without a DMP will be declined without review

All Renewal proposals must submit “proposal products” (publications, etc.) after the application is submitted PIs will be notified by PAMS and have 5 days to respond

We cannot review incoming proposals until this step is completed

These will eventually be captured with your annual Progress Report, but must be entered by hand during the transition phase

Recurring Submissions of Research Applications (new in FY 2018): “A previously declined application may be resubmitted to this FOA, but only after it has

undergone substantial revision. An application submitted to this FOA that has not clearly taken into account the major concerns from prior DOE reviews may be declined without review and will not be considered for funding.”

All FOAs have different eligibility, technical requirements, page limits, etc. Read the instructions carefully!

DOE/HEP PI Meeting 2018 26

Page 27: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Office of Science Data Management Plan

Focus of the SC Digital Data Management is the sharing and preservation of digital research data Data management involves all stages of the digital data life cycle including

capture, analysis, sharing, and preservation

See Dr. Laura Biven’s presentation on SC Digital Data Management, Sept. 2014 HEPAP meeting: http://science.energy.gov/hep/hepap/meetings/201409/

FOAs issued by HEP require Data Management Plan (DMP) compliance with the SC Statement

SC statement on DMPs: http://science.energy.gov/funding-opportunities/digital-data-management/

See Section IV, the subsection on Appendix 8 of the FOA, for requirements pertaining to DMPs that must be included in your application

Most experiments have developed DMPs for their collaborations When applying for financial assistance (universities) or submitting FWPs (labs),

PIs can cite the DMPs for their experiments with the appropriate links

If DMP cited, PIs must briefly describe how proposed research relates to the experiment

Theorists need DMPs: explain how theoretical/simulated data can be accessed/validated

If there is no data of any sort generated by the proposed research, the DMP must state this. A DMP that is blank or states “not applicable” is not acceptable

Each research thrust in a proposal requesting DOE research support, including the FY 2019 Comparative Review FOA, require addressing the DMP requirements for it to be reviewed, and hence, to be considered for funding

DOE/HEP PI Meeting 2018 27

Page 28: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Guidance Checklist for FY19 Comp Rev

Noncompliant applications will not be reviewed, and therefore, will not be considered for funding. As a convenience and courtesy, DOE/HEP plans to provide a checklist in the FY19 FOA. The list, on the opening pages of the FOA, is not intended to be complete;

applicants should review the FOA in detail and follow all instructions

FY 2018 Comparative Review FOA – GUIDELINE FOR APPLICATION REQUIREMENTS COMPLETED

Is the proposed research scope aligned with programmatic priorities of DOE-HEP? R

Personally Identifiable Information (PII): Do not supply any information, such as birth date or place, citizenship, home address, personal phone nos., etc., that should not enter into the merit review.

R

A Data Management Plan is required for each research thrust (e.g., ATLAS, LSST, lattice gauge theory, etc.).It must appear in Appendix 8 of the application and comply with page-limit requirements specified in the FOA.

R

Project Summary/Abstract Page: contains the name(s) of the applicant, the project director/principal investigator(s) and the PD/PI’s institutional affiliation, and any Co-Investigators and their affiliations.

R

DOE Cover Page: list each HEP research subprogram (e.g., Energy Frontier, HEP Theory) for which funding is requested. If there is more than one, be sure to attach the Cover Page Supplement.

R

Page limits for each section comply with the FOA requirements (as defined in Section IV of the FOA). R

Biographical sketches carefully follow the FOA instructions and avoid PII. R

Current and Pending Support information completed, including an abstract of the scope of work. R

In addition to the budget information for the full proposal: separate budget and budget justification narratives for each HEP research subprogram in the proposal for each year in which funding is being requested and for the cumulative funding period has been provided in Appendix 7.

R

Level of Effort Tables completed in Budget Justifications in Appendix 7: for each person for whom funding is requested in a research thrust, on the scope of activities during proposed project period.

R

Post-submission of a ‘renewal’ application, timely submitted the Renewal Proposal Products (RPP) in PAMS. RDOE/HEP PI Meeting 2018 28

Page 29: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Other Funding Opportunities

Workforce Development (WDTS) programs: https://science.energy.gov/wdts/

Office of Science Graduate Student Research fellowships (SCSGR)

Supports grad student research at a DOE lab, 3 to 12 months

Two calls per year, usually Feb/Aug.

Applications typically due May/Nov for following Fall or Summer start

Science Undergraduate Laboratory Internships (SULI)

Supports undergraduate research at a DOE lab, 10 to 16 weeks

Three calls per year, for following Spring/Summer/Fall terms

Now accepting applications for Spring 2018, due Oct 2

Visiting Faculty Program

Summer research support for faculty/students from historically underrepresented institutions

One call per year, usually in Oct. Applications due in Jan.

Office of Science programs: Early Career Research: https://science.energy.gov/early-career/

SC “Open Call” [DE-FOA-0001820]

HEP uses this primarily for conferences and emergencies (e.g. equipment failure)

DOE/HEP PI Meeting 2018 29

Page 30: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

DOE/HEP PI Meeting 2018 30

Early Career Research Program

Page 31: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Early Career Awards – Cosmic Frontier

DOE/HEP PI Meeting 2018 31

FY18:

Anja von der LindenDark Energy

Michael SchneiderDark Energy

Zeeshan AhmedCMB detectors

Marilena LoVerdeNeutrino theory

FY17:

Alexie LeauthaudDark Energy

Hee-Jong SeoDark Energy

Aritoki SuzukiCMB detectors

Daniel BowringDark matter QIS

Benjamin SafdiDark matter theory

Page 32: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Preparing an Early Career Proposal Plan to issue a FY 2019 funding opportunity announcement for the next round of

Early Career applicants Stay tuned to https://science.energy.gov/early-career/ for further updates…

Eligibility: tenure track, within 10 years of PhD

Maximum 3 tries, so choose wisely and heed feedback

In addition to the merit review criteria found in the FOA, review panels look for: Innovation (while advancing HEP program)

Leadership potential

Does your proposal outline a 5-year timeline, with key deliverables and personnel profiled during this project period?

What will be the self-contained outcome after 5 years?

Prior to submission, applicants may want to seek guidance from appropriate senior faculty and/or staff while preparing proposals (including the narrative and budget material) Applicants are also encouraged to draw guidance from any members within the

international collaboration

40

DOE/HEP PI Meeting 2018 32

Page 33: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Take Away Messages

HEP is maintaining the core of the DOE science mission The HEP Community is delivering exciting discoveries, important scientific

knowledge, and technological advances

We must stay focused and continue to deliver results

HEP is executing the P5 plan and delivering science Congress is supportive of the P5 plan and its success has impact

FY19 funding opportunities are anticipated to progress the same as FY18

FY 2019 Budget is in process Both President’s Request and Congressional Marks are not law

Fiscal budget is only known when Congress passes an appropriation and the President signs the bill

As P5-recommended projects ramp up, including those for the HL-LHC accelerator and detector upgrades and the U.S.-hosted international neutrino program, funding increases may actually put pressure on research funding. P5 believed this must be kept in balance.

DOE/HEP PI Meeting 2018 33

Page 34: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic Frontier Conclusion

Cosmic Frontier has great science! It is an exciting

time to be in it!

4 MIE coming to fruition

Opportunities for

contributing to experiments

at all stages of lifecycle

There is plenty of work to do!

DOE/HEP PI Meeting 2018 34

ResearchFron ers

Par

clePhysicsScienceDrivers

Page 35: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

DOE/HEP PI Meeting 2018 35

Cosmic Frontier

Page 36: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Cosmic Frontier

Research: higher priority to support laboratory research activities to address the dark matter and dark energy science drivers, and to carry out the final data analyses on Cosmic Frontier experiments completing in FY 2019

Facility Operations: focus on the installation, commissioning and pre-operations activities for LSSTcam, DESI, LZ, and SuperCDMS-SNOLAB as these projects transition to operations

Projects: priority to support the fabrication and installation of the DESI, LZ, and SuperCDMS-SNOLAB projects. LSSTcam project funding will conclude as planned

DOE/HEP PI Meeting 2018 36

Cosmic Frontier($ in K)

FY 2017 Actual

FY 2018 Enacted

FY 2019 Request

FY 19 vs. FY 18

Research 45,990 49,892 31,506 -18,386

Facilities/Operations 13,353 16,310 11,320 -4,990

Projects 74,375 52,400 30,850 -21,550

LSSTcam 45,000 9,800 - -9,800

DESI 12,800 20,000 11,400 -8,600

LZ 12,500 14,100 14,450 +350

SuperCDMS 3,400 7,400 5,000 -2,400

SBIR/STTR 2,270 2,644 1,770 -874

Total 135,988 121,246 75,446 -45,800

Page 37: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

DOE HEP Science Portfolio Review (2017-2018)

HEPAP was charged (Oct. 2017) to carry out a Portfolio Review

-- Modeled on NSF Portfolio Review and NASA Senior Reviews

What, How: Independent peer review of currently operating experiments supported by HEP

Overarching goal is to maintain and optimally execute the P5 plan Will focus on scientific impact and productivity of HEP-supported contributions with narrow

emphasis on P5 science drivers. HEP will use the results to define a detailed implementation plan for P5 strategic vision in the

FY19 to FY22 timeframe HEP will ensure that key officials in institutions or agencies that are partners in operating

experiments are apprised of the plans, results and program decisions. It is understood that many experiments have a much broader, high priority science

program than the P5 science drivers!

Experiments reviewed: Includes all currently-supported HEP experiments that have operated at least two years, and

are continuing significant DOE-supported research &/or operations efforts in 2019 and beyond. There are 2 separate subpanels:

1. LHC subpanel is chaired by Dr. Hugh Montgomery & covers ATLAS and CMS2. “Main” subpanel is chaired by Professor Paul Grannis and covers • 5 Cosmic Frontier experiments (Fermi-GLAST, AMS, HAWC, DES, eBOSS)• 8 Intensity Frontier experiments (Daya Bay, K0TO, MicroBooNE, Minerva, NA61/SHINE,

NOvA, SuperK, T2K)

DOE/HEP report to AAAC, 6/27/18 37

Page 38: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

HEP Portfolio Review – Timeline & Outcomes

HEPAP charged Oct. 2017• See Glen Crawford’s HEPAP Dec. 2017 Presentation at

https://science.energy.gov/~/media/hep/hepap/pdf/201712/Day1 Crawford_2017-11-30_DOE_Portfolio_Review.pdf

• Charge letter, instructions and FAQ at https://science.energy.gov/hep/hepap/reports/

February & March 2018 - Subpanels met face-to-face

May 14-15, 2018 meeting - Portfolio Review Reports went to HEPAP & were accepted.-- Main Panel Report prioritized their impact on P5 science drivers in 4 Tiers, from absolutely essential to “less effective”

HEP plan forwardHEP will prioritize ongoing support for top-Tier(s) Lower Tier(s) to be ramped down over a few years depending on budgets, partnerships, external factors US contributions to LHC experiments also examined, with generally high praise and a few comments

HEP is now discussing with partners; Will be sending out

guidance letters to each experiment.

DOE/HEP report to AAAC, 6/27/18 38

Page 39: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Portfolio Review – Draft main reoprt

Draft report was presented and accepted at the May 2018 HEPAP meeting https://science.energy.gov/~/media/hep/hepap/pdf/201804/Main_Panel_Report.pdfhttps://science.energy.gov/~/media/hep/hepap/pdf/201804/PGrannis_HEPAP_201805.pdf

We summarize the definitions of the groups and the subpanel’s recommendations for the 13 experiments. The ordering within a group is alphabetical.

Group I (Experiments that should be pursued with highest priority): DES, eBOSS, NOvA, T2K

Group II (Experiments with outstanding promise and relevance to the P5 Science Drivers, but whose funding could be reduced somewhat in the event of severe budget shortfalls): HAWC, MINERvA, NA61/SHINE

Group III (Experiments that address the P5 Drivers in important ways, but for which a reduction in funding would cause less harm to the DOE/HEP program than in the case of Groups I or II): Daya Bay, Fermi/LAT, MicroBooNE, SuperK

Group IV (Experiments that require further demonstration of likely success, or whose future program is less effective in advancing the P5 Science Drivers): AMS, KOTO

DOE/HEP report to AAAC, 6/27/18 39

Page 40: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

QIS has been identified as an important cross-cutting topic with potential

impact across all DOE Office of Science (SC) program offices See 11/29/17 Dear Colleague letter at: https://science.energy.gov/~/media/sc-

2/pdf/presentations/2017/DOE-Office_of_Science_Dear_Colleague_Letter_on_QIS.pdf

For HEP: Emphasis is on HEP mission, science drivers, and advancement

of QIS in the context of the broader SC initiative

FY 2018 Budget approved support for QIS (~ $15M).

• Funding Opportunity Announcement (FOA) for Universities & DOE Labs:

o https://science.energy.gov/~/media/grants/pdf/lab-announcements/2018/LAB_18-1893.pdf

o https://science.energy.gov/~/media/grants/pdf/foas/2018/SC_FOA_0001893.pdf

• Proposal review held & awards will be made by end of FY

FY 2019 Request ~ $27M

Quantum Information Science (QIS)

DOE/HEP report to AAAC, 6/27/18 40

Page 41: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Basic Research Needs Workshops (BRNs)

SC’s Office of Basic Energy Sciences initiated this approach with the Basic Research Needs to Assure a Secure Energy Future workshop in October 2002. This resulted in a comprehensive, 420-page report that identified 37 Proposed Research Directions. http://science.energy.gov/bes/community-resources/reports/.

Numerous (~20) subsequent topically-focused BRNs have helped to define directions and make the case for major new efforts such as Energy Frontier Research Centers and Innovation Hubs

While there are some variations and there has been

some evolution, many BRNs have involved:

Production of a Technology Perspectives Factual Document prior to the workshop

Definition of a set of Priority Research Directions that address the technology R&D challenges

Definition of a set of Science Grand Challenges that, if solved, might result in transformational changes

DOE/HEP, DM-BRN 41

Page 42: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

BRN process and structure

Targeted topics defined by, and workshop charge issued by, SC program office

Attendance is limited and by invitation only

Participants have considerable work to do before, during, and after the meeting

Workshop Chair and Co-Chairs develop agenda and select panel/working groups leads (with program office input)

Typical structure: Opening plenary sessions, panel/working group breakout sessions that develop priority research directions, closing plenary session, and extended writing session – draft report completed before departure!

Prompt output: final report released typically 60-90 days after the workshop

DOE/HEP, DM-BRN 42

Page 43: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

BRN impacts

BRN reports are expected to serve as reference documents with a long shelf life, and to be readily accessible

Post-workshop outreach activities often include communication of the results to the broader community by co-chairs and the SC program, and briefings by federal staff to other interested federal parties (within and beyond DOE)

BRNs may, individually or collectively, serve as the basis for subsequent funding opportunities. Examples:

The 2003 workshop report on Basic Research Needs for the Hydrogen Economy was referenced in and supported an FY2004 solicitation on Basic Research for the Hydrogen Fuel Initiative.

An FY2007 FOA on Basic Research for Advanced Nuclear Energy Systems was based directly on the corresponding BRN, stating specifically that “The workshop report is a current source of information and summarizes the interests of BES.”

The original FY2009 solicitation for the Energy Frontier Research Centers (up to $100M/yrtotal) centered on the 11 BRNs that SC-BES had held to date.

An FY2011 FOA from Fusion Energy Sciences on High Energy Density Laboratory Plasmas specifically sought applications addressing the research needs identified by the Basic Research Needs for High Energy Density Laboratory Physics workshop report and two prior reports.

The most recent FY2018 Energy Frontier Research Centers FOA (up to $98.9M/yr total) requires that applications address Priority Research Directions in one or more of 12 reports, 11 of which were BRNs.

DOE/HEP, DM-BRN 43

Page 44: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

HEP Program Optimization

HEP has undertaken several steps recently to help further optimize program plans and budgets (for more details on the

following, see Nov. 2017 and May 2018 HEPAP talks)

Lab Optimization

Portfolio Reviews

Basic Research Needs workshops

Accelerator Technology Roadmaps

Computing Infrastructure Working Group

Taken together these processes aim to: Improve the effectiveness and efficiency of HEP research programs and

supporting technology infrastructure

Identify currently operating experiments that have the highest impact on P5 science drivers

Identify research and technology R&D areas that are ripe for additional investments

DOE/HEP, DM-BRN 44

Page 45: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

HEP Small Projects Portfolio

HEPAP P5 Strategic Plan (2014), recommended • Balanced Program (maintain diversity of project scales in the program, i.e. ensuring small projects too)

• The search for dark matter particles as high priority science

HEP has funded a number of “small projects” and will continue to pursue timely physics opportunities with new experimental technique Long list includes COHERENT, ADMX-G2, HPS, …

Intermediate Neutrino Research Program workshop and FOA enabled PROSPECT, ANNIE

Future Basic Research Needs (BRN) workshops may help define and prioritize additional opportunities for small project investments• Potential topic areas include: accelerator applications (compact accelerators), Dark Matter, detector R&D

DOE/HEP, DM-BRN 45

Page 46: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

HEP Basic Research Needs Study – Dark Matter New Initiatives (DM-BRN)P5 recommended the search for dark matter particles as high priority science & to maintain a diversity of project scales in HEP (i.e. ensuring small projects too)

Stage A: Background: March 2017 community workshop held to determine & identify scientifically compelling areas to search and whether there are possible concepts for new experiments or studies to address these. See White Paper: https://arxiv.org/abs/1707.04591

Stage B: HEP has started a DM New Initiatives BRN Study (2018-2019) to Assess the science landscape for dark matter particle searches, AND Identify which high impact science areas would be suitable to be pursued with

small projects in the HEP program (i.e. that need HEP infrastructure and capabilities).

• DOE-HEP has issued “charge” letter. • Co-Chairs are organizing BRN study efforts.• Working groups have been formed/ conveners selected• BRN study will culminate in a workshop will be Oct 15-18 in Gaithersburg, MD.• The BRN’s compelling report will make the science case for HEP new initiatives for small DM project(s).

What it’s not:• The BRN is not an official advisory (FACA) panel; no consensus or official recommendations • It doesn’t make priorities, #1, 2, 3 (but can group high impact priority areas)• It won’t consider or set specific priorities on which projects to or carry out.

Stage C+: Depending on the case made and funding availability, next step would be a FOA to call for concept studies and near-term technology R&D that respond to high impact opportunities in the BRN, followed by development of small project(s).

DOE/HEP, DM-BRN 46

Page 47: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

Dark Matter BRN

DOE/HEP, DM-BRN 47

BRN study Co-Chairs: Rocky Kolb (Univ. of Chicago) Harry Weerts (Argonne National Laboratory)

Working groups and conveners

Direct Detection: Low-threshold direct detections (roughly masses > keV)

Rouven Essig (Stony Brook University)

Dan McKinsey (Univ. of CA, Berkeley)

Kathryn Zurek (LBL)

Ultra-Low: Ultra-light DM, including the QCD axion space (~ masses < keV)

Aaron Chou (FNAL)

Peter Graham (Stanford Univ.)

Accelerator: Accelerator production and detection for sub-GeV DM and new

forces

Natalia Toro (SLAC)

Richard Van de Water (LANL)

Cross-Cutting:

Juan Estrada (FNAL)

Joe Incandela (Univ. of CA, Santa Barbara)

Tim Tait (Univ. of CA, Irvine)

Page 48: HEP PI Meeting - Intensity Frontier...Aug 23, 2018  · Dark Matter Proceed immediately with a broad second-generation (G2) dark matter direct detection program with capabilities described

DM New Initiative Notional Schedule

DOE/HEP, DM-BRN 48

DM New Initiatives Process - Schedule

2017March pre-BRN Community workshop to assess DM landscape

2018June Planning for DM-BRN starts

2018May,June Interim Co-Chairs & Core Group identified

2018June DM-BRN Interim Chair & Core Group phone meetings and activities begins

2018October DM-BRN workshop (Core Group plus others by invitation only)

2018December DM-BRN report sent to DOE

Notional Schedule - Assuming BRN makes the Science Case & Funding Availability

2019EarlyFOA issued for proposals for concept studies or R&D for small projects that respond to the BRN report

2019Late HEP funding provided

Even More Notional!

2020Late Review to determine Concept(s) readiness to begin development

Future Years Stage Small Dark Matter program