Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains...
Transcript of Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains...
Help build
Britain’s
Robin Lapish
Supply Chain Manager, HS2 Ltd
HS2 Phase One
HS2 Phase 2a
HS2 Phase 2b
Existing network
Bringing Britain closer together
HS2 will be the backbone of
Britain’s transport network.
Helping to build a fairer, more
balanced country for everyone.
Building HS2 – Phase One
Why HS2?
More
capacityBetter connectivity
Cutting
carbon
Phase One construction statistics
216 KM ROUTE
LENGTH
50KM IN TUNNELS
75KM OF CUTTINGS
13mTONNES OF
CONCRETE
1.3mTONNES OF STEEL
16KM OF VIADUCTS
546BUILDING
DEMOLITIONS
REQUIRED
63KM OF
EMBANKMENT
63mCUBIC METRES OF
EXCAVATED
MATERIAL
3NEW STATIONS
Key technical features
360kph
Operational speed
18Trains per hour per
direction
30seconds
Average delay
target
2minute
Dwell times at
stations
ATOAutomatic Train
Operation
Slab track
For Phase One and
2a
Level
access
From street to seat
High
tonnages
Catalyst
for growth
Health, safety &
security standards
Skills &
employment
Customer
experience
Value
for money
Capacity &
connectivity
Sustainable &
a good neighbour
HS2 strategic goals
Catalyst for
growth
Health, safety &
security standards
Skills and
employment
Capacity &
connectivity
Value for money Customer
experience
Sustainable &
a good neighbour
Skills, Employment & Education
Ensure we have the
skills to deliver HS2
and leave a skills
legacy.
Create sustainable
skills, employment
and education
opportunities in
HS2 Ltd’s supply
chain.
Stimulate interest in
science, technology,
engineering and
maths (STEM).
Work in partnership
to maximise the
economic and
regeneration
benefits of HS2.
Why HS2 values matter
Progress report
Phase 2bPhase 2aPhase One
Underway and being built, 9,000 jobs
supported.
230 sites currently active between the
West Midlands and London.
Bill making its way through Parliament. At
House of Lords Committee stage. ‘Royal
Assent’ expected at the end of 2020.
Bill being prepared for route into
Manchester, securing the full western leg
from Birmingham.
The route into Leeds is part of the
Integrated Rail Plan.
Placement of LM’s modular bridge, Interchange site
Prime Minister Boris Johnson at Birmingham Curzon Street,
February 2020
South Portal progress,
June 2020
HS2 workers at Euston Two Towers demolition, March
2020
Tunnel Boring Machine Florence at the factory, July 2020
Ramping up
BBV JV
SCS JV
EKFB JV
• Skanska Construction UK Ltd
• Costain Group Plc
• STRABAG AG
• Balfour Beatty Group Ltd
• VINCI Construction Grands
Projets
• VINCI Construction UK Ltd
• VINCI Construction
Terrassement
• Eiffage Genie Civil SA
• Kier Infrastructure & Overseas
Ltd
• Ferrovial Agroman
• BAM Nuttall
BBV JV
EKFB JV
Align JV
SCS JV
• Bouygues Travaux Publics
• VolkerFitzpatrick
• Sir Robert McAlpine
Main works civil contracts
NORTH
SOUTH
CENTRAL
Supply chain opportunities
Examples
Service packages Professional services Works packages
• Occupational health
• Facilities management
• Site catering
• Security services
• Logistics management
• Waste management
• Materials supply
• Surveying services
• Monitoring and
measurement
• Specialist advice and
consultants
• Photography and
videography
• Printing
• Utilities diversions
• General civils
• Piling/diaphragm wall
• Fibre-reinforced concrete
• Earthworks
• Structural steel work
Our procurementsS
CO
PE
STA
TU
S
Design and
Services
Enabling works
contracts
Utilities and
on-network
works
Main Works
Civil ContractsStations Rolling stock
Railway
systems
Awarded Awarded Awarded Awarded Awarded
and
Launching
Tendering Launching
Stations procurement update
Birmingham Curzon Street station Interchange station
BREEAM ‘Outstanding’ certification
Prequalification to commence shortly
Schedule 17 planning consent has been granted
Tendering underway
Railway Systems procurement update
Track contracts OCS contractTunnel and
lineside M&EHV power Telecoms
Washwood
Heath & NICC
CCS
(signalling)
4x Track
1x S&C
1x Rail
1x Slab track
1x
Operational
Comms
1x 3rd Party
Comms
1x CCS & TM
1x EMS
1x route-wide
catenary
contract
1x route-wide
1x cross-
passage doors
1x route-wide
contract
1x depot
contract
Live procurement
Phase 2a
update
Connecting the Midlands
Engine to the Northern
Powerhouse.
Design and Delivery
Partner
(DDP)
Works contracts
London
Phase 2b
Leeds Manchester Piccadilly
Manchester Airport Toton, East Midlands
Completing
the network
east and west.
Bidding for work: getting to know HS2
• Understand HS2’s vision, values and strategic goals
• Register with the right online portals – CompeteFor
• Have policies in place (Quality, H&S, Equal Diversity & Inclusion,
Environment)
• Consider partnering with other suppliers
• Weigh up your decision to bid
• Build your network – attend events, webinars
• Be ready – have your boilerplate text
View HS2
supplier
guidance
Register on
CompeteFor
Work with
business
organisations
Contact us
directly
Use free
industry
resources
www.hs2.org.uk www.Compete
For.com/hs2
LEPs, Chambers,
ACAS, etc
[email protected] www.supplych
ainschool.co.uk
What you can do now