Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains...

20
Help build Britain’s Robin Lapish Supply Chain Manager, HS2 Ltd

Transcript of Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains...

Page 1: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Help build

Britain’s

Robin Lapish

Supply Chain Manager, HS2 Ltd

Page 2: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

HS2 Phase One

HS2 Phase 2a

HS2 Phase 2b

Existing network

Bringing Britain closer together

HS2 will be the backbone of

Britain’s transport network.

Helping to build a fairer, more

balanced country for everyone.

Page 4: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Why HS2?

More

capacityBetter connectivity

Cutting

carbon

Page 5: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Phase One construction statistics

216 KM ROUTE

LENGTH

50KM IN TUNNELS

75KM OF CUTTINGS

13mTONNES OF

CONCRETE

1.3mTONNES OF STEEL

16KM OF VIADUCTS

546BUILDING

DEMOLITIONS

REQUIRED

63KM OF

EMBANKMENT

63mCUBIC METRES OF

EXCAVATED

MATERIAL

3NEW STATIONS

Page 6: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Key technical features

360kph

Operational speed

18Trains per hour per

direction

30seconds

Average delay

target

2minute

Dwell times at

stations

ATOAutomatic Train

Operation

Slab track

For Phase One and

2a

Level

access

From street to seat

High

tonnages

Page 7: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Catalyst

for growth

Health, safety &

security standards

Skills &

employment

Customer

experience

Value

for money

Capacity &

connectivity

Sustainable &

a good neighbour

HS2 strategic goals

Catalyst for

growth

Health, safety &

security standards

Skills and

employment

Capacity &

connectivity

Value for money Customer

experience

Sustainable &

a good neighbour

Page 8: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Skills, Employment & Education

Ensure we have the

skills to deliver HS2

and leave a skills

legacy.

Create sustainable

skills, employment

and education

opportunities in

HS2 Ltd’s supply

chain.

Stimulate interest in

science, technology,

engineering and

maths (STEM).

Work in partnership

to maximise the

economic and

regeneration

benefits of HS2.

Page 9: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Why HS2 values matter

Page 10: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Progress report

Phase 2bPhase 2aPhase One

Underway and being built, 9,000 jobs

supported.

230 sites currently active between the

West Midlands and London.

Bill making its way through Parliament. At

House of Lords Committee stage. ‘Royal

Assent’ expected at the end of 2020.

Bill being prepared for route into

Manchester, securing the full western leg

from Birmingham.

The route into Leeds is part of the

Integrated Rail Plan.

Placement of LM’s modular bridge, Interchange site

Page 11: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Prime Minister Boris Johnson at Birmingham Curzon Street,

February 2020

South Portal progress,

June 2020

HS2 workers at Euston Two Towers demolition, March

2020

Tunnel Boring Machine Florence at the factory, July 2020

Ramping up

Page 12: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

BBV JV

SCS JV

EKFB JV

• Skanska Construction UK Ltd

• Costain Group Plc

• STRABAG AG

• Balfour Beatty Group Ltd

• VINCI Construction Grands

Projets

• VINCI Construction UK Ltd

• VINCI Construction

Terrassement

• Eiffage Genie Civil SA

• Kier Infrastructure & Overseas

Ltd

• Ferrovial Agroman

• BAM Nuttall

BBV JV

EKFB JV

Align JV

SCS JV

• Bouygues Travaux Publics

• VolkerFitzpatrick

• Sir Robert McAlpine

Main works civil contracts

NORTH

SOUTH

CENTRAL

Page 13: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Supply chain opportunities

Examples

Service packages Professional services Works packages

• Occupational health

• Facilities management

• Site catering

• Security services

• Logistics management

• Waste management

• Materials supply

• Surveying services

• Monitoring and

measurement

• Specialist advice and

consultants

• Photography and

videography

• Printing

• Utilities diversions

• General civils

• Piling/diaphragm wall

• Fibre-reinforced concrete

• Earthworks

• Structural steel work

Page 14: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Our procurementsS

CO

PE

STA

TU

S

Design and

Services

Enabling works

contracts

Utilities and

on-network

works

Main Works

Civil ContractsStations Rolling stock

Railway

systems

Awarded Awarded Awarded Awarded Awarded

and

Launching

Tendering Launching

Page 15: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Stations procurement update

Birmingham Curzon Street station Interchange station

BREEAM ‘Outstanding’ certification

Prequalification to commence shortly

Schedule 17 planning consent has been granted

Tendering underway

Page 16: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Railway Systems procurement update

Track contracts OCS contractTunnel and

lineside M&EHV power Telecoms

Washwood

Heath & NICC

CCS

(signalling)

4x Track

1x S&C

1x Rail

1x Slab track

1x

Operational

Comms

1x 3rd Party

Comms

1x CCS & TM

1x EMS

1x route-wide

catenary

contract

1x route-wide

1x cross-

passage doors

1x route-wide

contract

1x depot

contract

Live procurement

Page 17: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Phase 2a

update

Connecting the Midlands

Engine to the Northern

Powerhouse.

Design and Delivery

Partner

(DDP)

Works contracts

Page 18: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

London

Phase 2b

Leeds Manchester Piccadilly

Manchester Airport Toton, East Midlands

Completing

the network

east and west.

Page 19: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

Bidding for work: getting to know HS2

• Understand HS2’s vision, values and strategic goals

• Register with the right online portals – CompeteFor

• Have policies in place (Quality, H&S, Equal Diversity & Inclusion,

Environment)

• Consider partnering with other suppliers

• Weigh up your decision to bid

• Build your network – attend events, webinars

• Be ready – have your boilerplate text

Page 20: Help build Britain’s · NEW STATIONS. Key technical features 360 kph Operational speed 18 Trains per hour per direction 30 ... Capacity & connectivity Sustainable & a good neighbour

View HS2

supplier

guidance

Register on

CompeteFor

Work with

business

organisations

Contact us

directly

Use free

industry

resources

www.hs2.org.uk www.Compete

For.com/hs2

LEPs, Chambers,

ACAS, etc

[email protected] www.supplych

ainschool.co.uk

What you can do now