Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height...

29
CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY SHELL UA AVIATION Issue DRAFT DEC 2011 Page 1 of 29 Helideck Inspection Checklist HELIDECK INSPECTION CHECKLIST References: CAP 437 6 th Edition Offshore Helicopter Landing Areas (Amdt 01/2010) – Guidance on Standards FAA Advisory Circular Heliport Design No: 150/5390-2B (AC150/5390-2B) ICAO Publication “International Standards & Recommended Practices” Annex 14 (Aerodromes) Volume II – Heliports (A 14) ICAO Heliport Manual (HM) Shell Group Requirements for Air Operations (SGRAO) Parts 1, 2 & 5 Shell Exploration & Production Helicopter Landing Officers Manual (HLOM) HSAC RP 2008-01 Gulf of Mexico Helideck Markings (RP2008) Fourth edition of the International Chamber of Shipping (ICS) Guide to Helicopter/Ship Operations, published in December 2008 (2009) MSC/Code for Construction and Equipment of Mobile Offshore Drilling Units (IMO) Notes: The 6th edition of UK CAP 437, which is the principal reference document for Shell helideck standards, has been amended to include new ICAO Standards and Recommended Practices (SARPs) relating to offshore helidecks and shipboard heliports, which generally become applicable from November 2009. It has also been revised to include material which is part of the fourth edition of the International Chamber of Shipping (ICS) Guide to Helicopter/Ship Operations, published in December 2008. Inspectors should use their discretion in applying alternative standards, bearing in mind local conditions, length of contract period, etc. Installation Name: _______________ Inspector: _______________ Date: _______________

Transcript of Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height...

Page 1: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 1 of 29 Helideck Inspection Checklist

HELIDECK INSPECTION

CHECKLIST

References:

CAP 437 6th Edition Offshore Helicopter Landing Areas (Amdt 01/2010) – Guidance on Standards

FAA Advisory Circular Heliport Design No: 150/5390-2B (AC150/5390-2B)

ICAO Publication “International Standards & Recommended Practices” Annex 14 (Aerodromes) Volume II – Heliports (A 14)

ICAO Heliport Manual (HM)

Shell Group Requirements for Air Operations (SGRAO) Parts 1, 2 & 5

Shell Exploration & Production Helicopter Landing Officers Manual (HLOM)

HSAC RP 2008-01 Gulf of Mexico Helideck Markings (RP2008)

Fourth edition of the International Chamber of Shipping (ICS) Guide to Helicopter/Ship Operations, published in December 2008

(2009) MSC/Code for Construction and Equipment of Mobile Offshore Drilling Units (IMO)

Notes:

The 6th edition of UK CAP 437, which is the principal reference document for Shell helideck standards, has been amended to include new ICAO Standards and Recommended Practices (SARPs) relating to offshore helidecks and shipboard heliports, which generally become applicable from November 2009. It has also been revised to include material which is part of the fourth edition of the International Chamber of Shipping (ICS) Guide to Helicopter/Ship Operations, published in December 2008. Inspectors should use their discretion in applying alternative standards, bearing in mind local conditions, length of contract period, etc.

Installation Name: _______________

Inspector: _______________

Date: _______________

Page 2: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 2 of 29 Helideck Inspection Checklist

CONTENTS

Contents ........................................................................................................................................................................ 2

General Information ...................................................................................................................................................... 3

Guidance Helideck Drawings - Features ...................................................................................................................... 4

HLOTraining Records Overview (Include Those Of Opposite Shift) ............................................................................ 5

HDA Training Records (Include Those Of Opposite Shift) ........................................................................................... 6

Radio Operator & Radio Equipment ............................................................................................................................. 7

Meteorological Reports & Equipment ........................................................................................................................... 8

Protective Clothing ........................................................................................................................................................ 9

Passenger Waiting Area ............................................................................................................................................... 9

Helideck Surface ......................................................................................................................................................... 10

Helideck Dimensions And Markings: .......................................................................................................................... 11

Obstruction Environment ............................................................................................................................................ 16

Helideck Net (If Applicable) Not Applicable For Gulf Of Mexico ................................................................................. 18

Perimeter Net/Safety Net ............................................................................................................................................ 18

Perimeter Lighting ....................................................................................................................................................... 19

Helideck Flood Lighting .............................................................................................................................................. 19

General Lighting ......................................................................................................................................................... 20

Obstruction Marking And Lighting............................................................................................................................... 20

Additional Equipment .................................................................................................................................................. 21

Turbulence .................................................................................................................................................................. 21

Access Points ............................................................................................................................................................. 22

Fire Fighting Equipment .............................................................................................................................................. 22

Rescue Equipment ..................................................................................................................................................... 24

Miscellaneous ............................................................................................................................................................. 24

Aviation Fuel System. Fuel Bund................................................................................................................................ 26

Aviation Fuel System. Bulk Storage Tank Bund ......................................................................................................... 26

Aviation Fuel System. Pipework And Hoses .............................................................................................................. 26

Aviation Fuel System. Filtration Units ......................................................................................................................... 26

Aviation Fuel System. Pump Cabinet/Dispensing Unit ............................................................................................... 27

Aviation Fuel Systems. Miscellaneous ....................................................................................................................... 28

Draft Summary Of Non Compliances (To Be Left On Board If Required) .................................................................. 29

Page 3: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 3 of 29 Helideck Inspection Checklist

GENERAL INFORMATION

ITEM

Type of installation Spar

Location of inspection AC 857 Area of operations GoM

Largest type approved S92 D Value

Helideck height AMSL

Date due on contract NA

Name of person responsible for helideck maintenance

Name:

Phone: Email:

Name & contact information of person who will receive helideck inspection report and follow up non-conformances (if different from above)

Name:

Phone: Email:

OIM/Captain

(include back to backs)

Name:

Name:

Position:

Position:

Shell Representative or contact person(s) on board

Name:

Phone:

Position:

Email:

Last Shell or HCA Inspection Date:

Organization: Shell HCA

Other:

DOCUMENTS AND CERTIFICATIONS

Current approval By which agency? Period of Approval:

Restrictions /Limitations (CAA/BHAB/other)

HLO Manual or Procedures Guide

(CAP 437, 6.8)

Controlled copy? Yes No In date? Yes No

Readily available? Yes No Revision date: __-___-20__

Pre-Landing checklist? Yes No Manning levels stated in Manual?

Yes No

Is there dangerous goods reference material and documentation on board? Yes No

Helideck Training Exercises – written records- to be carried out monthly. Yes No

Emergency Procedures Guide: does it include aviation emergency procedures for HLO, OIM/Captain and Radio Operator? (No reference – good practice) Yes No

Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly recommended. Last performed:

(Drop test not authorized offshore.) __-___-20__

Perimeter Lighting – Power Rating (Min 25 Candelas yellow, 30 Candelas green)

If no documentation note the manufacture/ type / and style and look up on Internet upon return.

Manufacturer:

Type:

Style:

Compliant?

Yes No

Firefighting Equipment FOAM Test Certificate: (Date done/due (annual requirement)).

Note: Foam concentrate and produced foam to be tested (CAP 437 5.3.3), HSE Safety Notice 2/2004

__-___-20__

Page 4: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 4 of 29 Helideck Inspection Checklist

Foam System Maintenance & Testing – (Monitors must be functionally tested periodically for correct operation. Water test is acceptable. All parts of the foam production system should be tested annually by a competent person. (CAP 437 5.3) (Check documentation). Last Performed:

__-___-20__

Aviation Fuel Systems Is there a policy on refueling with passengers on board? (CAP 437, 8.9.2.(i). & HLOM, 6.6.2) Yes No

Records of receipts, delivery and quality control checks – check compliance with industry practice (CAP 437, 8.5) Yes No

Fuel system commissioning or Periodic Inspection

Note: The fuel system must be commissioned and then tested periodically by a competent and authorized Fuel inspector. Filter elements should be changed as required during these inspections. Maximum time between inspections should be 3 months.

Date done :

__-___-20__

Date Due:

__-___-20__

Helideck Drawings –

(a list of details which should be included on the following page)

(No reference – good practice)

Drawing number:

Do the plans accurately show the detail that is required? If no, state omissions.

Date:

__-___-20__

GUIDANCE HELIDECK DRAWINGS - FEATURES

Plans, which are required - to Scale:

General Arrangement (GA) of the whole Platform/Rig

Elevation - clearly showing the 180° 5:1 sector

Plan view of helideck and the obstacle environment Detail to be shown:

All helideck markings, giving dimensions and color

Deck net location

Tie down points

Perimeter net

Lighting - both perimeter and floodlighting

Location of RFFF

Refueling system

Guttering & down-pipes

Access points

Windsock(s)

210°, 150° & 180° sectors to be clearly shown

All obstruction non compliances to be detailed, stating height above/below deck level

Color scheme of above

Structures that might cause turbulence over the helideck

Hot emission sources e.g. flares, turbine exhausts Cold emission sources e.g. vents, blow-down

Helideck layout sketch

Page 5: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 5 of 29 Helideck Inspection Checklist

HLO TRAINING RECORDS OVERVIEW (INCLUDE THOSE OF OPPOSITE SHIFT)

Guidance: SGRAO Part 5 Section 2 Paragraph 2.5

HLO Name

Course Training Provider Validity Date Expires

HLO N/A N/A

Helicopter Fire Fighting

3 years

Refueling N/A N/A

Radio License N/A N/A

Competency Assessment

2 years

HLO Name

Course Training Provider Validity Date Expires

HLO N/A N/A

Helicopter Fire Fighting

3 years

Refueling N/A N/A

Radio License N/A N/A

Competency Assessment

2 years

HLO Name

Course Training Provider Validity Date Expires

HLO N/A N/A

Helicopter Fire Fighting

3 years

Refueling N/A N/A

Radio License N/A N/A

Competency Assessment

2 years

HLO Name

Course Training Provider Validity Date Expires

HLO N/A N/A

Helicopter Fire Fighting

3 years

Refueling N/A N/A

Radio License N/A N/A

Competency Assessment

2 years

Page 6: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 6 of 29 Helideck Inspection Checklist

HDA TRAINING RECORDS (INCLUDE THOSE OF OPPOSITE SHIFT)

Guidance: SGRAO Part 5 Section 2 Paragraph 2.5

HDA Name

Course Training Provider Validity Date Expires

Helicopter Fire Fighting

3 years

Refueling N/A N/A

HDA Name

Course Training Provider Validity Date Expires

Helicopter Fire Fighting

3 years

Refueling N/A N/A

HDA Name

Course Training Provider Validity Date Expires

Helicopter Fire Fighting

3 years

Refueling N/A N/A

HDA Name

Course Training Provider Validity Date Expires

Helicopter Fire Fighting

3 years

Refueling N/A N/A

HDA Name

Course Training Provider Validity Date Expires

Helicopter Fire Fighting

3 years

Refueling N/A N/A

HDA Name

Course Training Provider Validity Date Expires

Helicopter Fire Fighting

3 years

Refueling N/A N/A

Page 7: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 7 of 29 Helideck Inspection Checklist

RADIO OPERATOR & RADIO EQUIPMENT

Guidance: SGRAO Part 5 Section 2 Paragraph 2.3.4 & Appendix 2

Item Guidance

Is the Radio Operator Competent and licensed with knowledge of and access to SOPs and Emergency procedures?

CAP 437, 6.9.5.

CAP 452, 2.5

MODU Code,

SGAO pt5, 2.3.5

Do daily reports & departure messages contain all necessary information? (Position, weather, fuel state, POB, etc. The latest weather report from each installation should be made available to the operator one hour before take-off)

CAP 437, 6.4.3.1

SGAO pt5, 2.3.5

For DP vessels, is there an “aircrew alert procedures” during helicopter rotors running on deck operations, when there is a significant change in the environmental conditions such as relative wind and speed, vessel heading and roll/pitch figures?

AAIB; G-BKZE accident on the West Navion DP vessel

SGAO pt5, 5.1

MODU Code 13.6

Portable multi-channel hand held Radio (air band) including head set: number, type(s) and condition (a spare set is good practice)

CAP 437, 6.9.5

SGAO pt5, 6.3

Air band radios: type, condition and CAA approval (the second set is good practice to allow for redundancy and is required in busy areas so that the Air Traffic frequency remains free of Logistics chatter)

CAP 437, 6.9.5

SGRAO Part 5 Section 6 Par 6.3.

MODU Code, 11.6

Portable VHF FM: (if applicable)

CAP 437, 6.9.5

SGRAO Part 5 Section 6.3.

MODU Code 11.7

NDB – type, allocated frequency, call sign and CAA approval. Should be re-tunable (multi-frequency)

CAP 437, 6.9.6. SGRAO Part 5 Section 6 Par 6.4.

Industry practice, depending on location

Radio Log – Record of helix movements, POB, endurance, etc.

SGRAO Part 5 Appendix 2 / Good practice

Page 8: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 8 of 29 Helideck Inspection Checklist

METEOROLOGICAL REPORTS & EQUIPMENT

Item Guidance

Are weather reports in standard ICAO format?

CAP 437 6.4.

SGRAO Part 5 Appendix 2

AC150/5390-2B, 312.e.

Anemometer (fixed) – calibration date (annual)

CAP 437, 6.4.2.1.

CAP 437, 6.4.6.

Anemometer (hand) – calibration date (annual)

CAP 437, 6.4.2.1.

CAP 437, 6.4.6.

Wind direction: calibration date (annual), sensor in representative location? (Must be positioned in clear air.)

CAP 437, 6.4.2.1.

CAP 437, 4.1.6

CAP 437, 6.4.6.

Air temperature – sensor in representative location? I.e. in the vicinity of the helideck

CAP 437, 6.4.2.

CAP 437, 6.4.6.

Precision barometer/Twin Altimeters - height relative to helideck level, calibration date (annual) not sited inside pressurized compartment.

CAP 437, 6.4.2. Note 2

CAP 437, 6.4.6.

Visibility and cloud base equipment (if applicable): calibration date (annual)

CAP 437, 6.4.2. Note 1

CAP 437, 6.4.6.

Pitch, Roll and Heave equipment (if applicable): calibration date (annual)

Note: Should be able to report the maximum peak levels of Pitch, Roll and Heave over the last 10 minutes.

CAP437, 6.3

Maintenance Schedule for instruments (especially automated systems): Daily/weekly checks by Observer plus scheduled maintenance and calibration in accordance with manufacturers’ instructions.

Note: Observers should be trained to carry out daily/weekly checks.

CAP 746, 3

Manufacturers’ instructions

Page 9: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 9 of 29 Helideck Inspection Checklist

PROTECTIVE CLOTHING

Item Guidance

Quantity, quality and condition of protective clothing: (available for each member of helideck crew)

Two piece suits (bunker coat and trousers) to meet standard EN469 or equivalent, OR

One piece suits (preferably orange) to meet standard EN 469 or equivalent

Helmet with full face visor to meet BS 3864 or equivalent

Gloves to meet standard EN 659 or equivalent

Boots to meet standard EN 345 or equivalent

Note: CAP 437, Chapter 5.9. states only that fire fighting clothing should be made available to all assigned personnel and should meet “appropriate industry standards”. In the absence of more specific guidance Shell Aircraft have therefore adopted the Shell Expro standard. Advisers must use discretion in applying these standards in a tropical climate.

2 firemen’s outfits and two sets of personal equipment, (same as above) including breathing apparatuses. One of the outfits should be located at a position readily accessible from any helicopter deck.

HLOM, 5.6

CAP 437 5.9

MODU Code, 9.13.3, 9.16.4, 6

HLO identifying waistcoat: contrasting color to the rest of the helideck crew, flame retardant material, marked with the letters HLO in a reflective material on the front and back.

CAP 437, 5.8.1.

SGRAO Pt 5, 2.3.3

Stowage for firefighting equipment: Clothing should be hung and other equipment stored tidily in a quick access, clean and dry store near the helideck.

CAP 437 6.9.4

MODU Code, 9.16.4.6-7

PASSENGER WAITING AREA

Helicopter Emergency Diagram and Safety Posters SGRAO Part 5 Section 2 Paragraph 2.3.2.

Video/DVD player (state which) for Passenger safety video- This includes a supervised area for briefing. Briefing must include all types of expected to fly to the rig and reflect the configuration of the helicopter and the helicopter company.

SGRAO Part 5 Section 3 Paragraph 3.4.1

Heavy duty scales for baggage and freight: Calibration date (annual) CAP 437, 6.9.1.b.

Page 10: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 10 of 29 Helideck Inspection Checklist

HELIDECK SURFACE

Item Guidance

Color: (Dark green. If light grey or aluminum markings should be highlighted)

Condition:

Cleanliness:

CAP 437, 4.2.

CAP 437, 4.2.1.1.

RP2008 2.1.

Non slip characteristics (estimated): High/Medium/Low/Nil

CAP 437, 3.7.1 CAP 437, 3.7.5. CAA Paper 98002.

RP2008 2.1.

Last friction test: Date:

Validity:

Tested by whom?

CAP 437, 3.7.5 CAA Paper 98002.

Gutter or raised curb? Around the entire perimeter?

Means should be provided to prevent the collection of liquids on the helicopter deck and to prevent liquids from spreading to or falling on other parts of the unit.

CAP 437, 3.7.2.

MODU Code, 9.16.5

Drainage: Clear of debris, number of down pipes? Drain down pipes should be protected with a filter to stop large items blocking the drain - particularly important on NUIs.

Means should be provided to prevent the collection of liquids on the helicopter deck and to prevent liquids from spreading to or falling on other parts of the unit.

CAP 437, 3.7.2

A 14, 3.3.6 (slope only)

MODU Code, 9.16.5

Deck sealed? (no holes in deck for leaking/burning fuel)

CAP 437, 3.7.2

Aircraft tie-down points – location, quantity, flush. See notes below:

Tie-down configuration should be based on the centre of the touchdown marking and suitable for the largest size of helicopter expected to use the deck. Tie-down bars (if used) should be 22mm max (.8”).

Either/or:

Inner ring radius 2.5 meters (8’ 2”) with 6 evenly spaced tie-down points

Centre ring radius 5 meters (16’ 4”) with 6 evenly spaced tie-down points

Outer ring radius 7 meters (22’ 11”) with 6 evenly spaced tie-down points (required for 22.2 meters (72’ 8”) “D” and above only)

The Helideck should have recessed tie-down points for securing a helicopter.

CAP 437, 3.8.

MODU Code, 13.4.1

Page 11: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 11 of 29 Helideck Inspection Checklist

HELIDECK DIMENSIONS AND MARKINGS:

(Note: A reference table and diagrams are provided on the following 3 pages. Inspectors may prefer to write findings on the diagrams for ease of presentation)

Item Guidance

Overall Helideck Dimensions: Include run-off area if applicable

CAP 437, 3.6.

A 14, 3.3.2

RP2008 2.8.

AC150/5390-2B, 301.b

MODU Code, 13.3.2

Installation/rig/vessel name: State name painted on deck and position. Minimum 1.2 meters (3’ 11”) (preferable 2 meters 6’ 6”) high, white, not covered by landing net for CAP437, or

in symbols not less than 4 ft (1.2 meters) for RP2008 compliant decks

CAP 437, 4.1.3.

A 14, 5.2.9

MODU Code, 13.5.18-19

RP2008 2.4.

Perimeter line: Should be white, 30cm (1’) wide

CAP 437, 4.2.1.

A 14, 5.2.7

RP2008 2.2.

AC150/5390-2B, 309

MODU Code, 13.5.11

Page 12: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 12 of 29 Helideck Inspection Checklist

Touchdown/Positioning Marking (TD/PM) (or Aiming circle): Should be yellow, 1 meter (3’ 4”) wide. State inner diameter (0.5D)……………………

CAP 437, 4.2.6

A 14, 5.2.8

AC150/5390-2B, 301.b

AC150/5390-2B, 309

MODU Code,13.5.12-14

RP2008 2.10.

Chevron: Dimensions (0.79m x 0.10m) (2’ 6” x 3”), color (black), angle (210o), location.

For RP2008 compliant helix decks in the GoM:

Each leg of the chevron shall be a minimum of 2.5 ft long and 1 ft (0.3m) wide, forming an angle that indicates the direction of the limits of the 210o sector.

CAP 437, 4.2.2.

A 14, 5.2.10

MODU Code, 13.5.15

RP2008, 2.3.

Page 13: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 13 of 29 Helideck Inspection Checklist

D value marking: Correct value? Color, height, location. 3 times on the outboard edges, 0.6m (1’ 11”) height, white.

CAP 437, 4.2.4.

A 14, 5.2.10

AC150/5390-2B, 309.g.

MODU Code, 13.5.6-7

RP 2008, 2.9.

"H": State size, color, location, Swung? (4 x 3 x 0.75m for CAP437 (13’x 10’ x 2.5’ RP2008)) concentric with aiming circle, bar parallel with bisector of 210o sector)

CAP 437, 4.2.7. CAP 437, 4.2.8.

A 14, 5.2.2

RP2008, 2.10.

AC150/5390-2B, 309.b.

MODU Code, 13.5.5

Max. Allowable Mass: Correct value, size & color (0.9m (2’11”), white), and location, not covered by landing net.

A maximum allowable weight marking should consist of a one-two digit number to indicate the allowable helicopter weight in thousands of pounds, rounded to the nearest 1000 pounds. (I.e. for 15,600 lbs marked as 16). It should be marked in red numerals on a white background, as shown before. The height of the figures should be 3ft (0.9m) with a line width of approximately 5 inches (0.12m).

CAP 437, 4.2.5.

A 14, 5.2.3

MODU Code, 13.5.8, 9 , 10

RP2008, 2.7.

AC150/5390-2B, 309.h.

Page 14: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue xxx Page 14 of 29 Helideck Inspection Checklist

Table of Useful Dimensions for Different Helicopter Types

Helicopter Type D Value Main Rotor

Diameter 0.05D 0.12D

0.21D

Distance of “H” from deck edge

(0.4D)

Aiming circle inside

diameter (0.5D)

0.62D 0.83D “t”

value Landing net size

Bolkow 105D 12 9.9 0.6 1.44 2.52 4.8 6 7.44 9.96 2.4 Not

required

EC135 12.19 10.2 0.61 1.46 2.51 4.8 6.1 7.55 10.12 2.9 Not

required

Bolkow 117 13 11.0 0.65 1.56 2.73 5.2 6.5 8.45 11.05 3.2 Not

required

Agusta 109 13.05 11.0 0.65 1.57 2.74 5.22 6.53 8.1 10.83 2.6 Small

SA365 13.68 11.93 0.68 1.64 2.87 5.47 6.84 8.48 11.35 4.3 Not

required

EC155 14.3 12.6 0.72 1.72 3.00 5.72 7.15 8.87 11.87 4.8 Small/medi

um

S76 16.00 13.40 0.80 1.92 3.36 6.40 8.00 9.92 13.28 5.3 Medium

Agusta Bell AB139 16.66 13.8 0.83 2.0 3.50 6.66 8.33 10.3 13.82 6.4 Medium

Bell 412 17.13 14.00 0.86 2.06 3.6 6.85 8.57 10.62 14.22 5.2 Not

required

Bell 212 17.46 14.63 0.87 2.10 3.67 6.98 8.73 10.83 14.49 5.1 Not

required

AS332L 18.7 15.00 0.94 2.24 3.93 7.48 9.35 11.60 15.52 8.6 Medium

Bell 214ST 18.95 15.85 0.95 2.27 3.98 7.58 9.48 11.75 15.73 8 Medium

AS332L2 19.5 16.20 0.98 2.34 4.1 7.8 9.75 12.09 16.19 9.2 Medium

EC225 19.5 16.20 0.98 2.34 4.1 7.8 9.75 12.09 16.19 11.0 Medium

S92 20.88 17.17 1.04 2.51 4.38 8.35 10.44 12.95 17.33 11.9 Large

S61N 22.2 18.90 1.11 2.66 4.66 8.88 11.10 13.76 18.42 9.3 Large

EH101 22.8 18.60 1.14 2.74 4.79 9.12 11.40 14.14 18.92 14.3 Large

Chinook omni-directional

30.18 18.29 1.51 3.28 6.38 Centre of

Deck 15.10 NA 25.05 21.3 Large

Chinook bi-directional

30.18 18.29 1.51 3.28 6.38 Centre of

Deck *13.58 18.71 NA 21.3 Large

*To calculate the inside diameter of the aiming circle for the Chinook bi-directional helidecks, 0.9D is used, i.e. D=30.18, 0.9D=27.16

Note: All dimensions in meters

Page 15: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 15 of 29 Helideck Inspection Checklist

Helicopter Type D Value

(feet) Deck Size Marking

0.05 D (Feet)

0.62 D (Feet)

0.83 D (Feet)

Aiming circle inside diameter

(0.5D)

Rotor Diameter

(Feet)

Max weight (Lbs)

Deck weight

marking

EC 120 37.8 38 1.89 23.44 31.37 18.9 32.9 3,704 3.7

B 206 B 39.2 39 1.96 24.3 32.54 19.6 33.25 3,350 3.4

BO 105 39.36 39 1.97 24.4 32.67 19.68 32.25 5,511 5.5

EC 135 39.9 40 2 24.74 33.12 19.95 33.5 6,400 6.4

Bell 407 41.75 42 2.09 25.86 34.65 20.88 35 5,000 5

AS 350 42.6 43 2.13 26.41 35.36 21.3 35.1 4,960 5

AS 355 42.6 43 2.13 26.41 35.36 21.3 35.1 5,732 5.7

B 206L 42.75 43 2.14 26.5 35.48 21.35 37 4,450 4.5

A119 43 43 2.15 26.66 35.69 21.5 36.1 5,997 6.0

A109 43 43 2.15 26.66 35.69 21.5 36.1 6,600 6.6

EC155B1 46.9 47 2.35 29.08 38.93 23.45 41.25 10,582 10.6

S 76 52.48 52 2.62 32.54 43.56 26.24 44 11,700 11.7

AW 139 54.65 55 2.73 33.88 45.36 27.33 45.28 14,110 14.2

B 412 56.1 56 2.8 34.78 46.56 28.05 46 11,900 11.9

B212 57.27 57 2.86 35.5 47.53 28.64 48.2 11,200 11.2

AS332 L 61.34 61 3.07 38.03 50.91 30.67 49.6 19,840 19.8

B 214 ST 62.16 62 3.1 38.54 51.59 31.08 52 17,500 17.5

AS332 L2 63.96 64 3.2 39.66 53.09 31.98 53.2 20,502 20.5

EC225 63.96 64 3.2 39.66 53.09 31.98 53.2 24,251 24.3

S92 68.49 68 3.42 42.46 56.85 34.25 56.32 28,293 28.3

S61 72.82 73 3.64 45.15 60.44 36.41 62 20,500 20.5

Page 16: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 16 of 29 Helideck Inspection Checklist

OBSTRUCTION ENVIRONMENT

Item Guidance

210o Sector obstruction(s): Location & height above helideck level

CAP 437, 3.6

A 14, 3.3.5 & 4.1.23

MODU Code, 13.3.2.2.1

RP2008, App 1, 1.

150o Sector obstruction(s): Location & height above helideck level

Can be swung +/- 15 degrees, objects in the LOS out to a distance of .62D should not exceed a height of .05D.

CAP 437, 3.6

A 14, 4.2.16

RP2008, App 1, 2.

MODU Code, 13.3.2.3

180o Sector, 5:1 Falling gradient obstruction(s): What & where

CAP 437, 3.6

A 14, 4.2.14

RP2008, App 1, 3.

MODU Code, 13.3.2.2.2

Page 17: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 17 of 29 Helideck Inspection Checklist

Prohibited Landing Sector Markings: Location/Size/Rotation of ‘H’

CAP 437, 4.2.9.

RP2008, 2.12.

Midship Centerline Landing Area: CAP 437, 9.2.2.2-5 Fig 1

Side Non-Purpose Built in Landing Area: CAP 437, 9.4.1-3, 9.5.1-3

Winching Areas on Vessels: CAP 437, 10.1

Page 18: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 18 of 29 Helideck Inspection Checklist

HELIDECK NET (IF APPLICABLE)

Item Guidance

Age/Condition/Size:

CAP 437, 3.1.2 Table 1 / CAP 437, 3.7.4. Table 2

AC150/5390-2B, 301.2.d.(4)

Tension: Lift not above 25 centimeters near the center (at least 2225N)

CAP 437, 3.7.3

HM.2.3.1.11

Location: Should cover Touchdown/Positioning Marking/Aiming Circle and not cover rig identification & max mass weight value (‘t’ value markings)

CAP 437, 3.7.3

MODU Code 13.3.2.4

Material: Should be sisal with a maximum mesh size of 200 mm, not polypropylene (Frictape type acceptable)

CAP 437, 3.7.3

HM.2.3.1.11

Type: Threaded/Knotted/Inter-twined

CAP 437, 3.7.3

HM.2.3.1.11

Tie-down points: Every 1.5 meters

CAP 437, 3.8.

HM.2.3.1.11

Method of Securing: Rope/Webbing/Ratchet Tensioners. Compatible with the dimensions of tie-down strop attachments?

CAP 437, 3.7.3

Net size: 9 x 9m, 12 x 12m, 15 x 15m (covers the aiming circle not the name)

CAP 437, 3.7.4 Table 2

HM.2.3.1.12

Mesh size: max. 200mm

CAP 437, 3.7.3

HM2.3.1.11

Rope diameter: 20mm CAP 437, 3.7.3

HM.2.3.1.11

PERIMETER NET/SAFETY NET

Item Guidance

Material & Condition: Wire Mesh, braided nylon, or Frictape preferred (Polypropylene not recommended)

CAP 437, 3.9.2

HM, 1.4.4.1

Width from deck edge (1.5m) (4’ 11”)

CAP 437, 3.9.1

HM, 1.4.4.1

Hammock effect

CAP 437, 3.9.2

HM, 1.4.4.2

Slope: Slope (10º), highest point above deck level

CAP 437, 3.9.1

HM, 1.4.4.1

MODU Code, 13.4.2

AC150/5390-2B, Figure 3-20

Inspection & Test Schedule : (Note drop test is not to be carried out offshore)

Regular condition inspection schedule offshore weekly recommended.

Physical test of a representative section onshore, annual recommended

UKOOA Guidance Letter 10/02/2006

Page 19: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 19 of 29 Helideck Inspection Checklist

PERIMETER LIGHTING

Item Guidance

Color & Serviceability: Note: Perimeter lights must be colored green by 01/01/2009 for CAP437 compliant decks. In the Gulf of Mexico blue and amber lights

CAP 437, 4.3.1

A 14, 5.3.8.13

AC150/5390-2B, 310.a & e

MODU Code, 13.5.20

Height above deck level (<25 centimeters) (9.8”) & distance apart: (<3 meters) (9’ 10”) Note: except for circular helidecks there should be at least one light at each corner, and minimum of 4 lights per side (if square or rectangle).

CAP 437, 4.3.1

A 14, 5.3.8.6,7 & 18

AC150/5390-2B, 310.a - e

MODU Code, 13.5.20

Position: Do the lights delineate the safe landing area only, co-incident with perimeter line, and visible for 360o ADL?

CAP 437, 4.3.2

A 14, 5.3.8.5

MODU Code, 13.5.20

Power rating: (, 30 candelas green)

CAP 437, 4.3.1

MODU Code, 13.5.21

Limit of safe landing area: (Are red lights (30 candelas) used to delineate the unsafe sectors?)

CAP 437, 4.3.2

MODU Code, 13.5.23,24,25

Emergency power supply (perimeter and flood lights) Installation/vessel emergency power supply design should include the landing area lighting. Any failures or outages should be reported immediately to the helicopter operator. The lighting should be fed from an Uninterrupted Power Supply (UPS) system. For Gulf of Mexico helix decks commissioned prior to Nov 2011 the UPS requirement can be substituted with tie-in of the landing area lighting into the Emergency Power Supply of the installation (max 45 seconds switch-over time)

CAP 437, 4.3.12

MODU Code, 5.3.6.1.8

HELIDECK FLOOD LIGHTING

Item Guidance

Serviceability:

CAP 437, 4.3.3-5

A 14, 5.3.8

AC150/5390-2B, 310.i

MODU Code 13.5.22

Switching: controlled from the radio room or by HLO?

CAP 437, 4.3.7

Dazzle protection & power rating – state number and position. Do they dazzle the pilot during night operations? The recommended type of floodlights is the deck-mounted type.

CAP 437, 4.3.7

HM, 5.3.3.9

MODU Code, 13.5.22

Spectral distribution: Do they provide adequate illumination of the centre of the helideck? CAP 437, 4.3.3-7 A14, 5.3.8.23 HM 5.3.3.10

MODU Code, 13.5.22

Page 20: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 20 of 29 Helideck Inspection Checklist

GENERAL LIGHTING

Item Guidance

Installation/rig/vessel floodlighting: All floodlighting angled so as not to dazzle pilots

CAP 437, 4.3.3,7

MODU Code, 13.5.2.3

Structures 15 meter above deck level: Omni-directional red lights every 10m (32’ 10”) above deck level with a minimum intensity of 10 candelas. To include all crane booms. It is often preferable

for some structures such as flare booms and towers to be illuminated by floodlights as an alternative to fitting intermediate steady red lights, provided that the lights are arranged such that they will illuminate the whole of the structure and not dazzle the helicopter pilot.

CAP 437, 4.4.3

AC150/5390-2B, 311

MODU Code, 13.5.24

Highest point: Omni-directional light with intensity of 50 candelas for angles of elevation between 0 and 15 degrees, and a minimum intensity of 200 candelas between 5 and 8 degrees.

CAP 437, 4.4.4 - 4.5

MODU Code, 13.5.25

OBSTRUCTION MARKING AND LIGHTING

Item Guidance

Obstruction lighting (it is acceptable for flare stacks and booms to be floodlit)

CAP 437, 4.4.1 - 3

HM, 5.3.3.13

AC150/5390-2B, 311

MODU Code, 13.5.24.1,2,3

Color of cranes and obstacles: (black/yellow or red/white preferred if close to the helideck or 150o sector boundary)

CAP 437, 4.4.1 – 2

SGRAO pt5, 3.12.1

MODU Code, 13.5.23

Page 21: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 21 of 29 Helideck Inspection Checklist

ADDITIONAL EQUIPMENT

Item Guidance

Chocks – number and type (must be rubber, wood or sandbags, minimum amount 6, 2 for each wheel)

CAP 437, 6.9.1-2

Tie-down strops: minimum amount 6. Breaking strength 12.000 lbs

CAP 437, 6.9.1/6.9.3

Snow, ice clearing equipment and medium: (if applicable)

CAP 437, 6.9.1

AC150/5390-2B, 312.f.

Prohibited landing marker: 4 x 4 meter (13’ x 13’) red flag with diagonal yellow cross

CAP 437, 4.2.10.

AC150/5390-2B, 309.f.

Breathing apparatus: minimum 2 sets + 2 reserve cylinders. Check condition. Located close to the helideck

CAP 437, 5.7.2 & 5.9.3

Windsock: Check number, location(s), and color/condition. Must be lit for night operations

CAP 437, 4.1.5

HM 5.3.1

AC150/5390-2B, 306

MODU Code, 13.5.1, 2, 3

Helicopter starter unit: Rectifier or battery trolley, 28V DC? Condition?

CAP 437, 6.9.1

TURBULENCE

Item Guidance

Structures: Items likely to cause turbulence

CAP 437, 3.2

HM, 1.4.

Hot emissions likely to cause turbulence: Flares, turbine exhausts

CAP 437, 3.2

HM, 1.4

Cold emissions: vents, blow down

CAP 437, 3.2

HM, 1.4

Air gap beneath helideck?

CAP 437, 3.2

HM, 1.4

MODU Code, 13.3.5

Page 22: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 22 of 29 Helideck Inspection Checklist

ACCESS POINTS

Item Guidance

Locations: Minimum 2, upwind & downwind. Ensure that there are sufficient access points on small decks to ensure safe passage of personnel over the helideck.

CAP 437, 3.10.1-2

HM, 1.4.4.4

MODU Code, 13.4.3

SGRAO pt5, 6.2

Handrails: Collapsible/fixed

CAP 437, 3.10.5

HM, 1.4.4.5

SGAO pt5, 6.2

Steps: Clean and no trip/slip hazard

Good HSE practice

Safety Notices: Available and clearly readable

CAP 437 3.10.5

SGRAO Part 5 Section 6.2

Control of non-helideck crew & passengers: Procedures to prevent inadvertent access to helideck (e.g. chains)

CAP 437 3.10.5 (Note), CAP 437 6.7

SGRAO Part 5 Section 6.2

FIRE FIGHTING EQUIPMENT

Item Guidance

Foam monitors: Quantity (minimum 2) and type (Aspirated/non-aspirated, manual/oscillating)

CAP 437, 3.6.2. / CAP 437, 3.6.8. / CAP 437, 3.10.4. / CAP 437, 5.2

A 14, 6.1.7

MODU Code, 9.16.4.5

SGRAO pt5, 6.5

Fire main pressure: Always on during helicopter operations?

MODU Code 9.16.4.3.2

Foam concentrate: Type and quantity (for minimum amount of concentrate see table below)

CAP 437, 5.2

A 14, Table 6-3

MODU Code 9.16.4.4

Back-up concentrate: Must be 100%

CAP 437, 5.6

Foam Test Certificate: Date done/due (must be tested annually). Note: Foam concentrates and produced foam to be tested.

CAP 437, 5.3.3 HSE Safety Notice 2/2004

SGAO pt5, 3.2

Foam hand branches: Quantity, type and condition: must have on/of control. Check proportioner setting.

CAP 437, 5.2.9.

A 14, 6.1.7

MODU Code 9.16.4.3

Hydrant points: Quantity and location

At least two dual-purpose nozzles and hoses sufficient to reach any part of the helicopter

CAP 437, 5.2

HM, 6.10

MODU Code, 9.16.4.5

Foam System Maintenance & Testing: Monitors must be functionally tested periodically for correct operation. Water test is acceptable. All parts of the foam production system should be tested annually by a competent person.

CAP 437 5.3

MODU Code 9.19.1

Page 23: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 23 of 29 Helideck Inspection Checklist

Item Guidance

Portable extinguishers (complementary media: Dry Powder & CO2)

Minimum number of extinguishers:

One 45kg dry powder (trolley type) at each access

One 18kg CO2 with lance (trolley type)

Condition: last inspection date (minimum annual), particular attention to be paid to rubber hoses.

On any helideck there should be provided and stored near to the means of access to that deck:

At least two dry power extinguishers having a total capacity of not less than 45kg

Carbon dioxide extinguishers of a total capacity of not less than 18kg or equivalent, one of these extinguishers being so equipped as to enable it to reach the engine area of any helicopter using the deck.

CAP 437, 5.4.1-2

HLOM, 2.5.4

HM 6.10

MODU Code 9.16.4.1-2

Back-up stocks of complementary media (100%)

CAP 437, 5.4.7-9

Foam requirement Table

D Value Area AFFF 1% AFFF 2% AFFF 3% AFFF 4% AFFF 5% AFFF 6% Application

rate

(Meters) (m²) (Liters) (Liters) (Liters) (Liters) (Liters) (Liters) (Liters/min)

13.68 147 44 88 132 176 220 264 882

16 201 60 120 180 241 301 361 1206

17 227 68 136 204 272 340 408 1362

18 254 76 152 229 305 381 458 1527

18.7 275 82 164 247 329 412 494 1648

19 283 85 170 255 340 425 510 1701

20 314 94 188 282 377 471 565 1885

21 346 103 207 311 415 519 623 2078

22.2 387 116 232 348 464 580 696 2322

22.8 408 122 245 367 490 612 735 2450

23 415 124 249 374 498 623 747 2493

30.18 715 214 429 643 858 1073 1287 4292

Page 24: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 24 of 29 Helideck Inspection Checklist

RESCUE EQUIPMENT

Item Guidance

Crash box (number of crash boxes (one by each access point recommended), accessible, weatherproof) A responsible person should be appointed to ensure that the rescue equipment is checked and maintained regularly. Rescue equipment should be stored in clearly marked and secure watertight cabinets or chests. An inventory checklist of equipment should be held inside each equipment cabinet/chest. (Recommended, not required)

CAP 437, 5.7.

Adjustable wrench (one per crash box) CAP 437, 5.7.2

Large rescue axe (one per crash box) CAP 437, 5.7.2

Bolt cutters (one per crash box) CAP 437, 5.7.2

Large crowbar (one per crash box) CAP 437, 5.7.2

Heavy duty hacksaw (one per crash box) CAP 437, 5.7.2

Heavy duty blades (six per crash box) CAP 437, 5.7.2

Fire resistant blanket (one per crash box) CAP 437, 5.7.2

Side-cutting pliers (one per crash box) CAP 437, 5.7.2

Set of assorted screwdrivers (one per crash box) CAP 437, 5.7.2

Harness knife c/w sheath (one knife for each crew member) CAP 437, 5.7.2

Ladder: should be two sections of an aluminum ladder, each section 2-3 meters (6’ – 9’) long) CAP 437, 5.7.2

Hook, grab or salving: one per crash box CAP 437, 5.7.2

Fire resistant gloves (min 2 pairs) CAP 437, 5.7.2

Life Line (5 cm (2”), 15m (49’) in length) CAP 437, 5.7.2

MISCELLANEOUS

Item Guidance

Are pre-landing checks in accordance with a checklist & SOPs?

HLOM, 4.2.1

SGRAO pt5, 2.3.4

Is there dangerous goods reference material and documentation on board?

Good practice

SGAO pt5, 3.5

MODU Code 14.4

Helideck Manning Level – normally minimum of HLO plus three HDAs

SGRAO Pt 5, 2.4

CAP 437, 5.8.1 refers to UKOOA, 7.6.4

MODU Code 14.2.3, 14.2.4

Page 25: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 25 of 29 Helideck Inspection Checklist

Helicopter emergency diagrams & safety posters – location? All types?

SGRAO Part 5 Section 3.4.1

Helideck training exercises – written record - to be carried out at least once every month.

CAP 437 5.1

SGRAO Part 5, Section 5.2

MODU Code, 9.16.1.4,14.11, 12, 13, 14

Video/CD player (state which) for showing passenger safety briefings - & suitable supervised area for briefing. Briefing must include all types expected to fly to the rig and reflect the configuration of the helicopter and the helicopter company.

SGRAO Part 5 Section 3.4.1

Survival suits – Not required for Gulf of Mexico

SGRAO Part 1 Section 8.12.1 / SGRAO Part 2 Appendix 15

OGP AMG, 19.2.1.6

Heavy duty scales for baggage and freight: calibration date (annual)

CAP 437, 6.9.1

SGRAO pt5, 3.4.3

Stretcher – type and location

Good HSE practice

Dynamic Positioning – Does the vessel have a Policy/procedure to notify the Helicopter if there is a loss of DP?- 'In the case of floating structures and vessels, a loss of heading control (eg loss of Dynamic Positioning (DP)) or a significant change in motion characteristics must immediately be notified to the flight crew. This change in conditions may require the flight crew to prepare for immediate lift-off if the helideck motion limits or helicopter limits of operability are likely to be exceeded.'

SGRAO pt1 10.7.1

Page 26: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 26 of 29 Helideck Inspection Checklist

AVIATION FUEL SYSTEM: FUEL BUND

Item Guidance

Transportable Tank Bund - ensure that local tanks will fit – if so how many? (e.g. Shell North Sea tank dimensions (L x W x H); 2.57 x 1.98 x 2.23 meters)

CAP 437 8.5

Deluge system MODU Code, 9.16.1.3

Bund: large enough to hold 110% of tank contents Good HSE practice

AVIATION FUEL SYSTEM. BULK STORAGE TANK BUND

Item Guidance

Tank: must be fitted with floating suction CAP 437, 7.3.4.6.

Deluge system MODU Code, 9.16.1.3

Bund: large enough to hold 110% of tank CAP 437, 7.3.2.1. /Good HSE practice

AVIATION FUEL SYSTEM. PIPEWORK AND HOSES

Item Guidance

Pipelines: should be stainless steel, unpainted or black, grade markings, all joints bonded.

Industry standard practice

MODU Code, 9.16.6.6

Suction hose: type, length, fittings and condition

CAP 437, 7.3.6.1.(e)

Delivery hose: type, must meet EN 1361/API 1529 (old BS 3158) Type C

CAP 437, 7.3.6.1.(e)

AVIATION FUEL SYSTEM. FILTRATION UNITS

Item Guidance

Filter Water Separator: condition. Must be fitted with sample point and air eliminator & pressure differential gauge.

CAP 437, 7. 3.6.1. (b)

Filter Water Monitor: condition. Must be fitted with sample point and air eliminator and pressure differential gauge.

CAP 437, 7. 3.6.1. (b)

Transfer Filter Water Separator: (bulk systems only) condition. Must be fitted with sample point and air eliminator and pressure differential gauge.

CAP 437, 7. 3.6.1. (b)

All filters marked with date of last element change and date next due? Shell Aviation element maximum life; separators 3 years, monitors 1 years

CAP 437, 8.3.2./CAP 437, 8.3.6. Shell Airport Operations Manual 03.03.01

Page 27: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 27 of 29 Helideck Inspection Checklist

AVIATION FUEL SYSTEM. PUMP CABINET/DISPENSING UNIT

Item Guidance

Refueling equipment: general condition of all refueling equipment

Good practice

Fuel pump – Condition (second, emergency, pump is recommended to provide redundancy, may be manual)

CAP 437, 7. 3.6.1 (a).

Fuel pump strainer: Condition

CAP 437, 8.3.6.1. (c) (iv)

Non return valve – Fitted?

Good practice

Pump pressure gauge: Condition

Good practice

Differential pressure gauges: Location and condition (piston type required). Check inspection and calibration checks

Good practice

Flow meter calibrated in liters – Condition CAP 437, 7. 3.6.1. (c).

Refueling start and stop switches – Location, including at least one separate emergency stop button

CAP 437, 7.3.6.1.(a)

MODU Code, 9.11.7, 10

Dispensing cabinet – Dispensing equipment must be installed in cabinet

Good practice

Pump running light – Visibility and serviceability

CAP 437, 7.3.6.1.(a).

Delivery hose – Condition & age (10 year life from date of manufacture stamped on hose, but only if tested annually) - type must meet EN 1361/API 1529 (old BS 3158) Type C. If delivery hose is not pressure checked, life must be reduced to a maximum of 5 years. Hose to be inspected for serviceability and damage monthly.

CAP 437 7.3.6.1.(e)

Nozzle and/or pressure Refueling coupling – condition, including cone filter in nozzle and pressure nozzle filter. The filters should be checked weekly.

CAP 437 7.3.6.1.(g).ii)

Bonding lead: Condition, fitted with quick disconnects? Date of last continuity check?

CAP 437, 7.3.6.1.(f).

MODU Code, 9.16.6.4.3

Page 28: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 28 of 29 Helideck Inspection Checklist

AVIATION FUEL SYSTEMS. MISCELLANEOUS

Item Guidance

Is there a policy on Refueling with passengers on board?

CAP 437, 8.9.2.(i) / HLOM, 6.6.2

Sample jars – Size (4 liter) condition, quantity

CAP 437, 7.3.3.5.(e) / CAP 437, 8.2.

Retention samples - Labeled and retained in secure area?

CAP 437, 8.2.4.

Records of receipt, delivery and quality control checks – check compliance with industry practice

CAP 437, 8.5

Fuel samples: Are samples retained?

HLOM, 6.4.7.2

CAP 437 8.2

How are samples disposed of?

CAP 437, 7.3.5.

Are water detector tests performed? Are Shell Water Detectors used? If so are stocks sufficient and are they in date?

CAP 437, 8.2.1. / HLOM, 6.4.4.2

Fuel system commissioning or periodic inspection – date done & date due Note: The fuel system must be commissioned and then tested periodically by a competent and authorized Fuel Inspector. Filter elements should be changed as required during these inspections. Maximum periodicity between inspections should be 3 months.

CAP 437, 8.3.

Page 29: Helideck Inspection Checklist - Falck Inspection...Largest type approved S92 D Value Helideck height AMSL ... Perimeter Nets Inspection and Test Schedule (UKOOA Guidance Letter) Weekly

CONFIDENTIAL WHEN COMPLETE SHELL UPSTREAM AMERICAS STAFF ONLY

SHELL UA AVIATION Issue DRAFT DEC 2011 Page 29 of 29 Helideck Inspection Checklist

DRAFT SUMMARY OF NON COMPLIANCES (To Be Left On Board If Required)