Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code Analysis Disclaimer: This presenta1on was developed by a third party and is not funded by WoodWorks or the So=wood Lumber Board.

Transcript of Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE,...

Page 1: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Presented by:

Ara Sargsyan, PE, CBO, LEED AP

December 2015

Heights and Areas

Using Software to Ease

Building Code Analysis

Disclaimer:  This  presenta1on  was  developed  by  a  third  party  and  is  not  funded  by  WoodWorks  or  the  So=wood  Lumber  Board.  

Page 2: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

“The  Wood  Products  Council”  is  a  Registered  Provider  with  The  American  Ins<tute  of  Architects  Con<nuing  Educa<on  Systems  (AIA/CES),  Provider  #G516.      Credit(s)  earned  on  comple<on  of  this  course  will  be  reported  to  AIA  CES  for  AIA  members.  Cer<ficates  of  Comple<on  for  both  AIA  members  and  non-­‐AIA  members  are  available  upon  request.      

This  course  is  registered  with  AIA  CES  for  con<nuing  professional  educa<on.  As  such,  it  does  not  include  content  that  may  be  deemed  or  construed  to  be  an  approval  or  endorsement  by  the  AIA  of  any  material  of  construc<on  or  any  method  or  manner  of  handling,  using,  distribu<ng,  or  dealing  in  any  material  or  product.  __________________________________

Ques<ons  related  to  specific  materials,  methods,  and  services  will  be  addressed  at  the  conclusion  of  this  presenta<on.    

 

Page 3: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Disclaimer  

The training materials and opinions presented at this webinar do not constitute official views of the author's employer and should not be used as such. Anyone who wants an official ruling by the Building Official should contact the local Building Department.

IBC is © by International Code Council

Page 4: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Course  Descrip/on  This session will focus on the “Check Height and Area” software that reviews and analyzes building height and area compliance with the 2013 California Building Code (CBC), including the July 2015 supplement, for buildings up to six stories, with up to four occupancy groups at each level. This user-friendly application is created for design professionals and building officials to ease building code analysis. Step-by-step instructions will be provided and common issues related to height and area limitations will be illustrated with examples of actual mixed occupancy group, multi-story buildings.

Page 5: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Learning  Objec/ves  

•  Explore how to save time by using software to calculate grade plane for a variety of topography situations.

•  Discuss how to optimize building height and area values for all occupancy groups and types of construction using software as an aid.

•  Evaluate methods of calculating frontage increases to aid in building design and plan review.

•  Review calculation procedures for allowable height, area, and number of stories for a mid-rise structure

Page 6: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

•  Defini<ons  (502)  •  General  Height  and  Area  Limita<ons  (Table  503)  •  Building  Height  (504)  •  Mezzanines  and  Equipment  Pla\orms  (505)  •  Building  Area  Modifica<ons  (506)  •  Unlimited  Area  Buildings  (507)  •  Mixed  Use  and  Occupancy  (508)  •  Incidental  Uses  (509)  •  Special  Provisions  (510)  

Building  Height  and  Area  Limita/ons  

Page 7: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

8

Check Height & Area C C A H H A calculator

Page 8: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

2013  CBC  Building  Height  &  Area  Calculator  CHA-­‐CHA  

Page 9: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

2012  IBC  Building  Height  &  Area  Calculator  

http://www.woodworks.org/design-and-tools/design-tools/online-calculators/

Online Calculators … Heights and Area Calculator Ease building code analysis and maximize your wood building project within the code limits with this Excel tool which reviews and analyzes building height and area compliance with the 2012 IBC for buildings up to six stories, with up to four occupancy groups at each level. Download Heights and Area Calculator. More Online Calculators

Page 10: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

What  does  Cha-­‐Cha  do?    •   Checks  and  analyses  Building  Height  and  Area  in  compliance  with  the  2007,  2010  &  2013  CBC  for  buildings  up  to  6  stories,  with  up  to  4  occupancy  groups  at  each  level.    •   Op<mizes  design  values  for  all  occupancy  groups  and  types  of  construc<on  using  single  applica<on    •   Calculates  Frontage  increase  (I f)  •   Calculates  Grade  plane  eleva<on  for  any  topography  

Page 11: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

How  to  use  Cha-­‐Cha?  •   Select  proposed  Type  of  construc<on  

–   Cha-­‐Cha  will  show  max.  permiDed  height  for  the  building  without  sprinklers  per  Table  503    

•   Input  proposed  Building  Height  (f)    •   Input  proposed  number  of  stories  (6  max)    •   If  applicable,  check  the  box  for  sprinklers  throughout  per  903.3.1.1  or  903.3.1.2  

–   No  subs1tu1on  for  1-­‐hr  construc1on    •   If  applicable,  input  (I f)  value  •   Select  Occupancy  Groups  (4  per  level)  •   Input  corresponding  areas  (sq.  f.)  

Page 12: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Cha-­‐Cha  will  check:  

Allowable  height,  number  of  stories  and  the  area  for:  •   Each  Occupancy  group  at  each  floor    •   Each  floor    •   Each  Occupancy  group  throughout  En1re  building    •   Overall  building    

Page 13: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Abbrevia/ons  used  in  Cha-­‐Cha  

•   CHA  -­‐Check  Height  and  Area  •   NP  -­‐Not  PermiDed  •   OL  -­‐Over  PermiDed  Limit  •   SPA  -­‐Sprinklers  used  for  Area  increase  •   SPH  -­‐Sprinklers  used  for  Height  increase  •   SPS  -­‐Sprinklers  used  for  Story  increase  •   UL  -­‐Unlimited  

Page 14: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Code  Sec/ons  not  covered  by  Cha-­‐Cha  

•   503.1.1  (Special  industrial  occupancies)    •   Footnote  b  of  Table  503    •   504.3  (Roof  structures)    •   505  (Mezzanines)    •   507  (Unlimited  Area  Buildings)  

–   for  Frontage  increase  (If),  Cha-­‐Cha  considers  the  Excep1on  under  Sec.  506.2.1)  

•   510  (Special  provisions)    

Page 15: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Version: 13-CBC-02 Expires: 1/12/2016

Type of Construction: Special notes:Max Permitted Height

Building Height (ft): 85 W/out Sprinklers (ft): 65Number of stories: 6

I f = 0.4200

(not substituted for 1hr construction)

Floor # Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.)

1 6,000.00 18,000.00 3,000.00 5,000.00 32,000.00 CHA Overall Building:

2 2,000.00 8,000.00 6,000.00 3,000.00 19,000.00 Area: OLHeight: SPH

3 8,000.00 8,000.00 Stories: SPS

4 8,000.00 8,000.00

5 8,000.00 8,000.00 CHA Per Each OccupancyGroup @ Entire Building:

6 6,000.00 6,000.00 (Sec. 506.4.1)

Occup. Result Permitted Proposed

Total Building Area (s.f.): of ratios

CHA Per Occupancy Group @ Each Level: UL  -­‐ Unlimited S PH  -­‐ S prinklers  used  for  Height  increase for building A- 2 OK 39,760.00 6,000.00

NP  -­‐ Not  P ermitted S P S  -­‐ S prinklers  used  for  S tory  increase 2.5124 A- 3 OK 39,760.00 21,000.00

OL  -­‐ Over  P ermitted  L imit S PA  -­‐ S prinklers  used  for  Area  increase

Result Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed of ratios

Level 1 A- 2 Occ. A- 3 Occ. M Occ. B Occ. per Level B OK 292,410.00 19,000.00

Area OL OK 19,880.00 6,000.00 OK 19,880.00 18,000.00 OK 63,270.00 3,000.00 OK 97,470.00 5,000.00 1.3060Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 4 1 OK 4 1 OK 5 1 OK 6 1

Level 2 M Occ. B Occ. R- 1 Occ. A- 3 Occ.Area OK OK 63,270.00 2,000.00 OK 97,470.00 8,000.00 OK 34,080.00 6,000.00 OK 19,880.00 3,000.00 0.4406

Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 5 2 OK 6 2 OK 5 2 OK 4 2

Level 3 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 3

Level 4 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 4 M OK 189,810.00 5,000.00

Level 5 R- 1 Occ. R- 1 OK 68,160.00 30,000.00

Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories SPS SPS 5 5

Level 6 B Occ.Area OK OK 97,470.00 6,000.00 0.0616

Height SPH SPH 85 85

Stories SPS SPS 6 6

WoodWorks- Anaheim 2015

*Building Area is Overlimit per Sec. 506.5.2 *Level 1 Area is Overlimit per Sec. 508.4.2

81,000.00

www.ara4help.comhelp is one click away

Select the Code

Sprinklers Throughout per 903.3.1.1 Sprinklers Throughout per 903.3.1.1

2010 CBC

2007 CBC

2013 CBC

Page 16: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

2013  CBC  Building  Height  &  Area  Calculator  

Version:

Type of Construction:Max Permitted Height

Building Height (ft): 85 W/out Sprinklers (ft): 65Number of stories: 6

I f = 0.4200

(not substituted for 1hr construction)

Floor # Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.)

1 6,000.00 18,000.00 3,000.00 5,000.00 32,000.00

2 2,000.00 8,000.00 6,000.00 3,000.00 19,000.00

3 8,000.00 8,000.00

4 8,000.00 8,000.00

5 8,000.00 8,000.00

6 6,000.00 6,000.00

Total Building Area (s.f.): of ratios

WoodWorks- Anaheim 2015

81,000.00

www.ara4help.comhelp is one click away

Select the Code

Sprinklers Throughout per 903.3.1.1 Sprinklers Throughout per 903.3.1.1

2010 CBC

2007 CBC

2013 CBC

Page 17: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Version: 13-CBC-02 Expires: 1/12/2016

Type of Construction: Special notes:Max Permitted Height

Building Height (ft): 85 W/out Sprinklers (ft): 65Number of stories: 6

I f = 0.4200

(not substituted for 1hr construction)

Floor # Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.)

1 6,000.00 18,000.00 3,000.00 5,000.00 32,000.00 CHA Overall Building:

2 2,000.00 8,000.00 6,000.00 3,000.00 19,000.00 Area: OLHeight: SPH

3 8,000.00 8,000.00 Stories: SPS

4 8,000.00 8,000.00

5 8,000.00 8,000.00 CHA Per Each OccupancyGroup @ Entire Building:

6 6,000.00 6,000.00 (Sec. 506.4.1)

Occup. Result Permitted Proposed

Total Building Area (s.f.): of ratios

CHA Per Occupancy Group @ Each Level: UL  -­‐ Unlimited S PH  -­‐ S prinklers  used  for  Height  increase for building A- 2 OK 39,760.00 6,000.00

NP  -­‐ Not  P ermitted S P S  -­‐ S prinklers  used  for  S tory  increase 2.5124 A- 3 OK 39,760.00 21,000.00

OL  -­‐ Over  P ermitted  L imit S PA  -­‐ S prinklers  used  for  Area  increase

Result Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed of ratios

Level 1 A- 2 Occ. A- 3 Occ. M Occ. B Occ. per Level B OK 292,410.00 19,000.00

Area OL OK 19,880.00 6,000.00 OK 19,880.00 18,000.00 OK 63,270.00 3,000.00 OK 97,470.00 5,000.00 1.3060Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 4 1 OK 4 1 OK 5 1 OK 6 1

Level 2 M Occ. B Occ. R- 1 Occ. A- 3 Occ.Area OK OK 63,270.00 2,000.00 OK 97,470.00 8,000.00 OK 34,080.00 6,000.00 OK 19,880.00 3,000.00 0.4406

Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 5 2 OK 6 2 OK 5 2 OK 4 2

Level 3 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 3

Level 4 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 4 M OK 189,810.00 5,000.00

Level 5 R- 1 Occ. R- 1 OK 68,160.00 30,000.00

Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories SPS SPS 5 5

Level 6 B Occ.Area OK OK 97,470.00 6,000.00 0.0616

Height SPH SPH 85 85

Stories SPS SPS 6 6

WoodWorks- Anaheim 2015

*Building Area is Overlimit per Sec. 506.5.2 *Level 1 Area is Overlimit per Sec. 508.4.2

81,000.00

www.ara4help.comhelp is one click away

Select the Code

Sprinklers Throughout per 903.3.1.1 Sprinklers Throughout per 903.3.1.1

2010 CBC

2007 CBC

2013 CBC

Page 18: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Total Building Area (s.f.): of ratios

CHA Per Occupancy Group @ Each Level: UL  -­‐ Unlimited S PH  -­‐ S prinklers  used  for  Height  increase for building

NP  -­‐ Not  P ermitted S P S  -­‐ S prinklers  used  for  S tory  increase 2.5124

OL  -­‐ Over  P ermitted  L imit S PA  -­‐ S prinklers  used  for  Area  increase

Result Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed of ratios

Level 1 A- 2 Occ. A- 3 Occ. M Occ. B Occ. per Level

Area OL OK 19,880.00 6,000.00 OK 19,880.00 18,000.00 OK 63,270.00 3,000.00 OK 97,470.00 5,000.00 1.3060Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 4 1 OK 4 1 OK 5 1 OK 6 1

Level 2 M Occ. B Occ. R- 1 Occ. A- 3 Occ.Area OK OK 63,270.00 2,000.00 OK 97,470.00 8,000.00 OK 34,080.00 6,000.00 OK 19,880.00 3,000.00 0.4406

Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 5 2 OK 6 2 OK 5 2 OK 4 2

Level 3 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 3

Level 4 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 4

Level 5 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories SPS SPS 5 5

Level 6 B Occ.Area OK OK 97,470.00 6,000.00 0.0616

Height SPH SPH 85 85

Stories SPS SPS 6 6

81,000.00

2013  CBC  Building  Height  &  Area  Calculator  

of ratios

Page 19: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Version: 13-CBC-02 Expires: 1/12/2016

Type of Construction: Special notes:Max Permitted Height

Building Height (ft): 85 W/out Sprinklers (ft): 65Number of stories: 6

I f = 0.4200

(not substituted for 1hr construction)

Floor # Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.)

1 6,000.00 18,000.00 3,000.00 5,000.00 32,000.00 CHA Overall Building:

2 2,000.00 8,000.00 6,000.00 3,000.00 19,000.00 Area: OLHeight: SPH

3 8,000.00 8,000.00 Stories: SPS

4 8,000.00 8,000.00

5 8,000.00 8,000.00 CHA Per Each OccupancyGroup @ Entire Building:

6 6,000.00 6,000.00 (Sec. 506.4.1)

Occup. Result Permitted Proposed

Total Building Area (s.f.): of ratios

CHA Per Occupancy Group @ Each Level: UL  -­‐ Unlimited S PH  -­‐ S prinklers  used  for  Height  increase for building A- 2 OK 39,760.00 6,000.00

NP  -­‐ Not  P ermitted S P S  -­‐ S prinklers  used  for  S tory  increase 2.5124 A- 3 OK 39,760.00 21,000.00

OL  -­‐ Over  P ermitted  L imit S PA  -­‐ S prinklers  used  for  Area  increase

Result Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed Result Permitted Proposed of ratios

Level 1 A- 2 Occ. A- 3 Occ. M Occ. B Occ. per Level B OK 292,410.00 19,000.00

Area OL OK 19,880.00 6,000.00 OK 19,880.00 18,000.00 OK 63,270.00 3,000.00 OK 97,470.00 5,000.00 1.3060Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 4 1 OK 4 1 OK 5 1 OK 6 1

Level 2 M Occ. B Occ. R- 1 Occ. A- 3 Occ.Area OK OK 63,270.00 2,000.00 OK 97,470.00 8,000.00 OK 34,080.00 6,000.00 OK 19,880.00 3,000.00 0.4406

Height SPH SPH 85 85 SPH 85 85 SPH 85 85 SPH 85 85

Stories OK OK 5 2 OK 6 2 OK 5 2 OK 4 2

Level 3 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 3

Level 4 R- 1 Occ.Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories OK OK 5 4 M OK 189,810.00 5,000.00

Level 5 R- 1 Occ. R- 1 OK 68,160.00 30,000.00

Area OK OK 34,080.00 8,000.00 0.2347

Height SPH SPH 85 85

Stories SPS SPS 5 5

Level 6 B Occ.Area OK OK 97,470.00 6,000.00 0.0616

Height SPH SPH 85 85

Stories SPS SPS 6 6

WoodWorks- Anaheim 2015

*Building Area is Overlimit per Sec. 506.5.2 *Level 1 Area is Overlimit per Sec. 508.4.2

81,000.00

www.ara4help.comhelp is one click away

Select the Code

Sprinklers Throughout per 903.3.1.1 Sprinklers Throughout per 903.3.1.1

2010 CBC

2007 CBC

2013 CBC

Page 20: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

2013  CBC  Building  Height  &  Area  Calculator  

CHA Per Each OccupancyGroup @ Entire Building:

(Sec. 506.4.1)

Occup. Result Permitted Proposed

A- 2 OK 39,760.00 6,000.00

A- 3 OK 39,760.00 21,000.00

B OK 292,410.00 19,000.00

M OK 189,810.00 5,000.00

R- 1 OK 68,160.00 30,000.00

13-CBC-02 Expires: 1/12/2016

Special notes:

CHA Overall Building:

Area: OLHeight: SPHStories: SPS

*Building Area is Overlimit per Sec. 506.5.2 *Level 1 Area is Overlimit per Sec. 508.4.2

Page 21: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Area  Increase  Due  to    Frontage    

0.0000 Area increase due to frontage

0.000.00

0.0000

Point #LWall (ft)Yard (ft)

Point #LWall (ft)Yard (ft)

Point #LWall (ft)Yard (ft)

3 41 2 5 6 7 9 12 138 10 11

15 16 17 18 19

0.00

21 22 23 2513 14 20 24

29 30 31 3225 26 27 28 33 34 35 36 37

0.00

(I f )

(F)

(P)

(W/30)

ara4help.comhelp is one click away

Check if the Building meets req's of Sec 507 except 60' yards

Area Increase Due to Frontage

Page 22: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

23 South Ave (60')

Wes

t St

(60'

)

120'

New Building

60'

60'50' 30

'

20'

10'

70'

20'

10' 40'

30'

10'

30'

10'

60'

20'20' 40'

Existing Building

P.L.

P.L.

P.L.

P.L.

N

11

1 2

14

5

4

3

10

6

9

78

12 13

Page 23: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

24

Determining the Grade Plane Grade Plane Elevation (GPE)

Page 24: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Grade Plane Calculator

Point #

Elevation

Length (ft)

Point #

Elevation

Length (ft)

Point #

Elevation

Length (ft)

Point #

Elevation

Length (ft)

Point #

Elevation

Length (ft)

∑(En+En+1)xLi/2∑Li

Grade plane Calculator 106.24

19336.15

182.00 Grade plane Elevation: 106.24

45 46 47 48 49 50 51

0.00

=

52 53 54 55 56

4542 43 4434 35 36 37 38

0.00

39 40 41

28 29 343223 24 25 26 27

20.00 0.00 10.00 0.00 10.00

23

109.83 110.83 110.53 110.53

21 2220

110.83 102.83

12 13 14 15 16 17 18 19

1 2 3 4

102.83 106.83 106.83 107.60

9

104.84

10 11 125 6 7 8

109.83

7.42 7.05 6.93 21.00 61.00 0.00 0.00

107.35 105.68

11.00 21.00 0.00 6.60

104.83 109.83102.83108.01

33

0.00

30 31

Page 25: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

2013  CBC  Building  Height  &  Area  Calculator  EXAMPLE  

Version:

Type of Construction: ← SelectMax Permitted Height

Building Height (ft): ← Input W/out Sprinklers (ft):

Number of stories: ← Input InputI f =

(not substituted for 1hr construction)

Floor # Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.) Occup. Area (s.f.)

1

2

3

4

5

6

Total Building Area (s.f.): of ratios

WoodWorks- Anaheim 2015 www.ara4help.comhelp is one click away

Select the Code

Sprinklers Throughout per 903.3.1.1 Sprinklers Throughout per 903.3.1.1

2010 CBC

2007 CBC

2013 CBC

Page 26: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Other  Sofware  Applica<ons…  

•   Cha-­‐Cha  for  2006,  2009  &  2012  IBC  •   Cha-­‐Cha  for  2007,  2010  &  2013  CBC  •   Plumbing  Fixtures  Calculators  for:  

–   2007,  2010  &  2013  CBC/CPC  –   2006,  2009,  2012  &  2015  IBC/IPC  –   2007  FBC-­‐  Plumbing  (Florida)  

•   Sound  Transmission  Class  (STC)  •   etc…  

Page 27: Heights and Areas Using Software to Ease Building Code ...€¦ · Presented by: Ara Sargsyan, PE, CBO, LEED AP December 2015 Heights and Areas Using Software to Ease Building Code

Ques/ons?  

This  concludes  The  American  Ins<tute  of  Architects  Con<nuing  Educa<on  Systems  Course  

Ara  Sargsyan,  PE,  CBO,  LEED  AP  www.ara4help.com  [email protected]