Heating solutions for commercial and municipal applications Tailored, optimised, guaranteed

48
Heating solutions for commercial and municipal applications Tailored, optimised, guaranteed

Transcript of Heating solutions for commercial and municipal applications Tailored, optimised, guaranteed

Heating solutions for commercial and municipal applications Tailored, optimised, guaranteed

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:21 Uhr Seite 1

ELCO – Europe’s leading brand for commercial

and municipal heating solutions

Heating solutions that inspire

ELCO combines consulting, products, systems and service into complete heating solutions.

It offers intelligent, energy-saving technology that enables users to manage the heat and

hot water convenience based on their particular requirements and by working closely with

our specialist heating partners.

Consulting

Products

Systems

Service

2

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:21 Uhr Seite 2

Strong

1.7 mill.

Excellent

Leading

Pioneer

Relevant

• ELCO is a member of the Ariston Thermo Group,

one of the world’s leading companies in the

area of heating and warm water, with more than

6,500 employees.

• Over 1,700,000 installed heating systems in

Europe. ELCO is the market leader in Switzerland.

• ELCO offers excellent heating solutions for renova-

tion, modernisation and new buildings. The range

of applications covers everything from private

flats through commercial applications to large,

industrial plants.

• ELCO is the leading supplier of heating solutions

for commercial, municipal, industrial and private

customers.

• ELCO is one of the worldwide pioneers of the

modern condensing technology, burners and

solar units.

• Whether planner, heating fitter or operator – at

ELCO, each customer receives the advice that best

meets his or her individual requirements. To ensure

this, we offer a service that sets standards in the

sector. For maximal functional reliability and energy

efficiency over the entire lifetime of the system.

3

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:21 Uhr Seite 3

Consulting – ELCO is always at your side

Through efficiency to the optimal heating solution With ELCO, your benefits can be reduced to one concept:efficiency. In practice, this means simple planning, reliableimplementation, optimal system function. Your personalcontact gives you comprehensive advice, and calculatesthe investment costs, the annual operating costs and thepossible subsidies for you. This is supported by the Elconsultplanners’ software, the fastest path to a customer-specificheating solution. ELCO follows your building from the callfor tender through the heating installation to final accep-tance. In addition, you will find texts for tender requests,hydraulics diagrams, legal regulations and product infor-mation on the ELCO Planner website. The result is a tailor-made heating system with an excellent cost-benefit balance.

Energy-optimised heating solutions from the family hotelon the North Sea coast to the Olympic Village in Peking Everyone is talking about heating systems. ELCO is alreadya step further, with solutions oriented directly on the require-ments of operators in the commercial and municipal sectors.Whether renovation, new construction, modernisation orretrofitting – heating solutions by ELCO optimally meet therequirements of the building and the needs with regard toenergy source, energy savings, convenience, reliability andinvestment costs. The benefit is that an ELCO heating solu-tion is always complete, from the equipment through theservice to the calculated energy savings and possible sub-sidies. And of course, the ELCO heating solutions areespecially environment-friendly.

4

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:21 Uhr Seite 4

Associated Architects, Birmingham State of the art: the ELCO heating solution for one of the most innovative architects’ offices

Lindner Congress Hotel, Düsseldorf Economical heating comfort for a luxury hotel

Watermark Place, London Efficient gas condensing technology and an "Excellent" for sustainable building

5

Continuous care ELCO takes care of you and your building from the planning of the heating solution through the installation and commissioning of the system component to acceptance.

Reliable planning ELCO supports you in creating the planning documents with a tender plus hydraulics diagram, solar and heat pump simulation, and profitability calculations.

DatabaseELCO creates individual, project-specific system documentation (hydraulics drawings, electrical circuit diagrams, controller parameterisation, etc.) for each customer. These documents are deposited centrally with ELCO, so that we can later give directed support for the project, should this be necessary.

Planers’ forum ELCO holds regular symposiums, where well-known speakers keep you informed of the latest innovative heating solutions, and where you can exchange views with colleagues.

ElconsultWith Elconsult, ELCO offers you an innovation that gives you optimal assistance in your search for and implementation of heating solutions for your customers. This unique online consulting programme contains all the data that you need in the areas of sales, execution and service. Bundled andstructured so that you can access it in seconds.

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:22 Uhr Seite 5

Products/Systems – with an ELCO heating solution,all the components are perfectly harmonised

Complete product portfolio for heating and warm water ELCO offers a wide spectrum of products for the mediumand high performance ranges in commerce and publichousing. All types of energy can be used: oil and gas aswell as renewable energies. Our condensing units arecompact and quiet, modulating and highly effective. In the area of renewable energies, we offer highly efficientvacuum-tube and flat collectors for warm water processingand auxiliary heating. A great variety of heat pumps thatare quick and simple to install gives you great freedom inyour planning.

For us, “system” means best energy efficiency with maximum convenienceAt ELCO, the system components supplement each otherperfectly. This gives the user tangible added value: moreperformance, less energy consumption and sustained quality and economy. This saves you, as the planner, timein the implementation phase. ELCO heating systems can beextended at will, whether through warm water storages ofany size, extensions for under-floor heating or a swimming-pool, or the later installation of a solar plant.

ELCO system components: • Central heating units (burners, condensing units,

heat pumps) • Storages (warm water storages, solar storages,

buffering storages) • Pump assemblies • Controllers (intelligent, digital control equipment,

including solar technology)

6

Two cascaded RENDAMAX 3400 gas condensing boilersTotal power: 3.680 kW.

Condensing units wall-mounted or standing, from 0.9 to 1,840 kW

Burners from 10 kW to 45 MW, for commerce and industry

Solar collectors for solar warm water processing and auxiliary heating

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:22 Uhr Seite 6

7

Only the perfect interplay of all components brings out the full performance potential of a heating system.

Heat pumps Brine/water water andair-water from 5.4 to 113.6 kW

System components Warm water storages, controllers, pump assemblies

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:23 Uhr Seite 7

Service –long-term reliability in function and cost

With ELCO you are always on the safe side

Modern heating systems in commerce and the public sector

demand sophisticated technology and complex electronics.

So it is very important these days to have a system with a

“full service history.” After all, it should work economically with

low emissions for a whole heating lifetime. That is why ELCO

offers an unsurpassed selection of flexible service and main-

tenance items. Our current offers range from commissioning

and regular visual inspection to many years’ service and reli-

ability. Whether extended guarantee, free fault removal with

original replacement parts, or regular maintenance – at ELCO

you will find the service solution that suits your system best.

For long-term reliability in function and cost.

8

Reap the benefits of service:

• Professional commissioning

• Extended service for more reliability

• Calculable maintenance and replacement-part costs

• Constantly low energy consumption

• High degree of reliability and long lifetime

• Automatic conformance to legal regulations

• Professional service through well-trained service

employees

• Quick reaction and high availability of original

replacement parts for first-time removal of faults

• Extended guarantee

The promise: You can rely on ELCO – guaranteed!

We offer you all the services that keep you on the safe side.

Like a dense network of service technicians, who assist the

heating specialist or the operator directly, should the worst

come to the worst. You can rely on ELCO – guaranteed. A

service contract with ELCO minimises the risk in the case

of a failure (e.g. curtailment of rents). And the costs remain

planable for the operator. The ELCO service packages are

perfectly tailored to the energy-optimised heating systems

in commercial or public buildings.

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:23 Uhr Seite 8

9

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:23 Uhr Seite 9

Referencias

项目手册

РеференцииReferenze

Références

Referenties

Referenzen

References

Refe

renc

es/R

efer

enze

n

148,5 mm

Referenzen_Register_RZ.indd 1 22.12.10 13:41

Referenciák

Renovation:Moriggia Pelascini Hospital, Gravedona

Higher effi ciency, lower energy costs – thanks to state-of-the art condensing boiler technology

The “Ospedale Moriggia Pelascini”, with 210 beds,is situated in the picturesque, tranquil location of Gravedona, on the northern bank of the Comer Lake, in the Lombardy region. The hospital’s entire heating system was ageing and too costly to run. Consequently, the planning of a new heating sys -tem was essential.

The brief was to replace the old boilers with new, modern ones. The decisive factors for the planned renovation were fi rstly the improvement of the system’s cost-effi ciency in order to reduce costs, and secondly to signifi cantly reduce of the emis -sions in order to meet the requirements of the local legal regulations. ELCO had the solution ready on hand - namely, the gas condensing boilers RENDAMAX 3605, which tick all the boxes in terms of cost-effi ciency and emission values.

LocationMoriggia Pelascini Hospital Italia Hospital S.p.A. Via Pelascini, 3 22015 Gravedona

CustomerItalia Hospital S.p.A.

BENEFITSEffi ciency• High standard effi ciency factor up to 109.8 %• Infi nitely adjustable modulation in the range 1:4• High effi ciency

Convenience• Compact system unit comprising boiler

and burner• Integration possible into existing control

systems and building services control systems

• Low installation time – all the components are optimally preset

Savings• Extremely high energy cost savings• Signifi cant reduction of CO2 emissions• Highly attractive price/performance ratio

PlanningGarelli New Energy Tech Ing. Maurizio GarelliVia Bravetta 452 00164 Roma

InstallationCMS Service Massimo Corlito Via Aldo Moro 87 31100 Treviso

elco_Ref_Gravedona_Hospital_EN 4c RZ.indd 1 07.01.11 11:56

High-performance condensing boiler technology

With their innovative technology and compact dimensions, the gas condensing boilers from the two RENDAMAX series 3600/3400 are extremely effi cient in the medium and upper output range. Accordingly, they are ideally suited for use in large properties and commercial buildings.

• Eleven output ranges from 639 kW to 1,189 kW.• Infi nitely adjustable modulation in the range 1:4.• High standard effi ciency factor up to 109.8 % with

RENDAMAX 3600, standard effi ciency factor up to 103 % with RENDAMAX 3400.

• Compact system unit comprising boiler and burner, low weight.

• Extremely low emissions.• Very quiet running.• Timer and weather controls for up to 14 mixer circuits.• Integration possible into existing control systems and

building services control systems (DDC 2-12V).• Built-in premix burner.

ELCO Italia S.p.A.Via Roma, 64I-31023 Resana (TV)

Tel. +39 (0) 423 71 60Fax +39 (0) 423 71 6380www.elco.net

The new system

The RENDAMAX 3605 gas condensing boiler from ELCO was the perfect system for meeting the current requirements in terms of cost-effi ciency and emission values. And it also satis-fi es the requirements of the local, legal regulations in terms of environmental protection. The RENDAMAX 3605 also offers further advantages – thanks to its compact dimensions, it is highly space saving and very quiet when in operation.

Thanks to its effi ciency and its high standard effi ciency factor of up to 109.8 %, the ELCO gas condensing boiler not only saves energy costs, but also, thanks to its low emissions, makes a valuable contribution to climate and environmental protection.

Environmentally friendly plus high effi ciency factor – the RENDAMAX 3605 gas condensing boiler

Moriggia Pelascini Hospital is situated in the well-known delightful little tourist location of Gravedona (population of around 2800), on the Comer Lake. The hospital has 210 beds. In terms of the medical services patients enjoy excellent care in a modern hospital facility. The small hospital has over 12 clinical departments, which include general medicine, surgery, neurology, intensive care and rehabilitation. Following the extensive renovation, the hea ting system is now also right up to date.

Moriggia Pelascini Hospital – small but versatile

New system

R 36051,043 kW at 80/60 °C298 kW 109.8 % at 40/30 °C1,330 mm1,405 mm

2,658 mm1,410 kg

Equipment

Gas condensing boilerOutput, full loadOutput, minimum loadStandard effi ciency factorWidth overall Height overall Length overall incl. connectionsWeight

Renovation:Moriggia Pelascini Hospital, Gravedona

elco_Ref_Gravedona_Hospital_EN 4c RZ.indd 2 07.01.11 11:56

Renovation: Manhattan Center –Sheraton Hotel & Thon Hotel, Brussels

First-class hotels –fi rst-class heating system

In the Manhattan Center, Brussels’ modern busi-ness complex, lies the Sheraton Hotel and the Thon Hotel – two of the city’s most exquisite hotels. In order to accommodate business travellers and tourists in style, a new conference centre has been built and the spacious rooms have been en hanced. In the scope of the renovation work, the joint heating system of the two hotels was also brought up to date. Two modern R600 gas condensing boilers will immediately replace the old standard gas burners.

ELCO has already successfully collaborated with the Manhattan Center Sheraton for several years. ELCO also convinced its customers for this order with exceptional service from the signing of the contract to the maintenance. The heating system was renovated without interrupting the operation of the hotel thanks to the compact construction and the easy installation of the new heating sys -tem. It combines the highest degree of system

fl exibility with outstanding performance. The result is quality at a fair price and an investment that has quickly paid off.

CustomerStarwood Hotels and Resorts Worldwide, Inc. 1111 Westchester AvenueWhite Plains, NY 10604

User Manhattan Center SheratonCharles Rogier Square 31210 Brüssel

PlanningJean LinaresDu Boulevard Avenue1210 Brüssel

InstallationDidier DesplenterOude Postweg 17St.-Pieters-Leeuw

BENEFITSEffi ciency• Low volume of water for fast heat transfer• Consistently high effi ciency• Normal supply level 110.4 %

Convenience• Highest degree of system fl exibility• Compact and space-saving• Plug & Play principle

Savings• Energy savings of up to 35 %• Pollutant emissions 3 % lower than

with a standard system• Cost savings of € 80,000 in 7 months

elco_Ref_Manhatten Center_EN 4c RZ.indd 1 11.01.11 15:54

The benefi ts of the R600 boiler

This new generation of gas condensing boilers has been de veloped especially for greater performance requirements in commerce, industry and municipal housing. With heat ex -changers made from stainless steel and the patented com -bustion engineering, the R600 provides for minimal erosion and a consistently high degree of effi ciency and modulation. At the same time, the normal supply level is 110.4 %, meaning effi cient and environmentally-friendly energy production whilst emitting extremely few pollutants.

ELCO Belgium n.v./s.a.

Z.1 Researchpark 60

B-1731 Zellik

Tel. +32 (0) 2 463 19 05

Fax +32 (0) 2 463 17 05

www.elco.net

The new system

Both hotels combined have more than 1,000 rooms on 30 storeys. This enormous space required an effi cient heating system, which the R600 series by ELCO provides. Up to eight boilers and 15 mixer circuits can be synchronised, thereby generating up to 4,500 kW. Renovation using modern R600 gas condensing boilers enables 35 % energy savings com -pared to the old system. The result is signifi cant cuts in costs, namely up to € 80,000 in seven months. A weather-based electronic control reliably monitors all functions. All settings can be retrieved or changed using a digital display window.

In addition to its safe handling, another benefi t of the R600 gas condensing boiler is its easy assembly. Preassembled system kits for hydraulic separators and plate heat exchangers make it particularly easy to plan and install. This is the Plug & Play principle.

Feel-good heat for exquisite hotel comfort

Both hotels have central locations in the heart of the Belgian

capital. Directly across from the most vital shopping quarter

Rue Neuve, the old town with the Grand Place is only fi ve

minutes by foot. The hotels offer all services and amenities

that one would expect from a fi rst-class establishment. The

experienced and attentive hotel staff tend to their guests at

all hours and ensure maximum comfort. ELCO provides the

adequate heating comfort.

“Sheraton Hotel & Thon Hotel“ in the Manhattan Center in Brussels

Renovation: Manhattan Center –Sheraton Hotel & Thon Hotel, Brussels

Equipment

Gas condensing boiler Normal supply levelNominal heat outputDimensions (W x H x D)Weight (empty)

New System

R607110.4 %80.5 - 550 kW1,500 x 770 x 1,850 mm650 kg

elco_Ref_Manhatten Center_EN 4c RZ.indd 2 11.01.11 15:54

New building:Offi ce complex in Paddington Central, England

Outstanding BREEAM environmental rating thanks to innovative heating technology

Futuristic and ultra-modern. The offi ce complex built according to plans drawn up by Sheppard Robson and Skanska, with around 24,154 m² fl oor space and with the address and name ‘One Kingdom Street’, is the most innovative project in Paddington Central. As one might expect, the building’s planners were also innovative in terms of the heating technology – whose eco-friendliness has been awarded a top rating with the BREEAM classifi cation ‘Excellent‘, with the NOx emission values even undercutting the best BREEAM standard by a signifi cant margin.

Five RENDAMAX 3600 boilers have been in -stalled – with a connection to the high and low-temperature heating circuits. They satisfy all the requirements in terms of effi cient heating output and energy management. Three boilers supply the air conditioning and ventilation systems and the under-fl oor heating for the entire fl oor space, whilst the two smaller boilers supply the hot water and radiator heating systems.

CustomerOne Kingdom Street PaddingtonCity of WestminsterLondon W2

BuilderSkanska

BENEFITSEffi ciency• Precise controllability with high effi ciency• High effi ciency factor (109.8 %)• Extremely low emission values

(CO2< 15 mg/m³, NOx < 35 mg/m³)

Convenience• High degree of modulation 1:4,

fl exible output adjustment• Compact system unit comprising

boiler and burner

• Very low space requirement and low weight• Water-cooled premix burner

Reliability• Optimum operating reliability in

cascade connection• Timer and weather controller for up to

15 mixer circuits

elco_Ref_Paddington_EN 4c RZ.indd 1 11.01.11 13:49

With emission values of only 11.5 mg/kWh, the RENDAMAX

3600 undercuts the best BREEAM standard by a signifi cant

margin.

Martin McLaughlin, Specifying Consultant at Faber Maunsell

explains: ‘The low NOx emissions of the boilers were a major

contributory factor to the excellent BREEAM classifi cation of

the building. The space saved in the machine room was also

made possible by the compact design of these boilers.’

ELCO UK

MHS Boilers Ltd

3 Juniper West, Fenton Way

Southfi eld Business Park

Basildon, Essex

SS15 6SJ, UK

Tel. +44 (0) 12 68 54 67 00

Fax +44 (0) 12 68 88 82 50

www.elco.net

The new system

The fi ve state-of-the-art RENDAMAX 3600 condensing boilers

with gas pre mix burners from stainless steel have a total out-

put of 4.5 MW. They excel with their outstanding thermal out-

put, low consump tion, low sound level and low NOx and CO

values – and what is more in highly compact form. This allows

a great deal of fl oor space to be saved. The RENDAMAX 3400/

RENDAMAX 3600 burners offer a power range of 660 kW

to 1.9 MW. The ability to connect up to 8 boilers in cascade

makes these condensing boilers the perfect solution for large

commercial buildings.

In Paddington Central, the three large RENDAMAX 3605 boilers

supply the air conditioning and ventilation systems, the central

convectors and the warm-air heating of the whole building.

Two smaller boilers ‘manage’ the heating circuits with a fl ow

temperature of 80 °C for the heating and hot-water generation.

Modulating, water-cooled gas premix burners ensure maxi-

mum effi ciency coupled with minimum NOx emission values.

Maximum calculation and planning reliability – thanks to long-life service package for a fi xed price

BREEAM (Building Research Establishment Environmental

Assessment Method) is the leading and world’s most widely

used certifi cation method for buildings according to which

today over 110,000 buildings are already certifi ed and over

500,000 are already registered for certifi cation.

BREEAM comprises numerous, wide-ranging environmental

and sustainability aspects and enables, for example, architects

and project developers to provide proof of the environmental

standards of their buildings to their planners and clients.

BREEAM – a standard for eco-friendliness

New building:Offi ce complex in Paddington Central, England

New system

5 gas condensing boiler R 36004.5 MW

106 % /109,8 %4 high-performance storage tanks each 1,000 l with external heat exchanger

3,200 MWh/year

Equipment

BoilersTotal outputStandard effi ciency factor Storage tanks

Total energy consumption

elco_Ref_Paddington_EN 4c RZ.indd 2 11.01.11 13:49

Renovation:Lyon town hall and opera

Two historical buildings benefi tting from the most modern heat comfort

The “Hôtel de Ville“ in Lyon is one of the city’s most important historical monuments. It is found between Place des Terreaux and Place de la Comédie, directly across from the opera. The building has been protected as a historical monument since 1886. The “Opéra Nouvel” houses the National Opera of Lyon. The opera house was originally built in 1831, before well-known French architect Jean Nouvel put signifi -cant time and effort into converting it between 1985 and 1993. As a result, the building was then named after him.

The heating systems of the two buildings were, like in many other communities, technically out -dated and oversized. The result was high exhaust gas temperatures, discomfort and signifi cantly excessive heating costs. ELCO had scored with the city for many years with its reliable customer service. The old system registered virtually no disruptions. This also played a role in the deci-

CustomerVille de Lyon 1, Place de la ComédieF-69001 Lyon

PlanningServices Techniques – Direction de la Construction Place Louis Pradel F-69205 Lyon

BE Tellitech 62 Rue du Professeur Roux F-69200 Venissieux

InstallationIDEX 26Rue 35ème Régiment d‘Aviation F-69500 Bron

sion to go with a modern heating solution by ELCO in the course of the renovation. Two RENDAMAX 3504 gas condensing boilers today provide both buildings with central, energy-saving heat.

BENEFITSEffi ciency• Normal supply level 105.1%• Flexible adjustment of output:

modulation ratio 1:4• Investment quickly pays off

Convenience• Boilers can be dismantled in the case of

diffi cult placement• Easy assembly and maintenance• Fully electronic, easy-to-operate controls

• Low emissions and quiet operation• Low weight

Savings• Signifi cantly lower energy use• Minimal, space-saving installation• Low maintenance

elco_Ref_Rathaus_Opernhaus Lyon EN 4c RZ.indd 1 12.01.11 10:00

RENDAMAX 3504 condensing boilers: strong, effi cient and compact

Very high heat output in compact form, low consumption and low NOx and CO values – these are the characteristics of the RENDAMAX 3500 series gas condensing boilers. The series includes a total of fi ve different sizes, which cover out puts ranging from 613 to 1,000 kW. The model series is also ex-cellent for both renovation and new buildings. Long assembly times are not an issue: RENDAMAX 3500 gas condensing boilers are delivered complete from the plant with a built-in pre-mix boiler and custom-fi tted mountings. All components are pre-set and tested before delivery.

ELCO FranceCarré Pleyel - 5, Rue PleyelF-93521 Saint-Denis Cedex (Paris)

Tel. +33 (0) 1 55 84 94 94Fax +33 (0) 1 55 84 96 08www.elco.net

The new system

In order to provide the “Hôtel de Ville” and, as needed, the “Opéra Nouvel” with central heat from a boiler room, two modulating RENDAMAX 3504 gas condensing boilers were connected in a cascade. The advanced boiler management with load control and automatic digital fi ring devices also enabled the system to be connected to the existing building control system. The two buildings are connected by pipe systems underground. When needed, the opera house can also be heated easily and at low cost in addition to the base heating system installed there. The low volume of water and the compact heat exchangers allow for a fast, direct and effi cient transfer of heat. The central digital control offers the most operating and maintenance ease.

The RENDAMAX 3504 had another advantage. It had very close access to the historical building‘s central engineering room. Because the ELCO boilers can be dismantled and reassembled easily and quickly on site, this led to no problems whatsoever.

Custom-made, energy-saving technology

The theatre and later opera house of Lyon was originally built in an Italian style in 1831. It had a horseshoe-shaped hall, which was lined with rows of loges. The new construc-tion still has the same lobby and exterior. Nouvel tripled the area of the building. He achieved this by excavating one of the underground storeys, where the rehearsal rooms were located, and through an attention-grabbing barrel-shaped construction of steel and glass on the roof. This doubled the height of the building and covered the stage area.

The “Opéra Nouvel”: An architectural milestone

Renovation:Lyon town hall and opera

Equipment

Gas condensing boiler Nominal heat outputNormal supply levelOverall heightOverall width Weight

New System

Two R 35042 x 906 kW105.1 % 1,400 mm1,330 mm**1,070 kg

**without encasement less 64 mm

elco_Ref_Rathaus_Opernhaus Lyon EN 4c RZ.indd 2 12.01.11 10:00

New building:Parkstad Limburg Stadion, Kerkrade, Netherlands

The new star of the stadium: The RENDAMAX 3605

The vision for heating the new Parkstad Limburg Stadion in Kerkrade had been clearly defi ned: an effi cient, high-quality heating system in a cascade solution. The standards had been set high. The system is to cover the energy needs for the pitch heating system, the hot water for all showers and the home team Roda JC’s swimming pool as well as the heat for the offi ces and public lounges (air conditioning and radiators).

Those responsible for building the stadium chose three RENDAMAX 3605 gas condensing boilers, which provide overall heating power of around 3,300 kW. Another criterion in their decision was the fact that both the installation company Imtech and ELCO are in the area near to the football stadium. Moreover, the two companies had

established a good collaboration over the years that could be of benefi t.

Location Parkstad Limburg Stadion Roda JC, Roda JC Ring 1 6466 NH Kerkrade Netherlands

Installation Imtech Building Services Wiebachstraat 9 6466 NG Kerkrade Netherlands

BENEFITSEffi ciency• High effi ciency level of up to 109.8 %• Continuous modulation ratio of 1:4• Most modern, effi cient heating technology

Convenience• Compact system unit of boilers and burners• Weather compensated regulation with clock

program for up to 15 mixing zones

• Integration into existing controls andbuilding management systems possible

Savings• Particularly attractive cost-benefi t ratio• Extremely low emissions• Minimal assembly effort

elco_Ref_RODA JC_EN 4c RZ.indd 1 10.01.11 09:15

RENDAMAX – Peak output in the upper range

The RENDAMAX 3400 and 3600 series are ideal for use in larger real estate and commercial properties. Here they cover the upper power range all by themselves – in 11 power ranges from 639 kW to 1,189 kW. The RENDAMAX 3400 series offers an optimal cost-benefi t ratio when high design temperatures are required and a high degree of effi ciency in the case of a very high normal supply level. Additional advantages include the compact dimensions, the particularly quiet operation and the extremely low emissions.

ELCO Heating SolutionsRendamax BVHamstraat 76NL-6465 AG Kerkrade

Tel. +31 (0) 45 75 186 00Fax +31 (0) 45 56 699 10www.elco.net

The new system

The installation of the heating system was planned under the roof. For this reason its weight took on particular signifi cance. The RENDAMAX 3605 was very convincing given the fact that it was designed for very little water content (only 117 litres for 1,097 kW), thus making it substantially lighter than comparable burners. The advantage resulting from this is that the roof construction did not need to be additionally strengthened.

The ratio between the heat output and the size of the gas con-densing boiler has allowed for a relatively compact central heating room. This has enabled more space for air condition-ing and other technical systems. The option of operating the RENDAMAX 3605 gas condensing boiler with low gas pressure (min. 25 mbar) reduced the size of the gas booster for the central heating room. The overall capacity of the boilers is roughly 3,300 kW.

Home game for RENDAMAX: With maximum power and the highest degree of effi ciency

The Dutch football club Roda JC (Sport Vereniging Roda Juliana Combinatie Kerkrade), whose fi rst team plays in the top football league in the Netherlands, has played its home games at the Parkstad Limburg Stadion since August 2000. The stadium, located in the Kerkrade community, was built between 1999 and 2000 and can fi t up to 20,000 spectators. Roda JC inaugurated the stadium on 15 August 2000 in a friendly match against Real Zaragoza from Spain.

Parkstad Limburg Stadion: The home arena of Roda JC

New building:Parkstad Limburg Stadion, Kerkrade, Netherlands

Equipment

Gas condensing boilerFull load output at 80/60 °C Minimum load outputNormal supply level at 40/30 °COverall dimensions (W x H x D) Weight

New System

R 36051,043 kW298 kW

109.8 %1,330 x 1,405 x 2,658 mm1,410 kg

elco_Ref_RODA JC_EN 4c RZ.indd 2 10.01.11 09:15

New building: Watermark Place, London

Inspected and found to be “excellent” –thanks to highly effi cient heating technology

Gigantic and ultra-modern. The huge building com plex Watermark Place in London is an offi ce building with 14 storeys and a fl oor space of 42,350 m². Shortly after its completion, the build -ing was awarded the BREEAM classifi cation “Excellent” for sustainable building, which means: realising the minimisation of the consumption of energy and resources. A contributory factor to achieving this was the installation of the very latest, environmentally friendly gas condensing boilers RENDAMAX 3604, which signifi cantly undercut the NOx emission values for the best BREEAM standard.

The energy-effi cient gas condensing boilers from the RENDAMAX 3600 series supply the fan coils, underfl oor heating systems, radiators, warm-air circulation heating systems and air conditioning systems of the building. The specifi cations expert

CustomerWatermark Place 1 Angel LaneLondon EC4

Executing technical partnerWaterman Building Services Versailles Court, 3 Paris Garden London SE1 8ND

BENEFITSEffi ciency • Precise controllability with high effi ciency• Optimum standard effi ciency factor (>109.8 %)• 14 kW per m² greater output than a

comparable boiler• Extremely low pollutant emissions

Mark Tern drup from Waterman Building Services explains: “These have been our boilers of choice for a long time, because they satisfy both the tech -nical requirements and also the cost-effi ciency criteria specifi ed in our major contracts.“

Convenience• High degree of modulation,

fl exible output adjustment• Complete system kits, simple installation• Very low space requirement• Low weight, simple incorporation• Maintenance and service-friendly

Reliability• Optimum operating reliability in

cascade connection

elco_Ref_Watermark_EN 4c RZ.indd 1 05.01.11 14:59

Services to match the heating system

Modern heating systems are packed with sophisticated techno-

logy and complex electronics. Particularly in commercial and

public buildings, it is essential to have a system with a full ser -

vice history. The failure of the heating system can have dire con -

sequences in these buildings, resulting in production losses, rent

cuts and action for damages. Schools and hospitals also need to

be able to rely on trouble-free operation. For this reason, ELCO

offers the right services to match each heating system and every

requirement. From the professional commissioning, to the routine

maintenance through to servicing and reliability checks over

many years. Assure yourself long-term functional reliability and

cost certainty with an ELCO service agreement.

ELCO UK

MHS Boilers Ltd

3 Juniper West, Fenton Way

Southfi eld Business Park

Basildon, Essex

SS15 6SJ, UK

Tel. +44 (0) 12 68 54 67 00

Fax +44 (0) 12 68 88 82 50

www.elco.net

The new system

The RENDAMAX 3604 gas condensing boiler produces a highly

effi cient output per ground area of around 380 kW/m² and an

output-to-weight ratio of 0.98 kW/kg. This is approx. 14 kW per m²

greater output than a comparable boiler that also almost weighs

twice as much, with far bigger dimensions. The mo dulating, water-

cooled premix burner ensures maximum com bustion effi ciency –

and what is more with extremely low NOx emission values of just

11.5 mg/kWh, i.e. signifi cantly below the BREEAM standard.

The heat exchangers, fully equipped with stainless steel com po -

nents, increase the durability and service life of the RENDAMAX

3400/RENDAMAX 3600 SB series. The modulating premix burners

with innovative water cooling excel with their precision controll-

ability coupled with high effi ciency and clean combustion

processes. Thanks to rated output ranges of 660 kW to 1.9 MW

and the option of connecting up to 8 boilers in cascade, the

RENDAMAX 3400/RENDAMAX 3600 SB gas condensing boilers

are ideal for use in commercial buil dings, such as offi ce blocks,

schools, shopping centres, hotels, residential buildings and

district heating plants.

New building: Watermark Place, London

ELCO gas condensing boilers utterly convincing

There are various rating systems and certifi cates governing

the sustainability of buildings. BREEAM (Building Research

Establishment Environmental Assessment Method) is the most

widely used certifi cation system, which was compre hensively

updated in 2008.

In eight assessment categories, BREEAM awards a seal of quality

in four grades: excellent, very good, good or average. The

criteria take account of effects on global, regional, local and in -

door level. To date, over 100,000 buildings have been cer tifi ed

and over 500,000 registered in accordance with BREEAM.

BREEAM – the international certifi cate for sustainability

Equipment

Boilers

Rated power Total power Standard effi ciency factorStorage tanks

Total energy consumption

New system

4 gas condensing boilers R 3604cascaded4 x 995 kW3,980 kW

106 % /109.8 %4 high-performance storage tanks at1,000 l with external heat exchanger

3,200 MWh/year

elco_Ref_Watermark_EN 4c RZ.indd 2 05.01.11 14:59

Modernisation: “Das Zunfthaus zur Zimmerleuten“, Zurich

ELCO ensures pleasant heating and an outstanding energy balance

”Das Zunfthaus zur Zimmerleuten“, in Zurich has been freshly renovated and reopened in October 2010. A fi re back in 2007 gutted a large part of the building on the fi rst fl oor along with the party hall. The water used for extinguishing the fi re also however left noticeable traces, particularly in the rooms beneath this historic building, where the gas heating system was also affected, leaving it badly damaged and having to be replaced.

The newly restored splendour of the building also includes a high degree of comfort. This is ensured by a new, modern heating system from ELCO. Two wall-mounted R30 gas condensing boilers (each with 85 kW output) have been installed. This heat-ing system is very fuel-effi cient and excels with its low energy consumption and low pollutant emissions. As such, for the entire installations, it is possible to save up to 25 % energy compared with the old system.

CustomerZunft zur ZimmerleutenLimmatquai 40 CH-8001 Zürich

PlanningErnst Basler & Partner AG Bauingenieurbüro Mühlebachstrasse 11 CH-8008 Zürich

InstallationKoster AG Heizungen, Klimaanlagen, Lüftung Hermetschloostrasse 75 CH-8048 Zürich

BENEFITSEffi ciency• Standard effi ciency factor 110 % (at 40/30 °C)• Impressive modulation range of 1:6• Optimum heat transfer

Convenience• Very low space requirement• Very quiet running• Low weight, simple installation• Maintenance and service-friendly

Savings• Extremely low pollutant emissions• Short installation times• Signifi cant reduction of energy costs

elco_Ref_Zuerich_EN 4c RZ.indd 1 05.01.11 11:24

The R30 wall-mounted gas condensing boiler – a compact powerhouse

The spiral tube heat exchanger made from stainless steel

in the heart of the R30 ensures opti mum heat transfer and

achieves a standard effi ciency factor of 110 %. The R30 works

highly effi ciently, runs quietly and pro duces low pollutant

emissions. Being simple to install, main tenance-friendly and

offering a wide output range, the R30 is also ideally suited for

use in large installations.

Elcotherm AG

Sarganserstrasse 100

CH-7324 Vilters

Tel. +41 (0) 81 725 25 25

Fax +41 (0) 81 723 13 59

www.elco.net

The new system

The new technology for the time-honoured building came from

ELCO – namely, two R30 gas condensing boilers, connected in

cascade. The total thermal output of the two boilers is 170 kW

(2 x 85 kW). Thanks to the automatic adjustment of the burner

out put (modulation 1:12), combined with a weather-controlled

regulator, precisely the right amount of heat is always gene-

rated as and when required – this saves energy and reduces

emissions. The system supplies water heaters, air heaters, under-

fl oor heating and radiator heating systems.

For the planning and execution of the entire installations, only

those components could be considered that took up little space.

This was because in the only available utility room the space

available was extremely restricted – every centimetre counted.

The wall-mounted R30 from ELCO provided the perfect solu -

tion for this requirement. After all, compared with fl oor-mounted

boilers, this model makes it possible to save a few square metres

of valuable fl oor space.

Outstanding performance in the tightest of spaces – the ELCO system saves space and energy

„Das Zunfthaus zur Zimmerleuten“, originally called “Haus

zum Roten Adler“, is one of Zurich’s most important historic

buildings. It was built in its present form around 1708. The

oldest part of the building, a keep, dates back even as far as

the year 1156. The house is the headquarters of the “Zunft

zur Zimmerleuten”, but is also open to the public. “Das Zunft-

haus zur Zimmerleuten“ has a bar, a restaurant with terraces,

a conference centre and beautiful guild rooms. It is located

in one of the nicest areas of the city, directly on Lake Zurich.

“Das Zunfthaus zur Zimmerleuten“ – a building of historic importance

New system

R30 / 85 kW15.5 - 77.5 17.2 - 85.8 16.0 - 80.0 110.1 % 958 mm 465 mm 510 mm 65 kg 8.4 l 6 bar 70 °C

Equipment

Gas condensing boilerRated thermal output at 75/60 °CRated thermal output at 40/30 °CRated thermal load 8.6 – 60.7Standard effi ciency factor at 40/30 °C Height overall Width overallDepth overall WeightWater contentMax. permitted water pressureWaste gas temperature at 75/60 °C

Modernisation: “Das Zunfthaus zur Zimmerleuten“, Zurich

elco_Ref_Zuerich_EN 4c RZ.indd 2 05.01.11 11:24

Renovation: Lindner Congress Hotel, Düsseldorf

Economical cosiness for a luxury hotel

Innovative hotel concepts and a wide variety of relaxation facilities are the hallmark of the high-class hotels and resorts of the Lindner Hotel Group. One of their top establishments is the Lindner Congress Hotel, Düsseldorf. Excessive energy costs and warmth that no longer met modern requirements on comfort made it neces-sary to renovate the heating system. Two ELCO modulating gas condensing boilers formed the heart of the new system. The result was fl exible, comfortable heating and warm water that met all requirements – with the highest reliability and at calculable cost. The renovation was carried out parallel to the daily running of the hotel.

The RENDAMAX 3600

Double condensation for high energy utilisation The RENDAMAX 3600 low-temperature gas condensing boilers offer convincing fi gures at an attractive price in the upper per formance range of 639 to 1,043 kW. Thanks to double conden sation through a smooth-pipe and a ribbed-pipe heat exchanger, the standard effi ciency factor of the RENDAMAX 3600 is 109.8 %. All parts that come into contact with condensation are made of stainless steel, and are there -fore extremely resistant to corrosion. There is no return tem-perature limit. A three-stage boiler-circuit pump is installed ex works.

• Compact system unit comprising boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor (109.8 %). • Extremely low emissions. • Particularly quiet operation. • Timer and weather-infl uenced controls for up to

14 mixer circuits. • Integration in existing control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner.

Renovation: Lindner Congress Hotel, Düsseldorf

RENDAMAX 3600: Gas condensing boilers for highest effi ciency

ELCO GmbHDreieichstraße 10D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

Effi ciency• Reduction of operating costs by 20 % • Quick amortisation through energy savings

and reduced operating costs

Convenience • Flexible adjustment of power through wide

modulation range

BENEFITS • Hygienic warm water processing • Quick installation parallel to daily running

of the hotel

Reliability• One hundred percent operating reliability

through cascaded systems • Calculable costs through maintenance contract • Guaranteed service dispatch within 4 hours

Customer Lindner Hotels AGEmanuel-Leutze-Straße 17D-40547 Düsseldorf

Executing technical partner F. Schwenzer GmbH & Co. KGUlmenstraße 5D-40476 Düsseldorf

Prepared for solar energy The heating solution for the Hotel Lindner is prepared for optional retrofi tting of a thermal solar plant. For this, 20 fl at collectors with a gross area of 46 m² were installed. It was pos-sible to claim the BAFA subsidy for solar collector plants for this enhancement. There are also benefi ts from the KfW climatic protection fund and regional subsidisation programmes.

Technical Data R 3601 R 3602 R 3603 R 3604 R 3605

Power, full load at 80/60 °C kW 639 747 846 945 1,043

Power, minimum load kW 183 213 242 270 298

Standard effi ciency factor at 40/30 °C % 109.8 109.8 109.8 109.8 109.8

Width overall mm 1,330 1,130 1,130 1,330 1,330

Height overall mm 1,405 1,405 1,405 1,405 1,405

Length overall, including connections mm 2,265 2,653 2,653 2,653 2,658

Weight kg 890 1,040 1,150 1,280 1,410

elco_Referenz_Hotel Lindner_EN 4c RZ.indd 2-3 04.01.11 15:53

Renovation: Lindner Congress Hotel, Düsseldorf

Economical cosiness for a luxury hotel

Innovative hotel concepts and a wide variety of relaxation facilities are the hallmark of the high-class hotels and resorts of the Lindner Hotel Group. One of their top establishments is the Lindner Congress Hotel, Düsseldorf. Excessive energy costs and warmth that no longer met modern requirements on comfort made it neces-sary to renovate the heating system. Two ELCO modulating gas condensing boilers formed the heart of the new system. The result was fl exible, comfortable heating and warm water that met all requirements – with the highest reliability and at calculable cost. The renovation was carried out parallel to the daily running of the hotel.

The RENDAMAX 3600

Double condensation for high energy utilisation The RENDAMAX 3600 low-temperature gas condensing boilers offer convincing fi gures at an attractive price in the upper per formance range of 639 to 1,043 kW. Thanks to double conden sation through a smooth-pipe and a ribbed-pipe heat exchanger, the standard effi ciency factor of the RENDAMAX 3600 is 109.8 %. All parts that come into contact with condensation are made of stainless steel, and are there -fore extremely resistant to corrosion. There is no return tem-perature limit. A three-stage boiler-circuit pump is installed ex works.

• Compact system unit comprising boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor (109.8 %). • Extremely low emissions. • Particularly quiet operation. • Timer and weather-infl uenced controls for up to

14 mixer circuits. • Integration in existing control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner.

Renovation: Lindner Congress Hotel, Düsseldorf

RENDAMAX 3600: Gas condensing boilers for highest effi ciency

ELCO GmbHDreieichstraße 10D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

Effi ciency• Reduction of operating costs by 20 % • Quick amortisation through energy savings

and reduced operating costs

Convenience • Flexible adjustment of power through wide

modulation range

BENEFITS • Hygienic warm water processing • Quick installation parallel to daily running

of the hotel

Reliability• One hundred percent operating reliability

through cascaded systems • Calculable costs through maintenance contract • Guaranteed service dispatch within 4 hours

Customer Lindner Hotels AGEmanuel-Leutze-Straße 17D-40547 Düsseldorf

Executing technical partner F. Schwenzer GmbH & Co. KGUlmenstraße 5D-40476 Düsseldorf

Prepared for solar energy The heating solution for the Hotel Lindner is prepared for optional retrofi tting of a thermal solar plant. For this, 20 fl at collectors with a gross area of 46 m² were installed. It was pos-sible to claim the BAFA subsidy for solar collector plants for this enhancement. There are also benefi ts from the KfW climatic protection fund and regional subsidisation programmes.

Technical Data R 3601 R 3602 R 3603 R 3604 R 3605

Power, full load at 80/60 °C kW 639 747 846 945 1,043

Power, minimum load kW 183 213 242 270 298

Standard effi ciency factor at 40/30 °C % 109.8 109.8 109.8 109.8 109.8

Width overall mm 1,330 1,130 1,130 1,330 1,330

Height overall mm 1,405 1,405 1,405 1,405 1,405

Length overall, including connections mm 2,265 2,653 2,653 2,653 2,658

Weight kg 890 1,040 1,150 1,280 1,410

elco_Referenz_Hotel Lindner_EN 4c RZ.indd 2-3 04.01.11 15:53

The starting point

The old heating no longer met the requirementsA standard boiler with a jet burner and return riser and a power of 1 Gcal served to cover the base load. A second boiler of the same type covered the peak loads. Heating and warm water processing were distributed over 3 equipment rooms.

Hotel Lindner had rigorous requirements on warm water and heating comfort The energy costs made up too large a portion of the over-all operating costs of the hotel. The convenience of the heating and warm water did not meet the requirements. Hotel Lindner therefore decided on a new, modern heating solution. The greatest challenge was that the renovation was to be carried out parallel to the daily running of the hotel.

• Hotel with 230 rooms, 10,500 m² heated area • Energy consumption: 3,900 MWh

The new system

Cascaded gas condensing boilersTwo RENDAMAX 3603 gas condensing boilers are arranged in a cascade. This gives a total power of 1,692 kW, which is adjusted by mo dulation. The condensing boilers are of split HT/LT construction. This makes it possible for some 75 % of the annual heating operation to be kept within the condensing range. The heating solution achieves a standard effi ciency factor of 106/109.8 %.

The new heating system further reduces the temperature of the waste gases to below 80 degrees. Stand-by losses are reduced by the gradually raised boiler temperature. The central heating and the warm-water processing are located in 2 equip ment rooms. The harmonised, modular construction simplifi es installation. It was possible to maintain the daily running of the hotel.

The services to match the system:

COMFORT Service for fl exible coverage With the COMFORT Service, the new heating system is always optimally maintained. Fault-free operation is assured year after year.

• Cost transparency The COMFORT maintenance package protects the Hotel Lindner for at least 1 year from increasing maintenance costs. At the end of each year, the contract is automatically renewed for a further year. Signing the contract at commissioning pro-longs the guarantee period to 5 years, including original ELCO replacement and wear parts.

• Protection of investment System commissioning and the annual maintenance keep the entire system in perfect condition at all times.

• ReliabilityThe COMFORT Service offers everything necessary for re-liable operation, from the annual maintenance with defect removal free of charge (24 hours a day, 365 days a year) to the main inspection.

Remote monitoring minimises the risk of failure The existing remote monitoring system was taken over by ELCO. This permits remote diagnosis at any time and from anywhere, even before the operator of the heating notices anything. The risk of damage through failure of the heating is thus minimised.

Renovation: Lindner Congress Hotel, Düsseldorf

From standard boilers to moderngas condensing solution

Hotel Lindner AG

One of the few family-owned hotel groups.

Hotels 33 attractive business addresses, relaxation oases and sophisticated golf and sports hotels all over Europe.

Boarding houses 5 (3x Düsseldorf, Frankfurt and Leipzig).

Rooms A total of 4,131 (as of 12/2008). Since the year 2000 alone, the number of Lindner Hotels has tripled.

BathsHot bath and bathing landscape “Alpentherme”, Leukerbad.

Employees (as of 12/2008) 2,150 in Germany, Austria, Switzerland and Spain.

International marketing cooperative WORLDHOTELS

Consistent calculation and planning through fi xed-price Longlife Service Package

Years 0 1 2 3 4 5 6 7 8 9 10 15

COMFORT

Old system

Standard boilers with jet burners 2 Gcal/2,400 kW < 80 %4 warm-water buffers of 2,000 litres each with external heat exchanger

3,900 MWh per year

Equipment

BoilersRated powerTotal power Buffers

Total energyconsumption

New system

2 R 3603 gas condensing boilers, cascaded 2 x 846 kW1,692 kW

106 % /109.8 %4 high-performance buffers of 1,000 litres each with external heat exchanger

3,200 MWh per year

Equipment

Boilers

Rated power Total power Standard effi ciency factor Buffers

Total energyconsumption

elco_Referenz_Hotel Lindner_EN 4c RZ.indd 4-5 04.01.11 15:53

The starting point

The old heating no longer met the requirementsA standard boiler with a jet burner and return riser and a power of 1 Gcal served to cover the base load. A second boiler of the same type covered the peak loads. Heating and warm water processing were distributed over 3 equipment rooms.

Hotel Lindner had rigorous requirements on warm water and heating comfort The energy costs made up too large a portion of the over-all operating costs of the hotel. The convenience of the heating and warm water did not meet the requirements. Hotel Lindner therefore decided on a new, modern heating solution. The greatest challenge was that the renovation was to be carried out parallel to the daily running of the hotel.

• Hotel with 230 rooms, 10,500 m² heated area • Energy consumption: 3,900 MWh

The new system

Cascaded gas condensing boilersTwo RENDAMAX 3603 gas condensing boilers are arranged in a cascade. This gives a total power of 1,692 kW, which is adjusted by mo dulation. The condensing boilers are of split HT/LT construction. This makes it possible for some 75 % of the annual heating operation to be kept within the condensing range. The heating solution achieves a standard effi ciency factor of 106/109.8 %.

The new heating system further reduces the temperature of the waste gases to below 80 degrees. Stand-by losses are reduced by the gradually raised boiler temperature. The central heating and the warm-water processing are located in 2 equip ment rooms. The harmonised, modular construction simplifi es installation. It was possible to maintain the daily running of the hotel.

The services to match the system:

COMFORT Service for fl exible coverage With the COMFORT Service, the new heating system is always optimally maintained. Fault-free operation is assured year after year.

• Cost transparency The COMFORT maintenance package protects the Hotel Lindner for at least 1 year from increasing maintenance costs. At the end of each year, the contract is automatically renewed for a further year. Signing the contract at commissioning pro-longs the guarantee period to 5 years, including original ELCO replacement and wear parts.

• Protection of investment System commissioning and the annual maintenance keep the entire system in perfect condition at all times.

• ReliabilityThe COMFORT Service offers everything necessary for re-liable operation, from the annual maintenance with defect removal free of charge (24 hours a day, 365 days a year) to the main inspection.

Remote monitoring minimises the risk of failure The existing remote monitoring system was taken over by ELCO. This permits remote diagnosis at any time and from anywhere, even before the operator of the heating notices anything. The risk of damage through failure of the heating is thus minimised.

Renovation: Lindner Congress Hotel, Düsseldorf

From standard boilers to moderngas condensing solution

Hotel Lindner AG

One of the few family-owned hotel groups.

Hotels 33 attractive business addresses, relaxation oases and sophisticated golf and sports hotels all over Europe.

Boarding houses 5 (3x Düsseldorf, Frankfurt and Leipzig).

Rooms A total of 4,131 (as of 12/2008). Since the year 2000 alone, the number of Lindner Hotels has tripled.

BathsHot bath and bathing landscape “Alpentherme”, Leukerbad.

Employees (as of 12/2008) 2,150 in Germany, Austria, Switzerland and Spain.

International marketing cooperative WORLDHOTELS

Consistent calculation and planning through fi xed-price Longlife Service Package

Years 0 1 2 3 4 5 6 7 8 9 10 15

COMFORT

Old system

Standard boilers with jet burners 2 Gcal/2,400 kW < 80 %4 warm-water buffers of 2,000 litres each with external heat exchanger

3,900 MWh per year

Equipment

BoilersRated powerTotal power Buffers

Total energyconsumption

New system

2 R 3603 gas condensing boilers, cascaded 2 x 846 kW1,692 kW

106 % /109.8 %4 high-performance buffers of 1,000 litres each with external heat exchanger

3,200 MWh per year

Equipment

Boilers

Rated power Total power Standard effi ciency factor Buffers

Total energyconsumption

elco_Referenz_Hotel Lindner_EN 4c RZ.indd 4-5 04.01.11 15:53

Energy-saving contracting for a clinic

Highly reliable planning for an energy-saving heating solution

The building under restoration is a large clinic with a long tradition. Renovation of the heating system was due, in order to save energy and increase con- venience. The investor and heating contractor, Cofely, decided on a partnership with ELCO. Cofely is Europe’s leading name in the effi cient use of en ergies. The aim of this specialist company is not only to use energies as economically as possible in buildings, but also to make the cooperation with its partners as effi cient as possible. The team effort with ELCO thus produced a tailor-made heating solution.

Thanks to energetic renovation measures, it waspossible to achieve energy savings of 20 %. Partof the optimal heating solution is the perfect ser- vice. Cofely decided on the 10-year all-inclusive package from ELCO, and thus for reliable operation and transparent costs.

The RENDAMAX 3410

Condensing boiler technology at the highest level RENDAMAX 3410 condensing boilers cover the upper per-formance range up to 2,000 kW. Thanks to their double con-densation (smooth-tube and ribbed-tube heat exchangers), their standard effi ciency factor is around 103 %. The heat exchangers and all other parts that come into contact with condensation are manufactured in stainless steel. This ensures many years of reliable operation without a trace of corrosion.

• Compact system unit consisting of boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor of 103 %. • Extremely low emission. • Particularly quiet operation. • Timer and weather controls for up to 14 mixer circuits. • Integration in existing in control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner. • Very attractive price-performance ratio.

Energy-saving contracting for a clinic

RENDAMAX 3410: The gas condensing boiler for highest performance

ELCO GmbHDreieichstraße 10D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

Heating Contractor Cofely Deutschland GmbH Dürener Straße 403-405 50858 Kölnwww.cofely.de

Technical Data R 3407 R 3408 R 3409 R 3410

Power, full load 80/60 °C kW 1,309 1,496 1,683 1,870

Power, minimum load kW 350 400 450 500

Standard effi ciency factor at 40/30 °C % 103 103 103 103

Width overall mm 1,530 1,330 1,530 1,530

Height overall mm 1,370 1,370 1,370 1,370

Length overall, including connections mm 2,755 3,265 3,265 3,265

Weight kg 1,210 1,525 1,665 1,745

Effi ciency • Secure fi nancing of the new heating solution

through energy-saving contracting• Lowering of operating costs by 20 % • Quick amortisation though energy savings

and reduced operating costs

Convenience • Latest technology

BENEFITS • Compact construction, low space requirement • Extremely low emission and quiet operation • Flexible adjustment of power through wide

modulation range • Reliable operation for many years

Reliability • Highest operating reliability through

cascading solution • Calculable costs through fi xed-price

all-inclusive package

elco_Referenz_Marienhospital EN 4c RZ.indd 2-3 04.01.11 16:05

Energy-saving contracting for a clinic

Highly reliable planning for an energy-saving heating solution

The building under restoration is a large clinic with a long tradition. Renovation of the heating system was due, in order to save energy and increase con- venience. The investor and heating contractor, Cofely, decided on a partnership with ELCO. Cofely is Europe’s leading name in the effi cient use of en ergies. The aim of this specialist company is not only to use energies as economically as possible in buildings, but also to make the cooperation with its partners as effi cient as possible. The team effort with ELCO thus produced a tailor-made heating solution.

Thanks to energetic renovation measures, it waspossible to achieve energy savings of 20 %. Partof the optimal heating solution is the perfect ser- vice. Cofely decided on the 10-year all-inclusive package from ELCO, and thus for reliable operation and transparent costs.

The RENDAMAX 3410

Condensing boiler technology at the highest level RENDAMAX 3410 condensing boilers cover the upper per-formance range up to 2,000 kW. Thanks to their double con-densation (smooth-tube and ribbed-tube heat exchangers), their standard effi ciency factor is around 103 %. The heat exchangers and all other parts that come into contact with condensation are manufactured in stainless steel. This ensures many years of reliable operation without a trace of corrosion.

• Compact system unit consisting of boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor of 103 %. • Extremely low emission. • Particularly quiet operation. • Timer and weather controls for up to 14 mixer circuits. • Integration in existing in control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner. • Very attractive price-performance ratio.

Energy-saving contracting for a clinic

RENDAMAX 3410: The gas condensing boiler for highest performance

ELCO GmbHDreieichstraße 10D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

Heating Contractor Cofely Deutschland GmbH Dürener Straße 403-405 50858 Kölnwww.cofely.de

Technical Data R 3407 R 3408 R 3409 R 3410

Power, full load 80/60 °C kW 1,309 1,496 1,683 1,870

Power, minimum load kW 350 400 450 500

Standard effi ciency factor at 40/30 °C % 103 103 103 103

Width overall mm 1,530 1,330 1,530 1,530

Height overall mm 1,370 1,370 1,370 1,370

Length overall, including connections mm 2,755 3,265 3,265 3,265

Weight kg 1,210 1,525 1,665 1,745

Effi ciency • Secure fi nancing of the new heating solution

through energy-saving contracting• Lowering of operating costs by 20 % • Quick amortisation though energy savings

and reduced operating costs

Convenience • Latest technology

BENEFITS • Compact construction, low space requirement • Extremely low emission and quiet operation • Flexible adjustment of power through wide

modulation range • Reliable operation for many years

Reliability • Highest operating reliability through

cascading solution • Calculable costs through fi xed-price

all-inclusive package

elco_Referenz_Marienhospital EN 4c RZ.indd 2-3 04.01.11 16:05

The starting-point

Obsolete equipment, excessive energy consumption Originally there were three 4,000 kW high-pressure warm- water boilers with a fl ow temperature of 150° C installed in the hospital. The heating system was no longer technically up to date. This resulted in excessive energy consumption, excessive CO2 emission and excessive costs. A signifi cant investment was required to install a modern, economical heating system that could demonstrably save energy costs.

The solution was contracting. The heating contractor Cofely undertook the fi nancing and the technical implementation of the new heating system. The costs of the fi nancing were offset against the energy costs saved over the years.

The new system

Gas condensing boiler with high standard effi ciency factorThe ELCO heating concept offered convincing, modern tech-nology. One of the three former high-pressure water boilers was dismantled. In its place, two RENDAMAX 3410 gas con-densing boilers with a heating power of around 4 MWh were installed. The other two boilers will temporarily remain in place as a back-up. The RENDAMAX 3410 gas condensing boilers offer very high energetic performance. That means that, because of the high modulation, long burner times and signifi cantly lower run-up emissions are achieved. The patented stainless-steel premix burner has remarkably low noise and pollution emissions and a high standard effi ciency factor of 103 %.

There are also signifi cant economical benefi ts arising from the wide modulation range of 470 kW to 3,860 kW. This permits considerable energy savings – and at the same time is easy on wear parts and reduces maintenance effort.

The services to match the system:

All-inclusive package for long-term reliability The all-inclusive package ensures reliable operation with guaranteed technical availability.

• Cost transparencyWith their all-inclusive package, ELCO offer fl at-rate re lia -bility. Maintenance and repair are completely calculable, based on annual fl at charges. All the necessary original ELCO replacement wear parts are included in the price.

• Protection of investment Through regular annual maintenance, ELCO ensure that the entire system is in perfect condition at all times.

• Reliability Reliable operation of the RENDAMAX 3410 gas condensing boilers is guaranteed for 10 years. In addition, ELCO offer repair of faults within 24 hours, 365 days a year, including night-time.

Energy-saving contracting for a clinic

Latest heating technology helps savecosts and energy

Years 0 1 2 3 4 5 6 7 8 9 10 15

All-inclusive 10

COFELY – the new name for energy effi ciency

Cofely Germany GmbH is one of Germany’s leading spe -cialists in building-technology systems, plant and process technology, facility management, energy management and industrial refrigeration. Cofely Germany GmbH and its sub -sidiary Cofely Refrigeration GmbH, which covers the area of refrigeration technology, were out-founded in November 2009 from the former Axima Germany and Axima Refrig-eration companies, and belong to the French GDF Suez Group, Europe’s leading energy concern. The Cofely company has years of experience in energy-saving contracting (ESC), and has numerous successful reference projects to its name. On the basis of its high level of technical expertise in building and plant technology, building automation and economical operation of admin-istrative and production locations, the Cofely company im plements energy-optimisation solutions that are tailor-made for its customers. The latter benefi t from guaranteed energy savings, and from the increased energy-effi ciency of buildings and plants.

Equipment

Boilers Rated powerTotal powerTotal energyconsumption

Old System

3 high-pressure warm-water boilers4,000 kW12,000 kW

7,500 MWh per year

Equipment

Boilers Rated power Total powerStandard effi ciency factor Pollutant emission

Total energy consumption

New System

2 gas condensing boilers R 3410,cascadeds 2 x 1,930 kW3,860 kW

103 %NOx < 30 mg/kWhCO2 < 8 mg/kWh

6,000 MWh per year

elco_Referenz_Marienhospital EN 4c RZ.indd 4-5 04.01.11 16:06

The starting-point

Obsolete equipment, excessive energy consumption Originally there were three 4,000 kW high-pressure warm- water boilers with a fl ow temperature of 150° C installed in the hospital. The heating system was no longer technically up to date. This resulted in excessive energy consumption, excessive CO2 emission and excessive costs. A signifi cant investment was required to install a modern, economical heating system that could demonstrably save energy costs.

The solution was contracting. The heating contractor Cofely undertook the fi nancing and the technical implementation of the new heating system. The costs of the fi nancing were offset against the energy costs saved over the years.

The new system

Gas condensing boiler with high standard effi ciency factorThe ELCO heating concept offered convincing, modern tech-nology. One of the three former high-pressure water boilers was dismantled. In its place, two RENDAMAX 3410 gas con-densing boilers with a heating power of around 4 MWh were installed. The other two boilers will temporarily remain in place as a back-up. The RENDAMAX 3410 gas condensing boilers offer very high energetic performance. That means that, because of the high modulation, long burner times and signifi cantly lower run-up emissions are achieved. The patented stainless-steel premix burner has remarkably low noise and pollution emissions and a high standard effi ciency factor of 103 %.

There are also signifi cant economical benefi ts arising from the wide modulation range of 470 kW to 3,860 kW. This permits considerable energy savings – and at the same time is easy on wear parts and reduces maintenance effort.

The services to match the system:

All-inclusive package for long-term reliability The all-inclusive package ensures reliable operation with guaranteed technical availability.

• Cost transparencyWith their all-inclusive package, ELCO offer fl at-rate re lia -bility. Maintenance and repair are completely calculable, based on annual fl at charges. All the necessary original ELCO replacement wear parts are included in the price.

• Protection of investment Through regular annual maintenance, ELCO ensure that the entire system is in perfect condition at all times.

• Reliability Reliable operation of the RENDAMAX 3410 gas condensing boilers is guaranteed for 10 years. In addition, ELCO offer repair of faults within 24 hours, 365 days a year, including night-time.

Energy-saving contracting for a clinic

Latest heating technology helps savecosts and energy

Years 0 1 2 3 4 5 6 7 8 9 10 15

All-inclusive 10

COFELY – the new name for energy effi ciency

Cofely Germany GmbH is one of Germany’s leading spe -cialists in building-technology systems, plant and process technology, facility management, energy management and industrial refrigeration. Cofely Germany GmbH and its sub -sidiary Cofely Refrigeration GmbH, which covers the area of refrigeration technology, were out-founded in November 2009 from the former Axima Germany and Axima Refrig-eration companies, and belong to the French GDF Suez Group, Europe’s leading energy concern. The Cofely company has years of experience in energy-saving contracting (ESC), and has numerous successful reference projects to its name. On the basis of its high level of technical expertise in building and plant technology, building automation and economical operation of admin-istrative and production locations, the Cofely company im plements energy-optimisation solutions that are tailor-made for its customers. The latter benefi t from guaranteed energy savings, and from the increased energy-effi ciency of buildings and plants.

Equipment

Boilers Rated powerTotal powerTotal energyconsumption

Old System

3 high-pressure warm-water boilers4,000 kW12,000 kW

7,500 MWh per year

Equipment

Boilers Rated power Total powerStandard effi ciency factor Pollutant emission

Total energy consumption

New System

2 gas condensing boilers R 3410,cascadeds 2 x 1,930 kW3,860 kW

103 %NOx < 30 mg/kWhCO2 < 8 mg/kWh

6,000 MWh per year

elco_Referenz_Marienhospital EN 4c RZ.indd 4-5 04.01.11 16:06

Building project: SNOW DOME, Bispingen

ELCO turns on the heat in Europe’s largest indoor ski slope

The SNOW DOME in Bispingen, on the A7 motor -way near Hamburg, is regarded as the most modern indoor ski slope in Germany. A track 300 m long, equipped with a 6er lift gives young and old the opportunity to use skis and snowboards all year round, in any weather.

In the spring of 2006, the planning offi ce of Wenzel in Lüneburg requested tenders for the planned heating system. After several presentations, ELCO received the order. The recommended two gas condensing boilers, which work primarily for the ventilation, appealed to the technical partners on several counts: compact construction, low weight, low water content and a wide range of modulation for demand-oriented, energy-saving warmth. The Longlife service contract for guaranteed reliability and fi xed maintenance costs rounded off the so -lution package perfectly.

Building project: SNOW DOME, Bispingen

ELCO GmbHDreieichstraße 10 D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

CustomerSNOW DOME Sölden Bispingen GmbHHorstfeldweg 9 D-29646 Bispingen

Technical partnerIngenieurbüro Wenzel Industriegebiet Volksdorf Süd-West D-21397 Vasdorf

The RENDAMAX 3600

Double condensation for high energy utilisationThe RENDAMAX 3600 low-temperature gas condensing boilers offer con vincing fi gures at an attractive price in the upper performance range of 639 to 1,043 kW. Thanks to double condensation through a smooth-pipe and a ribbed-pipe heat exchanger, the standard effi ciency factor of the RENDAMAX 3600 is 109.8 %. All parts that come into contact with condensation are made of stainless steel, and are therefore extremely resistant to corrosion. There is no return temperature limit. A three-stage boiler-circuit pump is installed ex works.

• Compact system unit comprising boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor (109.8 %). • Extremely low emissions. • Particularly quiet operation. • Timer and weather-infl uenced controls for up to

14 mixer circuits. • Integration in existing control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner.

RENDAMAX 3600: Gas condensing boilers for highest effi ciency

Technical Data R 3601 R 3602 R 3603 R 3604 R 3605

Power, full load at 80/60 °C kW 639 747 846 945 1,043

Power, minimum load kW 183 213 242 270 298

Standard effi ciency factor at 40/30 °C % 109.8 109.8 109.8 109.8 109.8

Width overall mm 1,330 1,130 1,130 1,330 1,330

Height overall mm 1,405 1,405 1,405 1,405 1,405

Length overall, including connections mm 2,265 2,653 2,653 2,653 2,658

Weight kg 890 1,040 1,150 1,280 1,410

Effi ciency• Low operating costs • Latest energy-saving technology • Compact

Convenience• Quiet • Clean

BENEFITS

Reliability• High operating reliability through

cascade solution • Calculable costs through Longlife

maintenance contract • Guaranteed service dispatch within 3 hours

elco_Referenz_Snow_Dome EN 4c_RZ.indd 1-2 04.01.11 16:05

Building project: SNOW DOME, Bispingen

ELCO turns on the heat in Europe’s largest indoor ski slope

The SNOW DOME in Bispingen, on the A7 motor -way near Hamburg, is regarded as the most modern indoor ski slope in Germany. A track 300 m long, equipped with a 6er lift gives young and old the opportunity to use skis and snowboards all year round, in any weather.

In the spring of 2006, the planning offi ce of Wenzel in Lüneburg requested tenders for the planned heating system. After several presentations, ELCO received the order. The recommended two gas condensing boilers, which work primarily for the ventilation, appealed to the technical partners on several counts: compact construction, low weight, low water content and a wide range of modulation for demand-oriented, energy-saving warmth. The Longlife service contract for guaranteed reliability and fi xed maintenance costs rounded off the so -lution package perfectly.

Building project: SNOW DOME, Bispingen

ELCO GmbHDreieichstraße 10 D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

CustomerSNOW DOME Sölden Bispingen GmbHHorstfeldweg 9 D-29646 Bispingen

Technical partnerIngenieurbüro Wenzel Industriegebiet Volksdorf Süd-West D-21397 Vasdorf

The RENDAMAX 3600

Double condensation for high energy utilisationThe RENDAMAX 3600 low-temperature gas condensing boilers offer con vincing fi gures at an attractive price in the upper performance range of 639 to 1,043 kW. Thanks to double condensation through a smooth-pipe and a ribbed-pipe heat exchanger, the standard effi ciency factor of the RENDAMAX 3600 is 109.8 %. All parts that come into contact with condensation are made of stainless steel, and are therefore extremely resistant to corrosion. There is no return temperature limit. A three-stage boiler-circuit pump is installed ex works.

• Compact system unit comprising boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor (109.8 %). • Extremely low emissions. • Particularly quiet operation. • Timer and weather-infl uenced controls for up to

14 mixer circuits. • Integration in existing control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner.

RENDAMAX 3600: Gas condensing boilers for highest effi ciency

Technical Data R 3601 R 3602 R 3603 R 3604 R 3605

Power, full load at 80/60 °C kW 639 747 846 945 1,043

Power, minimum load kW 183 213 242 270 298

Standard effi ciency factor at 40/30 °C % 109.8 109.8 109.8 109.8 109.8

Width overall mm 1,330 1,130 1,130 1,330 1,330

Height overall mm 1,405 1,405 1,405 1,405 1,405

Length overall, including connections mm 2,265 2,653 2,653 2,653 2,658

Weight kg 890 1,040 1,150 1,280 1,410

Effi ciency• Low operating costs • Latest energy-saving technology • Compact

Convenience• Quiet • Clean

BENEFITS

Reliability• High operating reliability through

cascade solution • Calculable costs through Longlife

maintenance contract • Guaranteed service dispatch within 3 hours

elco_Referenz_Snow_Dome EN 4c_RZ.indd 1-2 04.01.11 16:05

Building project: SNOW DOME, Bispingen

Energy-saving heating performancecoolly calculated

The starting point

In the spring of 2006 the planning offi ce of Wenzel requested tenders for all technical systems in the SNOW DOME. Con -struction of the indoor ski slope began in May 2006.

The required boiler system was to have a power of about630 kWh overall. The tender was for a cascaded double boiler: one heating boiler for the base load, and a second one for peak loads.

The new system

ELCO succeeded in winning over the responsible heating com-pany with their competence in the area of condensing boilers. The types that were selected were the RENDAMAX 2906 with 387 kW and RENDAMAX 507 with 247 kW. The ELCO gas condensing boilers are characterised by very compact dimen-sions, low weight and the fact that they can be completely stripped down.

The extremely low noise and pollutant emissions – mean noise pressure level at 1 m distance from boiler < 52 db(A), NOx < 35 mg per kWh – make these boilers the most environ-mentally friendly of their kind. These values are achieved by the series installation of air-intake and exhaust-gas resonance muffl ers combined with elastomer sound-insulation feet, and by the water-cooled pre-mix burner system.

Because of the wide range of modulation (control range of up to 1:5) and the very high standard effi ciency factor of up to 110.8 %, these boilers enable ELCO to achieve a reduction in fuel costs of around 15 % compared with conventional hea t-ing systems. Thanks to the small dimensions and the wide, infi nitely adjustable range of modulation, the boilers cause extremely slight stand-time losses.

Longlife Service: Economy and reliability right from the start

Service to match the system:

Longlife 5 Plus with guaranteed technical availability The Longlife service package ensures reliable operation of the overall system with exactly calculable costs.

• Cost transparency The 5-year system contract allows exact calculation of the maintenance and repair costs on the basis of annual lump sums with constant costs. All original ELCO replacement and wear parts are included. • Protection of investment With system commissioning and the annual maintenance, the entire system is in perfect condition at all times.

• Reliability Reliable operation of the gas condensing boilers is guaranteed for 5 years. In addition, ELCO offers repair of faults within 24 hours, 365 days a year, including nights.

Years 0 1 2 3 4 5 6 7 8 9 10 15

Longlife 5 Plus

Equipment

Boilers

Rated power Total power Standard effi ciency factor

New system

1 gas condensing boiler R 2906 and 1 condensing boiler R 507 1 x 387 kW and 1 x 247 kW634 kW

up to 110.8 %

SNOW DOME Sölden Bispingen GmbH

Dimensions of slope: Length: 300 m; width at bottom: 100 m; gradient: 9 % to 20 %.

Areas:23,500 m² total area; approx. 3,100 m² ground area; approx. 600 m² seminar area; approx. 2,000 m² catering and hospitality area.

Snow production: At indoor temperatures between 2 and -4 ºC, 13 high-performance indoor snow guns spray unique powdery snow every day.

Ski-lifts: Coupled 6er chair-lifts with 30 chairs; capacity: 3,000 Persons per hour; speed: 2.0 m/sec; 80 m long “magic carpet”, capacity 1.3 m/sec.

Visitors: Per year: 480,000.

elco_Referenz_Snow_Dome EN 4c_RZ.indd 3-4 04.01.11 16:06

Building project: SNOW DOME, Bispingen

Energy-saving heating performancecoolly calculated

The starting point

In the spring of 2006 the planning offi ce of Wenzel requested tenders for all technical systems in the SNOW DOME. Con -struction of the indoor ski slope began in May 2006.

The required boiler system was to have a power of about630 kWh overall. The tender was for a cascaded double boiler: one heating boiler for the base load, and a second one for peak loads.

The new system

ELCO succeeded in winning over the responsible heating com-pany with their competence in the area of condensing boilers. The types that were selected were the RENDAMAX 2906 with 387 kW and RENDAMAX 507 with 247 kW. The ELCO gas condensing boilers are characterised by very compact dimen-sions, low weight and the fact that they can be completely stripped down.

The extremely low noise and pollutant emissions – mean noise pressure level at 1 m distance from boiler < 52 db(A), NOx < 35 mg per kWh – make these boilers the most environ-mentally friendly of their kind. These values are achieved by the series installation of air-intake and exhaust-gas resonance muffl ers combined with elastomer sound-insulation feet, and by the water-cooled pre-mix burner system.

Because of the wide range of modulation (control range of up to 1:5) and the very high standard effi ciency factor of up to 110.8 %, these boilers enable ELCO to achieve a reduction in fuel costs of around 15 % compared with conventional hea t-ing systems. Thanks to the small dimensions and the wide, infi nitely adjustable range of modulation, the boilers cause extremely slight stand-time losses.

Longlife Service: Economy and reliability right from the start

Service to match the system:

Longlife 5 Plus with guaranteed technical availability The Longlife service package ensures reliable operation of the overall system with exactly calculable costs.

• Cost transparency The 5-year system contract allows exact calculation of the maintenance and repair costs on the basis of annual lump sums with constant costs. All original ELCO replacement and wear parts are included. • Protection of investment With system commissioning and the annual maintenance, the entire system is in perfect condition at all times.

• Reliability Reliable operation of the gas condensing boilers is guaranteed for 5 years. In addition, ELCO offers repair of faults within 24 hours, 365 days a year, including nights.

Years 0 1 2 3 4 5 6 7 8 9 10 15

Longlife 5 Plus

Equipment

Boilers

Rated power Total power Standard effi ciency factor

New system

1 gas condensing boiler R 2906 and 1 condensing boiler R 507 1 x 387 kW and 1 x 247 kW634 kW

up to 110.8 %

SNOW DOME Sölden Bispingen GmbH

Dimensions of slope: Length: 300 m; width at bottom: 100 m; gradient: 9 % to 20 %.

Areas:23,500 m² total area; approx. 3,100 m² ground area; approx. 600 m² seminar area; approx. 2,000 m² catering and hospitality area.

Snow production: At indoor temperatures between 2 and -4 ºC, 13 high-performance indoor snow guns spray unique powdery snow every day.

Ski-lifts: Coupled 6er chair-lifts with 30 chairs; capacity: 3,000 Persons per hour; speed: 2.0 m/sec; 80 m long “magic carpet”, capacity 1.3 m/sec.

Visitors: Per year: 480,000.

elco_Referenz_Snow_Dome EN 4c_RZ.indd 3-4 04.01.11 16:06

Energy-saving contracting for Public Utilities, Weiden

Long-term guarantee gives planners a reliable basis for calculation

A unique assurance of guarantee by ELCO made it possible to implement an energy-saving contract project in Weiden (Oberpfalz). The contracting helped the town to open up extremely economical potentials for savings in their properties. The ELCO service contracts covered the entire run time of the project of up to 12 years. This gives the contractor, an association of engineers and planners, a long-term, reliable basis for calculation and planning with regard to the heating equipment. In total, the order in Weiden embraced 44 of the latest gas con -densing boilers. The result now is that the increase in energy effi ciency reduces the energy consump-tion and the CO2 emission, year in, year out, by more than 25 %. The savings in energy costs are distributed, with the contractors fi nancing their costs and the town council its investments.

Reliable, fl exible, easy to install:Gas condensing boiler R600

ELCO GmbHDreieichstraße 10D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

CustomerPublic Utilities Department, Weiden (Oberpfalz)

Contractor Association for Energy-saving contracting (ESC)

• Maximum reliability of installation through pre-assembled system kits. • Unique reliability though 10-year Longlife guarantee. • Sustained high effi ciency through corrosion-proof stainless-steel

heat exchangers. • Highly effi cient (110.4 %). • Environmentally friendly through extremely low pollutant emissions. • Convincing modulation range (1:7). • Extension to up to 8 boilers and 15 mixer circuits possible. • Simple assembly. • Unusually quiet operation. • Low weight.

Technical Data R600 601 602 603 604 605 606 607

Rated heating power at 80/60 °C kW 142.1 - 23.3 190.1 - 39.5 237.2 - 39.5 285.2 - 39.5 380.2 - 76.6 475.3 - 76.6 539.0 - 76.6

Rated heating power at 40/30 °C kW 150.7 - 26.7 201.6 - 45.2 251.4 - 45.1 302.3 - 45.2 403.1 - 87.7 503.9 - 87.7 571.5 - 87.7

Rated heating load kW 145.0 - 24.5 194.0 - 41.5 242.0 - 41.5 291.0 - 41.5 388.0 - 80.5 485.0 - 80.5 550.0 - 80.5

Standard effi ciency factor at 40/30 °C % 110.4 110.4 110.4 110.4 110.4 110.4 110.4

Total height mm 1,480 1,480 1,500 1,500 1,500 1,500 1,500

Total width mm 670 670 670 770 770 770 770

Total depth mm 1,220 1,375 1,585 1,335 1,550 1,700 1,850

Weight (empty) kg 295 345 400 465 535 590 650

Water content l 27 31 35 61 68 75 82

Max. permitted water pressure bar 8 8 8 8 8 8 8

Waste gas temperature at 80/60 °C °C 78 78 78 78 78 78 78

The R600 The solution for the wider power range R600 is the new generation of gas condensing boilers, and was developed specially for higher power requirements in trade, industry and public housing. The boilers in the R600 series combine extreme system fl exibility with excellent quality and a unique Longlife guarantee for up to 10 years. Stainless-steel quality for sustained, high effi ciency In the R600, stainless-steel heat exchangers and the patented combustion technology ensure minimal wear and sustained, high effi ciency – and that for decades! Thanks to excellent heat transfer, the R600 achieves a standard effi ciency factor of 110.4 %.

Effi ciency• Realisation of potential for energy saving in

the town through energy-saving contracting • Reduction of energy costs in 28 properties by

up to 27 %• Quick amortisation through energy savings

and reduced operating costs

BENEFITS Convenience• Compact construction, low space requirement • Extremely low emissions and quiet operation • Flexible adjustment of performance through

wide modulation range

Reliability• One hundred percent operating reliability

through cascaded system• Calculable maintenance costs through

Longlife fl at rate service contract • Guaranteed service dispatch within 3 hours

Energy-saving contracting for Public Utilities, Weiden

elco_Referenz_Weiden_EN 4c_RZ.indd 1-2 07.01.11 11:02

Energy-saving contracting for Public Utilities, Weiden

Long-term guarantee gives planners a reliable basis for calculation

A unique assurance of guarantee by ELCO made it possible to implement an energy-saving contract project in Weiden (Oberpfalz). The contracting helped the town to open up extremely economical potentials for savings in their properties. The ELCO service contracts covered the entire run time of the project of up to 12 years. This gives the contractor, an association of engineers and planners, a long-term, reliable basis for calculation and planning with regard to the heating equipment. In total, the order in Weiden embraced 44 of the latest gas con -densing boilers. The result now is that the increase in energy effi ciency reduces the energy consump-tion and the CO2 emission, year in, year out, by more than 25 %. The savings in energy costs are distributed, with the contractors fi nancing their costs and the town council its investments.

Reliable, fl exible, easy to install:Gas condensing boiler R600

ELCO GmbHDreieichstraße 10D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

CustomerPublic Utilities Department, Weiden (Oberpfalz)

Contractor Association for Energy-saving contracting (ESC)

• Maximum reliability of installation through pre-assembled system kits. • Unique reliability though 10-year Longlife guarantee. • Sustained high effi ciency through corrosion-proof stainless-steel

heat exchangers. • Highly effi cient (110.4 %). • Environmentally friendly through extremely low pollutant emissions. • Convincing modulation range (1:7). • Extension to up to 8 boilers and 15 mixer circuits possible. • Simple assembly. • Unusually quiet operation. • Low weight.

Technical Data R600 601 602 603 604 605 606 607

Rated heating power at 80/60 °C kW 142.1 - 23.3 190.1 - 39.5 237.2 - 39.5 285.2 - 39.5 380.2 - 76.6 475.3 - 76.6 539.0 - 76.6

Rated heating power at 40/30 °C kW 150.7 - 26.7 201.6 - 45.2 251.4 - 45.1 302.3 - 45.2 403.1 - 87.7 503.9 - 87.7 571.5 - 87.7

Rated heating load kW 145.0 - 24.5 194.0 - 41.5 242.0 - 41.5 291.0 - 41.5 388.0 - 80.5 485.0 - 80.5 550.0 - 80.5

Standard effi ciency factor at 40/30 °C % 110.4 110.4 110.4 110.4 110.4 110.4 110.4

Total height mm 1,480 1,480 1,500 1,500 1,500 1,500 1,500

Total width mm 670 670 670 770 770 770 770

Total depth mm 1,220 1,375 1,585 1,335 1,550 1,700 1,850

Weight (empty) kg 295 345 400 465 535 590 650

Water content l 27 31 35 61 68 75 82

Max. permitted water pressure bar 8 8 8 8 8 8 8

Waste gas temperature at 80/60 °C °C 78 78 78 78 78 78 78

The R600 The solution for the wider power range R600 is the new generation of gas condensing boilers, and was developed specially for higher power requirements in trade, industry and public housing. The boilers in the R600 series combine extreme system fl exibility with excellent quality and a unique Longlife guarantee for up to 10 years. Stainless-steel quality for sustained, high effi ciency In the R600, stainless-steel heat exchangers and the patented combustion technology ensure minimal wear and sustained, high effi ciency – and that for decades! Thanks to excellent heat transfer, the R600 achieves a standard effi ciency factor of 110.4 %.

Effi ciency• Realisation of potential for energy saving in

the town through energy-saving contracting • Reduction of energy costs in 28 properties by

up to 27 %• Quick amortisation through energy savings

and reduced operating costs

BENEFITS Convenience• Compact construction, low space requirement • Extremely low emissions and quiet operation • Flexible adjustment of performance through

wide modulation range

Reliability• One hundred percent operating reliability

through cascaded system• Calculable maintenance costs through

Longlife fl at rate service contract • Guaranteed service dispatch within 3 hours

Energy-saving contracting for Public Utilities, Weiden

elco_Referenz_Weiden_EN 4c_RZ.indd 1-2 07.01.11 11:02

Modern heating technology opens upgreat potential for energy savings

The starting point

28 properties with excessive energy consumptionThe heating systems in Weiden, as in many other munici-palities, were technically obsolescent and over-proportioned. High waste-gas temperatures, lack of effi ciency through the year and high losses through heat dissipation meant that, year after year, tens of thousands of Euros more than necessary were spent on heating costs. Those responsible at the Town Council were well aware of this, and that a lot of energy can be saved with modern technology and opti -misation of the hydraulics and the mode of operation. But who was to provide the investments? The problem, not only in Weiden, was the narrow budget.

The solution

The Association for Energy-saving Contracting (ESC) decides on ELCOThe contractor in Weiden was an association of planners and engineers with an offi ce in Berlin. They chose ELCO’s well thought out overall solution in preference to competi-tors of repute. One convincing argument was the compre-hensive service package with its fi xed price and guarantee assurance for the entire project run-time of twelve years. In addition, ELCO was able to meet the planners’ profi le with regard to equipment, function and power of the delivered heating boilers.

The new system

Gas condensing boiler with stainless-steel surface burner The Weiden order embraced 40 fl oor-mounted gas conden-sing boilers with customer-specifi c modifi cations, and four wall-mounted gas condensing boilers.

For optimal regulation of the performance, 17 of the systems were implemented as cascaded solutions. Because of special requirements, the boilers had to allow an operating mode with very great differences between fl ow and return temperatures without suffering damage.

In addition, there were to be communication and control capa -bilities for centrally controlled, power-dependent operation of the boilers. The contractor can thus fully control each boiler from his central offi ce in Berlin.

Temperature resistant and compact The contractor relies on a wide spread of temperatures, in orderto be able to transmit a lot of energy with a low volume of water. At the same time, the return temperatures should be as low as possible, so as to allow effi cient utilisation of the condensation. These extremes – very cold water into the boiler, and very hot water out of it – presents material problems for many of the boilers on the market.

RENDAMAX 3400: Fast heat transfer, fl exible mounting RENDAMAX 3400 gas condensing boilers offered the ideal so lution because of their special design, with low volumes of water and compact heat exchangers for fast, direct, effi cient heat transfer.

Further benefi ts are the low space requirement, reduced elec- tricity consumption, and fast, fl exible heat transmission. And one other aspect turned out to be important. The access paths to the boiler rooms were often very narrow, but because the ELCO boilers can be stripped down and reassembled quickly and easily on site, this caused no problems.

Optimised waste-gas systems Finally, special attention was paid to the waste-gas systems – for the purpose of optimising the combustion process, and to prevent a negative infl uence on the calculated performance data right from the start. ELCO suggested always operating the systems with under-pressure. With appropriate air-bleeder equipment, the behaviour of the chimney can then be kept under control at all times.

Services to match the system:

Longlife 12 Plus with guaranteed technical availability The Longlife service package ensures reliable operationof the overall system with exactly calculable costs.

• Cost transparency The 12-year system contract allows exact calculation of the maintenance and repair costs on the basis of annual lump sums with constant costs. All original ELCO replacement and wear parts are included.

• Protection of investment With system commissioning and the annual maintenance, the entire system is in perfect condition at all times.

• ReliabilityReliable operation of the gas condensing boilers is guaran-teed for 12 years. In addition, ELCO offers repair of faults within 24 hours, 365 days a year, including nights.

Years

Effi cient, compact heating equipment with centralised controls

0 1 2 3 4 5 6 7 8 9 10 12 15

Longlife 12 Plus

Situation: Weiden is a town with county rights in the Eastern Bavarian district of Oberpfalz. It is 100 km to the East of Nuremberg, and 35 km West of the Czech border.

Population: Some 42,000 people live in Weiden, in an area of 70.5 km².

Weiden in Oberpfalz

Importance: In terms of the Bavarian State Development Programme, Weiden is a major centre and, with a hinterland of some 300,000 people, it is the trade and service centre for the region of Northern Oberpfalz.

Economy: Companies that are known beyond the borders are the mail-order company Witt Weiden, the Hotel Porcelain Bauscher Weiden company, and the porcelain manufacturer Seltmann Weiden. Weiden is also the headquarters of the company Auto Teile Unger.

Energy-saving contracting for Public Utilities, Weiden

elco_Referenz_Weiden_EN 4c_RZ.indd 3-4 07.01.11 11:02

Modern heating technology opens upgreat potential for energy savings

The starting point

28 properties with excessive energy consumptionThe heating systems in Weiden, as in many other munici-palities, were technically obsolescent and over-proportioned. High waste-gas temperatures, lack of effi ciency through the year and high losses through heat dissipation meant that, year after year, tens of thousands of Euros more than necessary were spent on heating costs. Those responsible at the Town Council were well aware of this, and that a lot of energy can be saved with modern technology and opti -misation of the hydraulics and the mode of operation. But who was to provide the investments? The problem, not only in Weiden, was the narrow budget.

The solution

The Association for Energy-saving Contracting (ESC) decides on ELCOThe contractor in Weiden was an association of planners and engineers with an offi ce in Berlin. They chose ELCO’s well thought out overall solution in preference to competi-tors of repute. One convincing argument was the compre-hensive service package with its fi xed price and guarantee assurance for the entire project run-time of twelve years. In addition, ELCO was able to meet the planners’ profi le with regard to equipment, function and power of the delivered heating boilers.

The new system

Gas condensing boiler with stainless-steel surface burner The Weiden order embraced 40 fl oor-mounted gas conden-sing boilers with customer-specifi c modifi cations, and four wall-mounted gas condensing boilers.

For optimal regulation of the performance, 17 of the systems were implemented as cascaded solutions. Because of special requirements, the boilers had to allow an operating mode with very great differences between fl ow and return temperatures without suffering damage.

In addition, there were to be communication and control capa -bilities for centrally controlled, power-dependent operation of the boilers. The contractor can thus fully control each boiler from his central offi ce in Berlin.

Temperature resistant and compact The contractor relies on a wide spread of temperatures, in orderto be able to transmit a lot of energy with a low volume of water. At the same time, the return temperatures should be as low as possible, so as to allow effi cient utilisation of the condensation. These extremes – very cold water into the boiler, and very hot water out of it – presents material problems for many of the boilers on the market.

RENDAMAX 3400: Fast heat transfer, fl exible mounting RENDAMAX 3400 gas condensing boilers offered the ideal so lution because of their special design, with low volumes of water and compact heat exchangers for fast, direct, effi cient heat transfer.

Further benefi ts are the low space requirement, reduced elec- tricity consumption, and fast, fl exible heat transmission. And one other aspect turned out to be important. The access paths to the boiler rooms were often very narrow, but because the ELCO boilers can be stripped down and reassembled quickly and easily on site, this caused no problems.

Optimised waste-gas systems Finally, special attention was paid to the waste-gas systems – for the purpose of optimising the combustion process, and to prevent a negative infl uence on the calculated performance data right from the start. ELCO suggested always operating the systems with under-pressure. With appropriate air-bleeder equipment, the behaviour of the chimney can then be kept under control at all times.

Services to match the system:

Longlife 12 Plus with guaranteed technical availability The Longlife service package ensures reliable operationof the overall system with exactly calculable costs.

• Cost transparency The 12-year system contract allows exact calculation of the maintenance and repair costs on the basis of annual lump sums with constant costs. All original ELCO replacement and wear parts are included.

• Protection of investment With system commissioning and the annual maintenance, the entire system is in perfect condition at all times.

• ReliabilityReliable operation of the gas condensing boilers is guaran-teed for 12 years. In addition, ELCO offers repair of faults within 24 hours, 365 days a year, including nights.

Years

Effi cient, compact heating equipment with centralised controls

0 1 2 3 4 5 6 7 8 9 10 12 15

Longlife 12 Plus

Situation: Weiden is a town with county rights in the Eastern Bavarian district of Oberpfalz. It is 100 km to the East of Nuremberg, and 35 km West of the Czech border.

Population: Some 42,000 people live in Weiden, in an area of 70.5 km².

Weiden in Oberpfalz

Importance: In terms of the Bavarian State Development Programme, Weiden is a major centre and, with a hinterland of some 300,000 people, it is the trade and service centre for the region of Northern Oberpfalz.

Economy: Companies that are known beyond the borders are the mail-order company Witt Weiden, the Hotel Porcelain Bauscher Weiden company, and the porcelain manufacturer Seltmann Weiden. Weiden is also the headquarters of the company Auto Teile Unger.

Energy-saving contracting for Public Utilities, Weiden

elco_Referenz_Weiden_EN 4c_RZ.indd 3-4 07.01.11 11:02

Energy-supply contracting for a block of fl ats

ELCO ensures more energy and cost effi ciency

The property to be renovated was a block of fl ats in the Berlin district of Kreuzberg. The problem was an obsolete heating system with excessive energy consumption. Renovation of the heating system was urgently required, on one hand to save energy, and on the other hand to increase convenience. The housing administration decided on energy-supply contracting. The contract was awarded to GASAG WärmeService (GWS) from Berlin. The GWS chose an advanced solution from ELCO: the RENDAMAX 3406 and RENDAMAX 3408. The system was put into operation at the end of the year 2009.

Thanks to the renovation measures combined with a high-performance block-type thermal power station, it was possible to signifi cantly improve the energy balance of the block of fl ats. This resulted in savings of 19 %.

Energy-supply contracting for a block of fl ats

RENDAMAX 3400: State of the art condensing technology

ELCO GmbHDreieichstraße 10 D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

CustomerGASAG WärmeService GmbHReichpietschufer 60D-10785 Berlin

Executing technical partner Mercedöl-FeuerungsbauHauptstraße 56-60D-13158 Berlin (Pankow)

The RENDAMAX 3400

The gas condensing boilers in the low-temperature con-densing RENDAMAX 3400 series are powerful, economical and compact. The operating costs of these boilers are up to 15 % lower than those of conventional heating systems. Their leading-edge energy-saving technology makes them an effi cient, powerful heating solution for the upper perfor-mance range – with sur prisingly low emission values. And the option of arranging the gas condensing boilers in a cascade makes it possible to heat even good-sized complexes cheaply and economically.

• Compact system unit comprising boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor (103 %). • Extremely low emissions. • Particularly quiet operation. • Timer- and weather-infl uenced controls for up to

14 mixer circuits. • Integration in existing control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner. • Attractive price-performance ratio.

Technical Data R 3401 R 3402 R 3403 R 3404 R 3405 R 3406

Performance, full load 80/60 °C kW 657 729 853 965 1,024 1,189

Performance minimum load kW 167 182 213 241 277 297

Standard effi ciency factor at 40/30 °C % 103 103 103 103 103 103

Height overall mm 1,355 1,355 1,355 1,355 1,355 1,355

Width overall mm 1,330 1,330 1,130 1,130 1,330 1,330

Length overall (including connections) mm 2,265 2,265 2,653 2,653 2,658 2,658

Weight (empty) kg 675 740 840 950 1,070 1,200

Effi ciency• Reduction of operating costs • Quick amortisation through energy savings

and reduced operating costs • Effi ciency 96 %

Convenience • Leading-edge technology • Compact construction, low space requirement

BENEFITS• Extremely low emissions and quiet operation• Flexible adjustment of power through wide

modulation range

Reliability • Secure fi nancing of the new heating solution

through energy-supply contracting• Reliable operation over many years

elco_Referenz_GASAG_EN 4c RZ.indd 1-2 04.01.11 15:51

Energy-supply contracting for a block of fl ats

ELCO ensures more energy and cost effi ciency

The property to be renovated was a block of fl ats in the Berlin district of Kreuzberg. The problem was an obsolete heating system with excessive energy consumption. Renovation of the heating system was urgently required, on one hand to save energy, and on the other hand to increase convenience. The housing administration decided on energy-supply contracting. The contract was awarded to GASAG WärmeService (GWS) from Berlin. The GWS chose an advanced solution from ELCO: the RENDAMAX 3406 and RENDAMAX 3408. The system was put into operation at the end of the year 2009.

Thanks to the renovation measures combined with a high-performance block-type thermal power station, it was possible to signifi cantly improve the energy balance of the block of fl ats. This resulted in savings of 19 %.

Energy-supply contracting for a block of fl ats

RENDAMAX 3400: State of the art condensing technology

ELCO GmbHDreieichstraße 10 D-64546 Mörfelden-Walldorf

Tel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119www.elco.net

CustomerGASAG WärmeService GmbHReichpietschufer 60D-10785 Berlin

Executing technical partner Mercedöl-FeuerungsbauHauptstraße 56-60D-13158 Berlin (Pankow)

The RENDAMAX 3400

The gas condensing boilers in the low-temperature con-densing RENDAMAX 3400 series are powerful, economical and compact. The operating costs of these boilers are up to 15 % lower than those of conventional heating systems. Their leading-edge energy-saving technology makes them an effi cient, powerful heating solution for the upper perfor-mance range – with sur prisingly low emission values. And the option of arranging the gas condensing boilers in a cascade makes it possible to heat even good-sized complexes cheaply and economically.

• Compact system unit comprising boiler and burner. • Modulation ratio 1:4. • High standard effi ciency factor (103 %). • Extremely low emissions. • Particularly quiet operation. • Timer- and weather-infl uenced controls for up to

14 mixer circuits. • Integration in existing control systems and factory

master control systems possible (DDC 2-10 V). • Low weight. • Built-in premix burner. • Attractive price-performance ratio.

Technical Data R 3401 R 3402 R 3403 R 3404 R 3405 R 3406

Performance, full load 80/60 °C kW 657 729 853 965 1,024 1,189

Performance minimum load kW 167 182 213 241 277 297

Standard effi ciency factor at 40/30 °C % 103 103 103 103 103 103

Height overall mm 1,355 1,355 1,355 1,355 1,355 1,355

Width overall mm 1,330 1,330 1,130 1,130 1,330 1,330

Length overall (including connections) mm 2,265 2,265 2,653 2,653 2,658 2,658

Weight (empty) kg 675 740 840 950 1,070 1,200

Effi ciency• Reduction of operating costs • Quick amortisation through energy savings

and reduced operating costs • Effi ciency 96 %

Convenience • Leading-edge technology • Compact construction, low space requirement

BENEFITS• Extremely low emissions and quiet operation• Flexible adjustment of power through wide

modulation range

Reliability • Secure fi nancing of the new heating solution

through energy-supply contracting• Reliable operation over many years

elco_Referenz_GASAG_EN 4c RZ.indd 1-2 04.01.11 15:51

The new system

Gas condensing boilers for high performanceThe GWS decided on modern energy-saving technologyby ELCO – the RENDAMAX 3406 and RENDAMAX 3408 gas condensing boilers – in place of the obsolete oil-fi red heating boilers. In addition, a modern block-type heating power station was installed, with an electrical output of 49.5 kW and a thermal output of 97.2 kW. Taking both components boiler and heating power station, into account, a very high effi ciency of about 96 % was achieved in the fi rst year after commissioning.

The ELCO gas condensing boilers are characterised by their high heat output, low consumption and low emission values. In addition, they are compact and space-saving. The ener-getic performance of ELCO boilers is very high.

Thanks to the infi nite adjustment of the modulation of the burn-er power, the burners adapt precisely to the actual heating demands in the building. The high modulation shortens the burner running times, and the run-up emissions are signifi -cantly reduced. Thanks to the wide modulation range of 470 – 3,860 kW, great quantities of energy can be saved. This is easy on the wear parts, and reduces the maintenance effort. With the advanced boiler management with load regulation and digital, automatic burner controls, it would also be possible to arrange several boilers in a cascade.

Equipment

Boiler Rated powerTotal power Total energyconsumption

Old system

Viessmann LT boiler 1,500/1,750 kW5,000 kW

≈ 6,205 MWh per year, oilLoss through waste gases 15 %

Equipment

BoilersRated powerTotal powerTotal energyconsumption

New system

R 3406 + R 34081,189 + 1,456 kW2,685 kW

≈ 5,026 MWh per year, gas

Energy-supply contracting for a block of fl ats

Modern heating technology that convinces with effi ciency

The services to match the heating system:

Modern heating systems are crammed full of sophisticated tech-nology and complex electronics. So it is very important, especially in commercial and public buildings, to have a system with a “full service history”. Failure of the heating can have serious conse-quences in these cases: loss of production, curtailment of rents, or suits for damages. Schools and hospitals must also be able to rely on fault-free operation. That is why ELCO offers the matching services for each heating system and each requirement, from pro -fessional commissioning through regular maintenance to many years’ service and system reliability. Ensure long-term reliability of function and cost stability with an ELCO maintenance contract.

GWS – Specialists ineffi cient energy management

GASAG WärmeService GmbH (GWS) is a service company offering complete maintenance, service and tuning of en-ergy systems – and ensuring signifi cant energy savings. The services range from consulting through energy-supply contracting solutions, fi nancing and operating models, to the replacement of complete heating systems, including draining the oil and disposing of the tank. The portfolio of the GWS includes the operation and delivery of usable energy in the form of heat, electricity and refrigeration.

elco_Referenz_GASAG_EN 4c RZ.indd 3-4 04.01.11 15:51

The new system

Gas condensing boilers for high performanceThe GWS decided on modern energy-saving technologyby ELCO – the RENDAMAX 3406 and RENDAMAX 3408 gas condensing boilers – in place of the obsolete oil-fi red heating boilers. In addition, a modern block-type heating power station was installed, with an electrical output of 49.5 kW and a thermal output of 97.2 kW. Taking both components boiler and heating power station, into account, a very high effi ciency of about 96 % was achieved in the fi rst year after commissioning.

The ELCO gas condensing boilers are characterised by their high heat output, low consumption and low emission values. In addition, they are compact and space-saving. The ener-getic performance of ELCO boilers is very high.

Thanks to the infi nite adjustment of the modulation of the burn-er power, the burners adapt precisely to the actual heating demands in the building. The high modulation shortens the burner running times, and the run-up emissions are signifi -cantly reduced. Thanks to the wide modulation range of 470 – 3,860 kW, great quantities of energy can be saved. This is easy on the wear parts, and reduces the maintenance effort. With the advanced boiler management with load regulation and digital, automatic burner controls, it would also be possible to arrange several boilers in a cascade.

Equipment

Boiler Rated powerTotal power Total energyconsumption

Old system

Viessmann LT boiler 1,500/1,750 kW5,000 kW

≈ 6,205 MWh per year, oilLoss through waste gases 15 %

Equipment

BoilersRated powerTotal powerTotal energyconsumption

New system

R 3406 + R 34081,189 + 1,456 kW2,685 kW

≈ 5,026 MWh per year, gas

Energy-supply contracting for a block of fl ats

Modern heating technology that convinces with effi ciency

The services to match the heating system:

Modern heating systems are crammed full of sophisticated tech-nology and complex electronics. So it is very important, especially in commercial and public buildings, to have a system with a “full service history”. Failure of the heating can have serious conse-quences in these cases: loss of production, curtailment of rents, or suits for damages. Schools and hospitals must also be able to rely on fault-free operation. That is why ELCO offers the matching services for each heating system and each requirement, from pro -fessional commissioning through regular maintenance to many years’ service and system reliability. Ensure long-term reliability of function and cost stability with an ELCO maintenance contract.

GWS – Specialists ineffi cient energy management

GASAG WärmeService GmbH (GWS) is a service company offering complete maintenance, service and tuning of en-ergy systems – and ensuring signifi cant energy savings. The services range from consulting through energy-supply contracting solutions, fi nancing and operating models, to the replacement of complete heating systems, including draining the oil and disposing of the tank. The portfolio of the GWS includes the operation and delivery of usable energy in the form of heat, electricity and refrigeration.

elco_Referenz_GASAG_EN 4c RZ.indd 3-4 04.01.11 15:51

Ariston Thermo Group – the worldwide partner for energy efficiency and convenience

Improve, develop, investThe Ariston Thermo Group has three clear objectives. Con-ventional units like hot water boilers are under continual de-velopment, and are being made even more energy-saving.Over and above that, we develop leading-edge systemsthat utilise renewable energies, such as solar collectors andheat pumps. And we are already investing today in forward-looking solutions like gas heat pumps and cogeneration.

More energy efficiency In Europe, one third of the energy consumption is for heat-ing and warm water. With the constantly rising prices forenergy, it is only logical that the demand for energy-efficient,environment-friendly heating comfort is growing. The Ariston Thermo Group fulfils this wish with its offering ofhigh-quality products. But optimal energy efficiency takesmore than just first-class technology. The Ariston ThermoGroup offers a wide range of tailor-made, harmonised systems for almost any requirements. Add to this a com-prehensive offering of services that guarantee fast, compe-tent assistance and an energy-efficient operation from start to finish.

An association of powerful brands:

10

"By the year 2020 at the latest, we will be

doing 80 % of our business with highly efficient,

renewable energy solutions." Paolo Merloni, CEO

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:24 Uhr Seite 10

11

1.1 billion Euros turnover

6,500 employees

45 million Euros a year for research and development

250 employees in research and development

6.1 million products a year (plus 32 million components)

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:24 Uhr Seite 11

International success

ELCO supports planners, architects and customers in implementing heating solutions with

condensing technology, solar plants and heat pumps. ELCO heating solutions are in success-

ful use with demanding customers in a large number of reference buildings worldwide.

In addition to their first-class quality, they have a further convincing, tangible added value:

a highly positive cost-benefit balance.

ELCO Division ELCO Shared Services GmbHHohenzollernstraße 31D-72379 HechingenTel. +49 (0) 74 71/1 87-0Fax +49 (0) 74 71/1 87-111

BelgiumELCO Belgium n.v./s.a.Z.1 Researchpark 60B-1731 ZellikTel. +32 (0) 2 463 19 05Fax +32 (0) 2 463 17 05

ChinaELCO ChinaAriston Thermo China No.9, Xingchuang Yi Road, SingaporeIndustry Park, Wuxi, PR China 214028Tel. +86 (0) 510 68 89 95 95Fax +86 (0) 510 68 89 97 00

GermanyELCO GmbHDreieichstraße 10D-64546 Mörfelden-WalldorfTel. +49 (0) 61 05/9 68-0Fax +49 (0) 61 05/9 68-119

ItalyELCO Italia S.p.A.Via Roma, 64I-31023 Resana (TV)Tel. +39 (0) 423 71 60Fax +39 (0) 423 71 63 80

The Netherlands Elco Heating Solutions Rendamax BVHamstraat 76NL-6465 AG KerkradeTel. +31 (0) 45 75 186 00Fax +31 (0) 45 56 699 10

AustriaELCO Austria GmbHAredstraße 16-18A-2544 LeobersdorfTel. +43 (0) 22 56/6 39 99-0Fax +43 (0) 22 56/6 44 11

SwitzerlandElcotherm AGSarganserstrasse 100CH-7324 ViltersTel. +41 (0) 81 725 25 25Fax +41 (0) 81 723 13 59

United KingdomELCO UKMHS Boilers Ltd3 Juniper West, Fenton WaySouthfield Business ParkBasildon, EssexSS15 6SJ, UKTel. +44 (0) 12 68 54 67 00Fax +44 (0) 12 68 88 82 50

FranceELCO FranceCarré Pleyel-5, Rue Pleyel F-93521 Saint-Denis Cedex (Paris) Tel. +33 (0) 1 55 84 94 94 Fax +33 (0) 1 55 84 96 08

Image_Brosch_Ordner_Referenzen_V_EN_RZ:Layout 1 11.01.2011 10:24 Uhr Seite 12

Spec

ialis

t inf

orm

atio

n/Fa

chin

form

atio

nen

专业资讯

Информация для специалистов

Informazioni specialistiche

Información especializada

Vakinformatie

Informations techniques

Specialist informationFachinformationen