Health & SafetyExpectations Build ContractorsIncluding expectations for any H&S Site Audit/Inspection
Documentation & Management Expectations
Site Audit Example
Scoring Criteria
![Page 2: Health & Safety Expectations Build Contractors](https://reader036.fdocuments.us/reader036/viewer/2022082506/568142a6550346895daee426/html5/thumbnails/2.jpg)
H&S Site Audit / Inspection – Documentation Expectations:
• Safe Pass & CSCS Tickets (available on site – colour photocopy ok)
• Health and Safety Plan – site specific (e-mail copy to Client / Controller ahead of job)
– to remain on site for all works
– cover main tasks & significant hazards (work at heights / hot work / excavations / precautions with ESB / utilities / earth rods etc.)
– identify persons in charge (PSCS project mgr if not named & PICW rigging/ el / civil) and emergency contacts
• Daily Risk Assessment – Hazard ID/ Controls – Tailboard / Toolbox Review – Method Statements
– covering all significant tasks that day / daily conditions eg weather (1st thing)
– specific details – changes or adjustments to H&S Plan / daily incidents (add)
– completed by team & signed by workers / sub-contractors / others
![Page 3: Health & Safety Expectations Build Contractors](https://reader036.fdocuments.us/reader036/viewer/2022082506/568142a6550346895daee426/html5/thumbnails/3.jpg)
Score Range
Description Criteria Action
1 - 3 Site Failure Inspection identifies a significant number (>5) of medium/low risk problems & improvements required or identifies a single very high risk activity / situation in need of immediate corrective action
CC requests immediate work stoppage until issues are properly addressed
4 - 5 Additional Controls Required
A number of definite improvements are required to ensure proper safety management on this site.
CC contacts PSCS to address issues. Temporary / immediate corrective actions may be implemented. Expect improved procedures to be implemented by Civil Works Contractor
6 Basic Safety Precautions In Place
Basic precautions are in place. However, there may be little activity underway to demonstrate comprehensive risk management.
Feedback & Trend Reporting as appropriate.
7 - 8 Good Safety Practices In Place
All basic precautions are in place. High-risk activities appear to be well controlled.
Feedback & Trend Reporting as appropriate.
9 + Very Comprehensive Safety Being Implemented
The works demonstrate the highest levels of risk control systems including documentation / equipment / emergency resources etc.
Assess opportunity to transfer positive controls to other sites / contractors.
H&S Inspection / Audit Scoring Criteria
Note higher scores require significant tasks to be underway
![Page 4: Health & Safety Expectations Build Contractors](https://reader036.fdocuments.us/reader036/viewer/2022082506/568142a6550346895daee426/html5/thumbnails/4.jpg)
Example – score of 4.5• Public area
• No barriers / cones
• No warning sign
• No harness worn by operator
Other Checks :
• CR forms / harness id / scanner id & calibration
• First-aid resources / housekeeping / PPE / RF safety /
fire precautions
• Tools / ladders / hot works / insulated earth-rod drivers /
work at heights / documentation & FPE - rescue gear