HEALTH AND WELLBEING PRECINCT - H REFER TO …
Transcript of HEALTH AND WELLBEING PRECINCT - H REFER TO …
17003
17001
27001
17002
27002
17004
27004
17101
2
7102
1
7102
1
7100
1
7103
3
7103
2 7103
27100
27003
17110
2
7111
1
7111
2 7112
1
7112
3
7112
HOLDEN STREET
RAC
ECO
UR
SE R
OAD
GOLFCOURSE
HO
SPITAL RD
NEW COVEREDPEDESTRIAN ENTRYPATHWAY
NEW FORECOURTAND DROP OFFZONE
NEW GATEWAYBUILDING ANDPEDESTRIAN LINK
CARPARK MADEGOOD AFTERHELIPADDEMOLITION
WARD STREET
CAPE ST NORTH
HO
SPITAL RD
RAILWAY
PEDESTRIAN & SERVICES VEHICLES AREA ONLY
EX.HSB
EX. MULTISTORY
CARPARK
EX. MENTALHEALTH
EXHOSPITAL
SHOW GROUND ROAD
EX.DATA
EX.ROTARY
NEWAMBULANCE BAY
NEW BUILDING
NEW EDDROP OFF
NEWLANDSCAPEDCOURTYARD
FAUNCE STREET WESTBEANE S
TEET WEST
EX.SHED
EX.
LOADIN
G
DOCK
EX.CARPARKING
EX.CLINIC
GASCYLINDER
COMPOUND
EX.CAR
PARKING
EMER
GEN
CY
DR
IVEW
AY
DR
IVEW
AY
EX. STAFF CARPARKING
AD
MIN
NEWPUBLICENTRY
NEWPUBLICENTRY
EX.CARPARKING
EX.CLINIC
EX.CAR
PARKING
ADM
IN
ADM
IN
EX.CARPARKING
HEALTH AND WELLBEING PRECINCT -STAGE 1 BOUNDARY
AMBULANCEPATIENT PICK-UP/DROP OFF ONLY
MAJOR SIGNAGE LOCATIONSINDICATED
REFER TO SEPERATEARCHITECTURAL DESIGN PACKPREPARED BY FITZPATRICK &PARTNERS FOR DETAILS
N
DRAWN
DESIGNED
DRAWING CHECK
DESIGN REVIEW
REVIEWED
APPROVED
CLIENT
PROJECT
TITLE
SCALE (A0)
DRAWING No. REV
DRAWING STATUS
PROJECT MANAGER
KEY PLAN
DATE
DATE
NOTES:
ARCHITECTURE
ZONE 1
ZONE 2
GOSFORD HOSPITAL
FINAL ISSUE
1 : 500
615/06
/2015
11:39
:16 A
M
GOSFORD HOSPITAL
PROPOSED SITE PLAN (SSD)
Jacobs
Jacobs
AC
CY
CY 26/03/2015
VL 26/03/2015
HOLDEN STREETGOSFORD, NSW 2250
NB98078-NEWB-AR-DG-0051
100 Christie StreetSt Leonards, SYDNEY, NSW 2065AUSTRALIA
Tel: +61 2 9928 2100Fax: +61 2 9928 2500Web: www.jacobs.com
1 : 5000211PROPOSED SITE PLAN (SSD)1
REV DATE DRAWN REV'D APP'D AMENDMENT1 30/03/2015 SSD DRAFT ISSUE2 01/04/2015 SSD ISSUE3 09/04/2015 SSD UPDATE4 14/04/2015 SSD UPDATE5 24/04/2015 SSD FINAL ISSUE6 15/06/2015 SSD ISSUE
HOLDEN STREET
CAPE ST NORTH
RAC
ECO
UR
SE R
OAD
GOLFCOURSE
WARD STREET
HOSPITAL RD
HOSPITAL RD
W
E
N
S
TO CENTRALCOST HIGHWAY
WINTERAM-21st June
WINTERPM-21st June
SUMMERPM- 21st December
TO PACIFICHIGHWAY
VIEW
S O
VER
GO
LFCO
URSE
VIEWS TO
RUM
BALARAR
ESERVE
VIEWS TOWATERVIEW PARK
SECO
NDAR
Y W
IND
DIREC
TION
SOUT
HERL
Y
PREV
AIL
ING
WIN
DS
FRO
M N
.WW
ESTE
RLY
TO GOSFORDRAILWAY STATION
SUMMERAM- 21st December
EQUINOXAM-MARCH 20AM-SEPTEMBER 23
EQUINOXAM-MARCH 20AM-SEPTEMBER 23
17110
2
7111
1
7111
2 7112
1
7112
3
7112
GENERAL R
ESIDENTIAL
GENERAL R
ESIDENTIAL
GENERAL R
ESIDENTIAL
GENERAL R
ESIDENTIAL
COMMERCIAL
SCHOOL
GOLF CLUB
REFER TO SEPERATEARCHITECTURAL DESIGNPACK PREPARED BYFITZPATRICK &PARTNERS FOR DETAILS
SHOWGROUND ROAD
RAILWAY LINE
GOSFORD TRAIN STATION
LEGEND
TRAIN STATION
BUS STOP
HOLDENSTREETRACECOURSE
ROAD
N
DRAWN
DESIGNED
DRAWING CHECK
DESIGN REVIEW
REVIEWED
APPROVED
CLIENT
PROJECT
TITLE
SCALE (A0)
DRAWING No. REV
DRAWING STATUS
PROJECT MANAGER
KEY PLAN
DATE
DATE
NOTES:
ARCHITECTURE
ZONE 1
ZONE 2
GOSFORD HOSPITAL
FINAL ISSUE
1 : 1250
824/04
/2015
2:24
:03 P
M
GOSFORD HOSPITAL
SITE ANALYSIS PLAN
Jacobs
Jacobs
CP/AC
CY
CY 27/02/2015
VL 27/02/2015
HOLDEN STREETGOSFORD, NSW 2250
NB98078-NEWB-AR-DG-0007
100 Christie StreetSt Leonards, SYDNEY, NSW 2065AUSTRALIA
Tel: +61 2 9928 2100Fax: +61 2 9928 2500Web: www.jacobs.com
1 : 12500211SITE ANALYSIS PLAN1
1 : 12500211SECTION - BUILDING SITE2
REV DATE DRAWN REV'D APP'D AMENDMENT1 19/12/2014 PRELIMINARY 100% SD ISSUE2 30/01/2015 100% SCHEMATIC DESIGN ISSUE3 27/02/2015 100% SCHEMATIC DESIGN ISSUE4 17/03/2015 SSD ISSUE5 30/03/2015 SSD DRAFT ISSUE6 01/04/2015 SSD ISSUE7 01/04/2015 SD ISSUE8 24/04/2015 SSD FINAL ISSUE
HO
SPITAL RD
HO
SPITAL RD
RAILWAY
GOLFCOURSE
GOSFORDHIGH
SCHOOL
WATERVIEW PARK
D.1
D.2
D.3
AMBULANCEBAY
1.3
STAGE 1BLDG
ED
MENTALHEALTH
MULTISTOREY
CARPARKHEALTH SERVICE
BUILDING
LOCAL HEALTHDISTRICTBUILDING
AMB CARE /PATHOLOGY
MANDALABUILDING
COMPUTERCENTRE
WORKSHOP
RLA
WASTE
STAGE 4BLDG
STAGE 3BLDG
MAIN HOSPITAL
PAED /SUB STATION
EDUCATION
HARRY MAHOCKSBUILDING
IT
NURS
ES H
/O
NURS
ES H
/OD.4
D.5
H
SHOWGROUND ROAD
BEANE ST. W
ESTHOLDEN STREET
CAPE ST NORTH
RAC
ECO
UR
SE R
OAD
WARD STREET
TENNIS COURTAND RETAINING
WALL
D.6
D.7
HEALTH AND WELLBEING PRECINCT -STAGE 1 BOUNDARY
REDEVELOPMENT ZONE(HOSPITAL & HWP SCOPE OF WORKS)
FAUNCE ST. WEST
EXISTING SERVICES IN ROADMODIFIED TO SUIT NEWDEVELOPMENT. HATCHED PARTOF HOSPITAL ROAD TO BECLOSED OFF.
PHASE 1
BUILDING / FACILITY TO BE DEMOLISHED
LEGEND
CONSTRUCTION OR REFURBISHMENTAREA
DEMOLISH EDUCATION BUILDING
DEMOLISH HARRY MATTOCKS BUILDING
DEMOLISH ICT BUILDING
DEMOLISH PATHOLOGY / AMBULATORY CARE BUILDING
REMOVE CABINS
DEMOLISH TENNIS COURT AND RETAINING WALL
DEMOLISH WORKSHOP
EXISTING SERVICES IN ROAD MODIFIED TO SUIT NEWDEVELOPMENT. HATCHED PART OF HOSPITAL ROAD TO BECLOSED OFF. REMAINING SECTIONS TO BECOME TWO WAYTRAFFIC.
D.1
D.2
D.3
D.4
D.5
D.6
D.7
1.3
ENABLING
N
DRAWN
DESIGNED
DRAWING CHECK
DESIGN REVIEW
REVIEWED
APPROVED
CLIENT
PROJECT
TITLE
SCALE (A0)
DRAWING No. REV
DRAWING STATUS
PROJECT MANAGER
KEY PLAN
DATE
DATE
NOTES:
ARCHITECTURE
GOSFORD HOSPITAL
FINAL ISSUE
As indicated
915/06
/2015
11:34
:14 A
M
GOSFORD HOSPITAL
PHASING PLAN - PHASE 1 (SSD)
Jacobs
Jacobs
CP/AC
CY
CY 30/01/2015
VL 30/01/2015
HOLDEN STREETGOSFORD, NSW 2250
NB98078-NEWB-AR-DG-0009
1 : 750PHASING PLAN - PHASE 1 (SSD) - DEMOLITION PLAN1
PHASE 1 WORK
100 Christie StreetSt Leonards, SYDNEY, NSW 2065AUSTRALIA
Tel: +61 2 9928 2100Fax: +61 2 9928 2500Web: www.jacobs.com
REV DATE DRAWN REV'D APP'D AMENDMENT1 21/11/2014 70% SD ISSUE2 03/12/2014 FOR INFORMATION3 19/12/2014 PRELIMINARY 100% SD ISSUE5 17/03/2015 SSD ISSUE4 13/03/2015 INFO FOR SOP6 30/03/2015 SSD DRAFT ISSUE7 01/04/2015 SSD ISSUE8 24/04/2015 SSD FINAL ISSUE9 15/06/2015 SSD ISSUE
HOSPITAL RD
RAILWAY
GOLFCOURSE
GOSFORDHIGH
SCHOOL
WATERVIEW PARK
2.1
AMBULANCEBAY
STAGE 1BLDG
MENTALHEALTH
MULTISTOREY
CARPARKHEALTH SERVICE
BUILDING
AMB CARE /PATHOLOGY
MANDALABUILDING
COMPUTERCENTRE
RLA
STAGE 4BLDG
STAGE 3BLDG
PAED /SUB STATION
IT
NURS
ES H
/O
NURS
ES H
/O
H
HOSPITAL RD
HOSPITAL RD
WATERVIEW PARK
BEANE ST. W
EST
1.1a
HOLDEN STREET
CAPE ST NORTH
RAC
ECO
UR
SE R
OAD
WARD STREET
REMOVED TREES ON CARPARK SITE ANDEXTENT OF SERVICES RELOCATIONALONG HOLDEN STREET ANDSHOWGROUND ROAD SHOWNINDICATIVELY.REFER TO FITZPATRICK & PARTNERSDESIGN PACK FOR DETAIL
SHOWGROUND ROADLHD
HEALTH AND WELLBEING PRECINCT -STAGE 1 BOUNDARY
REDEVELOPMENT ZONE(HOSPITAL & HWP SCOPE OF WORKS)
AMBULANCEPATIENT PICK-UP/DROP OFF ONLY
FAUNCE ST. WEST
HO
SPITAL RD
HO
SPITAL RD
2 TREES TOBE REMOVED
STAGE MAIN CONSTRUCTION PROJECT
ENABLINGWORK
- ISOLATE NW FACE OF BUILDINGAGAINST NEW CONSTRUCTION- RELOCATION OF SERVICES ALONGHOLDEN STREET AND SHOWGROUNDROAD
NEWCONSTRUCTIONWORK
2.1 - MAIN NEW BUILDING WORK
RELOCATE UPON COMPLETION MOVE THEFOLLOWING INTO THE NEWHOSPITAL BUILDING:
L1- REHAB IPUL2- GERIATRICL3- NUCLEAR MEDICINEL4- WOMEN'S HEALTH- OPD / AMBULATORY CAREL5- BIRTHING- SURGICAL AND PROCEDURE UNITL6- ICU / HDUL7 & ABOVE- MATERNITY + IPUsL8- IPUL9- IPU + SHELL
PHASE 2
NEW BUILDING TO BECONSTRUCTED AND FITTED OUT.DEPARTMENT TO BE RELOCATEDUPON COMPLETION
2.1
NEW / REFURB / RELOCATION LEGEND
CARPARKENABLING WORK
DEMOLISH PROPERTIES ON CARPARKSITE
EXISTING BUILDING
NEW BUILDING
RELOCATION OF INGROUND SERVICESALONG HOLDEN STREET ANDSHOWGROUND ROAD
N
DRAWN
DESIGNED
DRAWING CHECK
DESIGN REVIEW
REVIEWED
APPROVED
CLIENT
PROJECT
TITLE
SCALE (A0)
DRAWING No. REV
DRAWING STATUS
PROJECT MANAGER
KEY PLAN
DATE
DATE
NOTES:
ARCHITECTURE
ZONE 1
ZONE 2
GOSFORD HOSPITAL
FINAL ISSUE
As indicated
415/06
/2015
11:40
:16 A
M
GOSFORD HOSPITAL
PHASING PLAN - PHASE 2 (SSD)
Jacobs
Jacobs
AC
CY
CY 26/03/2015
VL 26/03/2015
HOLDEN STREETGOSFORD, NSW 2250
NB98078-NEWB-AR-DG-0052
100 Christie StreetSt Leonards, SYDNEY, NSW 2065AUSTRALIA
Tel: +61 2 9928 2100Fax: +61 2 9928 2500Web: www.jacobs.com
1 : 750701PHASING PLAN - PHASE 21
PHASE 2 WORK
REV DATE DRAWN REV'D APP'D AMENDMENT1 30/03/2015 SSD DRAFT ISSUE2 01/04/2015 SSD ISSUE3 24/04/2015 SSD FINAL ISSUE4 15/06/2015 SSD ISSUE
WATERVIEW PARK
3.1
3.2
3.3
3.4
AMBULANCEBAY
3.5
SHOWGROUND ROAD
RAILWAY
GOLFCOURSE
GOSFORDHIGH SCHOOL
HOLDEN STREET
CAPE ST NORTH
RAC
ECO
UR
SE R
OAD
WARD STREET
LANDSCAPED COURTYARD TOCOMMENCE AFTERCOMPLETION OF THEATRESAND ACCESS TO EMERGENCYDEPARTMENT IS COMPLETED
HEALTH AND WELLBEING PRECINCT -STAGE 1 BOUNDARY
REDEVELOPMENT ZONE(HOSPITAL & HWP SCOPE OF WORKS)
AMBULANCEPATIENT PICK-UP/DROP OFF ONLY
3.6
3.6
3.7
3.7
3.8
3.9
FAUNCE ST. WEST
HO
SPITAL RD
HO
SPITAL RD
REFER TO SEPERATEARCHITECTURAL DESIGN PACKPREPARED BY FITZPATRICK &PARTNERS FOR DETAILS
STAGE - COMPLETED ED- REFURBISH EMPTY SPACE IN EXISTING
ENABLINGWORK
- DEMOLISH LHD BUILDING
NEWCONSTRUCTIONWORK
- NEW E.D. ACCESS ROAD- FORM NEW ENTRANCE TO E.D.- BUILD CAR PARK
RELOCATE UPON COMPLETION MOVE THEFOLLOWING INTO THE NEW HOSPITALBUILDING:L3- EMERGENCY DEPARTMENT
UPGRADE THE EXISTING AREAS TOFORM NEW ACCOMMODATION
PHASE 3
PAEDIATRIC - LEVEL 4
CARDIO VASCULAR - LEVEL 5
DAY ONCOLOGY - LEVEL 5
LHD BUILDING & HELIPAD TO BEDEMOLISHED
DEMOLITION LEGEND
NEW BUILDING / FACILITY / REFURBTO BE BUILTX.X
NEW / REFURB / RELOCATION LEGEND
3.1
3.2
3.3
3.4
3.5
RETAINING WALL & CAR ACCESS TO EDTO BE CONSTRUCTED AFTERAMBULANCE ACCESS COMPLETED
EXISTING BUILDING
NEW BUILDING
CARPARKING, EDUCATION AND RETAIL
PUBLIC DOMAIN WORKS
3.6 ED - LEVEL 3
3.7 AMU - LEVEL 3
3.8 SHORT STAY - LEVEL 3
3.9 RESPIRATORY - LEVEL 3
N
DRAWN
DESIGNED
DRAWING CHECK
DESIGN REVIEW
REVIEWED
APPROVED
CLIENT
PROJECT
TITLE
SCALE (A0)
DRAWING No. REV
DRAWING STATUS
PROJECT MANAGER
KEY PLAN
DATE
DATE
NOTES:
ARCHITECTURE
ZONE 1
ZONE 2
GOSFORD HOSPITAL
FINAL ISSUE
As indicated
415/06
/2015
11:41
:20 A
M
GOSFORD HOSPITAL
PHASING PLAN - PHASE 3 (SSD)
Jacobs
Jacobs
AC
CY
CY 26/03/2015
VL 26/03/2015
HOLDEN STREETGOSFORD, NSW 2250
NB98078-NEWB-AR-DG-0053
100 Christie StreetSt Leonards, SYDNEY, NSW 2065AUSTRALIA
Tel: +61 2 9928 2100Fax: +61 2 9928 2500Web: www.jacobs.com
1 : 750701PHASING PLAN - PHASE 31
PHASE 3 WORK
REV DATE DRAWN REV'D APP'D AMENDMENT1 30/03/2015 SSD DRAFT ISSUE2 01/04/2015 SSD ISSUE3 24/04/2015 SSD FINAL ISSUE4 15/06/2015 SSD ISSUE