    HD201R STEAM TRACING PIPING REQUIREMENTS

    FOR APPROVAL

    Jos Gilarranz Eduardo Santamaria

    ENGINEERING SPECIFICATION

    FEB.89

    MAY.901

    0

    24

    27

    ENGINEERING DESIGN MANUAL

    SPECIALISTS

    APPD.BY

    PDVSA

    http://especialistas/hd-201-r.pdfhttp://especialistas/hd-201-r.pdf
  • 7/29/2019 Hd 201 Rsteam Piping

    2/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 1

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    Index

    1 GENERAL 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.1 Scope 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2 References 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3 Regulations 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2 DESIGN 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.1 General Arrangement 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.2 Identification of Tracing System 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3 GENERAL INSTALLATION REQUIREMENTS 4. . . . . . . . . . . . . . . . . .

    3.1 Design of Tracer 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3.2 Appurtenance Tracing 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.3 Instruments 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.4 Relief Valve 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.5 Drains 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.6 Size and Length of Tracers 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.7 Trap Hookup 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.8 Tracer Condensate Collection 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.9 Strainers 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3.10 Attachment of Tracers 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.11 Expansion Loops 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    3.12 Supports 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3.13 Testing 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4 MATERIALS 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.1 Copper 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.2 Stainless Steel 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.3 Traps 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.4 Valves 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.5 Pipe and Miscellaneous Material 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    3/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 2

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    1 GENERAL

    1.1 Scope

    1.1.1 This specification contains requirements for the design, selection of materials,and installation of steam tracing. It should be used to prepare drawings andmodel work defining the steam tracing systems to be installed on the project.

    1.1.2 Items requiring steam tracing, such as process and utility piping, instruments,equipment, etc. shall be shown traced on the applicable Piping and Instrument(P&I) flow diagrams and/or as specified on the line schedules.

    1.2 References

    1.2.1 Additional requirements applicable to Steam Tracing are contained in thefollowing Engineering Specifications:

    Process and Utility Piping Design Requirements PDVSA H251

    Piping Materials PDVSA H221

    Piping Fabrication Requirements PDVSA H231

    Insulation Material and Application Hot Service PDVSA L212

    1.2.2 The following codes, standards and practices, including applicable addenda, ineffect as of the lastest edition, shall form a part of this specification to the extentspecified herein.

    American Society for Testing and Materials (ASTM)

    B68 Specification for Seamless Copper Tubing, Bright Annealed.

    B75 Specification for Seamless Copper Tubing

    American National Standards Institute (ANSI)

    B31.3 Chemical Plant and Petroleum Refinery Piping

    1.3 Regulations

    This specification requires compliance with all Venezuelan laws, standards andregulations which may be applicable.

    2 DESIGN

    2.1 General Arrangement

    2.1.1 Manifolds shall be provided for supply leads and condensate returns. SeeAppendix V.

    2.1.2 Single tracer suppliying from the steam main shall not be used unless the traceris in a remote location.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://h-251.pdf/http://h-251.pdf/http://h-251.pdf/http://h-251.pdf/http://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://h-231.pdf/http://h-231.pdf/http://h-231.pdf/http://h-231.pdf/http://../vol10/l-212.pdfhttp://../vol10/l-212.pdfhttp://../vol10/l-212.pdfhttp://../vol10/l-212.pdfhttp://../vol10/l-212.pdfhttp://h-231.pdf/http://../vol13-1/h-221.pdfhttp://h-251.pdf/http://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    4/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 3

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    2.1.3 The rules to be followed in determining the size and locations of manifolds are as

    follows:a. Manifolds shall be supplied when there are six or more connections located

    so the maximum distance from the supply lead to the item being traced doesnot exceed approximately 18 meters.

    b. In establishing the maximum distance, assume that tracer supplies andreturns are, routed NorthSouth, EastWest and vertically; not the shortestdistance between two points.

    c. The developed length for each supply and return shall include a 10%allowance for indirect routed such as U type configurations to avoidinterferences.

    d. Manifolds shall be 3 inches in size and mounted either horizontally orvertically.

    e. Connections not used are to be blocked off and will serve as leads for futureconnections.

    2.1.4 A single Y type strainer shall be installed in the supply line to the manifold andlocated as close to the manifold as practical.

    2.1.5 The location of tracer steam and condensate manifolds will be shown, wherepossible, on the model or arrangement drawings.

    2.1.6 The first block valve on steam mains for tracer manifold supplies will be locatedpreferentially on the model and/or shown on the drawings.

    2.1.7 The location of condensate returns to condensate mains shall be determined bythe personnel at the construction site.

    2.1.8 Block valves shall be accesible from grade, ladder or platforms and shall begrouped in central locations.

    2.1.9 All tracer supplies and tracers shall be routed to avoid pockets.

    2.1.10 Steam supplies and manifolds shall be arranged to provide the most economialinstallation without sacrificing freezing, operation or maintenance designconsiderations.

    2.1.11 Each tracer supply point shall be located at an elevation above the highest pointof the item being traced.

    2.1.12 Condensate from tracing steam traps shall normally be returned to thecondensate return system.

    2.1.13 Where this is not economical and with the prior approval of the Owner, thecondensate may be discharged to grade.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    5/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 4

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    2.2 Identification of Tracing System

    2.2.1 The steam supply line and the condensate line shall be provided with metal tagsbearing the number corresponding to the tracer number, as shown on theTabulation of Tracer drawings.

    2.2.2 The tags shall be located on or adjacent to both the steam supply block valve andthe trap on the condensate return end.

    2.2.3 The Dymo Model 101100 Tapewriter using stainless steel tape fastened with poprivets is an easy and inexpensive method of metal tagging.

    3 GENERAL INSTALLATION REQUIREMENTS

    3.1 Design of Tracer

    3.1.1 Tracers shall be installed in accordance with Appendices I, II, III, VI, VII, VIII andIX. Appendices I thru IX are typical and should be used for guidance only.

    3.1.2 Tracers shall follow the contour of valves, pumps, and other equipment havingnonregular surfaces.

    3.1.3 Pockets shall be avoided or kept to a minimum.

    3.1.4 No special straightening of tubing is necessary.

    3.1.5 A slight waviness can serve to accommodate expansion.3.1.6 Tracers on horizontal lines shall be installed in accordance with Appendices I and

    II.

    3.1.7 Multiple tracers used on vertical lines shall be equally spaced around thecircumference of the pipe. See Appendix II.

    3.1.8 For change of direction, all tubing shall be bent and have a minimum bend radiusof six times the outside diameter of the tubing.

    3.1.9 Crimped tubes will be rejected.

    3.1.10 Each tracer tube shall be individually trapped except at bypasses at control valvesor other similar hookups.

    3.1.11 No parallel tracers shall be combined and discharged to a single trap.

    3.1.12 All lines are to be routed in a neat and orderly manner using the followingguidelines:

    Tracer supply and return lines shall be located on the manifolds so the run ofthe piping will peel off to the item being traced, rather than cross over otherpiping.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    6/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 5

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    Any offset of these lines, other than 90, should be made in the horizontal plane

    rather than the vertical plane which will tend to conceal these offsets byblending with the vertical and horizontal lines of the plant.

    All lines shall be routed and shall be at right angles to the nearest pipe runs andshall be free from any sag so as to maintain a neat appearance.

    Supply and return lines shall be set to the same radius in order to present auniform flow.

    3.2 Appurtenance Tracing

    3.2.1 Sample connections, drains, vents, and closecoupled noncritical instrumentsattached to pipelines or equipment shall be traced with the pipeline or equipmenttracer.

    3.2.2 The first shutoff valve on a branch line off a steam traced line shall be traced,although the branch line may not be traced.

    3.3 Instruments

    3.3.1 All instruments which require steam tracing, except closecoupled noncriticaltypes, shall be provided with individual tracers.

    3.4 Relief Valve

    3.4.1 Apply tracer at relief valve as close as possible to valve seat to provide complete

    protection.

    3.5 Drains

    3.5.1 Tracers need not have low point drains.

    3.6 Size and Length of Tracers

    3.6.1 Use single or multiple tracers and lengths as follows:

    Line Size Number of Tracers

    4 & Smaller 16 to 16 2

    18 & Larger 3

    Steam Pressurekg/cm2 (gauge)

    3,5 7 10,5 14 17,6 21,1 and higher

    Tracer Lengthmeters

    38 46 53 61 69 76

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    7/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 6

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    3.6.2 The above lenths are based on 1/2 inch OD tubing. Multiply these lengths by 0,75

    for 3/8 inch OD tubing.3.6.3 Use 3/8 inch OD tubing instead of 1/2 inch OD to facilitate bending at control valve

    stations etc.

    3.6.4 These lengths apply to open trap discharge and insulation thickness of 1 inch or1 1/2 inches.

    3.6.5 For closed condensate return systems, reduce the tracer lengths 0,9 meters foreach Kg of back pressure at the trap.

    3.6.6 Where pockets cannot be avoided, such as in tracing of valves, flanges, etc., thesum of tracer pocket heights in meters shall not exceed 0,70 x 10% of inlet steam

    pressure.

    3.7 Trap Hookup

    3.7.1 The basic steam trap shall be thermodynamic type as specified in Paragraph 4.3

    3.7.2 These traps shall be used for steam pressures of 0,35 to 42,2 kg/cm2 (gauge)where closed condensate return systems do not cause back pressures at the trapin excess of 80% of the trap inlet pressure.

    3.7.3 Steam tracing installation shall be arranged to facilitate convenient removal forreplacement or repair of the trap.

    3.7.4 For a closed condensate system, with or without back pressure on the system,locate traps close to and above the condensate manifold or condensate returnline.

    3.7.5 For an open condensate system, locate traps close to point of discharge socondensate will drain freely from the discharge side of the trap (see Appendix IV).

    3.7.6 Thermodynamic traps shall preferably be installed in the vertical.

    3.7.7 Where necessary to install in the horizontal, the trap shall be rotated 90 so thebonnet of the trap is on the side.

    3.8 Tracer Condensate Collection

    Locate the tracer condensate header, whenever possible, at an elevation lowenough to permit flow of condensate from all connected tracer condensate lines.

    3.9 Strainers

    3.9.1 Where manifolds are used, a single Y strainer shall be installed in the supply lineto the manifold and no additional strainer will be required ahead of the traps.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    8/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 7

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    3.9.2 Where the alternate arrangement of a single tracer taken off a steam main is used,

    each trap shall have a strainer built into the trap.

    3.10 Attachment of Tracers

    3.10.1 Tracers shall be attached to pipe by 12,5 mm wide x 0,38 mm thick, Type 304,stainless steel strapping on approximately 1 meter centers.

    3.10.2 Between changes of direction, tracers should be banded snugly but still looseenough so as not to restrain the expansion of the tracer.

    3.10.3 Spacers shall be provided between tracers and the piping or equipment when thefollowing fluids are in the line being traced.

    Caustic fluids Acid fluids

    Fluids where hot spots will accelerate the corrosion rate due to the electrolyticproperties

    Heat sensitive fluids.

    3.10.4 Spacers can be Transite or Marinite 12,5 mm thick x 12,5 mm wide x 76 mm long.

    3.10.5 Where the pipe is austenitic stainless steel, spacers shall be coated with sodiumsilicate before installation.

    3.11 Expansion Loops3.11.1 Expansion loops shall be provided at approximately 12 meter intervals.

    3.11.2 Loops at tube fittings, changes in direction, valves and flanges shal serve asexpansion loops (see Appendix III).

    3.12 Supports

    3.12.1 All pipe and tubing including tracer supply and condensate returns installed fortracing purposes shall be adequately supported in the field using channels andclamps similar to Unistrut or equal.

    3.12.2 Tracers shall be supported from steel wherever possible.

    3.12.3 If there is no steel in the area and tracers are supported from pipe, select lineswhich are cold or uninsulated if possible.

    3.12.4 If supported from as insulated line, provision shall be made for thermal expansion.

    3.13 Testing

    3.13.1 The tracer system shall be pressure tested prior to insulating.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    9/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 8

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    3.13.2 Hydrostatic test pressure shall be at least 7 kg/cm2 (gauge) or 1 1/2 times the

    design pressure, whichever is greater.

    4 MATERIALS

    4.1 Copper

    4.1.1 Copper Tubing

    a. Systems using copper tubing shall be limited to 200 C.

    b. Leads and returns to and from the tubing adjacent to the traced item shallbe preinsulated and jacketed tubing as follows:

    1/2 inch OD x 0.049 inch wall seamless soft annealed copper tubing ASTMB68 or B75 insulated with inorganic fiberous glass (KTex or equal) and

    jacketed with 105 C PVC.

    c. Sufficient insulation shall be furnished to provide a maximum surfacetemperature of 60 C at 27 C ambient.

    d. Tubing shall be furnished in 76 meter of 152 meter coils on sturdy woodenreels.

    e. Bare copper tubing adjacent to traced item should be a choice of seamlesscopper soft annealed ASTM B68 or B75.

    4.1.2 Tube Fittings

    Tube fittings should be brass flareless type, Swagelok or equal.

    4.2 Stainless Steel

    4.2.1 Stainless Steel Tubing

    a. Stainless Steel Tubing shall be used as tracer tubing and noted on pipingisometric drawings when one or more of the following conditions exist:

    a. When the steam used for tracing exceeds 200 C.

    b. When the system being traced operates at design temperatures exceeding

    200 C.c. When the process in the area preclude the use of copper. (Eg. acetylene)

    b. Bare stainless steel tubing adjacent to traced items should be of welded type304 stainless steel per ASTM A269 as follows:

    3/8 OD x 0,035 wall thickness

    1/2 OD x 0,035 wall thickness

    c. Stainless steel tubing shall be furnished in the manufacturer s standardmaximum lenght coils on sturdy wooden reels.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    10/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 9

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    d. Leads to and returns from the stainless steel tracer shall be preinsulated

    and jacketed as follows:1/2 in. OD x 0,035 in. wall thickness, welded type 316 stainless steel tubing(ASTM A269) insulated with inorganic fiberous glass (Ktex or equal) and

    jacketed with 105 C PVC.

    e. The insulation on the preinsulated tubing shall be thick enough to providea maximum surface temperature of 60 C at 27 C ambient air temperature.

    4.2.2 Tube fittings should be type 316 stainless steel flareless type, Swagelok or equal.

    4.3 Traps

    4.3.1 Traps should be 1/2 inch NPT floating disc type Sarco, Yarway or equal.

    4.3.2 Traps shall be furnished with an integral strainer when the supply line is taken offa steam main as a single tracer lead. (Refer to Paragraph 3.9).

    4.4 Valves

    4.4.1 Valves upstream of traps shall be suitable for the supply steam; refer to the LineSpec. for steam in the Engineering Specification Piping Materials,PDVSAH221.

    4.4.2 Valves downstream of traps shall be suitable for the condensate return system;

    refer to the Line Spec. for steam condensate in the Engineering SpecificationPiping Materials, PDVSAH221.

    4.5 Pipe and Miscellaneous Material

    4.5.1 Pipe, pipe fittings, and other pipe material not listed above that are upstream ofthe trap shall be the same Class rating and Material as the Steam Supply LineSpec. in the Engineering SpecificationPiping Materials, PDVSAH221.

    4.5.2 Pipe, pipe fittings and other pipe material located downstream of the trap shall bethe same Class rating and Material as the Condensate System Line Spec. in the

    Engineering SpecificationPiping Materials, PDVSAH221.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://../vol13-1/h-221.pdfhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    11/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 10

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX I

    DETAILS FOR SINGLE TRACER TUBING

    MOULDED BLOCK INSULATION

    PIPINGS

    SECTION THROUGH ALL HORIZONTALAND VERTICAL LINES

    WIRE TIES ON 1.2 M CENTERS

    STEAM TRACER(BEND OFF CENTER AT PIPE SHOES)

    DETATIL OF WRAP AROUND TRACERFOR VERTICAL LINES

    WIRE TIES ON 1.2 M CENTERS

    MOULDED BLOCK INSULATION

    STEAM TRACER

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    12/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 11

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX II

    DETAILS FOR MULTIPLE TRACER TUBING

    TOP

    TOP

    INSULATION

    WIRE TIES ON1.2 M CENTERS

    STEAM TRACERS

    (BEND TO STRADDLE PIPE SHOES)

    (2 TRACERS)

    HORIZONTAL LINE VERTICAL LINE

    (3 TRACERS)

    HORIZONTAL LINE VERTICAL LINE

    30 30

    120 120

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    13/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 12

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX II CONTD

    DETAILS FOR MULTIPLE TRACER TUBING

    TOP

    HORIZONTAL LINE VERTICAL LINE

    (4 TRACERS)

    INSULATION

    WIRE TIES ON

    1.2 M CENTERS

    STEAM TRACERS

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    14/24

  • 7/29/2019 Hd 201 Rsteam Piping

    15/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 14

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX III CONTD

    TYPICAL STEAM TRACING INSTALLATIONS

    NOTE:SUPPLY AND RETURN RISERS

    TO BE SIZED FOR NUMBER OFTRACERS REQUIRED ANDLOCATED IN THE STRUCTURETO SUIT THE LOCATION OFITEMS TO BE TRACED.

    TO STEAM TRACERS

    GATE VALVE

    STEAM HEADER

    TRAP FOR RISER

    TO SEWER OR CONDENSATECOLLECTING SYSTEN

    FROMTRAPS

    STEAMTRACER

    STEAM TRACING FOR LARGE VALVE BODY(3 AND LARGER)

    (IF BONNET IS NOT FLAT,TRACING SHOULD INCLUDE IT)

    SUPPLY AND RETURN PIPINGAT TOWER STRUCTURE

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    16/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 15

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX III CONTD

    TYPICAL STEAM TRACING INSTALLATIONS

    IMPULSE ORTHERMODYNAMIC TRAP

    STEAM TRACERS

    CONDENSATE RETURN

    TRAP

    GATE VALVES

    STEAMNEADER

    STEAM TRACERS FOR HEADER AND BRANCHES

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    17/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 16

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX IV

    TRAP ARRANGEMENTS(OPEN DISCHARGE)

    STEAM TRACED ITEM

    CONNECTOR 1/2 LINE

    1/2 TRAP

    6 OR 8 DIAMETER SCRAP PIPEAPPROX. 1.3 METERS LONG FILLEDWITH LOOSE SHELL OR GRAVEL150mm

    GRADE

    SLOPE1/2 STEAMTRACER

    PLAN

    TRACER CONDENSATEHEADER

    SLOPE

    VENT STACK11/2 FOR 2 OR 3 HEADERS2 FOR 4 TO 6 HEADERS3 FOR 7 TO 12 HEADERS

    SAME AS FOR ABOVE OR SEWER

    VENT STACK

    LOCATE TOP OF STACKABOVE HEADROOM BUTNOT UNDER PLATFORMS

    OR PIPE RACKS

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    18/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 17

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX V

    TYPICAL MANIFOLD ARRANGEMENT

    2 SOCKOLET 3000 A105

    (1) REQD

    1 SCH 80 NIPPLES A106/B

    PLAIN END TYPICAL (7)

    REQD

    3 WELDED

    CAP (2)

    REQD3 SCH 40 PIPE A53 GR.B

    3/4 SOCKOLET

    3000 A105 (1)

    REQD

    1/2 SCH 80 NIPPLES

    A106/B PLAIN END

    TYPICAL (4) REQD

    No. REQD___TYPE A

    No. REQD___TYPE B

    SECTION AA TYPICAL

    FULL FILLET WELD

    2 SOCKOLET

    3000 A105 (1)

    REQD

    3 SCH. 40 PIPEA53 GR. B

    3/4 SOCKOLET

    3000 A105 (1)

    REQD1500 MM

    TYPE B

    TYPE A

    2400 MM

    150 MM

    300 MM TIP

    150 MM

    150 MM

    A

    A

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    19/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 18

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX VI

    MANIFOLD PIPING ARRANGEMENT

    1/2 SW NPT

    1/2 PIPE

    STEAMMAIN

    FOR LINE NUMBER &

    SPEC. SEE / ISOMETRIC

    OR PIPING ONE

    2 YSTRAINER

    FROM SUPPORT

    POINT

    455mm

    ANCHORSUPPORTBY FIELD

    RESTINGSUPPORTBY FIELD

    (M) INSULATION

    3/4 FIELD TO ROUTE TO

    NEAREST COND. TRACER

    MANIFOLD OR COND. HEADER

    T

    NIN1/2 TRAP

    STEAM TRACING MANIFOLD(STM3A) see legend

    1/2SWN

    PT

    TR3

    A4

    1/2 SPARE

    3/4

    3/4 x 1/2RED TEE

    1/2 TRACER SUPPLY

    TRACERSUPPLY

    PREINSULATED TUBING

    MALE CONNECTOR(TYP)

    COND. MAIN

    FOR LINE SIZE NUMBER& ESPEC. SEE ISOME-TRIC OR PIPING DWG

    150mm

    2

    3/4 VENT.

    3/4 VENT.

    1/2 TRAP

    1/2 SW NPT

    150mm

    TR3A4

    ANCHOR

    SUPPORTBY FIELD

    RESTINGSUPPORTBY FIELD

    455mm

    FROM SUPPORT

    POINT(M) INSULATION

    1/2 SPARE

    UNION

    NO INSULATION REQDFROM TRAP THRU LOWERNIPPLE (TYPICAL)

    1/2 TRACER RETURNPREINSULATED TUBING

    MALE CONNECTOR (TYP)MALE CONNECTOR

    PREINSULATEDTUBING

    ALTERNATE ARRANGE-MENT WHEN SINGLETRACER SUPPLY & RE-TURN IS USED

    UNION

    1/2 TRAP COND. MAINTRACER (see ISOor PIPING DNG)

    CONDENSATE TRACER MANIFOLD

    (CTM3A) see legend

    LEGEND

    DENOTESTRACER

    DENOTES MODEL TA-BLE NUMBER OR PI-PING DWG NUMBER

    DENOTES TRACERLEAD NUMBER

    DENOTES TYPEMANIFOLD

    DENOTES MANIFOLD

    TR3A1

    STM 3A

    CTM 3A

    STA OF TRACER

    FINISH OF TRACER

    S

    F

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    20/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 19

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX VII

    TYPICAL STEAM TRACING FOR VESSEL

    COILS ON 15 CM CENTERS ON BOT-TOM OF VESSEL

    NOTE: investigate plate coils as a more economical alternate.

    TO TRAP

    TO TRAP TO TRAP

    TO TRAP

    COIL ON 15 CM CEN-TERS

    FROM HEADER

    PLAN VIEW

    TO

    TRAP

    TO

    TRAP

    TO

    TRAP

    STEAM HEADER

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    21/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 20

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX VII CONTD

    TYPICAL STEAM TRACING FOR VESSEL

    1 O.D. TUBINGCOILS ON 30.5CM CENTERS

    PLAN

    ELEVATION

    FROMH

    EADER

    FROMH

    EADER

    TO TRAPS

    NOTE: INVESTIGATE PLATECOILS AS MORE ECONOMICAL ALTERNATE.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    22/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 21

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX VIII

    STEAM TRACING OF INSTRUMENTS

    STEAM TRACER

    STEAM TRACER

    TO TRAP

    STEAM TRACING FOR PRESSUREGAUGE IS STEAM TRACED

    STEAM TRACING FOR CONTROL VALVEAND PRESSURE LEAD IN TRACED LINE

    TO TRAP

    TO TRAP

    STEAM TRACING FOR LIQUIDLEVEL INSTRUMENT

    STEAM TRACING FOR GAUGE GLASSES

    FROM HEADER

    1/2 O.D. TUBING

    1/2 O.D. TUBING

    STEAM TRACER

    NOTE: INSULATION FOR GAUGE GLASSES TO BE ONE HALF SECTION OF PIPE IN-SULATION COVERED WITH PLASTIC. STEAM TRACER TO BE ON BACK OF RE-FLEX TYPE GLASSES AND ON ONE SIDE OF THROUGH VISION TYPE.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    23/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 22

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX VIII CONTD

    STEAM TRACING OF INSTRUMENTS

    FROM HEADER

    STEAM TRACING FOR PRESSUREINSTRUMENT

    ENCLOSURE

    CONNECT TRACER TOHEATING ELEMENT

    CONNECT TRACER TOHEATING ELEMENT

    ENCLOSURE

    FIG. AFIG. B

    STEAM TRACING FOR LIQUIDFLOWMETER WITHOUT SEAL POTS

    FROM HEADER

    GROUP AND INSULATE

    FROM HEADERFROM HEADER

    STEAM TRACING AT SEAL POTSFIG. C

    FIG. D

    STEAM TRACING FOR STEAMFLOWMETERNOTE: TRACER FOR FACE ORIFICE LEAD TO BE WRAPPEDAROUND POTS FORMING CLOSE COIL FOR UPPER SECTION OF

    POTS ENTIRE ASSEMBLY TO BE INSULATED.

    TO TRAP

    TO METER

    STEAM TRACE AND IN-SULATELOWER HALF COLDSPOTS AND LEADS TOENCLOSURE

    GROUP AND IN-SULATE

    CONT. TO ENCLOSURESAME AS FIG. B

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp
  • 7/29/2019 Hd 201 Rsteam Piping

    24/24

    REVISION FECHA

    ENGINEERING SPECIFICATION

    STEAM TRACING PIPING REQUIREMENT MAY.901

    PDVSA HD201R

    Pgina 23

    .Men Principal Indice manual Indice volumen Indice norma

    PDVSA

    APPENDIX IX

    HEATED RACK FOR SMALL LINES

    No. 24 GAUGE GALV. SHEETMETAL COVER

    1 1/2 BLOCK INSU-LATION

    HEATING LINE

    HEATED RACK FOR SMALL LINES

    NOTE: THE HEATING COIL SHALL BE 3/4 PIPE WHEN LIVE STEAM IS USED AND 1 PIPE WHEN EXHAUSTSTEAM IS USED. IN EACH CASE, THE MAXIMUM LENGTH TO BE USED WITH ONE TRAP SHALL BE 76.2 m.

    http://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santphttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/vol13-2/indice_vol13-2.htmhttp://www.intevep.pdv.com/santp/mid/indice_mid.htmhttp://www.intevep.pdv.com/santp