HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

6
HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008

Transcript of HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

Page 1: HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

HBD HV Controland Monitoring System

NOW @ PHENIX

Manuel ProisslHBD Meeting 12/09/2008

Page 2: HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

OUTLINE

Installation in PHENIX The completed procedure Mainframe Initialization

OUR HV Control Time To Talk: “What Do We Want?”

Forward/Reverse Bias Trip (Peak) Current for GEMs & Mesh P/T Correction Layers / Tables

Coming Up Voltage / Current Calibration Relay Boards, Cabling, MF testing, … HVCV2.0 Distribution

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008

HBD HV Control & Monitoring System Manuel Proissl Page 2 of 6

Page 3: HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

INSTALLATION IN PHENIX

December 8th, 2008 – 4PM EST :: HBD HV Control & Monitoring System successfully installed in PHENIX

Due to the HBD Simulation Project, the installation process without big complications!

TS5 has been powered up and connected to the HBD mainframe on the bridge.

The mainframe rack which is shared with the RXNP guys, has been powered up.

ALL 6 Run9-modified 1471Ns, which have been crash tested and prepared for installation since last Thursday continuously day & night, were installed in the 1458HP mainframe.

ALL 40 channels (GEMs & Mesh chn) have been ramped up and measured via Fluke by controlling them one by one through the HV Control System, which was run on a laptop connected to the PHENIX wireless.

The installation channel check procedure automatically ramped & disabled channel by channel after measurement.

The channel check has been completely successful!!!

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008

HBD HV Control & Monitoring System Manuel Proissl Page 3 of 6

Page 4: HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

INSTALLATION IN PHENIX

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008

Channel Check on the Bridge

View onto the HBD from HV Bridge

HBD HV Control & Monitoring System Manuel Proissl Page 4 of 6

Page 5: HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

OUR HV CONTROL :: FAQ!

How do we want the HBD to operate?

Operational & Standby Voltages Forward & Reverse Bias: dV is set manually by user for key voltages Trip Settings: GEMs (~165mkA?) and Mesh (~20mkA?) HV Control will be connected to the P/T database (update every 2min) and can so

adjust operational/standby voltages based on layers WE need to set automatically!

Questions? Ideas? Comments?

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008

HBD HV Control & Monitoring System Manuel Proissl Page 5 of 6

Page 6: HBD HV Control and Monitoring System NOW @ PHENIX Manuel Proissl HBD Meeting 12/09/2008.

COMING UP

Correction Curves for 1471N Calibration: this week! Relay Board Trip tests in the hall Simulating the HBD with load channel by channel

Distribution / Installation Files for Linux & XP/Vista Platform independence Final installation files with Installation Wizard Expected Date Online: January 2nd, 2009

HBD HV Control & Monitoring System Manuel Proissl Page 6 of 6

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 9 th, 2008