HB’2008 August 25-29, 2008 M. Martini 1
Evolution beam parameters during Evolution beam parameters during injection and storage of the high injection and storage of the high
brightness beams envisaged for the Linac4 brightness beams envisaged for the Linac4 injection into the CERN PS Boosterinjection into the CERN PS Booster
M. Aiba, Ch. Carli, M. Martini (CERN)
Acknowledgements
M. Chanel, B. Goddard, W. Weterings (CERN)S.M. Cousineau (ORNL), F.W. Jones (TRIUMF)
2HB2008 August 25-29, 2008 M. Martini
ContentsContents
Agenda PS Booster overview PSB injection – Hardware layout PSB injection – Longitudinal painting scheme Ch. Carli PSB injection – Painting and tracking with ORBIT M.
Aiba Benchmark – ORBIT/ACCSIM vs. measurements Summary Appendix: ORBIT/ACCSIM space charge modeling
3HB2008 August 25-29, 2008 M. Martini
AgendaAgenda
Studies of the injection and storage of the 160 MeV Linac4 beam for LHC into the CERN PS Booster (PSB)
– Simulations with the Orbit code of the H- charge exchange injection and following beam emittance evolution at 160 MeV
– Injection done via a painting scheme for optimal shaping of the initial particle distribution
Benchmarking of the Orbit and Accsim simulations with measurements performed in the PSB on the actual high intensity beam stored at 160 MeV
Motivation for the upgrade of the PSB with Linac4:Deliver beams for the LHC, CNGS and ISOLDE of higher
intensity or brightness than presently achieved
4HB2008 August 25-29, 2008 M. Martini
PS Booster overviewPS Booster overview
Actual PS Booster (PSB) – 4 superimposed rings (16 triplet cells, ≳90 per period)– Multi-turn injection at 50 MeV with betatron stacking and septum– Large acceptances of AH,V=180/120 m– Acceleration to 1400 MeV in ~500 ms, double harmonic RF (h=1, h=2)– High space charge regime up to ~0.5 tune spreads at 50 MeV
Upgrade PS Booster with Linac4 at 160 MeV– 1014 particles per pulse of 0.4 ms, 1.1 Hz repetition rate – Increase of intensity within given normalized emittances by a factor 2– Increase of PS Booster injection energy from 50 MeV to 160 MeV
• (2)160MeV/(2)50MeV~2 (space charge decreased by a factor 2 within equal normalized emittance)
– H- charge exchange injection, Linac4 beam chopping
from Ch. Carli
H- Distributor
Proton recombination
5HB2008 August 25-29, 2008 M. Martini
PSB injection – Hardware layoutPSB injection – Hardware layout
160 MeV H- Linac4 beam injection system – Two independent closed orbit bump systems
• Injection “chicane”, 4 pulsed dipole magnets (BS), yielding ~61 mm beam offset throughout the injection process
• Painting bump, 4 horizontal kickers (KSW, outside the injection region), giving a ~28 mm closed orbit bump with falling amplitude during the injection for horizontal phase space painting
– Stripping efficiency of ~98% expected (through a graphite stripping foil)
PSB injection regionInjected & circulating 1st turn beam envelopes of 4 with partly-stripped H0 and un-stripped H-
W. Weterings et al.
6HB2008 August 25-29, 2008 M. Martini
PSB injection – Longitudinal painting schemePSB injection – Longitudinal painting scheme
PSB with Linac4: similar RF system than at present– Double harmonic
• fundamental h=1 & h=2, systems to flatten bunches and reduce tune shifts– Injection with (B)/t=10 Tm/s– Little but not negligible motion in longitudinal phase space– Active painting with energy modulation to fill bucket homogeneously
Accelerating RF bucket for a beam in a double harmonic system (h=1& h=2)
from Ch. Carli
7HB2008 August 25-29, 2008 M. Martini
PSB injection – Longitudinal painting schemePSB injection – Longitudinal painting scheme
Principle of longitudinal painting– Triangular Linac4 energy modulation (slow, ~20 turns for LHC, ~41mA
peak, 3.251012 p/ring)– Beam on if mean energy inside a contour ~80% of acceptance, off if mean
energy outside (via a chopper, chopping factor ~62%) – Higher intensities: several and/or longer modulation periods (~41mA)– Possible limits: Linac4 energy jitter, PSB energy spread due to debunching
from Ch. Carli
dot-dashed: mean energy time evolution
0.4% /p change over 10 turns
8HB2008 August 25-29, 2008 M. Martini
PSB injection –Painting and tracking with ORBITPSB injection –Painting and tracking with ORBIT
Nominal LHC beam with Linac4– Single batch PSB transfer: 3 out of 4 rings used, 6 bunches from 3 rings
delivered (2 bunches per ring)– PSB intensity per ring at 1.4 GeV for loss-free / lossy transmission to
LHC: 2.761012 / 3.251012 particles– Required PSB transverse normalized emittances: n
H,V(1)=2.5 m
ORBIT model (without acceleration)– Injection particle distribution
• 20 beam files (12000 particles per injected turn), containing the 6D particle distributions at the end of the transfer line (from B. Goddard)
• The longitudinal painting process with proper chopping was implemented during the building of the above particle distributions
– ORBIT simulations• The injection “chicane” and transverse painting bumps are implemented
(thin lens approximation) (~400 turns BS dipole fall time)• Beam files are injected turn by turn (over 20 turns, ~20s)• Bucket “filling up” via double harmonic RF system: 8 kV (h=1), 6 kV (h=2) • Foil heating T~500K, ~9.5 foil hits per proton
from M. Aiba
9HB2008 August 25-29, 2008 M. Martini
Nominal LHC beam at 160 MeV PSB injection– Mismatched dispersion at injection (end line: DLinac4=0m, DPSB-
1.4m)– Bunching factor ~0.60– No impressive effect of dispersion mismatch
ORBIT : Longitudinal profile (flat)(2.2105 macro-particles)
-180 -120 -60 0 60 120 180-1.5
-1.0
-0.5
0.0
0.5
1.0
1.5 Fully mismatched Dx turn 20000
dE
(M
eV)
phase (deg)
ORBIT : Longitudinal phase-space plot-E [deg-MeV] (2.2105 macro-
particles)
from M. Aiba
PSB injection –Painting and tracking with ORBITPSB injection –Painting and tracking with ORBIT
10HB2008 August 25-29, 2008 M. Martini
ORBIT : Emittances after injectionn
H,V(1) [m] (2.2105 macro-particles)
ORBIT : Emittances after injectionn
H,V(99%) [m] (2.2105 macro-particles)
Emittance evolution on a 160 MeV energy plateau– Painting and subsequent tracking up to 2104 turns– Simulation done with space charge, ∆QH,V~-0.27/-0.32 (QH,V=4.28/5.45)
from M. Aiba
PSB injection –Painting and tracking with ORBITPSB injection –Painting and tracking with ORBIT
nV>2.5m (beyond the PSB emittance budget)
Remark: ~8% rms vertical emittance blow-up reduction after 104 turns when using 4 times more macro-particles (~9105)
11HB2008 August 25-29, 2008 M. Martini
-20 -10 0 10 20-4
-2
0
2
4 Fully mismatched Dx turn 20000
x' (
mra
d)
x (mm)
-20 -10 0 10 20
-6
-4
-2
0
2
4
6
Fully mismatched Dx turn 20000
y' (
mra
d)
y (mm)
ORBIT : Transverse phase-space scatter plotsX-X’ & Y-Y’ [mm-mrad] (2.2105 macro-
particles) (some halo develops in vertical plane)
from M. Aiba
PSB injection –Painting and tracking with ORBITPSB injection –Painting and tracking with ORBIT
12HB2008 August 25-29, 2008 M. Martini
PSB actual high-intensity beam on a 160 MeV energy plateau – Benchmark ORBIT & ACCSIM – High intensity beam (~1013 protons in one ring) on a 160 MeV
energy plateau– Two sets of benchmark measurements were made (M. Chanel)
1. Long bunches – PSB working point QH,V=4.21/4.35
– 1st & 2nd harmonic cavities at 8 kV in anti-phase– t=0 ms: 1.05×1013 p, n
H,V(1)=13.7/6.8 m, L(1)~0.25 eVs– t=200 ms: 1.03×1013 p, n
H,V(1)=13.1/7.5 m, L(1)~0.25 eVs
2. Short bunches – PSB working point QH,V=4.21/4.45(1)
– 1st & 2nd harmonic cavities at 8 kV in phase– t=0 ms: 1.03×1013 p, n
H,V(1)=19.2/7.1 m, L(1)~0.20 eVs– t=200 ms: 0.96×1013 p, n
H,V(1)= 20.4/7.3 m, L(1)~0.20 eVs(1) The vertical working point had to be changed to minimize the particle losses
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
13HB2008 August 25-29, 2008 M. Martini
ORBIT simulation – 1 beam file (single injection 2105 of macro-particles) holding
the “steady” 6D particle distribution at 160 MeV with the right initial longitudinal/transverse emittances (PSB measurement)
– Subsequent simulation performed with space charge– Tracking up to 3104 turns– No acceleration considered– Parallel processing using 7 CPUs (crashes when using more
CPUs!)– Computation time ~proportional to the macro-particle numbers
• ~1370 turns/h with 2.5104 macro-particles• ~160 turns/h with 2105 macro-particles (3104 turns in ~8 days)• ~32 turns/h with 106 macro-particles? (3104 turns in ~39 days?)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
14HB2008 August 25-29, 2008 M. Martini
ORBIT QH,V=4.21/4.35Long bunches
ORBIT QH,V=4.21/4.45Short bunches
Longitudinal phase-space plots-E [deg-MeV] (2105 macro-
particles) (green: at turn 1, red: at turn 30000)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
15HB2008 August 25-29, 2008 M. Martini
Longitudinal profilesProb{}/ [%/deg] vs. [deg]
( single particle phase)(2105 macro-particles)
ORBIT QH,V=4.21/4.45Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
16HB2008 August 25-29, 2008 M. Martini
Energy distributionsProb{EE}/E [%/MeV] vs. E
[MeV](E single particle energy variation)
(2105 macro-particles)ORBIT QH,V=4.21/4.45
Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
17HB2008 August 25-29, 2008 M. Martini
Emittance evolution comparison
6
7
8
9
10
11
12
13
14
0 20 40 60 80 100 120 140 160 180 200
Time [ms]
Nor
mal
ized
em
ittan
ce [
m]
rms_H ORBIT (200000 mp)
rms_V ORBIT (200000 mp)
rms_H MEAS
rms_V MEAS
rms_H ACCSIM (100000 mp)
rms_V ACCSIM (100000 mp)
ORBIT and ACCSIM : Long bunches – QH,V=4.21/4.35– 2nd harmonic cavity in anti-phase– ORBIT: ~30 ms, 3104 turns, ∆H&V/∆t~510-4 & 510-3 m/ms
– ACCSIM: ~25 ms, 2.5104 turns, ∆H&V/∆t~-0.003 & 0.1 m/ms
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
dashed: measured data interpolation
nH=13.7m
nV=6.8m
nH=13.1m
nV=7.5m
ACCSIM
ORBIT
18HB2008 August 25-29, 2008 M. Martini
ORBIT and ACCSIM : Long bunches – QH,V=4.21/4.35– 2nd harmonic cavity in anti-phase– Transverse emittance evolution n
H,V(1) [m] versus number of turns for various number of macro-particles (2.5104 to 2105)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
Normalized emittance evolution comparison
11.5
12.0
12.5
13.0
13.5
14.0
0 5000 10000 15000 20000 25000 30000
Number of turns
Hor
izon
tal e
mitt
ance
[m
]
6.5
7.0
7.5
8.0
8.5
9.0
Ver
tical
em
ittan
ce [
m]
rms_H ORBIT (200000 mp) rms_H ORBIT (100000 mp)rms_H ORBIT (25000 mp) rms_H ACCSIM (100000 mp)rms_H ORBIT (50000 mp) rms_V ORBIT (200000 mp)rms_V ORBIT (100000 mp) rms_V ORBIT (25000 mp)rms_V ACCSIM (100000 mp) rms_V ORBIT (50000 mp)
19HB2008 August 25-29, 2008 M. Martini
ORBIT and ACCSIM : Long bunches – QH,V=4.21/4.35– 2nd harmonic cavity in anti-phase– Transverse normalized emittance evolution n
H,V(1) [m] (at turn 3104) versus number of macro-particles (from 2.5104 to 2105)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
Evolution of the normalized emittance
13.4
13.6
13.8
14.0
25000 50000 75000 100000 125000 150000 175000 200000
Number of macro-particles
Hor
izon
tal e
mitt
ance
[m
]
7.0
7.5
8.0
8.5
Ver
tical
em
ittan
ce [
m]
rms_H ORBIT
rms_V ORBIT
Larger macro-particle number yields smaller emittance growth.Asymptote limit? >> 106 macro-particles?
20HB2008 August 25-29, 2008 M. Martini
ORBIT and ACCSIM : Long bunches – QH,V=4.21/4.35– 2nd harmonic cavity in anti-phase– Longitudinal remittance evolution n
L(1) [eVs] for various number of macro-particles (2.5104 to 2105)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
Longitudinal emittance evolution comparison
0.23
0.24
0.25
0.26
0 5000 10000 15000 20000 25000 30000
Number of turns
OR
BIT
sim
ulat
ion
[eV
s]
0.2
0.3
0.4
0.5
AC
CS
IM s
imul
atio
n [e
Vs]
rms_L ORBIT (200000 mp) rms_L ORBIT (100000 mp)rms_L ORBIT (25000 mp) rms_L ORBIT (50000 mp)rms_L ACCSIM (100000 mp)
21HB2008 August 25-29, 2008 M. Martini
Emittance evolution comparison
6
8
10
12
14
16
18
20
22
0 20 40 60 80 100 120 140 160 180 200Time [ms]
Nor
mal
ized
em
ittan
ce [
m]
rms_H ORBIT (200000 mp)
rms_V ORBIT (200000 mp)
rms_H MEAS
rms_V MEAS
rms_H ACCSIM (100000 mp)
rms_V ACCSIM (100000 mp)
ORBIT and ACCSIM : Short bunches – QH,V=4.21/4.45– 2nd harmonic cavity in phase– ORBIT: ~30 ms, 3104 turns, ∆H&V/∆t~0.024 & 0.013 m/ms
– ACCSIM: ~22 ms, 2.2104 turns, ∆H&V/∆t~0.04 & 0.2 m/ms
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
nH=19.2m
nV=7.1m
nH=20.4m
nV=7.3m
dashed: measured data interpolation
ACCSIM
ORBIT
22HB2008 August 25-29, 2008 M. Martini
ORBIT and ACCSIM : Long bunches – QH,V=4.21/4.35– Only short simulation duration (time consuming)– ORBIT: Fairly good estimation of growth rates in both planes – ACCSIM: Overestimation / fairly good estimation of growth rates
in the vertical / horizontal planes
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
ORBIT and ACCSIM : Short bunches – QH,V=4.21/4.45– Only short simulation duration (computation time ~200 turns/h)– ORBIT: Slight overestimation of growth rates in both planes – ACCSIM: Overestimation / slight overestimation of growth rates
in the vertical / horizontal planes– Insufficient statistics?
• More emittance measurements set equally apart? (along the 200 ms)
23HB2008 August 25-29, 2008 M. Martini
ORBIT and ACCSIM : Short bunches – QH,V=4.21/4.45– 2nd harmonic cavity in phase– Transverse emittance evolution n
H,V(1) [m] versus number of turns for various number of macro-particles (2.5104 to 2105)
Normalized emittance evolution comparison
14
15
16
17
18
19
20
21
22
23
0 5000 10000 15000 20000 25000 30000
Number of turns
Hor
izon
tal e
mitt
ance
[m
]
7
8
9
10
11
Ver
tical
em
ittan
ce [
m]
rms_H ORBIT (200000 mp) rms_H ORBIT (100000 mp)rms_H ORBIT (25000 mp) rms_H ACCSIM (100000 mp)rms_H ORBIT (50000 mp) rms_V ORBIT (200000 mp)rms_V ORBIT (100000 mp) rms_V ORBIT (25000 mp)rms_V ACCSIM (100000 mp) rms_V ORBIT (50000 mp)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
24HB2008 August 25-29, 2008 M. Martini
ORBIT and ACCSIM : Short bunches – QH,V=4.21/4.45– 2nd harmonic cavity in phase– Transverse normalized emittance evolution n
H,V(1) [m] (at turn 3104) versus number of macro-particles (from 2.5104 to 2105)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
Evolution of the normalized emittance
19
20
21
22
23
25000 50000 75000 100000 125000 150000 175000 200000
Number of macro-particles
Hor
izon
tal e
mitt
ance
[ m
]
7
8
9
10
11
Ver
tical
em
ittan
ce [ m
]
rms_H ORBIT
rms_V ORBIT
Larger macro-particle number yields smaller emittance growth.Asymptote limit? >>106 macro-particles?
25HB2008 August 25-29, 2008 M. Martini
ORBIT and ACCSIM : Short bunches – QH,V=4.21/4.45– 2nd harmonic cavity in phase– Longitudinal emittance evolution n
L(1) [eVs] for various number of macro-particles (2.5104 to 2105)
• ACCSIM: particles escape the bucket (initial density not quite matched)Longitudinal emittance evolution comparison
0.19
0.20
0.21
0.22
0 5000 10000 15000 20000 25000 30000Number of turns
OR
BIT
sim
ulat
ion
[eV
s]
0
1
2
3
4
AC
CS
IM s
imul
atio
n [e
Vs]
rms_L ORBIT (200000 mp) rms_L ORBIT (100000 mp)
rms_L ORBIT (25000 mp) rms_L ORBIT (50000 mp)
rms_L ACCSIM (100000 mp)
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
26HB2008 August 25-29, 2008 M. Martini
Emittance evolution
60
70
80
90
100
110
120
130
0 5000 10000 15000 20000 25000 30000Number of turns
Hor
izon
tal e
mitt
ance
[m
]
25
30
35
40
45
50
55
60
Ver
tical
em
ittan
ce [
m]
99%_H (norm) 95%_H (norm) 90%_H (norm)
99%_V (norm) 95%_V (norm) 90%_V (norm)
Transverse emittancesn
H,V(99, 95, 90%) [m](2105 macro-particles)
Emittance evolution
50
58
66
74
82
90
0 5000 10000 15000 20000 25000 30000
Number of turns
Hor
izon
tal e
mitt
ance
[m
]
25
30
35
40
45
50
Ver
tical
em
ittan
ce [
m]
99%_H (norm) 95%_H (norm) 90%_H (norm)
99%_V (norm) 95%_V (norm) 90%_V (norm)
ORBIT QH,V=4.21/4.45Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
27HB2008 August 25-29, 2008 M. Martini
Emittance evolution
80
100
120
140
160
0 5000 10000 15000 20000 25000 30000
Number of turns
Hor
izon
tal e
mitt
ance
[m
]
50
60
70
80
90
Ver
tical
em
ittan
ce [
m]
100%_H (norm)
100%_V (norm)
Emittance evolution
100
120
140
160
180
200
220
240
0 5000 10000 15000 20000 25000 30000
Number of turns
Hor
izon
tal e
mitt
ance
[m
]
50
60
70
80
90
100
110
120
Ver
tical
em
ittan
ce [
m]
100%_H (norm)
100%_V (norm)
Transverse emittances n
H,V(100%) [m](2105 macro-particles)
ORBIT QH,V=4.21/4.45Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
28HB2008 August 25-29, 2008 M. Martini
Tune diagrams(2105 macro-particles)
(green: at turn 1, red: at turn 30000)
ORBIT QH,V=4.21/4.45Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
QH~-0.20 QV~-0.32
QH~-0.26 QV~-0.48
29HB2008 August 25-29, 2008 M. Martini
Transverse emittances scatter plots n
H- nV [m-m] (2105 macro-
particles)(particle emittance distribution)(n
H,V single particle emittance)(green: at turn 1, red: at turn 30000)ORBIT QH,V=4.21/4.45
Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
30HB2008 August 25-29, 2008 M. Martini
Log-log “upper tail area” plot Prob{n
H,V>nH,V} [%] vs. n
H,V [m](n
H,V single particle emittance)(2105 macro-particles)
ORBIT QH,V=4.21/4.45Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
31HB2008 August 25-29, 2008 M. Martini
Horizontal phase-space scatter plots X-X’ [mm-mrad] (2105 macro-particles)
(green: at turn 1, red: at turn 30000)
ORBIT QH,V=4.21/4.45Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
32HB2008 August 25-29, 2008 M. Martini
Vertical phase-space scatter plots Y-Y’ [mm-mrad] (2105 macro-
particles)(green: at turn 1, red: at turn 30000)
ORBIT QH,V=4.21/4.45Short bunches
ORBIT QH,V=4.21/4.35Long bunches
Benchmark – ORBIT/ACCSIM vs. measurementsBenchmark – ORBIT/ACCSIM vs. measurements
33HB2008 August 25-29, 2008 M. Martini
SummarySummary
PSB injection simulations– Controlled longitudinal injection painting scheme based on a triangular
modulation of the Linac4 output energy examined
– Tailoring of the longitudinal and transverse distributions to minimize peak densities is effective in lessening the transverse emittance blow-up
PSB benchmarking simulations– Benchmark of the simulations with experiments at 160 MeV seems to
indicate that the simulations done with Orbit are hopeful (i.e. emittance growth rates ~similar to measurements) while those conducted with Accsim are rather pessimistic (i.e. overestimation of growth rates but horizontal plane and long bunches)
34HB2008 August 25-29, 2008 M. Martini
ORBIT transverse space charge routines (parallel processing)– 2½D space charge model (“mixed 2D & 3D models: space charge
force on macro-particles scaled according to the longitudinal charge density). 3D space charge model exists too
– Transverse space charge tracking calculation (applied at each space charge kick “nodes” inserted around the ring)• Pair-wise sum: “Particle-Particle” method. Computes the Coulomb
force on one particle by summing the force over all other particles• Brute Force Particle-In-Cell (PIC): “Particle-Mesh” method. Bins the
macro-particles on a grid, computes the force at each grid point and on each particle by linear interpolation from the grid (grid size automatically fitted to the beam extent)
• FFT-PIC: Alike to the brute-force PIC but a FFT computes the force on the grid via the binned particle distribution (the fastest solver)
ORBIT chromaticity (for Teapot based tracking)– Chromatic tune shift generated by the transfer matrix considering
the p/p (particle kicks at lattice elements depend on p/p)
Appendix: ORBIT/ACCSIM space charge modelingAppendix: ORBIT/ACCSIM space charge modeling
35HB2008 August 25-29, 2008 M. Martini
ACCSIM transverse space charge routines (non-parallel processing)– 2½D space charge model (similar as in ORBIT )– Transverse space charge tracking calculation (made at user-
specified intervals in the ring)• Fast Multipole Method (FMM): “Particle-Particle Tree-code” method
(lumping charges together). The force on each particle is derived from field calculation and kicks denoting the force integral are applied
• Hybrid Fast Multipole (HFM): FMM is combined with elements of PIC-style methods by overlaying a proper grid on the densely-populated beam core region, assigning compound charges to the grid points, and letting FMM solve the whole system of core grid + halo charges (handle correctly large-amplitude beam halos)
ACCSIM chromaticity (MAD8 based tracking)– Chromatic tune shift generated by extra particle betatron phase
space rotation (2∆QH,V) once or more per turn, driven by the first-order chromaticity H,V and p/p
Appendix: ORBIT/ACCSIM space charge modelingAppendix: ORBIT/ACCSIM space charge modeling