HAZOP STUDY REPORT
HAZOP
STUDY
6 | P a g e
HAZOP STUDY REPORT
7 | P a g e
HAZOP STUDY REPORT
8 | P a g e
HAZOP STUDY REPORT
Equipment
reference and
operating condition
Deviation from
operating condition
What event can cause this deviation
Consequences of this deviation on
item of equipment under
consideration
Additional implication of
this sequences
Action Required (recommendation)
Pump PU-01
Flow
Less
More
1. NH3 storage empty
2. LCV-01 fails closed
3. NRV-01 fails closed
4. Line 100 plugs
5. Line 101 plugs
6. LIC-1 fails, closing LCV-01
7. LCV-01 fails open
8. LIC-1 fails, opening LCV-01
Pump cavitates
Deadhead pump
Deadhead pump
Pump cavitates
Deadhead pump
Deadhead pump
Upset in vaporizer
Upset in vaporizer
Damage to pump
Damage to pump
Damage to pump
Damage to pump
Damage to pump
Damage to pump
Liquid level increases
Pressure
Use level alarm in NH3
Storage Use by pass manual
valve system at LCV-01 Use Flow Indicator
Use flow Indicator
Use by pass manual valve system
Use by pass manual valve system
Use drain valve before pump
Use by pass manual valve system
9 | P a g e
HAZOP STUDY REPORT
increases
Liquid level increases
Pressure increases
Pressure
More
Less
9. LCV-01 fails closed
10.NRV-01 fails closed
11.LIC-1 fails, closing LCV-01
12.Line 101 plugs
13.LCV-01 fails open
14.LIC-1 fails, opening LCV-01
15.NH3 storage empty
16.Line 100 plugs
Deadhead pump
Deadhead pump
Deadhead pump
Deadhead pump
Liquid level increases
Liquid level increases
Pump cavitates
Pump cavitates
Damage to pump
Damage to pump
Damage to pump
Damage to pump
Upset in vaporizer
Upset in vaporizer
Damage to pump
Damage to pump
Use by pass manual valve system
Use pressure Indicator
Use by pass manual valve system
Use pressure Indicator
Use by pass manual valve system
Use by pass manual valve system
Use level alarm in NH3
Storage
10 | P a g e
HAZOP STUDY REPORT
Temperature
More17.LCV-01 fails
closed18.NRV-01 fails
closed19.LIC-1 fails,
closing LCV-0120.Line 101 plugs
Deadhead pump
Deadhead pump
Deadhead pump
Deadhead pump
Damage to pump
Damage to pump
Damage to pump
Damage to pump
Use temperature Indicator
Use temperature Indicator
Use temperature Indicator
11 | P a g e
HAZOP STUDY REPORT
12 | P a g e
HAZOP STUDY REPORT
Equipment
reference and
operating condition
Deviation from
operating condition
What event can cause this deviation
Consequences of this deviation on
item of equipment under
consideration
Additional implication of this sequences
Action Required (recommendation)
VaporizerVE-01
LevelLess 21. Line 101
plugs
22. Rupture line 101
23. PCV-01 fails open
24.PIC-1 fails opening PCV-01
25.LCV-01 fails closed
26.NRV-01 fails closed
27.LIC-1 fails, closing LCV-01
28.FCV-01 fails open
Heat/steam loss
Heat/steam loss
Heat loss/steam loss
Excessive vaporization
Heat loss/steam loss
Excessive vaporization
Heat/steam loss
Heat/steam loss
Heat/steam loss
Heat loss/steam loss
Heat loss/steam
Excessive vaporization
Excessive vaporization
Side reaction will occur in the reactor
Ammonia loss
Side reaction will occur in the reactor
Ammonia loss Excessive
vaporization Excessive
vaporization Excessive
vaporization
Side reaction will occur in the reactor
Ammonia loss Side reaction will
Use cascade loop with PIC for level controlling
Use by pass manual valve system
Use by pass manual valve system
Use by pass manual valve system
Use by pass manual valve system
13 | P a g e
HAZOP STUDY REPORT
More
No
29.FFC-1 fails, opening FCV-01
30.PCV-01 fails close
31.PIC-1 fails, closing
32.FCV-01 fails close
33.FFC-1 fails, closing FCV-01
34.LCV-01 fails open
35.LIC-1 fails, opening LCV-01
Same as less
loss
Insufficient vaporization
Insufficient vaporization
Vaporizer Overflow
Vaporizer Overflow
Vaporizer Overflow
Vaporizer Overflow
occur in the reactor
Ammonia loss
Incomplete reaction in the reactor
Incomplete reaction in the reactor
Reaction seize
Reaction seize
Insufficient vaporization
Insufficient vaporization
Use by pass manual valve system
Use by pass manual valve system
PressureMore 36.LCV-01 fails
open37.LIC-1 fails,
opening LCV-0138.FCV-01 fails
close
Tank rupture Tank rupture
Tank rupture
Tank rupture
Use safety valve in VE-01
Use safety valve in VE-01
14 | P a g e
HAZOP STUDY REPORT
Less
39.FFC-1 fails, closing FCV-01
40.PCV-01 fails open
41.PIC-1 fails, opening
42.Rupture discharge line
43.Rupture line 101
44.Tank rupture
45.FCV-01 fails open
46.FFC-1 fails, opening FCV-01
47.PCV-01 fails close
48.PIC-1 fails, closing
49.LCV-01 fails closed
Tank rupture Tank rupture
NH3 loss
NH3 loss
NH3 loss
More heat is required in VE-01
More heat is required in VE-01
Vaporization seize
Vaporization seize
Vaporization seize
Vaporization seize
Vaporization seize
NH3 Displaces oxygen from ground up
Insufficient NH3
in the reactor Insufficient NH3
in the reactor Insufficient NH3
in the reactor Side reaction will
occur in the reactor
Side reaction will occur in the reactor
Incomplete reaction in the reactor
Incomplete reaction in the reactor
Incomplete reaction in the reactor
Incomplete reaction in the reactor
Incomplete reaction in the
Use pressure Indicator
Alarming system should be installed
Alarming system should be installed
15 | P a g e
HAZOP STUDY REPORT
50.LIC-1 fails, closing LCV-01
51.NRV-01 fails closed
reactor
Temperature
More
Less
52.LCV-01 fails close
53.LIC-1 fails, closing LCV-01
54.NRV-01 fails closed
55.FCV-01 fails close
56.FFC-1 fails, closing FCV-01
57.PCV-01 fails open
58.PIC-1 fails, opening
59.PCV-01 fails close
60.PIC-1 fails, closing
Excessive vaporization
Excessive vaporization
Excessive vaporization
Excessive vaporization
Excessive vaporization
Excessive vaporization
Excessive vaporization
No vaporization occurs in VE-01
No vaporization occurs in VE-01
less vaporization occurs in VE-01
Side reaction will occur in the reactor
Side reaction will occur in the reactor
Side reaction will occur in the reactor
Reaction seize in the reactor
Reaction seize in the reactor
Side reaction will occur in the reactor
Side reaction will occur in the reactor
Reaction seize
Reaction seize
Use temperature Indicator
Use temperature Indicator
Use temperature Indicator
Use temperature Indicator
16 | P a g e
HAZOP STUDY REPORT
61.LCV-01 fails open
62.LIC-1 fails, opening LCV-01
less vaporization occurs in VE-01
Incomplete reaction in the reactor
Incomplete reaction in the reactor
17 | P a g e
HAZOP STUDY REPORT
18 | P a g e
HAZOP STUDY REPORT
Equipment
reference and
operating condition
Deviation from
operating condition
What event can cause this deviation
Consequences of this deviation on
item of equipment under
consideration
Additional implication of this sequences
Action Required (recommendation)
Compressor
C-01
FlowHigh
Less
63.Piece of filter material (i.e. cloth) breaks free
64.Filter saturated
65.Line 103 chock
Damage to compressor
Damage to compressor
Damage to compressor
Insufficient air for reaction in the reactor
Insufficient air for reaction in the reactor
Another filter should be installed as standby
Another filter should be installed as standby
CompositionAs well as
66.Line 103 rupture
67.Filter saturated
68.Atmosphere humidity increases
Load increases on the compressor
Load increases on the compressor
Load increases on the compressor
Damage to compressor
Side reaction may occur in the reactor
Damage to compressor
Side reaction may occur in the reactor
Damage to
Moisture collector should be installed
19 | P a g e
HAZOP STUDY REPORT
compressor Potential to
corrodes
PressureMore 69.Piece of filter
material (i.e. cloth) breaks free
70.Line 106 chock
Damage to compressor
Surge the compressor
Damage to compressor
Insufficient air for reaction in the reactor
Blow off valve should be installed
Temperature
More71.Ambient
temperature increases
Performance decreases
Reaction condition will not meet
Use temperature indicator
20 | P a g e
HAZOP STUDY REPORT
21 | P a g e
HAZOP STUDY REPORT
Equipment
reference and
operating condition
Deviation from
operating condition
What event can cause this deviation
Consequences of this deviation on
item of equipment under
consideration
Additional implication of this sequences
Action Required (recommendation)
ReactorRE-01
Composition
Other than
As well as
72.Wrong reagent
73.Impurities in reagent
Another possible reaction
No reaction
Another possible reaction
Side reaction will occur in the reactor
Side reaction will occur in the reactor
Use analyzer indicator
PressureMore
Less
74.FCV-01 fails open
75.FFC-1 fails, opening FCV-01
76.Rupture line 106
77.Rupture line
Stress on catalyst bed
Stress on catalyst bed
NH3 and O2 loss
NO and NO2 loss
NH3 and O2 will not enter in the
Tank rupture
Tank rupture
Insufficient ratio of NH3 and O2 in the reactor
Damage the catalyst bed
Reaction seize
Installed rupture disk at reactor (RE-01)
Use pressure indicator with alarming system
22 | P a g e
HAZOP STUDY REPORT
107
78.FCV-01 fails close
79.FFC-1 fails, closing FCV-01
reactor NH3 and O2 will
not enter in the reactor
Reaction seize
Temperature
More
Less
80.PCV-01 fails open
81.PIC-1 fails, opening
82.FCV-01 fails open
83.FFC-1 fails, opening FCV-01
84.Rupture line 106
85.FCV-01 fails close
Thermal Stress on catalyst bed
Thermal Stress on catalyst bed
Thermal Stress on catalyst bed
Thermal Stress on catalyst bed
NH3 and O2 loss
Desired Reaction seize
Desired Reaction seize
Side reaction will occur in the reactor
Side reaction will occur in the reactor
Side reaction will occur in the reactor
Side reaction will occur in the reactor
Incomplete reaction in the reactor
Side reaction will occur in the
There must be inter cooling system in the reactor
23 | P a g e
HAZOP STUDY REPORT
86. FFC-1 fails, closing FCV-01
reactor
Side reaction will occur in the reactor
Side reaction will occur in the reactor
24 | P a g e
HAZOP STUDY REPORT
25 | P a g e