William S. Hart Union High School District
Modernization Update
May 19, 2010
PHASE 1
400
500
700
COMPLETED
PHASE 2
300
1100
COMPLETED
PHASE 3 IN PROGRESS COMPLETION 6/2010
200
100
1000
900
800
PHASE 4SUMMER SPRINT 2010 COMPLETION FOR FALL IN AUGUST OF 2010 SCIENCE & HOME EC
1000
900
800
PHASE 4SUMMER SPRINT 2010 COMPLETION FOR FALL IN AUGUST OF 2010 SCIENCE & HOME EC
500
400
300
200
100ADMIN
LIBRARY
COMPLETED MEASURE V PHASE 1 MODERNIZATION
Hart High SchoolPhase I -M
oderniza
tion Plan
All Buildings
M oderniza
tion/New Construction: Science Bldg, C, F, J, K, M , Q & R
Existing Condition
Existing Condition
Segm ent 1: Dem o Bldg A and T
Portables
Segm
ent 1: Dem o Building A and T Portables
Segm ent 1 : Dem o Bldg A and T
Portables
Segm
ent 1: Dem o Building A and T Portables
Segm ent 1 : Add Interim Housing
Segm
ent 1: Add Interim Housing
Segm ent 1 : Q 9 Toilet
Segm
ent 1: Q -Village Toilet Building
Segm ent 1 : BldgsC
& F
Segm
ent 2: Building C South and Building F North
Segm ent 1 : Bldg F South
Segm
ent 3: Building F South
Bldg C Floor Plan
Modernized
Food Service Classroom
M odernized
Restroom
Standard Size Cla
ssroom
s, Typ.
EXISTING
M O DERNIZED
Building C Plans
LightingCarpet / TileCabinetryPower / DataAcoustical Treatm entFire AlarmNew HVACAdditional Storage Space
Bldg F Floor Plan
EXISTINGBuilding F Plans
M O DERNIZED
LightingCarpet / TileCabinetryPower / DataAcoustical Treatm entFire AlarmNew HVACAdditional Storage Spaces
M odernized
RestroomStandard Size Classroom
s, Typ.
Segm ent 1: Bldg S
Segm
ent 4: New Science Building
Science Bldg Floor Plan
Proposed Science Building Floor Plan
New Standardized
Lab Classroom
s and Prep room
s Typ.
LightingCarpet / TileCabinetryPower / DataAcoustical Treatm entFire AlarmHVACStorage room
sRestroom
s
Segm ent 1 : Bldg. M SITE
Segm
ent 5: Building M
Bldg. M Floor
Plan
MO DERNIZED
EXISTINGBuilding M Plans
Standard Size Classroom
s, Typ.New Restroom
sM odernized
Art Studios
LightingCarpet / TileCabinetryPower / DataAcoustical Treatm entFire Alarm
Segm ent 1 : Bldg. K Site
Segm
ent 6: Buildings J & K
Bldg J Floor Plan
MO DERNIZED
EXISTING
M odernized
Physics Lab and Prep Room
New Restroom
s
Standard Size Classroom
s,
Typ.
Building J Plans
LightingCarpet / TileCabinetryPower / DataAcoustical Treatm entFire AlarmNew HVAC
Bldg. K Floor
Plan
EXISTINGBuilding K Plans
Standard Size Classroom
s, Typ.
Standard Lab / Classroom
s, Typ.
LightingCarpet / TileCabinetryPower / DataAcoustical Treatm entFire Alarm
M O DERNIZED
Segm ent 1 : Bldg. R Site
Segm
ent 7: Building R
Bldg. R Floor
Plan
EXISTINGBuilding R Plans
New Band Room
M odernized
Choral and Practice Room
s
LightingCarpet / TileCabinetryPower / DataAcoustical Treatm entFire AlarmNew HVACAdditional Storage Room
s
M O DERNIZED
All Buildings
M oderniza
tion/New Construction: Science Bldg, C, F, J, K, M , Q & R
Segm ent 9 : Sitew
ide
m
od +
NC
Segm
ent 9: New Fire Alarm System
All Buildings
M oderniza
tion/New Construction: Scheduled Com pletion: Fall 2010
All Buildings
M oderniza
tion/New Construction: Added Bldg E, Interim s rem
oved
E
• Pre-Increment I - Abatement & Demolition (Completed)• Abatement of Asbestos and Lead-Based Paint of existing Buildings A, C South, F North
and T3-T9• Demolition of existing Buildings A and T3 -T9• Installation of ten (10) Interim Housing portable classrooms with complete power and data• Temporary fencing for the Construction Laydown Areas, Interim Housing and Demolition
Areas• Potholing and Exploration of Underground Utilities• Increment I - Modernization (In Progress)• Abatement of Asbestos and Lead-Based Paint of Buildings F South J, K, M and Partial R.• Modernization of Buildings C South, F, J, K, M, and associated site works.• Partial Demolition and Expansion of Building R (Band Room).• Site work associated with New Modular Science Classrooms Building S• Expansion of Building R (Band Room) and Site Fencing• Expansion of South Roadway• Installation of New Campus-wide Fire Alarm System• Demolition of Portable Classrooms J5 and J6• Increment II - New Science & Restroom Bldgs. (Substantially Completed)• Design, engineering, DSA approval, manufacturing and installation of :• - New Modular Science Classrooms Building (17,364 SF)• - New Modular Restrooms Building (480 SF)• Building E - Modernization (Not Started)• Modernization of Building E (6,030 SF) Classroom Building• Site Sewer Line Relocation (Not Started)• Relocation of County Sewer line from Building S Site to the Parking Lot
•
Increm
ent II•
Substantial Com pletion Ja
n
25, 2009 (A)•
Interior S -Punch List / Clean-up Ja
n
25, 2010 (A)•
Final Com pletion Feb 05, 2010 (P)•
Increm
ent I•
Building S Earthwork Aug 03, 2009 (A)•
Parking Lo
t Site W ork Aug 03, 2009 (A)•
M odular Restroom
s Utilities Aug 03, 2009 (A)•
Bldgs. B, E, T, L, G Fire Alarm Aug 10, 2009 (A)•
Bldgs. J & M Restroom
s O ct 02, 2009 (A)•
Bldg. Q
10 Dem olition Dec 28, 2009 (A)•
Bldg. F South M oderniza
tion Ja
n
08, 2010 (A)•
Bldg. K M oderniza
tion M ay 07, 2010 (P)•
Bldg. R M oderniza
tion Ju
l 30, 2010 (P)•
Bldg. R New Construction Ju
l 30, 2010 (P)•
Bldgs. D, P, Q Fire Alarm Ju
l 30, 2010 (P)•
Fire Alarm System
Activation Ju
l 30, 2010 (P)•
Bldgs. J5
& J6
Dem olition Ju
l 30, 2010 (P)•
Final Com pletion Ju
l 30, 2010 (P)•
Building E (Re-Bid)•
First Advertisem
en
t Apr 06, 2010 (P)•
Jo
b
W alks Apr 13, 2010 (P)•
Bids O pening Apr 28, 2010 (P)•
Board Award of Contracts M ay 05, 2010 (P)•
NTP Issu
a
n
ce M ay 14, 2010 (P)•
Start of Construction M ay 14, 2010 (P)•
Final Com pletion Aug 12, 2010 (P)•
Site Sewer Line Relocation•
Jo
b
W alks Feb 11, 2010 (A)•
Bids O pening M ar 02, 2010 (A)•
Board Award of Contracts M ar 31, 2010 (A)•
Start of Construction Ju
n
07, 2010 (P)•
Substantial Com pletion Ju
l 30, 2010 (P)•
Final Com pletion Aug 04, 2010 (P)•
(A): Actual (P): Projected
William S. Hart Union High School District
Modernization Update
May 19, 2010