Harrison Street Complete Streets Project
Desplaines to Wabash
South Loop Neighbors Meeting
October 15, 2013
Mike Amsden, Project Manager
David Gleason, Project Engineer
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 2/30
Complete StreetsCitywide policy to create safer and more comfortable streets for all
users – pedestrians, bicyclists and motorists – and particularly for themost vulnerable – children, the elderly and persons with disabilities.
• Reduce Crashes
• Calm traffic
• Increase walking, cycling,
and transit trips
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 3/30
Project Corridor
Harrison
• 0.90 mile in length
• Connects UIC to the South Loop
• Parallels CTA Blue Line, connects to CTA Red Line
• Multiple CTA Bus Routes throughout
• DIVVY Stations at Canal Street and State Street
• Crosstown Bike Route in the Streets for Cycling Plan 2020
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 4/30
Existing Conditions - Pedestrians
• Crosswalks inconsistently marked
• Undefined travel lanes make it difficult to cross the street
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 5/30
• Popular east/west bike route
•Bicycle-friendly bridge
• No on-street accommodations
• Sidewalk riding is common
Existing Conditions - Bicyclists
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 6/30
• Undefined lane markings on east and west end of project
encourage high speeds and/or weaving/passing on the right• Traffic signals/turn lanes not optimized for predominant
movements
• Minimal on-street parking
Existing Conditions - Motorists
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 7/30
• Improve traffic safety
• 554 crashes within project limits between
2007 and 2011• 1 fatal and 19 injury pedestrian
crashes (36 total pedestrian crashes)
• 3 serious injury bicycle crashes
(28 total bicycle crashes)
• 490 motor vehicle crashes, including
44 injury crashes
• Bike/ped crashes = 48% of injury
crashes, but only 11.5% of all crashes
• Increase in transportation choices
• Implementation of the Streets for Cycling
Plan 2020
• Balance the roadway
• Clearly defined space for all users
Project Objectives
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 8/30
Pedestrian CrosswalksExisting
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 9/30
Pedestrian CrosswalksProposed
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 10/30
Midblock Cross SectionExisting
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 11/30
Midblock Cross SectionExisting
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 12/30
Midblock Cross SectionProposed
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 13/30
Midblock Cross SectionProposed
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 14/30
Types of BikewaysConventional Bike Lanes
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 15/30
Types of BikewaysBuffer-Protected Bike Lanes
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 16/30
Types of BikewaysBarrier-Protected Bike Lanes
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 17/30
Types of Bikeways
• Barrier-protected bike lanesproposed for most blocks.
D e
s p l a i n e s
J e f f e r s o n
C l i
n t o n
C a
n a l / C o n g r e s s
W a c k e r / F r a n k l i n
W e l l s
C l a
r k
D e
a r b o r n
S t a t e
W a b a s h
Barrier-Protected Bike Lane
Buffer-Protected Bike Lane
Conventional Bike Lane
• Buffer-protected andconventional bike lanes
proposed where lane widths
and vehicle paths preclude
barrier-protection
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 18/30
Parking Impacts
• Parking proposed to beremoved at 3 sites
• Desplaines to Jefferson
(south curb) – 2 free, 8
metered spots
D e
s p l a i n e s
J e f f e r s o n
C l i n t o n
C a
n a l / C o n g r e s s
W a c k e r / F r a n k l i n
W e l l s
C l a r k
D e
a r b o r n
S t a t e
W a b a s h
Metered Parking Removal
Free Parking Removal
• Clark to Federal (south curb) – 6 free spots
• State to Wabash (south curb)
– 9 metered spots
• Metered parking could beadded to Plymouth north of
Harrison.
P l y m o u t h
F e d e r a l
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 19/30
Bus Stop Changes
• 7 bus stops within corridor
• All west of river
• Two existing bus stops will
be consolidated into one
new bus stop
D e
s p l a i n e s
J e f f e r s o n
C l i n t o n
C a
n a l / C o n g r e s s
W a c k e r / F r a n k l i n
W e l l s
C l a r k
D e
a r b o r n
S t a t e
W a b a s h
Removed Bus Stop
New Bus Stop
Unchanged Bus Stop
• Removed
• EB Nearside at Jefferson
• EB Nearside at Clinton
• Added
• EB Farside at Jefferson
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 20/30
Left Turn Lanes
• Existing left turn lanesadjusted based on demand
and geometry
• Lengthened at 3 locations
D e
s p l a i n e s
J e f f e r s o n
C l i n t o n
C a
n a l / C o n g r e s s
W a c k e r / F r a n k l i n
W e l l s
C l a r k
D e
a r b o r n
S t a t e
W a b a s h
Shortened
Removed
Lengthened P l y m o u t h
• Shortened at 3 locations
• Removed at 2 locations
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 21/30
Right Turn Lanes
• New right turn lanesproposed at 6 locations
D e
s p l a i n e s
J e f f e r s o n
C l i n t o n
C a
n a l / C o n g r e s s
W a c k e r / F r a n k l i n
W e l l s
C l a r k
D e
a r b o r n
S t a t e
W a b a s h
• Improves intersectioncapacity by allowing
• Allows right turners to
exit through lane
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 22/30
Signal Equipment
• 12 of 15 intersections are
signalized.
• Remaining three are
uncontrolled.
D e
s p l a i n e s
J e f f e r s o n
C l i n t o n
C a
n a l / C o n g r e s s
W a c k e r / F r a n k l i n
W e l l s
C l a r k
D e
a r b o r n
S t a t e
W a b a s h
F i n a n c i a l
L a S a l l e
Signalized Intersection
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 23/30
Signal Equipment
• New Timing proposed for 9
intersections.
• New Equipment proposed
for 3 intersections.
D e
s p l a i n e s
J e f f e r s o n
C l i n t o n
C a
n a l / C o n g r e s s
W a c k e r / F r a n k l i n
W e l l s
C l a r k
D e
a r b o r n
S t a t e
W a b a s h
New Signal Equipment
New Signal Timing
• Canal – EB to NB Left turn
arrow
• Clark – EB to SB right turn
arrow
• State – EB & WB right turn
arrows
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 24/30
Harrison and StateExisting
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 25/30
Harrison and StateExisting
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 26/30
Harrison and StateProposed
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 27/30
Harrison and StateProposed
EastBound
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 28/30
Harrison and StateProposed
WestBound
7/27/2019 Harrison Public Meeting - FINAL
http://slidepdf.com/reader/full/harrison-public-meeting-final 29/30
• Resurfacing between State and LaSalle – Fall 2013
• Installation – Fall 2013• Collect after data – Spring/Summer 2014
• Traffic counts
• Crash data
• Evaluate/Modify/Upgrade – Summer/Fall 2014
Project Schedule