Harrison Public Meeting - FINAL

30
 Harrison Street Complete Streets Project Desplaines to Wabash South Loop Neighbors Meeting October 15, 2013 Mike Amsden, Project Manager David Gleason, Project Engineer

Transcript of Harrison Public Meeting - FINAL

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 1/30

 Harrison Street Complete Streets Project

Desplaines to Wabash

South Loop Neighbors Meeting

October 15, 2013

Mike Amsden, Project Manager

David Gleason, Project Engineer

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 2/30

Complete StreetsCitywide policy to create safer and more comfortable streets for all

users – pedestrians, bicyclists and motorists – and particularly for themost vulnerable – children, the elderly and persons with disabilities.

• Reduce Crashes

• Calm traffic

• Increase walking, cycling,

and transit trips

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 3/30

Project Corridor

Harrison

• 0.90 mile in length

• Connects UIC to the South Loop

• Parallels CTA Blue Line, connects to CTA Red Line

• Multiple CTA Bus Routes throughout

• DIVVY Stations at Canal Street and State Street

• Crosstown Bike Route in the Streets for Cycling Plan 2020

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 4/30

Existing Conditions - Pedestrians

• Crosswalks inconsistently marked

• Undefined travel lanes make it difficult to cross the street

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 5/30

• Popular east/west bike route

•Bicycle-friendly bridge

• No on-street accommodations

• Sidewalk riding is common

Existing Conditions - Bicyclists

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 6/30

• Undefined lane markings on east and west end of project

encourage high speeds and/or weaving/passing on the right• Traffic signals/turn lanes not optimized for predominant

movements

• Minimal on-street parking

Existing Conditions - Motorists

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 7/30

• Improve traffic safety

• 554 crashes within project limits between

2007 and 2011• 1 fatal and 19 injury pedestrian

crashes (36 total pedestrian crashes)

• 3 serious injury bicycle crashes

(28 total bicycle crashes)

• 490 motor vehicle crashes, including

44 injury crashes

• Bike/ped crashes = 48% of injury

crashes, but only 11.5% of all crashes

• Increase in transportation choices

• Implementation of the Streets for Cycling

Plan 2020

• Balance the roadway

• Clearly defined space for all users

Project Objectives

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 8/30

Pedestrian CrosswalksExisting

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 9/30

Pedestrian CrosswalksProposed

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 10/30

Midblock Cross SectionExisting

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 11/30

Midblock Cross SectionExisting

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 12/30

Midblock Cross SectionProposed

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 13/30

Midblock Cross SectionProposed

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 14/30

Types of BikewaysConventional Bike Lanes

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 15/30

Types of BikewaysBuffer-Protected Bike Lanes

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 16/30

Types of BikewaysBarrier-Protected Bike Lanes

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 17/30

Types of Bikeways

• Barrier-protected bike lanesproposed for most blocks.

   D   e

   s   p    l   a   i   n   e   s

   J   e    f    f   e   r   s   o   n

   C    l   i

   n   t   o   n

   C   a

   n   a    l    /   C   o   n   g   r   e   s   s

   W   a   c    k   e   r    /   F   r   a   n    k    l   i   n

   W   e    l    l   s

   C    l   a

   r    k

   D   e

   a   r    b   o   r   n

   S   t   a   t   e

   W   a    b   a   s    h

Barrier-Protected Bike Lane

Buffer-Protected Bike Lane

Conventional Bike Lane

• Buffer-protected andconventional bike lanes

proposed where lane widths

and vehicle paths preclude

barrier-protection

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 18/30

Parking Impacts

• Parking proposed to beremoved at 3 sites

• Desplaines to Jefferson

(south curb) – 2 free, 8

metered spots

   D   e

   s   p    l   a   i   n   e   s

   J   e    f    f   e   r   s   o   n

   C    l   i   n   t   o   n

   C   a

   n   a    l    /   C   o   n   g   r   e   s   s

   W   a   c    k   e   r    /   F   r   a   n    k    l   i   n

   W   e    l    l   s

   C    l   a   r    k

   D   e

   a   r    b   o   r   n

   S   t   a   t   e

   W   a    b   a   s    h

Metered Parking Removal

Free Parking Removal

• Clark to Federal (south curb) – 6 free spots

• State to Wabash (south curb)

 – 9 metered spots

• Metered parking could beadded to Plymouth north of 

Harrison.

   P    l   y   m   o   u   t    h

   F   e    d   e   r   a    l

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 19/30

Bus Stop Changes

• 7 bus stops within corridor

• All west of river

• Two existing bus stops will

be consolidated into one

new bus stop

   D   e

   s   p    l   a   i   n   e   s

   J   e    f    f   e   r   s   o   n

   C    l   i   n   t   o   n

   C   a

   n   a    l    /   C   o   n   g   r   e   s   s

   W   a   c    k   e   r    /   F   r   a   n    k    l   i   n

   W   e    l    l   s

   C    l   a   r    k

   D   e

   a   r    b   o   r   n

   S   t   a   t   e

   W   a    b   a   s    h

Removed Bus Stop

New Bus Stop

Unchanged Bus Stop

• Removed

• EB Nearside at Jefferson

• EB Nearside at Clinton

• Added

• EB Farside at Jefferson

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 20/30

Left Turn Lanes

• Existing left turn lanesadjusted based on demand

and geometry

• Lengthened at 3 locations

   D   e

   s   p    l   a   i   n   e   s

   J   e    f    f   e   r   s   o   n

   C    l   i   n   t   o   n

   C   a

   n   a    l    /   C   o   n   g   r   e   s   s

   W   a   c    k   e   r    /   F   r   a   n    k    l   i   n

   W   e    l    l   s

   C    l   a   r    k

   D   e

   a   r    b   o   r   n

   S   t   a   t   e

   W   a    b   a   s    h

Shortened

Removed

Lengthened    P    l   y   m   o   u   t    h

• Shortened at 3 locations

• Removed at 2 locations

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 21/30

Right Turn Lanes

• New right turn lanesproposed at 6 locations

   D   e

   s   p    l   a   i   n   e   s

   J   e    f    f   e   r   s   o   n

   C    l   i   n   t   o   n

   C   a

   n   a    l    /   C   o   n   g   r   e   s   s

   W   a   c    k   e   r    /   F   r   a   n    k    l   i   n

   W   e    l    l   s

   C    l   a   r    k

   D   e

   a   r    b   o   r   n

   S   t   a   t   e

   W   a    b   a   s    h

 

• Improves intersectioncapacity by allowing

• Allows right turners to

exit through lane

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 22/30

Signal Equipment

• 12 of 15 intersections are

signalized.

• Remaining three are

uncontrolled.

   D   e

   s   p    l   a   i   n   e   s

   J   e    f    f   e   r   s   o   n

   C    l   i   n   t   o   n

   C   a

   n   a    l    /   C   o   n   g   r   e   s   s

   W   a   c    k   e   r    /   F   r   a   n    k    l   i   n

   W   e    l    l   s

   C    l   a   r    k

   D   e

   a   r    b   o   r   n

   S   t   a   t   e

   W   a    b   a   s    h

   F   i   n   a   n   c   i   a    l

   L   a   S   a    l    l   e

Signalized Intersection

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 23/30

Signal Equipment

• New Timing proposed for 9

intersections.

• New Equipment proposed

for 3 intersections.

   D   e

   s   p    l   a   i   n   e   s

   J   e    f    f   e   r   s   o   n

   C    l   i   n   t   o   n

   C   a

   n   a    l    /   C   o   n   g   r   e   s   s

   W   a   c    k   e   r    /   F   r   a   n    k    l   i   n

   W   e    l    l   s

   C    l   a   r    k

   D   e

   a   r    b   o   r   n

   S   t   a   t   e

   W   a    b   a   s    h

New Signal Equipment

New Signal Timing

• Canal – EB to NB Left turn

arrow

• Clark – EB to SB right turn

arrow

• State – EB & WB right turn

arrows

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 24/30

Harrison and StateExisting

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 25/30

Harrison and StateExisting

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 26/30

Harrison and StateProposed

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 27/30

Harrison and StateProposed

EastBound

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 28/30

Harrison and StateProposed

WestBound

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 29/30

• Resurfacing between State and LaSalle – Fall 2013

• Installation – Fall 2013• Collect after data – Spring/Summer 2014

• Traffic counts

• Crash data

• Evaluate/Modify/Upgrade – Summer/Fall 2014

Project Schedule

7/27/2019 Harrison Public Meeting - FINAL

http://slidepdf.com/reader/full/harrison-public-meeting-final 30/30

Questions?

Thank You!

[email protected]