Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

13
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Transcript of Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. KirkBrookhaven National Laboratory

MERIT Installation Issues

CERN Meeting June 20, 2006

Harold G. Kirk

The MERIT Experiment (3/3)

To be installed in the TT2A tunnel upstream of the nTOF target

Data taking: “two-weeks” at the PS startup in 2007

Beam dump (new)

Experiment

Collimator & beam instrumentation

Quads for focusing (new)

Electronics + cryogenics

Access

concrete

blocks

Cryogenics exhaust line to TT10

Harold G. Kirk

Experiment at CERNTT10

TT2

TT2A

ISR Tunnel

MERIT

Hyd Pump& Controls

in TT2

AccessShaft

Harold G. Kirk

The Cold Valve Box

Harold G. Kirk

The Cryo Heater

Harold G. Kirk

Experiment Layout

Hg target is a self-contained module inserted into the magnet bore

Two containment barriers between the Hg and the TT2A tunnel environment

Hydraulic pump will be in TT2, personnel in Bldg 272 remote control room

Harold G. Kirk

The Hg Jet Control Rack

Harold G. Kirk

The Hg Jet Control Rack (cont)

Harold G. Kirk

The MERIT Experiment (2/3)

Target chamberSolenoid

Hg container

Hg-jet hydraulic system

Proton Beam

Harold G. Kirk

Hg Jet Secondary Containment

Harold G. Kirk

The Hg Jet System

HydraulicsInstrumentationOptical diagnosticsHg drain & fill (without opening secondary)Hg extraction (in event of major leak in primary containment)

Passive filtration

Harold G. Kirk

The Pulsed Solenoid

Harold G. Kirk

Rigging the Solenoid at MIT

Movie of moving the solenoid at MIT is found at:

http://198.125.178.188/bnlpulsed/MERITMagRig.mpg