Hardware Commissioning

13
Hardware Commissioning 1 LEMIC, January 29, 2008 - Roberto Saban

description

Hardware Commissioning. … a quick look at last year. Powering Tests Consolidation. Powering Tests. Installation Cool down. Installation. Installation. Installation. Installation. Installation. Reconnection of the inner triplet left of Point 8 Exchange of a dipole - PowerPoint PPT Presentation

Transcript of Hardware Commissioning

Page 1: Hardware  Commissioning

1

Hardware Commissioning

LEMIC, January 29, 2008 - Roberto Saban

Page 2: Hardware  Commissioning

… a quick look at last year

2

Inst

alla

tion

Pow

erin

g Te

sts

Pow

erin

g Te

sts

Cons

olid

ation

Inst

alla

tion

Inst

alla

tion

Inst

alla

tion

Inst

alla

tion

Cool

dow

n

Inst

alla

tion

Interconnection of the continuous cryostat

Leak tests of the last sub-sectors

Global pressure test & consolidation

Cool down

Powering tests

Warm up

Reconnection of the inner triplet left of Point 8Exchange of a dipoleShortening of main bus bars in some short straight sectionsRepair of a few known cold mass to insulation vacuum leaksRepair of two short circuitsRepair of line Y in the heat exchanger tubeReplacement of some plug in modules

LEMIC, January 29, 2008 - Roberto Saban

Page 3: Hardware  Commissioning

Quinto workshop italiano sulla fisica p-p ad LHC 3

Powering Tests

19 Dec 07:00 19 Dec 11:00 19 Dec 15:00 19 Dec 19:000

1000

2000

3000

4000

5000

6000

7000

8000

9000[A

]

Perugia, January 30, 2008 - Roberto Saban

Page 4: Hardware  Commissioning

4

First cool down of Sector 45

28

Jun

05

Jul

12

Jul

19

Jul

26

Jul

02

Au

g

09

Au

g

16

Au

g

23

Au

g

30

Au

g

06

Se

p

13

Se

p

20

Se

p

27

Se

p

04

Oct

11

Oct

18

Oct

25

Oct

01

No

v

08

No

v

15

No

v

22

No

v

29

No

v

0

50

100

150

200

250

300

350

Tem

pera

ture

[K

]

Average Magnet Temperature

Stops required to repair the flexibles: one one side of the sector, then on the side

… about 9 weeks + the time required to stabilize

LEMIC, January 29, 2008 - Roberto Saban

Page 5: Hardware  Commissioning

5LEMIC, January 29, 2008 - Roberto Saban

Page 6: Hardware  Commissioning

6

The superconducting circuits

1.9K

4.5K

LEMIC, January 29, 2008 - Roberto Saban

Page 7: Hardware  Commissioning

Quinto workshop italiano sulla fisica p-p ad LHC 7

The superconducting circuits

Circuit TypeSector

LHC1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-1

13 kA 3 3 3 3 3 3 3 3 24

Indipendently Powered Dipoles 3 2 2 3 1 0 2 3 16

Indipendently Powered Quadrupoles 14 7 6 13 12 5 7 14 78

600A with Energy Extraction 23 27 28 24 23 27 27 23 202

600A Energy Extraction in Converter 14 20 20 14 14 20 20 14 136

600A no Energy Extraction 16 9 2 9 9 2 9 16 72

80-120A Correctors 50 37 22 33 33 22 37 50 284

TOTAL 123 105 83 99 95 79 105 123 812

Circuit TypeSector

LHC1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-1

60A Closed Orbit Correctors 94 94 94 94 94 94 94 94 752

Perugia, January 30, 2008 - Roberto Saban

Page 8: Hardware  Commissioning

8

RF cavities in Point 4

1. Continuing the conditioning of the cavities & the main couplers

2. Setting up of 1. the Tuner Loop2. the RF feedback3. the Klystron Polar Loop4. the one-turn feedback

Goal: set-up of the first three loops on one cavity before warm-up

Already achieved is the parallel conditioning of eight cavities up to:

• ~150kW (1MV/cavity) with QL = 20’000Started on four cavities:

• ~200kW intermediate position of movable Main Coupler nominal field (2MV/cavity with QL = 60’000)

Courtesy O.BrunnerLEMIC, January 29, 2008 - Roberto Saban

Page 9: Hardware  Commissioning

9

Test of the Access Control System

• The LHC access system was nearly completely commissioned during the first week of January 2008 by a joint AB-TS team in collaboration with the supplier's team.

• Access is presently (from Monday 14/1) possible again with the CERN access card. No major issues encountered during the 7 days of intense tests.

• From early April access to the LHC will be made with dosimeter and biometric control.

1. Test the Access System when doing a patrol of all the LHC points 2. In « Access Mode », test the correct system behaviour when one

or more EIS-beam becomes unsafe 3. In « Beam Mode », test the triggering of all the « EIS-BEAM» and

external interfaces (BI, LBDS) in case of intrusion, door opening inside the LHC or Emergency stop.

Ob

ject

ives

LEMIC, January 29, 2008 - Roberto Saban

Page 10: Hardware  Commissioning

10

Status of the sectors

Sector Temperature Status

12 warm Leak test

23 warm Preparation for cool down

34 warm Preparation for cool down

45 cold Powering tests

56 cold Stand by

67 warm Preparation for cool down

78 warm Cool down next week

81 warm Cool down to start in week 6

LEMIC, January 29, 2008 - Roberto Saban

– short to ground

Page 11: Hardware  Commissioning

Quinto workshop italiano sulla fisica p-p ad LHC 11

Provoked and Natural quenches in RB circuit

Perugia, January 31, 2008 - Roberto Saban

@9500A17R4-B @9789 A

27L5 (C-B-A)

@9857A22R4 (A-B-C) then

21R4 (C)

Page 12: Hardware  Commissioning

Quinto workshop italiano sulla fisica p-p ad LHC 12

Progress chart

Perugia, January 31, 2008 - Roberto Saban

182

92

92 circuits commissionable if :-If Stand alone of LL5 released (level gauges) (4 IPQD + 10 DOC)-If good conditions for the DOC circuits are met (~120 circuits)-No major contingencies for QPS/Interlocks (last ISTs before powering)

Page 13: Hardware  Commissioning

13

LHC General schedule

• The engineering run originally foreseen at end 2007 is precluded by delays in installation and equipment commissioning.

• 450 GeV operation is part of normal setting up procedure for beam commissioning to high-energy

• The general schedule being reassessed, accounting for inner triplet repairs and their impact on sector commissioning– Machine closed April 2008

– Beam commissioning starts May 2008

– First collisions at 14 TeV c.m. July 2008

– Pilot run pushed to 156 bunches for reaching 1032cm-2·s-1as soon as possible

• No provision for major mishaps, e.g. additional warm-up/cooldown of sector: a success-oriented schedule !

Courtesy R.AymarLEMIC, January 29, 2008 - Roberto Saban