    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 2 of 17

    DISTRIBUTE PTN 910 GENERAL INFORMATION

    In the physical board and in the ODUs take the serial numbers and fill the following table:

    SLOT HARDWARE SERIAL NUMBER

    IDU sub-rack Order: No:

    1 CXPA 16 digits

    2 CXPA 16 digits

    3 IFE 2 16 digits

    4 IFE 2 16 digits

    5 PIU 16 digits

    6 FAN 16 digits

    ODU Main ODU 20 digits

    ODU Stand by ODU 20 digits

    Access to the IDU and export the Board Information Report

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    3/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 3 of 17

    CHAPTER I

    HARDWARE INSTALLATION PROTOCOL

    1. CABINET INSTALLATION INSPECTION

    1.1No parts on the cabinets are damaged or detached. No cables are

    damaged or snappedNO YES N/A

    1.2 Verify that the equipment metal supports dont have oxide trace NO YES N/A

    1.3Equipment installed according to the TSS and/or customer

    recommendations.NO YES N/A

    1.4The supports are positioned and spaced in accordance with the

    drawing of the installation holes. (This item applies to the cabinet

    installation on the ESD floor.)

    NO YES N/A

    1.5All supports are fixed to the floor correctly. (This item applies to the

    cabinet installation on the ESD floor.)NO YES N/A

    1.6All components of the supports are installed correctly. (This item

    applies to the cabinet installation on the ESD floor.)NO YES N/A

    1.7All floor holders are installed at the same height. (This item applies

    to the cabinet installation on the ESD floor supported by floor

    holders.)

    NO YES N/A

    1.8 Each cabinet is well insulated from the support or the floor. NO YES N/A

    1.9All cabinet accessories are installed, including front door, back

    door, and side doors.NO YES N/A

    1.10The row labels, column labels, and product labels are attached to

    the specified positions.NO YES N/A

    1.11The ESD wrist strap is connected to the ESD bonding point on the

    cabinet.NO YES N/A

    1.12 Insulation is performed for shockproof parts between multiple rowsof cabinets.NO YES N/A

    1.13All bolts are fixed with flat washers and spring washers in a correct

    order.NO YES N/A

    1.14 The cabinets are stable and orderly. NO YES N/A

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    4/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 4 of 17

    1.15 The cabinet its correctly aligned NO YES N/A

    1.16All cabinet side doors facing the aisle are aligned with the error less

    than 5 mm. NO YES N/A

    1.17The surfaces of the cabinets are clean without any fingerprint or

    smudge. There is no dust, excessive cable tie ends or other

    sundries either inside or outside each cabinet.

    NO YES N/A

    1.18 All kinds of labels are correct, legible and intact. NO YES N/A

    1.19 The front and back doors of the cabinets are easy to open or close. NO YES N/A

    1.20 The modules in one cabinet are aligned from the top down. NO YES N/A

    1.21 All the filler panels are installed. NO YES N/A

    1.22All Subracks are installed in proper positions, and their DIP

    switches are properly set.NO YES N/A

    1.23 No paint is detached. NO YES N/A

    2. CABLE INSTALLATION INSPECTION

    2.1 Power and PGND cables

    2.1.1The -48 V power cables are blue, the PTN 910 power cables are

    black, and the PGND cables are green and yellow. The power

    cables shall meet the field requirements.

    NO YES N/A

    2.1.2All the core wires of the power cables and PGND cables are

    made of copper.NO YES N/A

    2.1.3 No power cable or PGND cable is damaged or snapped. NO YES N/A

    2.1.4 No welding point exists in the power cables and PGND cables. NO YES N/A

    2.1.5No breaking device such as the switch or fuse exists in the

    electric connection of the grounding system.NO YES N/A

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    5/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 5 of 17

    2.1.6The power cables and PGND cables of extra length are trimmed

    rather than coiled.NO YES N/A

    2.1.7The grounding bars and PGND bars are finally connected to one

    grounding conductor.NO YES N/A

    2.1.8The grounding bar of the PDB is well connected to the grounding

    bar provided by the customer.NO YES N/A

    2.1.9The output current values of the PDB and the DC power

    distribution panel meet the requirements.NO YES N/A

    2.1.10All power cables and PGND cables are not short-circuited or

    reversely connected.NO YES N/A

    2.1.11 The OT terminals of the power cables and PGND cables arewelded or crimped securely.NO YES N/A

    2.1.12

    The power cables and PGND cables connecting the power

    distribution box with the functional modules, and the PGND

    cables connecting the modules with the grounding bar are all

    correctly installed and have satisfactory contact.

    NO YES N/A

    2.1.13The front, back, and side doors are respectively connected to the

    grounding bolts on the lower enclosure of the cabinet through the

    6 mm2green and yellow cables.

    NO YES N/A

    2.1.14

    The power cables and PGND cables are laid straight and bound

    orderly in the cabinets or in the PDB. Each switch on the PDB ismarked with the number of the corresponding cabinet.

    NO YES N/A

    2.1.15Engineering labels are attached to both ends of each power

    cable or PGND cable.NO YES N/A

    2.1.16The power cable of the alarm box laid on a wall is in a PVC

    trough.NO YES N/A

    2.1.17 Power Test. NO YES N/A

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    6/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 6 of 17

    3. MW ANTENNA SYSTEM INSTALLATION INSPECTION

    3.1 Mw system Installation Inspection

    3.1.1Equipment installed according

    to the TSS and/or customer

    recommendations.

    NO YES N/A

    3.1.2

    Equipments correctly aligned,

    fixed and fit in their supports, inorder to avoid interfering with

    any existing infrastructure.

    BREAKERS NO YES N/A

    IDU NO YES N/A

    ODUs NO YES N/A

    ANTENA NO YES N/A

    POLE NO YES N/A

    3.1.3The antenna support is securely

    connected to the tower or the

    rooftop.

    NO YES N/A

    3.1.4

    The labelsare attached orderly and

    neatly to the feeders and jumpers.

    They face the same direction

    according to the specifications.

    NO YES N/A

    3.1.5Correspondence of the IF cable

    with the ODUs according to the

    configuration of the protection.

    IF 1

    NO YES N/A

    IF 2

    NO YES N/A

    3.1.6 -48 VDC PTN 910 power cableis correctly installed.

    POWER CABLE 1

    NO YES N/A

    POWER CABLE 2 NO YES N/A

    3.1.7The IF cables are correctly

    connected.NO YES N/A

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    7/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 7 of 17

    3.1.8

    All outdoor jumper connectors

    are waterproofed and sealed.

    Waterproof curves are made for

    the jumpers.NO YES N/A

    3.1.9

    A certain length of ties is kept

    when you cut the ties after

    binding all the outdoor jumpers.NO YES N/A

    3.1.10Grounding cable installed with

    terminals correctly fit, and

    conductive grease applied.

    IDU NO YES N/A

    ODU 1 NO YES N/A

    ODU 2 NO YES N/A

    IF CABLE NO YES N/A

    3.1.11Curvature radius of IF's cables

    fulfills with the manufacturer

    specifications.NO YES N/A

    3.1.12Verify to cut properly the plastichatbands after the cables are

    aligned and groupsNO YES N/A

    3.1.13The TBN connector is protected

    with insulating tape and

    waterproof tape.NO YES N/A

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    8/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 8 of 17

    3.1.14 The labels are correctly pastedin the following equipments:

    PTN:

    Power-PTNNO YES N/A

    Sub-RACK NO YES N/A

    GND NO YES N/A

    ODU:

    ODU 1 NO YES N/A

    ODU 2 NO YES N/A

    GND NO YES N/A

    IF CABLES NO YES N/A

    Transmission Cables:

    Ethernet Tx NO YES N/A

    BREAKERS:

    -48VDC NO YES N/A

    GND NO YES N/A

    3.1.15Antennas azimuths are

    according to customer

    requirement

    NO YES N/A

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    9/17

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    10/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 10 of 17

    CHAPTER II

    COMMISSIONING TEST PROTOCOL

    Test Items for Preliminary Test

    Interface and System Test Item Test Sub-Item

    System function test Hardware performance Alarm management

    Actual transmit frequency of the ODU

    Actual receive frequency of the ODU

    Actual transmit power of the ODU

    RF parameter configuration

    Actual receive power of the ODU

    IF/RF test

    Microwave protection HSB switching

    IDU Power Protection IDU board protection 1+1 Power Protection Board

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    11/17

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    12/17

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    13/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 13 of 17

    2.2 IDU Power protection

    2.2.1 IDU board protection - 1+1 Power Protection Board

    Test Sub-Item HSB Switching

    Node No. Function Test Conclusion

    Turn-off the main breaker and check thepower status of the IDU. NO YES

    N/A

    Turn-off the protection breaker and checkthe power status of the IDU NO YES

    N/A

    Indexes:

    Remarks:

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    14/17

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    15/17

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    16/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 16 of 17

    HARDWARE AND COMMISSIONING ACCEPTANCECERTIFICATE

    This document certifies that equipments passed the inspection according internal order.

    Network Element PTN 910

    Site Local Name

    Site Remote Name

    Contract Name NII 3G Per Project

    Comments:

    Inspection Date:

    Company:

    Huawei del Per S.A.C.

    Customer:

    Nextel del Per S.A. Cooperator in charge:

    Name: Name:

    Title: Title:

    Signature: Signature:

    Place & Date: Place & Date:

  • 8/10/2019 Hardware and Commissioning Checklist PTN 910 v3.0

    17/17

    HARDWARE AND COMMISSIONING CHECKLISTHUAWEI PTN 910 MODEL NETWORK 3G

    Version 3 HUAWEI Proprietary and Confidential Page 17 of 17

    HARDWARE AND COMMISSIONING FINAL ACCEPTANCECERTIFICATE

    This document certifies that equipments passed the inspection according internal order.

    Network Element PTN 910

    Site Local Name

    Site Remote Name

    PO Number

    Contract Name NII 3G Per Project

    Huawei Internal Contract Number

    Comments:

    Customer :

    NEXTEL DEL PER S.A.

    Company:

    HUAWEI DEL PER S.A.C.

    Name:

    GUSTAVO REY-SANCHEZ

    Name:

    EDUARDO ZEVALLOS

    Title:

    OVERALL ENGINEERING PROJECT MANAGER

    Title:

    OVERALL PROJECT MANAGER

    Signature: Signature:

    Place & Date :

    Lima, , 2009

    Place & Date:

    Lima, , 2009