Happy Holidays and Best Wishes for 2012 from the Employees of The following are some of our Clients...

13
Happy Holidays and Best Wishes for 2012 from the Employees of e following are some of our Clients success stories from 2011

Transcript of Happy Holidays and Best Wishes for 2012 from the Employees of The following are some of our Clients...

  • Slide 1
  • Slide 2
  • Happy Holidays and Best Wishes for 2012 from the Employees of The following are some of our Clients success stories from 2011
  • Slide 3
  • Wakeman Boys & Girls Club, Smilow Burroughs Clubhouse Bridgeport, CT, Construction Completed 2011
  • Slide 4
  • Achievement First Bridgeport Academy Barnum Addition Bridgeport, CT, Construction Completion 2012
  • Slide 5
  • R.D. Scinto Inc.- 50 Waterview Dr. Shelton, CT, Construction Completed 2011
  • Slide 6
  • The Edge Fitness Club, Derby, CT Completed 2011
  • Slide 7
  • Watermark at East Hill Villa, Southbury, CT Design Completed, Construction Started 2011
  • Slide 8
  • Sacred Heart University Library Renovation, Fairfield, CT Construction Completed 2011
  • Slide 9
  • Sacred Heart University, Health & Wellness Center, Bridgeport, CT, Construction 2012
  • Slide 10
  • AF Elm City College Preparatory Middle School Field & Parking Lot, New Haven, CT, Completed 2011
  • Slide 11
  • Sacred Heart University, Presidents Residence Bridgeport, CT Complete Construction 2012
  • Slide 12
  • Sacred Heart University, Softball Stadium Fairfield CT, Completed Construction 2012
  • Slide 13
  • Cooper Surgical, Trumbull, CT, Completed November 2004 Eastside Memorial Funeral Home, Waterbury, CT Designed 2011, Construction 2012
  • Slide 14
  • Happy Holidays and Best Wishes for 2012 from the Employees of Thanks for a Great 2011 Press Esc. To End