![Page 1: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/1.jpg)
TRANSPORT
25 november 2011
Hanzelijn Technical solution for the signalling
system
Ronald Doeleman, MIRSE
![Page 2: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/2.jpg)
Hanzelijn : Context
• New line Lelystad-Zwolle (50 km)
Hanzelijn - Technical solution - 25 November 2011 2
![Page 3: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/3.jpg)
Hanzelijn : Context
• New line & stations under construction (commercial service 12/2012)
Hanzelijn - Technical solution - 25 November 2011 3
![Page 4: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/4.jpg)
Hanzarail Context
RVTO Hanzelijn
Document 01 Opdrachtomsschrijving
Document 02 Eisen
specificatie BBGF
Document 02.2 Eisen
specificatie BBGF
subsysteem Bovenleiding
Document 02.3 Eisen
specificatie BBGF
subsysteem Geluidschermen
Document 02.4 Eisen
specificatie BBGF
subsysteem Energie
voorziening
Document 02.1 Eisen
specificatie BBGF
subsysteem Spoor
Document 02.5 Eisen
specificatie BBGF
subsysteem Beveilinging
Document 02.6 Eisen
specificatie BBGF
subsysteem ATM
Document 02 Eisen
specificatie BBLLS
App1 Eisen Breakdown
App2 Lijst bindende documenten
App3 Overzicht raakvlakken BBGF
App4 Raakvlakken BBGF
Document 02.5 Eisen
specificatie BEVIL
subsysteem Beveilinging
SPES Hanzelijn1 - SPES System/SubSystem (SSS)System Specification Working Staff ProtectionIRSs BEVNL
2 – Gebruikersprocessen (User processes)
3 – Operational Scenario ERTMS L2 Overlay
4 – Functional Requirements Dutch Interlocking
5 – Voorschriften (Avs)
Basisovereenkomst(+ Appendix)
Addendum
Appendix XIV : Service Framework Agreement
(+ Annex)
RVTO Lelystad
Hanzelijn - Technical solution - 25 November 2011 4
![Page 5: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/5.jpg)
Hanzarail Context
• Call for tender end of May 2008 (including requirement specifications and operating principles)
• Tender Design process during 5 months led to a refined specification dossier based on Change Requests issued by the suppliers.
• Negotiation phase from Jan to April 2009; update of specification dossier based on signalling specialist meetings (e.g. finalisation of entrance in level 2 principles).
• Since contract signature in May 2009, close collaboration between Prorail and HanzaRail Team (dedicated specialist meetings at least once a month).
Hanzelijn - Technical solution - 25 November 2011 5
![Page 6: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/6.jpg)
Hanzelijn : Signalling system
Flevolijn
Almere
New:IXL & ATP (ATB-EG)
Lelystad Opstelterrein
Lelystad Centrum
GoederenwachtsporenSwifterbant Dronten Hattemerbroek
AanslTunnel
Drontermeer
VeluwelijnLelystad
OpstelterreinAansl
Kampen Zuid Zwolle
New: IXL & ATP: ATB-EG & ERTMS
L2
Hanzelijn - Technical solution - 25 November 2011 6
![Page 7: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/7.jpg)
Scope of supply
Signalling scope (technical) BBGF : Lelystad
Opstelterrein
Lelystad Centrum Goederenwachtsporen
SwifterbantDronten
HattemerbroekAansl
Tunnel Drontermeer
Veluwelijn
LelystadOpstelterrein
Aansl
Flevolijn
Kampen Zuid
Beveiliging:NS54 en ERTMS
Beveiliging:NS54
Beveiliging:NS54 en ERTMS
Beveiliging:NS54
• The Greenfield part shall be equipped with an IXL controlling signals and ATB-EG + ERTMS L2 as overlay + Hand Held Terminal (track worker protection);
• Train equipped with ERTMS can run in ERTMS Level 2 at 200 km/h or in ATB EG (140 km/h) if it is not equipped with ERTMS
• Interfaces − Point Machines (EBI
Switch) − Signals − Track circuit
• Interfaces − TTI − B-Relay IXL
(Hattemerbroek) − VPT Zwolle
Hanzelijn - Technical solution - 25 November 2011 7
![Page 8: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/8.jpg)
Scope of supply
Signalling scope (technical) BBLLS :
• Lelystad station equipped with an IXL controlling ATB-EG and signals, trains can run in ATB at 140km/h.
Perron
PerronLevel 2/
Level STMLevel STM
B-RelaisIXL
• Interfaces − Track circuit − B-Relay IXL (Almere
Oostvaarders) − VPT (Amsterdam)
• Interfaces − Point Machines (NSE
Steller) − Signals
Hanzelijn - Technical solution - 25 November 2011 8
![Page 9: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/9.jpg)
Generic Architecture - BEVNL
Hanzelijn - Technical solution - 25 November 2011 9
![Page 10: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/10.jpg)
Architecture - BBGF
SDM
VIS
To KBV
JRDL
-R
Central Equipment Room at Lelystad RHA30
Gateway
CLC R
FE 1 N FE 2 N
Gateway
CLC N
OD
LM
OD
LM
ED
LM
ED
LM
MCESmax 6
Adjacent IXLTTI
Relay cabinet
Lineside signal
EIA 485
PM max 6
WAK
Point Machine
tracksideelements
trackside elements
tracksideelements
tracksideelements
TFMNetwork 3
ODLM ODLM ODLM ODLM ODLMODLM
EIA 485
Redundant CNET
FE 1 R FE 2 R
Gateway
Gateway
Gateway
Gateway
CLC
FE 1 FE 2
ATB-EG
UM/ PM Cabinet
LEU
switchable balise
OD
LM
OD
LM
MCES
Relay
Lineside signal
RK RK
Connection to CNET Lelystad
UM Cabinet
ATB-EG
TFM Cabinet
RK
TFM Cabinet
RK
TFM Cabinet
RK
TFM Cabinet
RK
RBC MSS
NTG GSM-R to the NTG via GSM-R Network
HPU
KMC
+ UPSto external
power supplyInternal power supply
RHA 30
TFMNetwork 2
TFMNetwork 1
Hanzelijn - Technical solution - 25 November 2011 10
![Page 11: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/11.jpg)
Architecture - BBLLS
SDM
VIS
to KBV Central Equipment Room at Lelystad
RHA30
Gateway
CLC R
FE 1 N
Gateway
CLC N
ODLM
+ UPS
MCES max6 UM
Cabinet
EIA 485
TFM Network 1
RHA30
ODLM ODLM
Redundant CNET
FE 1 R
CLC
FE 1
Connection to CNET Greenfield
to external power supply
Internal power supply
ODLM
EDLM
EDLM
EIA 485
PM max6 PM
Cabinet
Relay cabinet
Cable frame (outside BBLLS scope)
Signals
ATB EG
Points
ODLM
MCES max6 UM
Cabinet
EIA 485
RH20
ODLM
EDLM
EDLM
EIA 485
PM max6 PM
Cabinet
Relay cabinet
Cable frame (outside BBLLS scope)
Signals
ATB EG
PointsAdj IXL
JRDL(shared with BBGF)
RHA30
OD
LM
OD
LM
ED
LM
ED
LMEIA 485
EIA 485
UM/ PM Cabinet
Cable frame (outside BBLLS scope)
Signals ATB EG Points
MCES max6
PM max6
Hanzelijn - Technical solution - 25 November 2011 11
![Page 12: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/12.jpg)
Main functions
• Dutch application of Euro-IXL signalling rules, including: − Set, lock, monitor, release, cancel routes, − Manage ATB-EG, − Manage Signals, − Manage Movable elements, − Manage TTI, − Interface adjacent IXL, − Interface RBC − ATB-VV
Conventional IXL functions
ERTMS Level 2 overlay
• ERTMS and ATB-EG/Signals are driven in parallel by IXL (no consistency check between both).
• Work area management Hanzelijn - Technical solution - 25 November 2011 12
![Page 13: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/13.jpg)
Hanzelijn : Main Operational Processes
• Traffic Controller does not know whether a train is fitted with ERTMS or not
• Driver has to respect signal at danger (Red or dark) even if Cab signalling allows to run
• Consistency of TSRs shall be ensured procedurally
• Driver can change the ATP system in case of degraded mode
ERTMS Level 2 overlay
Hanzelijn - Technical solution - 25 November 2011 13
![Page 14: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/14.jpg)
Hanzelijn Implementation – Status
• IXL and RBC software development finalised
• IXL and RBC configuration ready
• IXL-RBC integration on-going
• Installation of cabinets along the tracks 100%
Hanzelijn - Technical solution - 25 November 2011 14
![Page 15: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/15.jpg)
Hanzelijn Implementation – Status
• GASC SML300T ISA assessed + delivered
• SASC LLS final (in service 19 september 2011)
• SASC BEVNL 01-12-2011 (+ restrictions)
• System ready from technical point of view: 31-03-2012
• Start “Integraal proefbedrijf”: 01-06-2012
• Commercial operation: 12-12-2012
Safety Case Infrastructuur
Safety Case BBGF
Specific Application Safety Case
BEVNL
Generic Application Safety Case
SML300T
Hanzelijn - Technical solution - 25 November 2011 15
![Page 16: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/16.jpg)
Cabinets along the tracks
Hanzelijn - Technical solution - 25 November 2011 16
![Page 17: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/17.jpg)
Equipment in central room (RHa30)
Hanzelijn - Technical solution - 25 November 2011 17
![Page 18: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/18.jpg)
CLC
Hanzelijn - Technical solution - 25 November 2011 18
![Page 19: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/19.jpg)
Gateway - ODLM
Hanzelijn - Technical solution - 25 November 2011 19
![Page 20: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/20.jpg)
UPM
Hanzelijn - Technical solution - 25 November 2011 20
![Page 21: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/21.jpg)
TFM33
Hanzelijn - Technical solution - 25 November 2011 21
![Page 22: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/22.jpg)
TFM33
Hanzelijn - Technical solution - 25 November 2011 22
![Page 23: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/23.jpg)
B-Relays
Hanzelijn - Technical solution - 25 November 2011 23
![Page 24: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/24.jpg)
VIS
Hanzelijn - Technical solution - 25 November 2011 24
![Page 25: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/25.jpg)
SDM
Hanzelijn - Technical solution - 25 November 2011 25
![Page 26: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/26.jpg)
RBC
Hanzelijn - Technical solution - 25 November 2011 26
![Page 27: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/27.jpg)
NTG (release 3)
Hanzelijn - Technical solution - 25 November 2011 27
![Page 28: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/28.jpg)
HPU
Hanzelijn - Technical solution - 25 November 2011 28
![Page 29: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/29.jpg)
Eurobalise
Hanzelijn - Technical solution - 25 November 2011 29
![Page 30: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/30.jpg)
Lineside Encoder Unit (LEU)
Hanzelijn - Technical solution - 25 November 2011 30
![Page 31: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/31.jpg)
MMS
Hanzelijn - Technical solution - 25 November 2011 31
![Page 32: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/32.jpg)
RH20 (LLS)
Hanzelijn - Technical solution - 25 November 2011 32
![Page 33: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/33.jpg)
RH20
Hanzelijn - Technical solution - 25 November 2011 33
![Page 34: Hanzelijn presentation 20111125 IRSE v1 0...ODLM ODLM ODLM ODLM ODLM ODLM EIA 485 Redundant CNET FE 1 R FE 2 R Gate way Gate way Gate way Gate way CLC FE 1 FE 2 ATB-EG UM/ PM Cabinet](https://reader033.fdocuments.us/reader033/viewer/2022042403/5f1578ad0e51132d74583bf1/html5/thumbnails/34.jpg)
TRANSPORT
www.alstom.com