Hanoi, January 29 th 2015 Enrico Weber DEI – Politecnico di Milano IMRR Project 12 – Thac Ba...

21
Hanoi, January 29 th 2015 Enrico Weber DEI – Politecnico di Milano IMRR Project 12 – Thac Ba policy design INTEGRATED AND SUSTAINABLE WATER MANAGEMENT OF RED-THAI BINH RIVER SYSTEM IN A CHANGING CLIMATE

Transcript of Hanoi, January 29 th 2015 Enrico Weber DEI – Politecnico di Milano IMRR Project 12 – Thac Ba...

Hanoi, January 29th 2015

Enrico WeberDEI – Politecnico di Milano

IMRR Project

12 – Thac Ba policy design  

INTEGRATED AND SUSTAINABLE WATER MANAGEMENT OF RED-THAI BINH RIVER SYSTEM

IN A CHANGING CLIMATE

HB =49%

YB=23%

TB=5%

TQ=11%

HY=12%

The Red-Thai Binh River basin 

ST

Thac Ba release optimization

All photo from http://cwrct.wrd.gov.vn

Experiment settings

En

erg

y d

em

an

d [G

Wh

]

2 alternative hydropower objectives:

1) max Energy Production

2) min Weighted Deficit

De

ficit we

ight [%

] max ,t t

t

E h R

min ,t t t tt

w D E h R

Off-line Management Problem

or

s.t.

Experiment settingsHorizon: 2002/01/01-2012/07/31

Res

ervo

ir in

flow

[m3/

s]

Stochastic inflow model: AR(0)

Design algorithm

Stochastic Dynamic Programming

First results

Historical

Reservoir level

[GW

h x

year

]

[-]

Yearly Energy Production Yearly Weighted Deficit Yearly Threshold Violation

Day

s x

year

[m]

First results

Historical

EProd opt. constr.

Reservoir level

[GW

h x

year

]

[-]

Yearly Threshold Violation

Day

s x

year

[m]

Yearly Energy Production Yearly Weighted Deficit

First results

Historical

EProd opt. constr.

Reservoir level

[GW

h x

year

]

[-]

Yearly Threshold Violation

Day

s x

year

Deficit opt.

[m]

Yearly Energy Production Yearly Weighted Deficit

First results

Historical

EProd opt. constr.

Reservoir level

[GW

h x

year

]

[-]

Yearly Threshold Violation

Day

s x

year

Deficit opt.

Deficit opt. constr.

[m]

Yearly Energy Production Yearly Weighted Deficit

First results

Historical

EProd opt. constr.

Reservoir level

[GW

h x

year

]

[-]

Yearly Threshold Violation

Day

s x

year

Deficit opt.

Deficit opt. constr.

EProd opt.

[m]

Yearly Energy Production Yearly Weighted Deficit

First results

Historical

EProd opt. constr.

Reservoir level

[GW

h x

year

]

[-]

Yearly Threshold Violation

Day

s x

year

Deficit opt.

Deficit opt. constr.

EProd opt.

Compromise

[m]

Yearly Energy Production Yearly Weighted Deficit

First resultsHistorical

[GW

h]

Deficit Weight

Daily Energy Production

Energy Demand

[-]

First resultsHistorical

EProd opt. constr.

[GW

h]

Deficit Weight

Daily Energy Production

Energy Demand

[-]

First resultsHistorical

EProd opt. constr.

[GW

h]

Deficit Weight

Deficit opt.

Daily Energy Production

Energy Demand

[-]

First resultsHistorical

EProd opt. constr.

[GW

h]

Deficit Weight

Deficit opt.

Deficit opt. constr.

Daily Energy Production

Energy Demand

[-]

First resultsHistorical

EProd opt. constr.

[GW

h]

Deficit Weight

Deficit opt.

Deficit opt. constr.

EProd opt.

Daily Energy Production

Energy Demand

[-]

First resultsHistorical

EProd opt. constr.

[GW

h]

Deficit Weight

Deficit opt.

Deficit opt. constr.

EProd opt.

Compromise

Daily Energy Production

Energy Demand

[-]

Thanks for your attention

XIN CẢM ƠN