Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and...
Transcript of Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and...
![Page 1: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/1.jpg)
Presented By:El Dorado CountyCommunity Development Agency, Transportation Division
John Kahling, P.E.Deputy Director of Engineering
Dwight Anderson, P.E.Associate Civil Engineer
David FriestadAssistant in Civil Engineering
Hank's Exchange Road Bridge Replacement Project
Public Information Meeting, Wednesday, May 12, 2014Gold Oak School
1
![Page 2: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/2.jpg)
• Welcome and Introduction – John Kahling
• County Bridge Program / Funding – John Kahling
• Hank’s Exchange Bridge - Facts / Conditions –Dwight Anderson
• Project Overview – Dwight Anderson
• Open Question & Discussion Period
• County Staff Available to Answer Questions and Receive Public Input
Public Meeting Agenda
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014 2
![Page 3: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/3.jpg)
• 79 Bridges in County Bridge Inventory
• 21 are in 2013-14 Capital Improvement Program adopted February 11, 2014 http://www.edcgov.us/Government/DOT/CIP.aspx(see Section VIII: West Slope Projects)
• Included in the CIP – Hank’s Exchange Road at Squaw Hollow Creek – Bridge Replacement (CIP# 77135)
• Project is eligible for 100% reimbursement from the federal funding Highway Bridge Program (HBP)
County Bridge Inventory
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014 3
![Page 4: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/4.jpg)
Highway Bridge Program (HBP)
4
• Federal funding program for bridge safety projects -maintenance, rehabilitation and replacement
• Program authorized by Federal Highway Administration (FHWA) & administered by State DOT’s (CA – Caltrans)
• Requires Planning, Environmental, and Preliminary Engineering (PE) completed within 10 years of PE authorization date
• April 2012 – County received FHWA authorization to proceed with PE for Hank's Exchange at Squaw Hollow Creek – Bridge Replacement Project
• 100% Federal Participating Share - No Local Match(County General Fund will NOT be used)
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
![Page 5: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/5.jpg)
Bridge Inspections / Sufficiency Ratings
5Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
• Each bridge is thoroughly inspected by Caltrans every 2 years and rated on 140 elements
• Given a Sufficiency Rating (SR) score of 0 to 100
• Rating is overall measure of the bridge condition and sufficiency to remain in service
• Used to determine eligibility for federal funds and prioritization
![Page 6: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/6.jpg)
Federal Funding Eligibility Criteria
6
• SR < 80 is eligible for Rehabilitation
• SR < 50 is eligible for Replacement
-Hank’s Exchange Bridge Sufficiency Rating: 40.7 (2011 inspection)
• Rehab projects – cannot use any additional federal aid for 10 years.
• Replacement projects - bridge must be either functionally obsolete or structurally deficient.
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
![Page 7: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/7.jpg)
Bridge Sufficiency Terminology
7Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
Structurally Deficient:Limitations of the structural condition of the bridge, such as weight limits or load capacity.
Functionally Obsolete:Built to standards that are not used today, such as inadequate lane widths, shoulder widths, or vertical clearances to serve current traffic demand.
This status of this bridge is Functionally Obsolete.
![Page 8: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/8.jpg)
Hank's Exchange Bridge Location
8Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
![Page 9: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/9.jpg)
• Year Built: 1930 (84 years old)• Expected life: 75 years• One-lane,13.5-foot wide x 22-foot span• Reinforced Concrete Slab • Avg. Daily Traffic: 1,245
(both directions, 2010 traffic count)
• Sufficiency Rating: 40.7 (2011)• Functionally Obsolete• 2011 inspection shows abutments are
abraded along and below water line.
Hank's Exchange Bridge Facts / Condition
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014 9
![Page 10: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/10.jpg)
Hank's Exchange Bridge Photos
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014 10
![Page 11: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/11.jpg)
Why Replace the Existing Bridge?
11
• Bridge is 19 years past the 75 year life expectancy
• Bridge is classified as Functionally Obsolete
• Anticipated 100% federal funding; this funding may
not be available in future, if the project is postponed
• No County funds are proposed to be used for this
project
• Narrow one-lane bridge restricts emergency access
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
![Page 12: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/12.jpg)
12Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
Hank's Exchange Bridge Existing Conditions
![Page 13: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/13.jpg)
13Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
Hank's Exchange Bridge Alternatives Considered
Option 1 PRELIMINARY DESIGN
![Page 14: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/14.jpg)
14Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
Hank's Exchange Bridge Existing Conditions
![Page 15: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/15.jpg)
15Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
Hank's Exchange Bridge Alternatives Considered
Option 2PRELIMINARY DESIGN
![Page 16: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/16.jpg)
16Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
Hank's Exchange Bridge Existing Conditions
![Page 17: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/17.jpg)
17Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
Hank's Exchange Bridge Alternatives Considered
PRELIMINARY DESIGN
![Page 18: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/18.jpg)
El Dorado County uses the CALTRANS RW process
• Permits to Enter for Surveying & Environmental Studies
• County Right-of-Way in Fee
• Utility, Slope & Drainage Easements
• Temporary Construction Easements
• Acquisition Process:
– Appraisals
– Negotiations
– Closing Escrow
Perfecting the Right-of-Way
18Hank's Exchange Bridge - Public Information Meeting, May 12, 2014
![Page 19: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/19.jpg)
Project Prioritized/Federal Funding Programmed (Highway Bridge Program)
Prepare Environmental Document in Compliance with CEQA & NEPA
Develop Plans, Specifications and Estimate (PS&E)
Right of Way Acquisition
Construct Project
2014
2014/15
2015/16
2015/17
2016/17
2018/19
Develop Alternatives, Public Meeting, Preliminary Design
Public Review 2015/16
Estimated Project Schedule
Hank's Exchange Bridge - Public Information Meeting, May 12,
19
![Page 20: Hank's Exchange Road Bridge Replacement Project Projects... · 12/05/2014 · •Welcome and Introduction – John Kahling • County Bridge Program / Funding – John Kahling •](https://reader034.fdocuments.us/reader034/viewer/2022051815/603bec3f9b2ff06ded756eec/html5/thumbnails/20.jpg)
Questions or Comments
20
Fill out a Comment Card Today
Visit the project website: www.edcgov.us/bridgeprojects/
Email: [email protected]
Mail: El Dorado County CDA-TransportationAttn: Dwight Anderson
2441 Headington RoadPlacerville, CA 95667
Phone: (530) 621-6593
Hank's Exchange Bridge - Public Information Meeting, May 12, 2014