Hands - on
The process of discovery and development of drugs is ever longer and costly.
It happens in an environment of research teams from different organizations
(coming from the pharmaceutical industry, academia, SMEs, etc.) often
placed in distant locations where there the need for constant discussions and
interactions. Those communications seldom take place based on graphical
elements (3D, 2D, images…) that might require strict confidentiality due to
their high industrial value. Consequently, the majority of interactions is
performed in presence meetings, which is costly and time consuming.
The idea is to develop a software that enables research teams from the drug
discovery and development sector (pharmaceutical, biotechnological, etc) to
collaborate from a distance and discuss in real time over graphical elements
(3D molecules, result tables, images, etc.) without the need of face-to-face
meetings so often, accelerating the entire process.
Project idea
Hands - on
• Small-medium collaborative project
• Funding: around 3.000.000 €
• Length: maximum of 3 years
• Related fields: IST – eHealth, IST – eWork, GROWTH, Quality of
Life, etc. Possible topics:• IST II.2.2: New methods of work and electronic commerce - Smart organisations
To explore and validate novel technologies, applications, architectures and practices aimed at supporting the transformation of profit and non-profit entities into "smart" organisations: knowledge driven, internetworked, dynamically adaptive to new organisational forms and practices, learning as well as agile in their ability to create and exploit the opportunities offered by the digital economy.”• IST II.1.5: Promoting broad adoption of eCommerce & eWork in regional and sectoral settings. • GROWTH 1.4.1: New methods of organisation, work and human capital improvementThe aim is to develop new organisational and work practices together with developments in industrial products, processes and services, and the appropriate human capital, competence and skills. RTD should address methodologies and tools for efficient organisation, knowledge and technology management, and support close integration and networking of people, organisations and technologies, recognising the importance for innovation / competitiveness of better procurement methods and decision making tools.
Basic Characteristics
Hands - on
Potential PartnersName Type Country Expertise Profile
Fundació Biomèdica (FBM)
Non-profit research centre
Spain Modelling 3D, software, drug discovery research
-
Lab. Vida S.A. (LV) Private company Spain Pharmaceutical company Usual collaborator
IBMF Technologies (IBMF)
Private company UK Software / hardware development generic
Known
Università de Milano (UMI)
Academia Italy Drug discovery research Unknown – Guru
Universidade Santiago de Compostela (USC)
Academia Spain Drug discovery research Usual collaborator
AstraSeneca (AS) Private company Sweden Top pharmaceutical company Unknown
Drug Discovery Software Srl (DDS)
Private company – SME
Italy Molecular software development Known
Joint Research Center (JRC)
European Commission
Europe Generic software research Unknown
Digital Security UK (DIGI)
Private company UK Security, encryptation Unknown
Universitat de Catalunya (UCAT)
Academia Spain Software development Known – Guru
Instituto de Tecnología de Murcia (ITM)
Non-profit research centre
Spain Security, encryptation Usual collaborator
University of Bremen (UBR)
Academia Germany Molecular software development, drug discovery research
Unknown – Guru
Microsoluciones SL (MICRO)
Private company – SME
Spain Software development (generic) Usual collaborator
Transgen SL (TGEN) Private company France Biotech Unknown
University of Düsseldorf (UD)
Academia Germany Drug discovery research Usual collaborator
Hands - on
1) List the objectives of the project
2) Select an acronym
3) Choose the partners for the consortium
Exercise 1
Hands - on
WRAP-UP 1
Project objectives
LINK3D aims to develop, test and prepare the commercial exploitation of a real-time, interactive distant collaboration environment for professionals working in an strategically crucial field: Molecular Discovery (MD). The specific objectives of the project are:
1) To gather detailed requirements of MD professionals in terms of tele collaboration.
2) To develop a set of software applications, configuring a real-time tele-collaboration environment for Drug Discovery professionals.
3) To test the system in real-life environments, both for inter-organisational and intra-organisational collaborative settings and considering the different types of actors involved (industry, academia).
4) To analyse the potential market, the business possibilities of the LINK3D system, and prepare its commercial exploitation, considering extension to other sectors.
Hands - on
WRAP-UP 1
Partners LINK3D:
Name Type Country Expertise Profile
Fundació Biomèdica (FBM)
Non-profit research centre
Spain Modelling 3D, software, drug discovery research
-
Lab. Vida S.A. (LV) Private company Spain Pharmaceutical company
Usual collaborator
AstraSeneca (AS) Private company Sweden Pharmaceutical company
Unknown
Drug Discovery Software Srl (DDS)
Private company – SME
Italy Molecular software development
Known
Digital Security UK (DIGI)
Private company UK Security, encryptation Unknown
Universitat de Catalunya (UCAT)
Academia Spain Software development Known – Guru
University of Düsseldorf (UD)
Academia Germany Drug discovery research
Usual collaborator
Hands - on
1) List the Work Packages
2) Define Deliverables and Milestones
3) Assign Work Packages Leaders
Exercise 2
Hands - on
WRAP-UP 2
List of Work Packages:
WP1 Project management and co-ordination (FBM)
WP2 User requirements gathering (FBM)
WP3 System specifications (DDS)
WP4 System development (UCAT)
WP5 In-process testing (DDS)
WP6 Real-world testing (FBM)
WP7 Exploitation (DDS)
WP8 Dissemination (FBM)
WP9 Assessment and evaluation (FBM)
Hands - on
WRAP-UP 2
Tasks:
WP1 Project management and co-ordination (FBM)
T1.1. Day to day operational management
T1.2. Project co-ordination
WP2 User requirements gathering (FBM)
T2.1 Planning
T2.2 Execution
T2.3 Analysis of results
WP3 System specifications (DDS)
T3.1 File formats
T3.2 Communication protocols
T3.3 Security issues
T3.4 Definition of standard hardware configuration requirements
T3.5 Global definition of the system specifications
Hands - on
WRAP-UP 2
Lista de Tasks:
WP4 System development (UCAT)
T4.1 Development of the communication protocols
T4.2 Development of the whiteboard metaphors and graphical engines
T4.3 Development of the security
T4.4 System adjustments
T4.5 User manuals
WP5 In-process testing (DDS)
T5.1 Planning
T5.2 Execution
T5.3 Analysis of results
Hands - on
WRAP-UP 2
Tasks:
WP6 Real-world testing (FBM)
T6.1 Testing planning (inter-organisational setting)
T6.2 Testing execution (inter-organisational setting)
T6.3 Analysis of results (inter-organisational setting)
T6.4 Testing planning (intra-organisational setting)
T6.5 Testing execution (intra-organisational setting)
T6.6 Analysis of results (intra-organisational setting)
T6.7 Integration of testing results
WP7 Exploitation (DDS)
T7.1 Market analysis
T7.2 IPR issues
T7.3 Business plan
T7.4 Extension to other industrial sectors
Hands - on
WRAP-UP 2
Tasks:
WP8 Dissemination (FBM)
T8.1 Web site
T8.2 Brochure
T8.3 Other activities
WP9 Assessment and evaluation (FBM)
T9.1. Quality assurance
T9.2. Risk management
T9.3. Project evaluation
Hands - on
WRAP-UP 2
Deliverables list:Del. no. Deliverable name WP
no.Del. type* Delivery
(proj.month)
D1Report on the set-up of the organisation and infrastructure of the LINK3D project
1 Report 3
D2 Project presentation 8 Document 3
D3Report on user requirements (investigation methods and results)
2 Report 4
D4 Dissemination and use plan 8 Report 6
D5 Report on the specifications of the LINK3D system 3 Specification 7
D6First version of the LINK3D system including user manuals
4 Prototype 19
D7Report on the in-process testing (methods and results)
5 Report 19
D8First report on real-world testing of the LINK3D system (methods and results)
6 Report 22
D9Report on the specifications of the improved LINK3D system
3 Specification 23
D10 Report on market analysis 7 Report 24
D11Improved version of the LINK3D system including user manuals
4 Prototype 26
D12Final report on real-world testing of the LINK3D system (methods and results)
6 Report 29
D13 Final report on dissemination activities 8 Report 30
D14 Report on the business plan 7 Report 30
D15 Assessment and evaluation report 9 Report 30
Hands - on
WRAP-UP 2
Milestones list:
M1 Definition of user requirements
M2 Completion of the system specifications (first version)
M3 Completion of the first version of the LINK3D system
M4 Completion of the first stage of the real-world testing
M5 Completion of the market analysis
M6 Completion of the improved system specifications
M7 Completion of an improved version of the LINK3D system
M8 Completion of the second stage of the real-world testing
M9 Completion of the business plan
M10 LINK3D project completion
Hands - on
• Responsibility Assignment Matrix, defined by
project roles
R: Responsible
W: Major contribution
I: Minor contribution
Exercise 4
Hands - on
WRAP-UP 4: RAM LINK3D
FMB LV AS DDS DIGI UCAT UD
WP1 - Project Management and Coordination
R W W
WP2 - User requirements gathering R W W W
WP3 - System specifications I R W W
WP4 - System development W W R
WP5 - In-process testing R I I W W W I
WP6 - Real-world testing R W W W
WP7 - Exploitation W R W I
WP8 - Dissemination R I I I I I I
WP9 - Assessment and evaluation R I I I I
Hands - on
• RAM of efforts
• 3 steps:• Relative weight of each WP• Estimate the total effort amount• Estimate the breakdown of efforts per task
Hint: the total amount can be estimated dividing
the total funding by 5000-10000 Euro
(depending on the consortium profile).
Hint: Estimate the relation between R, W, I: • W= 2 I• R= 3 I
Exercise 5
Hands - on
WRAP-UP 5: RAM LINK3D
FMB LV AS DDS DIGI UCAT UDpm
totalpm
targetWeight
WP
WP1 - Project Management and Coordination
15 10 10 35 35 7
WP2 - User requirements gathering
17 11 11 11 50 50 10
WP3 - System specifications 4 13 9 9 35 35 7
WP4 - System development 36 36 54 125 125 25
WP5 - In-process testing 13 4 4 8 8 8 4 50 50 10
WP6 - Real-world testing 35 23 23 23 105 105 21
WP7 - Exploitation 13 19 13 6 50 50 10
WP8 - Dissemination 8 3 3 3 3 3 3 25 25 5
WP9 - Assessment and evaluation
11 4 4 4 4 25 25 5
total pm 151 41 45 57 72 93 41 500 500 100
Full-time Equivalents (FTE) 4,2 1,1 1,2 1,6 2,0 2,6 1,1 13,9
Hands - on
• Construct the budget
• Take into account the type of expenditure:
personnel, equipment, consumables, travel,
subcontracting, indirect costs.
• Take into account that funding agencies do
not always cover 100% of the direct costs of
the project (difference between “budget” and
“funding”).
Exercise 6
Hands - on
WRAP-UP 6: Budget LINK3D FMB LV AS DDS DIGI UCAT UD
total pm 151 41 45 57 72 93 41
Full-time Equivalents (FTE) 4,2 1,1 1,2 1,6 2,0 2,6 1,1
Average personnel rate 4000 4500 6000 5500 7000 3500 3900
Overhead rate 0,6 0,45 0,3 0,6 0,6 0,6 0,6
Other costs (travel, consumables, etc.)
45000 30000 30000 45000 30000 45000 30000
RTD
total pm 104 39 39 21 53 71 39
Personnel costs 417024 173750 231667 118021 369583 247292 150583
Subcontracting
Other direct costs 31110 27987 25763 17073 22107 34095 27987
Overheads max. 268880 78188 77229 81056 235014 168832 107142
Total costs 717014 279924 334659 216151 626705 450218 285712
EC contribution 537761 139962 167330 162113 313353 337664 214284
Management
total pm 15 0 0 10 0 10 0
Personnel costs 60000 0 0 55000 0 35000 0
Subcontracting 2000 0 0 1000 1000 1000 0
Other direct costs 4476 0 0 7956 0 4826 0
Overheads max. 38686 0 0 37774 0 23895 0
Total costs 105162 0 0 101730 1000 64721 0
EC contribution 105162 0 0 101730 1000 64721 0
Hands - on
FMB LV AS DDS DIGI UCAT UDOther
total pm 32 3 6 25 19 13 3
Personnel costs 126190 12500 38095 138046 131944 44097 10833
Subcontracting
Other direct costs 9414 2013 4237 19970 7893 6080 2013
Overheads max. 81363 5625 12700 94809 83902 30106 7708
Total costs 216967 20138 55031 252825 223739 80283 20555
EC contribution 216967 20138 55031 252825 223739 80283 20555
total pm 151 41 45 57 72 93 41 500,0
Personnel costs 603214 186250 269762 311066 501528 326389 161417 2359626
Subcontracting 2000 0 0 1000 1000 1000 0 5000
Other direct costs 45000 30000 30000 45000 30000 45000 30000 255000
Overheads max. 388929 83813 89929 213640 318917 222833 114850 1432910
Total costs 1039143 300063 389690 570706 851444 595222 306267 4052536TOTAL COSTS
EC contribution 859889 160100 222361 516669 538092 482668 234839 3014618TOTAL
FUNDING
No. of certificates needed 2,3 0,4 0,6 1,4 1,4 1,3 0,6
TOTAL
WRAP-UP 6: Budget LINK3D