Hancock Expressway/ Academy Boulevard Stakeholders Meeting ... · HANCOCK EXPRESSWAY/ACADEMY...
Transcript of Hancock Expressway/ Academy Boulevard Stakeholders Meeting ... · HANCOCK EXPRESSWAY/ACADEMY...
H a n c o c k E x p r e s s w a y /A c a d e m y B o u l e v a r d
S t a k e h o l d e r s M e e t i n g
W E L C O M E
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Project Background
Hancock/Academy PEL, 13207-01, 08.27.2015
CDOT / City of Colorado Springs
Powers Swap
Hancock / Academy Prototype
Node
Prototypes
Great Streets Plan
k
AcademyBoulevard
CheltonRoadDrennan Road
Sand C
reek
AcademyBoulevard
S andCre
eAirport Road
Pikes Peak Avenue
Fountain Boulevard
AcademyBoulevard
Constitution Avenue
Palmer Park RoadChelt onRoad
MurrayRoad
Galley Road
Platte Avenue
Hancock Expressway
MurrayRoad
HANCOCK/ACADEMYSTUDY AREA
Hancock / Academy PEL
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
1-3 mos. 4-6 mos. 3-6 mos.Existing Conditions Alternatives Development & Analysis and PEL Development Indicative Design/Bridging Documents
Publ
icIn
volv
emen
t Collect Concerns & Issues
Identify PAI's
Informed Consent
One-On-One Meetings as Necessary
◆ City Furnished data◆ GIS Information◆ Land Use◆ Traffic Counts◆ Ownership Research◆ Fims Mapping◆ Accidents◆ Demographic Data
Data Collection
◆ Do Nothing◆ Intersection Types◆ TSM/TDM◆ Transmission Lines◆ Multi-Modal◆ Economic Development
Develop a Full Range of Alternatives
RecommendedAlternative
Traffic Study◆ Safety Analysis◆ Traffic Operations◆ Traffic Projections
Economic/Community Development
Identify Resource Constraints
Refine Project Limits
Develop Purpose & Need
Alte
rnat
ives
Dev
elop
men
t&
Ana
lysis
Envi
ronm
enta
lTe
chni
cal S
tudi
es &
Des
ign
Data Collection
Existing ResourceCollection
Conceptual Design
BridgingDocuments
Resouce Impacts
Public Information
Alternatives Analysis and Selection
Level 1: (Qualitative) ◆ Purpose & Need Critieria
Level 2: (Quantitative)◆ Conceptual Design ◆ Benefits & Impacts◆ Operations◆ Safety◆ Costs◆ Economic Development◆ Access◆ Implementation◆ Multi-Modal
Indicative Design◆ Roadway◆ Right-of-Way◆ Cost Estimates◆ Utilities
Project Implementation Plan
Transmission Line Evaluation
PEL Development, Report, & Approval
FHWA PEL Questionnaire
Stakeholder Meeting Public Meeting
Work Flow
Hancock/Academy PEL, 13207-01, 08.27.2015
WE ARE HERE
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design Purpose and Need
Hancock/Academy PEL, 13207-01, 02.25.2015
Intersection Crash Patterns
Study Area Crash RateComparison toStatewide Averages
Existing Access to AdjacentParcels on Academy Blvd.
Existing Bus Routes, Bus Stops andMissing Multimodal Facilities
Year 2035 Intersection Level ofService and Existing Intersection Lanes
Level of Service atIntersections based
on Average Delayin Seconds
To provide a safer transportation system for the
traveling public and pedestrians; and to improve
multi-modal accessibility to the local community and
businesses in the Hancock/Academy area, and
contribute to the revitalization of this portion of the
South Academy Corridor and its associated planning
areas.
Project PurposeProject Purpose
> Safety
> Vehicle access to adjacent parcels
> Multimodal accessibility
> Vehicular mobility and congestion
Project NeedProject Need
NEED: Higher than average crash rates concentratedaround intersections.
Issue:
> Study area crash rates much higher than expected compared to similar roadways with similar traffic volumes • The crash rate for all crashes is double the statewide average • The injury and fatality crashes are three to seven times higher than average
SafetySafetyNEED: Lack of accessibility to adjacent land use fromAcademy Blvd.
Issue:
> Compared to the rest of the study area Academy Blvd. north of and south of Hancock Expressway to the next traffic signal has very limited access.
Vehicular AccessVehicular Access
NEED: Inadequate intersection geometry and congestion during peak hours
Issues:
> Hancock/Academy intersection • Through movements over capacity • Left turn movements back up • Intersection serves many travel patterns • Fort Carson traffic • Typical commuter traffic on Hancock • High percentage of trucks due to nearby industrial area
Vehicular Mobility &Vehicular Mobility &CongestionCongestion
> Many study area intersections have statistically poor safety performance
> The predominant crash types are: • Side-swipe crashes which are concentrated near the existing ramp junctions on Academy Blvd. average • Rear-end crashes • Approach turn (left turn in front of a through vehicle)
NEED: Deficient pedestrian and bike facilities and lack of multimodal connectivity
Issue:
> Sidewalk system gaps > Deficient pedestrian facilities at intersections > Academy Blvd. ramps are a constraint to pedestrian connectivity > Connecting existingSand Creek and Milton Proby trails
Multimodal AccessibilityMultimodal Accessibility
A
B
C
D
E
F
No vehicle waits longer than one signal indication.
On rare occasions vehicles wait through more than one signal indication.
Intermittently vehicles wait through morethan one signal indication, occasionally backups may develop, traffic flow still stable and acceptable.
Delays at intersections may become extensive, but enough cycles with lower demand occur to permit periodic clearance,preventing excessive backups. LOS D has historically been regarded as a desirable design objective in urban areas.
Very long queues may createlengthy delays
Backups from locations downstream restrict or prevent movement of vehicles out of approach creating "gridlock" condition
≤10sec
>10-20sec
>20-35sec
>35-55sec
>55-80sec
>80sec
PDO - Property Damage Only
INJ - Injury Crashes
FAT - Fatal Crashes
Hancock/Academy PEL, 13207-01, 08.27.2015
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Alignments RetainedExisting AlignmentRecommendation: Retain for PEL Evaluation
Opportunities & Constraints
Cross SectionAcademy Boulevard
(view north)
2040 Level of Service: D
Stakeholder Comments
Intersection Delay: 55 sec/veh
Provides best opportunity to improve access
Could create beneficial impacts to adjacent businesses
Potential for less cost and construction requirements than shifting to a new alignment
More favored by businesses because it doesn’t favor one side or the other unlike the shift alternatives
Fewer utility impacts and improvements could be phasedover time
Favorable Unfavorable
Concerned about width of Academy Blvd. pedestrian crossing
Reduced opportunities for creating “Gateway” image
• Retains existing Academy Blvd. alignment • Adds 3rd NB and SB through lanes to Academy Blvd.• Removes at-grade diamond intersection ramps at Hancock/Academy intersection• Provides pedestrian crosswalks at Hancock/Academy and Hancock/Boychuk intersections and improves pedestrian
facilities• Pedestrians cross 8 lanes at Academy Blvd.• Lengthens turn lanes and creates safer vehicle turning movements• Opens adjacent intersection quadrant areas for optional uses - Transmission lines constrain NW, NE, and SE quadrants - Gas pipelines constrain edges of each quadrant• Allows for phased implementation of improvements• Connects Milton Proby and Sand Creek Trails
Split IntersectionRecommendation: Retain for PEL Evaluation
Opportunities & Constraints
2040 Level of Service: C
Stakeholder Comments
Intersection Delay: 31 sec/vehicle
• Splits NB and SB Academy lanes into separate 3-lane alignments to enhance intersection operation • Would reduce Academy speeds and removes at-grade diamond intersection ramps at Hancock/Academy intersection• Provides pedestrian crosswalks at intersections, with an open area between split lanes - Pedestrians cross 4 lanes at west Academy intersection - Pedestrians cross 3 lanes at east Academy intersection• Lengthens turn lanes and creates safer vehicle turning movements• Opens an area between lanes for optional uses - constraints include: - Segmented parcels - Transmission lines and gas pipeline easements • Constraints to phased implementation of improvements• Connects Milton Proby and Sand Creek Trails
Split maximizes intersection capacity
Pedestrian and ADA advantages of crossing two smaller intersections.
Improves transit accessibility for pedestrians
Advantages to moving Academy Blvd. closer to business on both sides of Academy with improved visibility
Open central area may allow for future BRT transfer center
Open area provides opportunity to create a “gateway” toSouth Academy
Favorable Unfavorable
Split does not address the improved access needs for businesses
Sight distance concerns due to short curves, requiring quick corrections
Expense of moving transmission lines not warranted
Open area may become a “no man’s land”
Concerns for cost and phasing of improvements
Cross SectionAcademy Boulevard
(view north)
N
S
EW
0 50 100 200
BU
S
POT
S S
UB
SU
SU
B
BUS
BUS
Hancock Expressway
Aca
dem
yB
lvd
Astrozon Blvd
Boychuk Ave
Jet W
ing
Dr
Jet W
ing Dr
Hancock Expressway
Sand C
reek
UNDERGROUND ELECTRIC LINE
SANITARY SEWER LINE
WATER LINE
PARCEL LINE
BUS STOP
CURB AND GUTTER
MEDIAN
5 FOOT NEW SIDEWALK
10 FOOT MULTI-USE PATH
BUS STOP
PROPOSED FEATURES
ROADWAY LIMITS WITHSTOP LINE OR CROSSWALK
BUS
BUS
Hancock Plaza Landfill(closed)
LamplighterCommunity
Mission TraceShopping Center
TacoBell
Kum & Go
Goodwill
Kelker Electric Substation
BurgerKing
Hancock PlazaShopping Center
KingSoopers
PizzaHut
TCFBank
Starbucks
DollarTree
ArcThrift
TYPICALSECTION
NEW RIGHT-IN/RIGHT-OUT ACCESS
10 FOOTMULTI-USE PATH
115 KVTRANSMISSION LINE
115 KVTRANSMISSION LINE
NEW RIGHT-IN/RIGHT-OUT ACCESS
NEW RIGHT-IN/RIGHT-OUT ACCESS
SINGLE POLEELECTRICDISTRIBUTION
NEW RIGHT-IN/RIGHT-OUT ACCESS
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
Aca
dem
yB
lvd
230 KVTRANSMISSION LINE
RELOCATE UTILITYPOLE & ADJUSTUTILITY EASEMENT
RELOCATE UTILITYPOLES
20-INCHWATER MAIN
RELOCATEUTILITY POLES
N
S
EW
0 50 100 200
COLORADOFHU1984COLORADOFHU1984COLORADOFHU1984COLORADOFHU1984
10' 99'
37'131'
7'
Exi
stin
g R
OW
Pro
po
sed
RO
W
Pro
po
sed
RO
W
Exi
stin
g R
OW
5'
Use of extra spaceto be determined
Use of extra spaceto be determined
COLORADOFHU1984
39'
37'59'
Pro
po
sed
RO
W
Exi
stin
g R
OW
Exi
stin
g R
OW
5'7'
COLORADOFHU1984COLORADOFHU1984
10'
COLORADOFHU1984
392'
Pro
po
sed
RO
W Use of extra spaceto be determined
POT
S S
UB
POT
S S
UB
SU
B
SU
B
BUS
BUS
BUS
BU
S
BU
S
Hancock Expressway
Aca
dem
yB
lvd
Astrozon Blvd
Boychuk Ave
Jet W
ing
Dr
Jet W
ing Dr
Hancock Expressway
Sand C
reek
Hancock Plaza Landfill(closed)
LamplighterCommunity
Mission TraceShopping Center
TacoBell
Kum & Go
Goodwill
Kelker Electric Substation
BurgerKing
Hancock PlazaShopping Center
KingSoopers
PizzaHut
TCFBank
Starbucks
DollarTree
ArcThrift
GAS LINE AND EASEMENT
OVERHEAD ELECTRIC AND EASEMENT
UNDERGROUND ELECTRIC LINE
SANITARY SEWER LINE
WATER LINE
PARCEL LINE
BUS STOP
EXISTING FEATURESCURB AND GUTTER
MEDIAN
5 FOOT NEW SIDEWALK
10 FOOT MULTI-USE PATH
BUS STOP
PROPOSED FEATURES
LEGEND
ROADWAY LIMITS WITHSTOP LINE OR CROSSWALK
BUS
BUS
TYPICALSECTION
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,
RIGHT-OUT)
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
10 FOOTMULTI-USE PATH
115 KVTRANSMISSION LINE
115 KVTRANSMISSION LINE
NEW RIGHT-IN/RIGHT-OUT ACCESS
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,RIGHT-OUT)
SINGLE POLEELECTRICDISTRIBUTION
NEW RIGHT-IN/RIGHT-OUT ACCESS
Aca
dem
yB
lvd
230 KVTRANSMISSION LINE
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Alignments Not Retained
Hancock/Academy PEL, 13207-01, 08.27.2015
Shift East AlignmentRecommendation: Not Recommended for PEL Evaluation
Opportunities & Constraints
2040 Level of Service: D
Stakeholder Comments
Intersection Delay: 55 sec/veh
• Shifts Academy Blvd. alignment to eastern edge of intersection, adjacent to businesses and community resources in NE and SE quadrants • Would reduce Academy Blvd. speeds• Adds 3rd NB and SB through lanes to Academy Blvd.• Removes at-grade diamond intersection ramps at Hancock/Academy intersection• Provides pedestrian crosswalks at Hancock/Academy and Hancock/Boychuk intersection and improves area pedestrian
facilities • Pedestrians cross 8-lanes at Academy Blvd.• Lengthens turn lanes and creates safer vehicle turning movements• Opens an area of development in the NW and SW quadrants - Constraints include segmented parcels - Transmission lines and gas pipeline easements • Constraints to phased implementation of improvements• Connects Milton Proby and Sand Creek Trails
Favorable Unfavorable
Concerns for cost and phasing of improvements
Utility Impacts
Impacts to east side businesses due to road and easement encroachments
Reduces visibility for west side businesses
Little additional benefit than staying on existing alignment
Cross SectionAcademy Boulevard
(view north)
Quadrant IntersectionRecommendation: Not Recommended for PEL Evaluation
Opportunities & Constraints
2040 Level of Service: D
Stakeholder Comments
Intersection Delay: 45 sec/veh
Favorable Unfavorable
Very confusing for drivers, difficult to adjust travel patterns, and would require a lot of “way finding”
Removing left turns onto Academy and shifting traffic toJet Wing and Astrozon would create a safety hazard
The inability to make a left turn to Academy would divert traffic to secondary roads that are less maintained, or make it more difficult to locate businesses on Academy
Quadrant would disrupt egress following church services toNB Academy
• Retains existing Academy Blvd. alignment • Adds 3rd NB and SB through lanes to Academy Blvd.• Represents an innovative design concept by relocating left turns from Hancock Expressway to Jet Wing Dr. and Astrozon Blvd. to improve intersection operations• Removes at-grade diamond intersection ramps at Hancock/Academy intersection• Provides pedestrian crosswalks at Hancock/Academy and Hancock/Boychuk intersections and improves pedestrian facilities• Pedestrians cross 8 lanes at Academy Blvd.• Lengthens turn lanes and creates safer vehicle turning movements• Opens adjacent intersection quadrant areas for optional uses - Transmission lines constrain NW, NE, and SE quadrants - Gas pipelines constrain edges of each quadrant• Allows for phased implementation for improvements• Connects Milton Proby and Sand Creek Trails
Cross SectionAcademy Boulevard
(view north)
Shift West AlignmentRecommendation: Not Recommended for PEL Evaluation
Opportunities & Constraints
2040 Level of Service: D
Stakeholder Comments
Intersection Delay: 55 sec/veh
• Shifts Academy Blvd. alignment to western edge of intersection, adjacent to businesses and community resources in NW and SW quadrants
• Would reduce Academy Blvd speeds• Adds 3rd NB and SB through lanes to Academy Blvd.• Removes at-grade diamond intersection ramps at Hancock/Academy intersection• Provides pedestrian crosswalks at Hancock/Academy and Hancock/Boychuk intersections and improves area pedestrian
facilities• Pedestrians cross 8-lanes at Academy Blvd.• Lengthens turn lanes and creates safer vehicle turning movements• Opens an area of development in the NE and SE quadrants - Constraints include segmented parcels - Transmission lines and gas pipeline easements • Constraints to phased implementation of improvements• Connects Milton Proby and Sand Creek Trails
Shift to west would provide more visibility to business in SW quadrant
Minimal impact to utilities
Favorable Unfavorable
Creates limited number of relatively small parcels between the utility easement and Academy, which were not viewed as substantial economic drivers
Concerns for cost and phasing of improvements
Impacts to businesses on west side
Cross SectionAcademy Boulevard
(view north)
N
S
EW
0 50 100 200
N
S
EW
0 50 100 200
POT
S S
UB
POT
S S
UB
SU
B
SU
B
BUS
BUS
BUS
BU
S
BUS
Hancock Expressway
Aca
dem
yB
lvd
Astrozon Blvd
Boychuk Ave
Jet W
ing
Dr
Jet W
ing Dr
Hancock Expressway
Sand C
reek
UNDERGROUND ELECTRIC LINE
SANITARY SEWER LINE
WATER LINE
PARCEL LINE
BUS STOP
CURB AND GUTTER
MEDIAN
BUS STOP
PROPOSED FEATURES
LEGEND
ROADWAY LIMITS WITHSTOP LINE OR CROSSWALK
BUS
BUS
Hancock Plaza Landfill(closed)
LamplighterCommunity
Mission TraceShopping Center
TacoBell
Kum & Go
Goodwill
Kelker Electric Substation
BurgerKing
Hancock PlazaShopping Center
KingSoopers
PizzaHut
TCFBank
Starbucks
DollarTree
ArcThrift
TYPICALSECTION
10 FOOTMULTI-USE PATH
115 KVTRANSMISSION LINE
115 KVTRANSMISSION LINE
SINGLE POLEELECTRICDISTRIBUTION
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
Aca
dem
yB
lvd
230 KVTRANSMISSION LINE
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,
RIGHT-OUT)
NEW RIGHT-IN/RIGHT-OUT ACCESS
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,RIGHT-OUT)
NEW RIGHT-IN/RIGHT-OUT ACCESS
N
S
EW
0 50 100 200
Relocate WB to SB
Left-Turn Lane
to Jet Wing Dr.
Relocate EB to NB
Left-Turn Lane
to Astrozon Blvd.
Quadrant Intersection
Ast
rozo
n B
lvd
.
Jet W
ing D
r.
COLORADOFHU1984COLORADOFHU1984 COLORADOFHU1984
10' 99'
131'
7'
Exi
stin
g R
OW
Pro
po
sed
RO
W
Pro
po
sed
RO
W
Exi
stin
g R
OW
5'
COLORADOFHU1984
Relocate transmissionline pole
Use of extra spaceto be determined
COLORADOFHU1984COLORADOFHU1984COLORADOFHU1984 COLORADOFHU1984
10' 99'
37'131'
7'
Exi
stin
g R
OW
Pro
po
sed
RO
W
Pro
po
sed
RO
W
Exi
stin
g R
OW
5'
Use of extra spaceto be determined
Use of extra spaceto be determined
COLORADOFHU1984COLORADOFHU1984COLORADOFHU1984 COLORADOFHU1984
10' 99'
164'131'
7'
Exi
stin
g R
OW
Pro
po
sed
RO
W
Pro
po
sed
RO
W
Exi
stin
g R
OW
5'
Use of extra spaceto be determined
POT
S S
UB
POT
S S
UB
BU
S
BUS
BUS
SU
B
BU
S
Hancock Expressway
Aca
dem
yB
lvd
Astrozon Blvd
Boychuk Ave
Jet W
ing
Dr
Jet W
ing Dr
Hancock Expressway
Sand C
reek
GAS LINE AND EASEMENT
OVERHEAD ELECTRIC AND EASEMENT
UNDERGROUND ELECTRIC LINE
SANITARY SEWER LINE
WATER LINE
PARCEL LINE
BUS STOP
EXISTING FEATURESCURB AND GUTTER
MEDIAN
PROPOSED FEATURES
LEGEND
ROADWAY LIMITS WITHSTOP LINE OR CROSSWALK
BUS
BUS
Hancock Plaza Landfill(closed)
LamplighterCommunity
Mission TraceShopping Center
TacoBell
Kum & Go
Goodwill
Kelker Electric Substation
BurgerKing
Hancock PlazaShopping Center
KingSoopers
PizzaHut
TCFBank
Starbucks
DollarTree
ArcThrift
TYPICALSECTION
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,
RIGHT-OUT)
10 FOOTMULTI-USE PATH
115 KVTRANSMISSION LINE
115 KVTRANSMISSION LINE
NEW RIGHT-IN/RIGHT-OUT ACCESS
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,RIGHT-OUT)
SINGLE POLEELECTRICDISTRIBUTION
NEW RIGHT-IN/RIGHT-OUT ACCESS
RELOCATE UTILITYPOLES & ADJUST
UTILITY EASEMENT
20-INCHWATER MAIN
RELOCATEUTILITY POLE
RELOCATE UTILITYPOLE
ADD UTILITY POLE &ADJUST UTILITYEASEMENT
RELOCATE UTILITYPOLE
RELOCATE UTILITYPOLE & ADJUST
UTILITY EASEMENT5 FOOT
NEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
Aca
dem
yB
lvd
230 KVTRANSMISSION LINE
POT
S S
UB
POT
S S
UB
SU
B
SU
B
BUS
BUS
BUS
SU
B
BU
S
Hancock Expressway
Aca
dem
yB
lvd
Astrozon Blvd
Boychuk Ave
Jet W
ing
Dr
Jet W
ing Dr
Hancock Expressway
Sand C
reek
UNDERGROUND ELECTRIC LINE
SANITARY SEWER LINE
WATER LINE
PARCEL LINE
BUS STOP
CURB AND GUTTER
MEDIAN
BUS STOP
PROPOSED FEATURES
LEGEND
ROADWAY LIMITS WITHSTOP LINE OR CROSSWALK
BUS
BUS
Hancock Plaza Landfill(closed)
LamplighterCommunity
Mission TraceShopping Center
TacoBell
Kum & Go
Goodwill
Kelker Electric Substation
BurgerKing
Hancock PlazaShopping Center
KingSoopers
PizzaHut
TCFBank
Starbucks
DollarTree
ArcThrift
TYPICALSECTION
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,
RIGHT-OUT)
10 FOOTMULTI-USE PATH
115 KVTRANSMISSION LINE
115 KVTRANSMISSION LINE
NEW RIGHT-IN/RIGHT-OUT ACCESS
NEW 3/4 ACCESS(LEFT-IN, RIGHT-IN,RIGHT-OUT)
SINGLE POLEELECTRICDISTRIBUTION
NEW RIGHT-IN/RIGHT-OUT ACCESS
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
10 FOOT MULTI-USE PATHCONNECTING SAND CREEK
AND MILTON E. PROBY TRAILS
5 FOOTNEW SIDEWALK
Aca
dem
yB
lvd
230 KVTRANSMISSION LINE
20" Water Line
Hancock/Academy PEL, 13207-01, 08.27.2015
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Alternative Access Options
Existing Alignment
Split AlignmentLegend
Right of Way Line
Multiuse Path
Existing Traffic Signal
New Signalized Access
New Right-In/Right-OutAccess
New 3/4 Access
Aca
dem
y B
lvd
.
Hancock Expressway
Aca
dem
y B
lvd
.
Hancock Expressway
Aca
dem
y B
lvd
.
Hancock Expressway
Aca
dem
y B
lvd
.
Hancock Expressway
Aca
dem
y B
lvd
.
Hancock Expressway
Restricted AccessNorth & South
1a Restricted Access North& New Signalized SouthR&
1b New SignalizedNorth & SouthNN
1 c
Restricted AccessNorth & SouthRN
2a Restricted Access North& New Signalized SouthR&
2b
(closed) (closed) (closed)
(closed)(closed)
Hancock/Academy PEL, 13207-01, 08.27.2015
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Evaluation Matrix
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Hancock/Academy Intersection
Hancock/Academy PEL, 13207-01, 08.27.2015
ExamplePedestrian Refuge
Crosswalk DetailCrosswalk DetailVictoryWorld
Outreach
Starbucks
TCF Bank
EmergiCare
Aca
dem
y B
lvd
.
Hancock Expressway
Boychuk Ave.
TRANSIT
STATION
Pedestrian Refuge
(typical)
Pedestrian Refuge
(typical)
New Trail Connectionto Link Sand Creek
and Milton Proby Trails
Pedestrian Refuge
C lk D il36' 12' 72'
Hancock/Academy PEL, 13207-01, 08.27.2015
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Recommended Alternative
Legend
Right of Way Line
Multiuse Path
Existing Traffic Signal
New Signalized Access
New Right-In/Right-Out Access
New 3/4 Access
Close Access
Intersection PedestrianEnhancements
New Sidewalk Connections
HancockPlaza
Landfill(Closed)
Kelker ElectricSubstation
Mission TraceShopping Center
LamplighterCommunity
King Soopers
VictoryWorld
Outreach
Starbucks
TCF Bank
Pizza Hut
Burger King
Goodwill
Kum & Go
Taco Bell
EmergiCare
Key Bank
Aca
dem
y B
lvd
.
Hancock Expressway
Jet W
ing D
rive
Boychuk Ave.
Kin
Connection to
Sand Creek Trail
Ave.
Ultimate Access:Signalized and wide median for pedestrian refuge area
Ultimate Access:Signalized and wide median for pedestrian refuge area
Ultimate Access:Access closed
Wide median for pedestrian refuge(typical)
Initial Access:3/4 movement
Initial Access:Right-in/right-out
Southbound right turn lane
Make sidewalk connection to
Bentley Commons
Improved intersection geometry and
pedestrian access
New multi-use trail to connect Sand Creek and
Milton Proby trails
New sidewalk connection
New right-in/right-out
access
TRANSITSTATION
Hancock/Academy PEL, 13207-01, 08.27.2015
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Livability - Transit
NORTH
New Transit Station inSouthwest Corner Example Station Areas
New Bus Routing with Station
3222 27
27
27
27
27
27
2
Legend
Transit Stops
Bus Routes
Proposed Station
Traffic Signal
XX
1
1
1
1
Southwest quadrant provides good bus access
Reduces out of direction bus travel
Good pedestrian connectivity to station with new signalized access
Supportive adjacent landowners
Aca
dem
y B
lvd
.
Hancock Expressway
Astrozon Blvd.
Ast
rozo
n B
lvd.
Aca
dem
y B
lvd
.
Hancock Expressway
TransitStation
TransitStation
Boychuk Ave.
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Utility Undergrounding
Hancock/Academy PEL, 13207-01, 08.27.2015
An underground transmission duct bank is proposed to replace
the existing 115-kV overhead, H-Frame, transmission power line
to the east of Academy Boulevard. The general underground
installation consists of a duct bank, which includes PVC conduits,
115-kV insulated cable, communication fiber, and necessary
grounding cable, encased in concrete. The duct bank is routed to
potentially two, riser pole structures where the circuit transitions
from underground cable to overhead wire. This circuit ties into
existing facilities at the Kelker Substation on the north and exist-
ing overhead structures to the south. The underground duct bank
is proposed to be installed within the roadway limits of Academy
Boulevard.
The high-level project cost is estimated at approximately
$3.5-5.5 million.
General Project Installation
TypicalRiser Pole115- kV, single-circuit H-frame – likely candidate for under-
grounding
1. Single circuit line
2. Provides visual enhancement to the Hancock/Academy setting
3. Provides development opportunities by eliminating existing easement
A 115kV, double circuit lattice tower line – not a likely candidate for
undergrounding
1. Double circuit line more costly than undergrounding a single
circuit line
2. Does not provide significant new development opportunities in the
northwest corner since underground would still require an easement
through northwest quadrant of the intersection
3. Required riser pole in the northwest corner would provide little
visual advantage over the existing lattice tower, and would not
enhance the Hancock/Academy setting
A 230kV, single circuit monopole line – not a likely candidate for
undergrounding
1. Would not provide significant amounts of new right-of-way for
redevelopment opportunities
2. CSU typically does not install underground transmission circuits
above 115kV
12kV distribution line – likely candidate for undergrounding
Typical Duct Bank Installation
100'
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Conceptual Landscape Treatments
Hancock/Academy PEL, 13207-01, 08.27.2015
H A N C O C K E X P R E S S W A Y / A C A D E M Y B O U L E V A R DPlanning and Environmental Linkages, Study and Design
Land Use Concepts
Hancock/Academy PEL, 13207-01, 08.27.2015