© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 1
Halliburton Cyprus
▌ Company Registered May 2013▌ Nicosia Office December 2013▌ Larnaca Base Jan 2015▌ Main business – Completion
Tools, Cementing, Drilling Fluids, Waste Management, Continuous Circulation, Coring and Drill Bits
▌ Relocation to Fanoremeni office April 2015
▌ Total of 8 Employees in country with 88% national workforce
▌ Peak workforce 58
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2
Lloyds recommendations and citizen concerns
▌ Visual Impact Halliburton changed vertical tanks to horizontal to minimise visual
impact▌ Noise Impact
Halliburton brought in low noise generators to minimise audible impact
▌ Dust Included the latest in dust collection technology to bring dust to
lowest practical level▌ Water Pollution
Weekly measurement of water quality in drainage culvert to the port. No discharge to environment.
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3
Radioactive Mud
▌ The mud was measured by and found to be non radioactive
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4
BARASWIFTTM & Bulk Powder Facility
▌ BARASWIFTTM Liquid Mud Plant
Total storage capacity= 1536 m3 24 tanks of 54 m3 each capacity 2 x 40 m3 independent mixing
tanks
▌ Bulk Facility
Total storage capacity= min. 360 ton 3 x 62.3 m3 (2200 cuft ) silos with
loading cells 1 x 5.7 m3 (200 cuft) cutting bottle 2 x Air compressors with driers Dust collector
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5
BARASWIFTTM - Larnaca Set-Up
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 6
Liquid & Bulk powder facility – Larnaka- 49 x 35 mt