Hackney Central Master Plan p1-30

download Hackney Central Master Plan p1-30

of 28

Transcript of Hackney Central Master Plan p1-30

  • 8/14/2019 Hackney Central Master Plan p1-30

    1/28

    DEVELOPMENT PLAN DOCUMENTFOR PUBLIC PARTICIPATION

    Draft Interim Hackney Central Area Action Plan(Phase 1) - Masterplan

    March 2009

    Local Development FrameworkLDF

  • 8/14/2019 Hackney Central Master Plan p1-30

    2/28

    PART I: Context and Analysis

    Chapter 1: Introduction

    1.1 Purpose of the Masterplan

    1.2 Who is it for & How can it be used?

    1.3 Method and Approach

    1.4 Status of the Masterplan1.5 Masterplan Overview

    Chapter 2: Context The place and its people

    2.1 Taking the Wider View

    2.2 The Study Area

    2.3 Masterplan Development

    2.4 Hackney Central consultation

    2.5 The Local Context

    2.6 Summary SWOT

    2.7 Key Issues

    2.8 Options Development

    PART II: The Masterplan Framework

    Chapter 3: The Masterplan Vision

    3.1 Masterplan Vision

    3.2 Masterplan Themes and Objectives

    Chapter 4: Theme 1 - Promoting high quality urban

    design for Hackney Central

    4.1 Reinforcing character and identity

    4.2 Enhancing town centre legibility4.3 Addressing severance

    4.4 Locating tall buildings

    4.5 Maximising benefits of opportunity areas

    Chapter 5: Theme 2 - Enhancing the public realm

    5.1 The importance of the public realm

    5.2 Principle public spaces

    5.3 Points of arrival

    5.4 A clear street hierarchy

    5.5 Play and Recreation Spaces

    5.6 Management and Maintenance

    Chapter 6: Theme 3 Ensuring a functional town

    centre for living, working and shopping

    6.1 Land use strategy

    6.2 Retail Strategy

    6.3 Housing Provision

    6.4 Employment Provision

    6.5 Community Facilities

    6.6 Development Content

    Chapter 7: Theme 4 - Establishing a coherent and

    attractive movement network7.1 A hierarchy of movement and access

    7.2 Pedestrian movement

    7.3 Approach to crossings and junctions

    7.4 Cycle Routes

    7.5 Public Transport

    7.6 Parking Strategy

    7.7 Servicing Strategy

    Chapter 8: Theme 5- Promoting forward thinkingsustainable regeneration strategies

    8.1 Introduction - The Energy Strategy

    8.2 Energy hierarchy

    8.3 Energy reduction and efficiency guidance

    8.4 Supply strategy

    8.5 Energy service company

    8.6 General considerations for renewables

    8.7 GLA renewable energy compliance

    8.8 Biomass guidance

    8.9 Low carbon landmarks

    PART III: Shaping Local Character

    Chapter 9: Character Areas and Opportunity Sites

    9.1 Character Areas and Sites Overview

    9.2 Area 01: Mare Street East

    9.3 Area 02: Amhurst Road

    9.4 Area 03: Mare Street

    9.5 Area 04: St John-at Hackney Church

    9.6 Area 05: Civic Heart

    9.7 Area 06: Mixed Employment

    9.8: Area 07: Traditional Streets9.9 Area 08: Kenmure Triangle

    9.10 Area 09: Horton Road

    9.11 Area 10: Clarence Mews

    9.12: Area 11: Clarence Road

    9.13: Area 12: Residential Estates

    PART IV: Moving Forward

    Chapter 10: Delivery and Implementation

    10.1 Introduction

    10.2 Delivery constraints and opportunities10.3 Responding to the market

    10.4 Council ownership

    10.5 Private sites

    10.6 Funding

    10.7 Phasing

    10.8 Risks

    10.9 Conclusion

    10.10 Moving Forward

    APPENDICESA Relevant London Plan ObjectivesB Technical Energy Tables

    CONTENTS

  • 8/14/2019 Hackney Central Master Plan p1-30

    3/28

    4

    PART I: Context and Analysis1.1 Stages of the Masterplan Project

    2.1 Hackney Central and Dalston context

    2.2 The masterplan boundary

    2.3 Listed buildings and conservation area

    2.4 Crossrail 2 safeguarded land

    2.5 Constraints summary2.6 Opportunity sites

    2.7 Option 1

    2.8 Option 2

    2.9 Option 3a

    2.10 Option 3b

    2.11 Option 4

    3.1 A vision for Hackney Central

    3.2 The urban design framework

    PART II: The Masterplan Framework4.1 Character areas4.2 Legibility

    4.3 Barriers to movement

    4.4 Indicative building heights

    4.5 3D image of the Masterplan area

    4.6 Cross-section through the

    Masterplan area

    5.1 Areas for public realm enhancement

    5.2 Town Hall Square

    5.3 St John-at-Hackney Churchyard

    and Gardens

    5.4 New Town Square5.5 New connecting routes

    5.6 Gateways and Nodes

    5.7 Hierarchy of routes

    5.8 Play strategy

    6.1 Land use plan

    6.2 Retail strategy diagram

    6.3 Proposed community infrastructure

    7.1 Context map for London Borough

    of Hackney

    7.2 Vehicular movement network

    7.3 Pedestrian strategy7.4 Cyclist strategy

    7.5 Parking, access and servicing strategy

    8.1 Energy strategy

    8.2 Energy hierarchy

    PART III: Shaping Local Character9.1 Proposed character areas

    9.2 Opportunity sites block reference diagram

    9.3 Design principles and constraints for

    character area 01

    9.4 Proposal for character area 01: Option 01

    9.5 Proposal for character area 01: Option 02

    9.6 View south towards proposed new town

    square

    9.7 Indicative schematic Option 19.8 Indicative schematic Option 2

    9.9 View west along Morning Lane

    9.10 Proposal for Character Area 02

    9.11 View towards Hackney Central station

    9.12 Schematic of station plaza site

    9.13 Station Plaza opportunity site

    9.14 Proposals for character area 03

    9.15 The Narrow Way northern gateway site

    9.16 Indicative schematic of Mare Street

    character area

    9.17 Proposal for Character Area 04

    9.18 The Rectory opportunity site

    9.19 Indicative schematic of The Rectory site

    9.20 Proposal for Character Area 05

    9.21 Indicative schematic of Character Area 05

    9.22 Proposal for Character Area 06

    9.23 Indicative schematic of Hackney Yards

    9.24 Hackney Yards opportunity site

    9.25 Character Area 07: Traditional Streets

    9.26 Hackney Lanes opportunity site

    9.27 Indicative schematic of Hackney Lanes

    opportunity site

    9.28 Character Area 089.29 Indicative schematic of Kenmure Triangle

    9.30 Indicative schematic of Horton Road

    9.31 Proposal for Character Area 09

    9.32 Proposal for Character Area 10

    9.33 Indicative schematic of Clarence Mews

    9.34 Proposal for Character Area 11

    9.35 Indicative schematic of Clarence Road

    9.36 Proposal for Character Area 12

    9.37 Indicative schematic of the Trelawney Estate

    9.38 Indicative schematic of the Marcon Estate

    9.39 Indicative schematic of the Trelawney Estate

    Tables2.1 Masterplan Scoping opportunity sites table

    2.2 SWOT audit and analysis

    3.1 Masterlpan themes and objectives

    5.1 Proposed quantums of playable space

    8.1 CO2 reduction and cost

    9.1 Opportunity sites

    LIST OF FIGURES AND TABLES

  • 8/14/2019 Hackney Central Master Plan p1-30

    4/28

    5

    PART I - CONTEXT AND ANALYSIS

    This section describes the Hackney Central Masterplan area and

    summarises the analytical work undertaken to date, which serves as a

    foundation for the Masterplan.

    1.1 Purpose of the Masterplan

    A Masterplan is a comprehensive strategy for

    co-ordinated development and design in an area

    that reflects local aspirations for the future of that

    area. A Masterplan helps to guide development

    and provides confidence and certainty to developers

    and other public sector bodies that their proposals

    are grounded.

    Where a masterplan allocates land, as in the

    case of this masterplan, it must be prepared as

    an Area Action Plan.

    The overall purpose of the Hackney Central

    Masterplan will be to establish the basis for

    shaping the regeneration of the area. It will ensure

    the continued and enhanced role of Hackney

    Central as an important Town Centre and civic

    heart to the borough, responding to the needs

    of future communities and housing growth over

    the coming years.

    The regeneration of Hackney Central will seek

    to address:

    Town Centre liveability: through social and

    physical regeneration, including better streets

    and linkages, buildings, housing, community and

    cultural facilities as well as providing new public

    open spaces, especially enhanced green and

    play spaces;

    Strengthened local character and enhancedheritage: by encouraging community-led

    development and facilitating an integrated and

    balanced town centre that is attractive as a place

    to live, work, visit and invest;

    Stronger definition of the town centre as the

    civic heart to the borough and as a key civic

    and cultural hub within London;

    To provide quality local retail and amenities

    for the people of Hackney Central, inspiring

    developers and stakeholders by illustrating how

    the area can be improved; and,

    The quality of the public realm through a

    focus of investment in key routes and spaces,

    introducing areas of new public open space, and

    means of access to facilities.

    The Masterplan will meet these objectives by:

    identifying the key strengths and weaknesses of

    the town centre;

    ascertaining the issues that currently affect the

    town and may influence the towns future;

    setting out the principles and parameters for

    new development to take place - site design,capacities, uses, funding and phasing;

    defining the principles for environmental

    enhancement to take place identification of

    local distinctiveness, character areas,

    improvement areas;

    identifying areas to improve the public realm and

    introduce new public open space and community

    facilities; and,

    assessing the practicalities of co-ordinated

    development and land assembly.

    The Masterplan guides the overall regeneration of

    Hackney Central, providing more specific detail than

    the emerging Core Strategy. An important aspect of

    the Masterplan is the promotion of high quality,

    sustainable mixed-use development.

    The Civic heart, Mare Street shops and wealth of historic character capture much of the essence that is Hackney Central.

    01 Introduction and Background

  • 8/14/2019 Hackney Central Master Plan p1-30

    5/28

    6

    1.2 Who is it for how can it be used?

    The Council will use the Masterplan to:

    identify potential for growth including residential

    in mixed-use development;

    co-ordinate development within the town

    centre area;

    ensure an appropriate mix of land uses, and

    thus allocate land;

    assess developer proposals; and,

    forecast future service and communityfacility needs.

    This draft Masterplan establishes a strategic

    framework identified through a series of policies and

    principles, setting out the policy context (in addition

    to the emerging Core Strategy) for development

    proposals coming forward within Hackney Central

    town centre. These principles will be used to inform

    development and proposals throughout the area

    and assess planning applications. Developers, land

    owners, stakeholders, residents; neighbourhood

    organisations and community organisations can use

    this document to:

    identify suitable locations for new developments;

    identify what density is appropriate and how

    they can integrate developments into the

    surrounding context;

    identify what land uses are suitable on

    specific sites; identify what types of developments the Council

    is planning for the area as a whole as well as

    specific sites; and

    to forecast future service needs.

    All developers, individuals and organisations should

    work with the Council to achieve the principles

    set out in this document to inform proposals. The

    Policy/Design Principles are set out in a higlighted

    box throughout each theme and character area.

    Stage 1: Masterplan Scoping

    Stage 2: Initial Options

    Stage 3: Consultation Draft Masterplan

    (current stage)

    Stage 5: Finalise Masterplan (Phase 1 AAP)

    SustainabilityAppra

    isal

    EqualitiesImpactAssessment

    Informal Community Consultation

    Formal Consultation with Community, Stakeholders, Ward Members

    Ward Members Consultation and Design Review Panel

    Stage 4: Consultation

    Hackney

    CentralMasterplan

    Steering

    Gro

    up

    (Councilofficers,

    key

    stakeholders,etc.)Consultation/Meetings

  • 8/14/2019 Hackney Central Master Plan p1-30

    6/28

    7

    1.3 Method and Approach

    The project programme so far has been structured

    in the following stages:

    Stage 1: Masterplan Scoping & Initial Consultation

    Stage 2: Initial Options

    Stage 3: Consultation Draft Masterplan

    (current stage)

    Stage 4: Public Consultation/Public Participation

    Stage 5: Finalise Masterplan (Phase 1 AAP)

    These stages have resulted in two document

    parts, namely Part 1 Hackney Central Masterplan

    Scoping and Baseline Report which consists of

    background supporting material which informed

    Part 2 the Draft Hackney Central Area Action Plan

    (Phase 1) Masterplan (this document).

    Following public consultation of this draft

    Masterplan, the Council will take into account all

    comments received to produce a final Phase 1

    Area Action Plan to be endorsed by Cabinet.

    Following the endorsement of Phase 1 and the

    adoption of the Core Strategy, a Phase 2 Draft

    Hackney Central Area Action Plan will be prepared

    to reflect the adopted Core Strategy which will then

    be consulted on. Following public consultation and

    subsequent amendments made to the document

    resulting from comments received during the

    consultation period, the Phase 2 AAP will be

    adopted by Council as the final Hackney Central

    Area Action Plan.

    Sustainability Appraisal

    Underpinning the approach to the development of

    the Masterplan is the process of formulating and

    undertaking a Sustainability Appraisal (S.A.) for the

    key stages of the project. An SA has informed the

    preparation of the Masterplan and should be read in

    conjunction with this document.

    Equalities Impact Assessment

    The Masterplan is accompanied by an initial

    Equalities Impact Assessment that examines what

    effect the Masterplans implementation may have on

    different groups in the community. A full Equalities

    Impact Assessment will be produced during the

    drafting of the Submission version.

    1.4 Status of the Masterplan

    This document has been prepared during a time

    of change within the current planning system. The

    Unitary Development Plan (UDP) is progressively

    being replaced by the Hackney Local Development

    Framework (LDF). Hackneys Core Strategy

    Preferred Options Report has undergone statutory

    public consultation in April and May 2008.

    This Masterplan has been prepared as a Draft

    Area Action Plan (Phase 1) process as part of the

    Local Development Framework (LDF). It provides

    policy and design guidance to be used as part

    of the development control process and to help

    inform investment decisions. As a Development

    Plan Document, this Masterplan will be a material

    consideration in the assessment of planning

    applications, and will be able to allocate land use.

    On advice from the Government Office for London,

    Hackney Central Area Action Plan will follow the

    Core Strategy process to ensure consistency and

    conformity. This document therefore is Phase 1

    of this AAP process; it replaces the existing Issues

    and Options Hackney Central Area Action Plan

    (2005). Once the Core Strategy is adopted, the

    AAP will be developed from this Phase 1 stage

    into a consultation document, and taken forward

    as a development plan document for full adoption.

    Consultation feedback from earlier stages and

    baseline information has therefore been fed into the

    production of this Masterplan.

    1.5 Masterplan Overview

    This document is the culmination of the first three

    stages of work and sets out a strategic urban

    framework that will guide future development in the

    Town Centre.

    This masterplan also identifies the main opportunity

    sites in Hackney Central and these represent theareas where change is most likely to occur and sets

    out possible development scenarios for these sites.

    It puts forward an urban design-led approach to

    the regeneration of the area, with an appreciation of

    context as a means of informing appropriate design

    solutions. It also provides illustrative examples

    for each opportunity site to show how they could

  • 8/14/2019 Hackney Central Master Plan p1-30

    7/28

    8

    develop based upon strategic urban design and

    development principles.

    The document is presented in four parts:

    PART I Context and Analysis

    This section describes the Hackney Central

    Masterplan area site and summarises the analytical

    work undertaken to date, which serves as a

    foundation for the Masterplan.

    PART II Masterplan Framework

    This section establishes the over-arching urban

    design framework and the development principles.

    This section also sets out the key topics of the

    Masterplan in terms of indicative preferred building

    footprints, a public realm strategy, land use,

    indicative building heights, movement and access

    and community infrastructure.

    PART III Shaping Local Character

    This section outlines design parameters for each

    of the areas within the town centre, aiming to

    strengthen the character and unique identity that

    already exists. Detailed development proposals are

    envisaged and illustrated on a site-by-site basis.

    Some sites are shown as having different scenarios

    to indicate different possibilities for development,

    dependent on land assembly, viability, cost, etc. The

    development proposals are indicated in both plan

    form and three-dimensionally, to provide a general

    sense of the overall massing of the proposed

    development on site.

    PART IV Moving Forward

    This section provides the overall strategy for

    implementation and sets out which projects,

    measures and actions are required for successful

    delivery of the Masterplan.

    Matrix Partnership Ltd Lead Consultants, Urban

    Design and PlanningRamboll Whitbybird Ltd Transport, Energy and

    Sustainability

    Bernard Williams Associates Land Assembly and

    Development Economics

  • 8/14/2019 Hackney Central Master Plan p1-30

    8/28

    9

    02 Context: the place and its people2.1 Taking the wider view

    Masterplans are being prepared in parallel for both

    Dalston and Hackney Central town centres to

    ensure that a complementary planning strategy is

    pursued for each location. Dalston and Hackney

    Central are the Boroughs two main existing town

    centres and as such will be the focus for new retail,

    commercial, leisure and other related development

    over the coming years. Dalston is the Boroughs

    foremost centre and is designated a Major Town

    Centre in the London Plan. Whilst Hackney Central

    is designated as a lower order District Town Centre,

    with the area a major focus for regeneration over the

    plan period, it is possible that growth will lead to it

    becoming elevated in planning policy terms.

    Both Masterplans also need to capitalise on

    major new planned rail infrastructure, such asthe remodelling of both Dalston Kingsland and

    Hackney Central North London Line stations as part

    of the Overground Network. In Dalston, planned

    extensions to the East London Line are potentially

    to be accompanied by a new Hackney-Chelsea

    line station, transforming the way that the centre

    is connected to the London rail network. The

    development pressures that this new infrastructure

    will bring provides both challenges and

    opportunities for considering how each centre

    is to evolve in the future.

    Whilst both centres are major focal points for

    shopping, Dalston is primarily a comparison

    shopping destination (i.e. non-food such as clothing)

    and Hackney Central is largely a convenience

    shopping centre (i.e. food). At present too much

    spending power leaves the borough. It is therefore

    necessary to encourage the provision of more and

    higher quality shopping and services to encourage

    local residents to shop more locally for a wider range

    of goods and services. However, there is a finite

    quantum of such development that can be spreadin market economic terms between the two

    centres (and to a much lesser extent smaller

    centres) and so it is important that a complementary

    retail strategy is pursued in each location.

    Each centre has much in common in terms of

    future planning provision but also it is important

    to recognise the unique selling points that sets

    each place apart and gives its special character. In

    Dalston, there are three fundamental influences that

    shape the dynamic of the area:

    Kingsland High Street, a lively thoroughfare that

    is in parts somewhat run-down characterised by

    small, independent shops and services, many

    catering to the areas ethnically diverse population

    in terms of food and other specialist products;

    Ridley Road Market, a bustling street market thatdraws from a wide catchment area; and

    the prevalence of creative industries and

    organisations that are located in the area,

    including a lively evening economy of clubs

    and bars.

    Although there are overlapping characteristics,

    Hackney Central is notable for:

    the Town Hall, Hackney Empire Theatre and other

    related facilities establishing this as the civic heart

    of the borough; the intimate qualities of the Narrow Way, flanked

    by St Johns-at-Hackney Church and churchyard,

    an area with a distinctive feel, though undermined

    at present by all day traffic congestion; and

    like Dalston, the area is increasingly becoming

    a focus for cultural and creative activities, some

    transferring from Shoreditch.

    The strategic intention is to ensure a well-balanced

    offer, with two complementary poles of regeneration

    activity, each specified to strengthen localdistinctiveness and character.

  • 8/14/2019 Hackney Central Master Plan p1-30

    9/28

    10

    Figure 2.1 Hackney Central and Dalston town centres context

  • 8/14/2019 Hackney Central Master Plan p1-30

    10/28

    11

    2.2 The Hackney Central Masterplan Study Area

    The Hackney Central Masterplan Area comprises

    and area of 36.7 hectares and is situated centrally

    within the London Borough of Hackney and east

    of Dalston town centre. The Masterplan site area

    was identified to incorporate what is commonly

    identified as the town centre area, including the

    principal shopping length of Mare Street and the

    Narrow Way, the Town Hall, Amhurst Road and the

    stretch of Morning Lane that includes the Tesco site.

    The Marcon and Trelawney Estates are also included

    along with St John-at-Hackney church and gardens.

    Figure 2.2 illustrates the study boundary.

    2.3 Masterplan Development

    The draft Hackney Central Masterplan has evolved

    through various meetings and consultation events

    with key stakeholders and the local community. In

    December 2007 the London Borough of Hackney

    organised a steering group for the Masterplan,

    which included members from the Council, TfL,

    the GLA and the LDA. Throughout the project

    there have been informal and formal meetings with

    (amongst others): the Masterplan Steering Group;

    the local community (see Section 2.4); Crossrail;

    Network Rail; LBH Streetscene; St John-at Hackney

    church; Tesco; and, Arriva.

    2.4 Hackney Central Consultation

    As part of Stage I: Masterplan Scoping (Baseline), an

    informal community consultation event was held on

    Wednesday 9th April between 11 a.m. and 7 p.m.

    outside the Old Town Hall. The aim of the consultation

    was to get a snapshot of what

    issues are most important to those who use the

    town centre and how they would like to see

    development of the Masterplan move forward. The

    consultation/exhibition did not put forward any

    proposals for development but rather stressed the

    fact that future change could take many forms,

    from public realm improvement to new buildings.

    Feedback from the consultation was provided onquestionnaires filled out during the consultation event

    or returned in the following weeks. A total of 85

    responses were received.

    Analysis of the consultation feedback reveals

    the following:

    The majority of people liked the public open spaces

    and local amenities Hackney Central had to offer;

    Being part of a diverse and multi-cultural

    community is important to the local people;

    Respondents were keen to see bus and trafficcongestion resolved, most notably along the

    Narrow Way;

    75% of respondents like the streets and spaces in

    Hackney Central with the majority of people using

    them for shopping;

    51% of respondents do not find it easy to move

    around Hackney Central. Road safety is the

    primary reason;

    85% agreed with the opportunity sites identified.

    Most respondents would like to see traditionaland affordable housing and tended to prefer

    development to retain and foster existing

    local character;

    74% of respondents thought Hackney Central

    would benefit from a more diverse retail offer. The

    feedback suggests that there is no clear desire by

    the local people for new, large supermarkets; and,

    Generally, respondents are keen to refurbish

    rather than demolish.

  • 8/14/2019 Hackney Central Master Plan p1-30

    11/28

    12

    Figure 2.2 The Masterplan boundary

  • 8/14/2019 Hackney Central Master Plan p1-30

    12/28

    13

    2.5 The Local Context

    This masterplan has been informed by the Hackney

    Central Scoping Report (February 2008). The

    scoping study was commenced as the initial stage

    in the preparation of the Masterplan. Its purpose

    was to undertake an audit and analysis of the town

    centre to provide a comprehensive environmental

    baseline. The report forms a background document

    to accompany the Masterplan.

    The Scoping Report considered a wide range of

    issues and identified both the strengths of the area

    as well as the challenges it faces. In particular the

    scoping study examined:

    Character Areas;

    Site and Context Analysis e.g. land use, open

    space etc.;

    Access and Movement;

    Energy;

    Planning Policy and Initiatives;

    Constraints and Opportunities; and,

    Opportunity Sites.

    A summary of the key physical constraints is

    provided in Figure 2.5. These identify some of the

    key aspects of the baseline analysis, including issues

    of legibility, frontage, tall buildings, character settings

    and open space/public realm quality.

    The following is a summary of the issues identified:

    Barriers to movement - The presence of high

    level railway lines restricts the ability of people to

    move around Hackney Central, especially north-

    south movement through the railway bridge which

    forms both a physical and psychological barrier.

    Hostile pedestrian/cycle environment -

    Congested roads, narrow pavements and some

    poorly overlooked locations create a difficult

    environment to get round for some people. These

    can also, in effect, act as a barrier to getting

    around.

    Conservation Areas and listed buildings -

    Large parts of the Masterplan area are designatedas conservation areas in recognition of their

    historic and architectural importance.

    A number of listed buildings are also present.

    They provide areas of positive character and

    will need to be respected by future

    development proposals.

    Improve legibility - e.g. Strategic views and local

    views to well-known landmarks provide important

    signals to help people find their way around.

    Where possible these views should be preserved.

    Fig. 2.3 above identifies the listed buildings and conservation

    area to be taken into account in the masterplan.

    Fig. 2.4 above identifies the constraints presented by the CTRL

    and safeguarded land and the proposed Chelsea-Hackney Line

    (Cross Rail2)

  • 8/14/2019 Hackney Central Master Plan p1-30

    13/28

    14

    Figure 2.5 Constraints summary

  • 8/14/2019 Hackney Central Master Plan p1-30

    14/28

    15

    Important Settings - Key public buildings and

    streets are viewed within a wider setting or

    particularly well-defined area. Hackney

    Town Hall Square and St John-at-Hackney

    churchyard and gardens are notable set piece

    spaces that emphasise the importance of

    these public buildings.

    Gateways and nodes - These denote important

    points of entry into the Masterplan area, such as

    Town Hall Square, signaling that you have arrived

    in the town centre. Minor nodes also indicate

    other places of activity or locations of significance

    such as secondary junctions or crossings. Many

    would benefit from improvements to reinforce their

    function.

    CTRL and Proposed Chelsea Hackney line(Crossrail 2 - CR2) safeguarded land - Large

    parts of the area are safeguarded for the future

    CR2 project. This means that proposals for

    development within this area will need to

    consult with Crossrail to ensure they do not

    compromise the project.

    The Narrow Way and Amhurst Road junction -

    The Narrow Way is a distinctive meandering street

    but the quality of the environment is compromised

    by heavy bus congestion. The junction with

    Amhurst Road and Mare Street would benefit

    from significant improvements

    of its public spaces.

    Public Transport - Hackney Central is well served

    by two railway stations and numerous bus routes.

    Development in this area should maximise its

    relationship with these public transport assets,

    improving their viability.

    Areas for tall buildings - The Hackney Tall

    Buildings Strategy (2005) has previously identified

    several areas where taller buildings might be able

    to be accommodated. The tower blocks on the

    Trelawney Estate are already visually prominent

    structures in one of these areas.

    Opportunity Sites - A range of opportunity sites

    have been identified where there may be scope

    for change or refurbishment of existing buildings.

    The two single largest areas are the Tescos and

    Bus Garage sites and these potentially offer the

    greatest scope for change.

    Edges - Many streets are well-defined by strong

    building lines, creating clear edges to the street.

    Other areas contain weakly-defined edges,

    particularly on Morning Lane.

    Frontages - Many building frontages include

    positive lively facades, such as along Mare Street,

    with shops and businesses generating activity.

    Others are inactive or dead frontages and create

    poor streets that can feel unsafe. Where possible

    these should be addressed.

    As part of the baseline analysis, a group of

    opportunity sites within the Masterplan area

    were identified where development and/or

    improvements are most likely. Some of these

    sites present opportunities for new development

    and others are more suited for refurbishment or

    other site improvements. Some of the sites

    included have been granted planning permission

    and the schemes planned for these sites are

    included within the Masterplan for the purposes

    of completeness and providing the development

    context for the Masterplan.

    The opportunity sites are listed in Table 2.1 and

    shown on Figure 2.6 over leaf.

  • 8/14/2019 Hackney Central Master Plan p1-30

    15/28

    16

    Figure 2.6 Opportunity sites

  • 8/14/2019 Hackney Central Master Plan p1-30

    16/28

    17

    2.6 Summary SWOT Analysis

    The issues and considerations emerging from

    the Hackney Central Scoping Report reveal that

    the area has many positive attributes, as well

    as challenges. These also present potential

    opportunities for improvement, although certain

    issues pose potential threats to change. The

    Strengths, Weaknesses, Opportunities and Threats

    (SWOT) are summarised in Table 2.2 [overleaf].

    Table 2.1 Scoping Report Opportunity Sites

    Hackney Central Masterplan

    Scoping Report Opportunity Sites

    Site NameSite

    1 Amhurst Triangle

    2 Clapton Bus garage

    3 2-20 Morning Lane

    4 356 Mare Street, The Rectory

    5 Land rear of 392-396 Mare Street

    6 23-25 Sutton Place

    7 Land adj. 1 Sutton Place

    8 Trelawney Estate

    9 Hackney Central and Hackney Downs

    Station upgrading

    10 Service First Centre11 280 Mare Street

    12 Florfield Road Depot

    13 199-205 Richmond Road

    14 Tesco site Morning Lane

    15 250-352a Bohemia PLace

    16 298-300 Mare Street

    17 Ocean Venue, Mare Street

    18 5-13 Morning Lane

    19 302 Mare Street

    20 Car Sales Yard between 229 and 239Graham Road

    21 224-238 Mare Street

    22 354 Mare Street (Old Town Hall)

    23 117 Wilton Way

    24 70 Sylvester Road

    25 1-10 Great Eastern Buildings, Reading Lane

    26 3-13 Lower Clapton Road

    27 Marcon Estate and Aspland Estate

  • 8/14/2019 Hackney Central Master Plan p1-30

    17/28

    18

    Strengths

    Historic buildings

    Cultural diversity

    Strong local landmarks

    Good open spaces and trees Excellent public transport links

    A clear High Street character

    A clear focus for civic activities

    A good mix of uses in the town centre

    Areas of positive historic and architectural character

    A variety of independent traders and national chains

    Weaknesses

    Traffic congestion i.e. bus and car congestion, especially bus congestion on the Narrow Way

    Poor connections to railway stations Low quality of pedestrian environment

    Limited uses within existing public open spaces

    Inactive frontages and weakly defined streets in some areas

    Restricted north-south connections

    Limited connections east of Mare Street

    Railways divide the area

    Areas of poor architectural quality / townscape

    Low perception of safety

    Limited retail offer

    Opportunities

    A range of locations and potential for change / improvement, including sites within the heart of

    the town centre

    Potential improvements to connections through the area, both east-west and north-south

    More improved shopping facilities

    Enhanced pedestrian environment / streetscape

    Reduced traffic dominance

    New and improved public open spaces

    Opportunities to improve connections to and enhance existing stations

    Enhance areas of weak townscape / character

    Potential to address the perceived safety of some areas

    Good potential for sustainable forms of development

    Threats

    Ad hoc piecemeal development

    Missed opportunities through uncoordinated development of key opportunities sites

    Continued traffic congestion

    Inappropriate/poorly designed development could harm existing character

    Low perceptions of safety

    Table 2.2 SWOT (Audit and Analysis Summary)

  • 8/14/2019 Hackney Central Master Plan p1-30

    18/28

    19

    2.7 Key Issues

    Key issues and themes emerging from the Scoping

    Report study were:

    Retention and enhancement of the Conservation

    areas with specific attention to those areas that

    exhibit clear character settings

    (e.g. the Narrow Way);

    Opportunities for taller buildings are influenced by:

    areas along rail alignments where the CTRL and

    Crossrail will constrain development potential;

    backland areas within existing housing estates;

    and

    areas where sensitivity to existing traditionalhousing will be required and character;

    Key local and strategic view corridors;

    Reinforcing of a number of major nodes across

    the area and attention to more local gateways as

    shown;

    Areas requiring significant public realm

    enhancement, especially aligned with key routes

    into the town centre (e.g. Amhurst Road,

    Mare Street);

    Reinforcing of connections into the open green

    spaces to the northeast of the area around St

    John-at-Hackney church and improvements to

    the grounds themselves;

    Addressing the key intersection at Mare Street,

    Amhurst Road and the Narrow Way including the

    intersecting rail infrastructure; and,

    Addressing comprehensively the Tesco and busgarage locations.

    2.8 Options Development and Summary

    Four preliminary options were developed based on

    the key issues arising out of the Masterplan Scoping

    Report. They represented a holistic response to

    the over-arching issues of the current lack of a

    high quality public realm, open space, accessibility,

    economic vitality, and active frontage.

    Each option was developed in sufficient detail to

    indicate block layouts and building footprints. The

    options were also tested in terms of site needs,

    transportation and energy implications. The options

    were illustrated in plan form to convey the massing

    and form.

    The four options have been prepared as the basis of

    discussion and a comprehensive evaluation has yet

    to be applied. They seek to convey a sliding scale -

    from the do minimum to the do maximum. Option

    1 - the minimum option - represents a way forward

    with no planning-led intervention, whilst Option 4

    seeks more significant redevelopment to re-integrate

    parts of the town centre with the existing fabric. With

    greater levels of change comes a greater ability to

    create a shift in overall character and introduce new

    uses into the area.

    Clearly at the lower end of the scale, policy

    objectives relating to such issues as open space and

    play facilities, for example, will fail to be met. There

    will also be fewer planning obligations generated

    to invest in community infrastructure. However,

    the upper end of the scale raises major delivery

    questions - both from a policy perspectives (e.g. the

    quantum of retail floor space and the impact of this)

    and in terms of funding and logistics. Comprehensive

    change will require significant land assembly and

    establishing co-ordinated solutions such as anintegrated town centre - wide energy solution will be

    far from easy.

    Understanding the Place

  • 8/14/2019 Hackney Central Master Plan p1-30

    19/28

    20

    The SA assisted in the assessment of Options and

    led to the propositions for the site scenarios set out

    in Part III.

    A combination of Options 2 and 3b was selected,

    subject to further refinement, modifications and

    more detailed proposals. This combination puts

    forward the most significant positive change for the

    town centre whilst maintaining and strengthening

    the existing character and providing a new and

    improved public realm network.

    2.8.1 Option 1 Overview

    Option 1 sets out a development scenario that

    could emerge where there to be no significant

    planning-led intervention. Design development is

    predominantly based on a sites-led approach

    where sites likely to come forward through themarket are the key drivers.

    This option does not therefore capture the potential

    of Hackney Central as would a comprehensive

    approach. It does, never the less, allow for known

    sites to be brought forward and, where possible,

    seeks to recycle value for wider public realm

    improvements (e.g. along Morning Lane).

    The key development proposals include:

    Development of the Tesco site south of the

    railway and fronting onto Morning Lane in

    accord with current Tesco proposals tabled

    at pre-application discussions. Development

    includes new 80,000 sq.ft (7,400sq.m) store

    with 100 residential flat units above. Localised

    improvements to the streetscape and highways

    along Morning Lane.

    Redevelopment of a number of mixed use

    sites along the southern and northern edges

    of Morning Lane towards the junction with

    Mare Street.

    Sites granted planning permission or under

    construction that include Sutton Place,

    Richmond Road and 239-257 Graham Road.

    Option 1 was discarded because it does notfacilitate significant positive change for the town

    centre. By not proposing any significant new

    public open space or enhancements to major

    road arteries. As such, it does not redress the

    inadequacies of the public realm quality

    identified in the Scoping Report.

    Furthermore, the residential development capacity

    is low, significantly less than that identified if London

    Plan density recommendations were applied

    (see Masterplan Scoping Report).

  • 8/14/2019 Hackney Central Master Plan p1-30

    20/28

    21

    Figure 2.7 Option 1 Vision

  • 8/14/2019 Hackney Central Master Plan p1-30

    21/28

    22

    2.8.2 Option 2 Overview

    Option 2 examines the development scenario

    that could result from a moderate amount of

    intervention. The proposal therefore identifies a

    greater number of peripheral sites that could

    come forward (e.g. the site west of the railway

    off Richmond Road) as well as considering a

    reconfigured Tesco development south of the

    railway along Morning Lane. A key proposal is

    also the proposition to relocate the bus garage

    to a basement facility, allowing a new residential

    development at grade with high quality public realm.

    The key development proposals include:

    Development of the Tesco site south of the

    railway and fronting onto Morning Lane.

    Development includes a new 9,300sq.m store

    over 2 levels, delivery/storage of 2,600sq.m. with180 residential flat units above.

    Redevelopment of the bus garage site to

    basement facility to allow for new at-grade

    residential-led development with an element of

    office use.

    Additional smaller scale retail units (with residential

    units above) addressing the new link between

    Morning Lane and Mare Street/the railway.

    These screen the unsightly backs of the existing

    buildings along Mare Street.

    Refurbished Town Hall to include environmental

    technologies as exemplar for retro-fitting existing

    buildings.

    The Rectory site, adjacent Learning Trust

    buildings and yard are comprehensively

    addressed.

    3-13 Lower Clapton Road and 2-20 Morning

    Lane are comprehensively developed with mixed

    retail and residential development.

    Sites on Wilton Road/Sylvester Street are

    comprehensively developed around existing

    buildings to be retained.

    Sites on Reading Lane developed for mixed

    residential/commercial uses.

    Option 2 was considered in part because there would

    a better provision of public realm improvements

    throughout the town centre and the new public link

    proposed off Morning Lane connecting through to the

    arches would facilitate greater pedestrian permeability.

    In addition, the residential development capacity in

    Option 2 is a significant increase on Option 1. The

    retail floor space delivers over the amount of provision

    in the Hackney Retail and Leisure Capacity Study

    (9,200sqm net additional in the Borough).

  • 8/14/2019 Hackney Central Master Plan p1-30

    22/28

    Figure 2.8 Option 2 Vision

    23

  • 8/14/2019 Hackney Central Master Plan p1-30

    23/28

    2.8.3 Option 3a Overview

    Option 3a envisages significant change around

    the area of major potential - focusing on the

    Tesco and Bus Garage sites with an improved

    Hackney Central station entrance. Under this

    scenario, there will be major public open space

    improvements along the southern edge of

    St John-at-Hackney gardens and much

    greater east-west permeability.

    This option builds upon the development sites likely

    to come forward under Option 2 which are also

    envisaged to occur under this option. The south-

    eastern end of Amhurst Road is redeveloped to

    provide higher quality and higher density residential

    development, greatly improving the streetscene of

    this street.

    Public realm enhancements are more significant

    but focused primarily on improvements to the areas

    surrounding the core area and associated junctions

    to assist pedestrian movement.

    The key development proposals include:

    Tescos is relocated to the north side of the railway

    above a newly constructed bus garage located

    beneath the store.

    The existing Tesco site is redeveloped.

    New residential development south of the railway

    and fronting Morning Lane.

    A new public space is created in front of the

    Trelawney Estate with enhanced pedestrian

    connections and links south to Paragon Road.

    The public space adjacent to the Old TownHall is

    remodelled.

    The Rectory site, adjacent Learning Trust

    buildings and yard are comprehensively

    addressed.

    3-13 Lower Clapton Road and 2-20 Morning

    Lane are comprehensively developed.

    Sites on Wilton Road/Sylvester Street are

    comprehensively developed around existing

    buildings.

    Sites on Reading Lane developed.

    Option 3a was dismissed because of the

    complexities of the land swap between Tesco and

    the bus garage, but also because of the scale of

    the development. It was not felt to be appropriate to

    introduce a large format retail development adjacent

    to the sensitive setting of the church gardens.

    This option however delivers a major residential-led

    mixed-use offer along Morning Lane.

    24

  • 8/14/2019 Hackney Central Master Plan p1-30

    24/28

    25

    Figure 2.9 Option 3a Vision

  • 8/14/2019 Hackney Central Master Plan p1-30

    25/28

    26

    2.8.4 Option 3b Overview

    Option 3b focuses on a variation to the major

    opportunity area east of Mare Street and focusing

    on the Tesco and Bus Garage sites. Under this

    scenario development is re-organised to resolve

    access constraints currently impacting on the bus

    garage (bottle neck with single access in/out).

    The bus garage is located south of the railway

    under a land swap arrangement with Tesco. The

    Garage benefits from better access off Morning

    Lane, better internal circulation and a new exemplar

    town centre facility.

    The benefits to Tesco include a much more visible

    frontage onto the primary shopping route (Mare

    Street / the Narrow Way) and frontage onto what will

    become a new high quality public open space at the

    Old Town Hall.

    This option also builds upon the development sites

    likely to come forward under Option 2 which are also

    envisaged to occur under this option.

    Public realm enhancements are more significant

    but focused primarily on improvements to the areas

    surrounding the core area and associated junctions

    to assist pedestrian movement.

    The key development proposals include:

    Tesco relocated to the north side of the railway

    with a new 8,400sq.m store.

    The bus garage moves south of the railway.

    A new high quality public route is provided to

    connect Trelawney Estate to the bottom of

    narrow Way.

    A new public space is created in front of the

    Trelawney Estate with active ground floor uses.

    The public space adjacent to the Old Town Hall is

    enhanced.

    Key peripheral sites are developed.

    The Rectory site, adjacent Learning Trust

    buildings and yard are addressed.

    Elements of Option 3b were dismissed (as with

    Option 3a) because of the complexities of the land

    swap between Tesco and the bus garage. Similarly

    it was not felt to be appropriate to introduce a large

    format retail development adjacent to the sensitive

    setting of the church gardens.

    Option 3b was, however, partly selected for

    the treatment to the backs of Mare Street and

    the design of the new pedestrian routes through

    the arches.

  • 8/14/2019 Hackney Central Master Plan p1-30

    26/28

    27

    Figure 2.10 Option 3b Vision

  • 8/14/2019 Hackney Central Master Plan p1-30

    27/28

    2.8.5 Option 4 Overview

    Option 4 seeks to radically transform the character

    of retail and public realm offer. At present the centre

    has a well established civic quarter but no clearly

    defined retail heart. This lack of retail centrality

    results in a dispersed rather than consolidated

    retail-focus. A new large retail developmentco-located with a new high quality urban piazza

    at the junction of Narrow Way, Mare Street and

    Amhurst Road is proposed. Existing retailers (e.g.

    M&S) would be re-provided in the new retail centre

    with the bus garage located in basement.

    The key development proposals include:

    Redevelopment of the bus garage site

    Significant new retail accommodation (19,000sq.m) that would provide for 2 new anchor stores.

    Development of the Tesco site south of the railway

    to allow for new north-south pedestrian route.

    New mixed use retail/residential addressing the

    new north-south link between Morning Lane and

    the Old Town Hall open space.

    New public piazza at junctions of Narrow Way/

    Mare Street/Amhurst Road.

    New Hackney Central station.

    The Rectory site, adjacent Learning Trust

    buildings and yard are addressed.

    3-13 Lower Clapton Road and 2-20 Morning

    Lane are comprehensively developed.

    Sites on Wilton Road/Sylvester Street are

    comprehensively developed.

    Sites on Reading Lane developed.

    Option 4 was discarded primarily because of the

    scale of the proposed new piazza described above.

    It was felt that the character of the area - that of

    tight-knitted development should be retained. It was

    also not deemed appropriate to introduce a large

    quantum of new retail (new anchor stores) adjacent

    to the church gardens.

    28

  • 8/14/2019 Hackney Central Master Plan p1-30

    28/28