Plant Layouts – A comparative overview
An Educational Series Presentation 4/28/11
MVS Engineering Limited, New Delhi Where Innovation Meets Quality !
! On the next few pages, we are going to compare the typical layouts of the various Water Electrolysis technologies used in Hydrogen production.
! We have considered Hydrogen production stream of 2 x 10 NM3/hr Hydrogen with 2 high pressure booster compressors rated for total 20 NM3/hr capacity each.
! We are not considering cylinder storage for this comparison. This space will be required for all technologies if the power plant is intending to supply Hydrogen by cylinders.
! These layouts are based on what is typically seen in the industry and will vary from supplier to supplier.
2 www.mvsengg.com
Lye
Pr
epar
atio
n
Rect
ifier
+ M
CC
+ C
ontr
ol P
anel
Electrolyser Cells +
Water Seal + Feed Water Tanks +
KOH Makeup + Gas Analyzer +
Mist Eliminators + Compressor +
Dryers Buffe
r Ves
sels
+
H 2 C
ompr
esso
rs
Cylin
der F
illin
g St
atio
n
Low Pressure Gas Holders
28-30 m
15 m
7-8 m
Outdoor
Land required (min) 22 m x 28 m = 616 m2
Building required (min) 15 m x 28 m = 420 m2
Est. Building Cost = Rs. 1.05 Crores
Building Size
3 www.mvsengg.com
Safe Area
Hazardous Area
Lye
Pr
epar
atio
n
Rect
ifier
+ M
CC
+ C
ontr
ol P
anel
Electrolyser Cells + Feed Water Tanks +
Lye Circulation Skid + Purification Skid +
Dryer Skid
Buffe
r Ves
sels
+
H 2 C
ompr
esso
rs
Cylin
der F
illin
g St
atio
n
20-22 m
15 m
Building required (min) 15 m x 20 m = 300 m2
Est. Building Cost = Rs. 75 Lacs
Building Size
4 www.mvsengg.com
Safe Area
Hazardous Area
Buffe
r Ves
sels
+
H 2 C
ompr
esso
rs
Cylin
der F
illin
g St
atio
n
12 m
7 m M
CC +
Con
trol
Pa
nel f
or
com
pres
sors
Building required 7 m x 12 m = 84 m2
Est. Building Cost = Rs. 21 Lacs
HOGE
N Building Size
Complete Hydrogen Generation
System
5 www.mvsengg.com
Safe Area
Hazardous Area
! In summary, for typical installations, the building cost is substantially lower when installing HOGEN® Hydrogen Generator from Proton OnSite, USA.
! Building Costs ! Uni-Polar : Rs. 105 Lakhs ! Bi-Polar Alkaline : Rs. 75 Lakhs
! Bi-Polar PEM by Proton : Rs. 21 Lakhs
6 www.mvsengg.com
! This was another educational series presentation from MVS Engineering Limited – Your trusted partners in delivering quality engineered and reliable Onsite Gas Generation solutions.
! Your contacts at MVS & Proton: ! Rajeev Bhalla
! 098180 45554 ! [email protected]
! Siddharth Rastogi ! 099587 88822 ! [email protected]
! Tom Skoczylas ! +1 (203) 915-5239 ! [email protected]
Visit us at www.mvsengg.com
7 www.mvsengg.com