H07 - The Shoreline · PRELIMINARY (not for construction) FOR TENDER PURPOSES ONLY Permission to...

1
FOR TENDER PURPOSES ONLY PRELIMINARY (not for construction) Permission to proceed does not release contractor of the obligation to carry out works in accordance with contract specifications; any variations are to be reported to the architect/engineer as soon as they are noted. FOR INFORMATION PURPOSES ONLY FOR REVIEW & APPROVAL FOR CONSTRUCTION PLANNING & PERMITTING DRAWING ISSUE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - By Rev REVISIONS Description Date No part of this document may be reproduced, stored or transmitted in any form or by any means, without the previous written permission of the author. Copyright © THE CONTRACTOR IS OBLIGED TO INFORM THE CONSULTANT OF DISCREPANCIES, IF ANY, BETWEEN THESE DRAWINGS AND THE WORKS. THE CONTRACTOR SHALL NOT PROCEED WITH THE RELEVANT WORKS UNTIL RECEIPT OF AN INSTRUCTION, IN WRITING, BY THE CONSULTANT. Sheet Title Project Design Drawn Checked Approved Sheet Size Scale Date Client Job No. Type Doc No. Rev Bldg No. - Author Code Project Descrip�on - - - - The Shoreline 1602 - CAS - - A3 1:100 10/06/2019 - - - Apartment H07 Render Plan - - --- -- --- DG -- 0000 00 1 2 3 4 5 6 7 8 8 7 6 3 2 1 A A B B C C D D E E F F ARCHITECT & STRUCTURAL ENGINEER INTERIORS COMMERCIAL ARCHITECT BUILDING SERVICES ACOUSTICS LIGHTING PROJECT & COST MANAGEMENT LEED CLIENT Ground Floor GF Area: 88.5 sq.m First Floor GF Area: 90.1 sq.m Second Floor External Area: 59.0 sq.m GF Area: 63.6 sq.m 2 Bedroom Apartment H07 External Area: 38.4 sq.m GF Area: 192.5 sq.m N A D E F G C B H

Transcript of H07 - The Shoreline · PRELIMINARY (not for construction) FOR TENDER PURPOSES ONLY Permission to...

Page 1: H07 - The Shoreline · PRELIMINARY (not for construction) FOR TENDER PURPOSES ONLY Permission to proceed does not release contractor of the obligation to carry out works in accordance

FOR TENDER PURPOSES ONLYPRELIMINARY (not for construction)

Permission to proceed does not release contractor of the obligation to carry out works in accordance withcontract specifications; any variations are to be reported to the architect/engineer as soon as they are noted.

FOR INFORMATION PURPOSES ONLYFOR REVIEW & APPROVAL

FOR CONSTRUCTIONPLANNING & PERMITTING

DR

AWIN

G IS

SUE

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

ByRev

REV

ISIO

NS

Description Date

No part of this document may be reproduced, stored or transmitted in any form or by any means, without theprevious written permission of the author. Copyright ©

THE CONTRACTOR IS OBLIGED TO INFORM THE CONSULTANT OFDISCREPANCIES, IF ANY, BETWEEN THESE DRAWINGS AND THE WORKS. THE

CONTRACTOR SHALL NOT PROCEED WITH THE RELEVANT WORKS UNTILRECEIPT OF AN INSTRUCTION, IN WRITING, BY THE CONSULTANT.

Sheet Title

Project

Design Drawn Checked Approved Sheet Size Scale Date

Client Job No.

Type Doc No. RevBldg No.

-Author Code

Project Descrip�on

- - - -

The Shoreline 1602

- CAS - - A3 1:100 10/06/2019

---

Apartment H07 Render Plan--

--- -- --- DG -- 0000 00

1 2 3 4 5 6 7 8

876321

A A

BB

C C

DD

E E

FF

ARCHITECT & STRUCTURAL ENGINEER INTERIORS

COMMERCIAL ARCHITECT BUILDING SERVICES

ACOUSTICS

LIGHTING

PROJECT & COST MANAGEMENT

LEED

CLIENT

Ground FloorGF Area: 88.5 sq.m

First FloorGF Area: 90.1 sq.m

Second Floor

External Area: 59.0 sq.mGF Area: 63.6 sq.m

2 Bedroom Apartment

H07External Area: 38.4 sq.mGF Area: 192.5 sq.m

N

A

D

E

F

G

CB

H