Gym Floor Refinishing: Wooster Middle School · IMG 0753 IMG 0755 2020- 02 IMG 0754 IMG 0756 Page:...

5
5/19/2020 Addendum 1 1 of 2 ADDENDUM #1 Gym Floor Refinishing: Wooster Middle School 150 Lincoln Street Stratford, CT 06614 TOWN PROJECT NUMBER: 2020-052 ISSUED: 5/19/2020 PROJECT TEAM Architect / Project Manager

Transcript of Gym Floor Refinishing: Wooster Middle School · IMG 0753 IMG 0755 2020- 02 IMG 0754 IMG 0756 Page:...

Page 1: Gym Floor Refinishing: Wooster Middle School · IMG 0753 IMG 0755 2020- 02 IMG 0754 IMG 0756 Page: 2/2 IMG 0749 IMG 0751 2020-04-02 IMG 0750 IMG 0752 Page: 1 / 2 : Author: Brian Snyder

5/19/2020

Addendum 1 1 of 2

ADDENDUM #1

Gym Floor Refinishing: Wooster Middle School 150 Lincoln Street Stratford, CT 06614 TOWN PROJECT NUMBER: 2020-052 ISSUED: 5/19/2020

PROJECT TEAM

Architect / Project Manager

Page 2: Gym Floor Refinishing: Wooster Middle School · IMG 0753 IMG 0755 2020- 02 IMG 0754 IMG 0756 Page: 2/2 IMG 0749 IMG 0751 2020-04-02 IMG 0750 IMG 0752 Page: 1 / 2 : Author: Brian Snyder

5/19/2020

Addendum 1 2 of 2

The work shall be carried out in accordance with the following supplemental instructions and in accordance with the Contract Documents.

CHANGES / CLARIFICATIONS

1. Requests for Information (RFI’s) • See attached updated RFI Log.

*** END OF ADDENDUM #1 ***

Page 3: Gym Floor Refinishing: Wooster Middle School · IMG 0753 IMG 0755 2020- 02 IMG 0754 IMG 0756 Page: 2/2 IMG 0749 IMG 0751 2020-04-02 IMG 0750 IMG 0752 Page: 1 / 2 : Author: Brian Snyder

RFI LOGGym Floor Refinishing:Wooster Middle School5/19/2020

Question Date Received

Directed To Response Response Date

1 There are several metal floor inserts that appear to be unused. Is removing them part of the scope of work?

5/14/2020 Town/Snyder Contractor shall remove all metal floor inserts. For pricing purposes contractor shall assume removing (25) +/-4" metal floor inserts/anchors. Repair, stitch-in, maple flooring to match existing. See attached photos for reference.

5/19/2020

234567891011121314

Page 4: Gym Floor Refinishing: Wooster Middle School · IMG 0753 IMG 0755 2020- 02 IMG 0754 IMG 0756 Page: 2/2 IMG 0749 IMG 0751 2020-04-02 IMG 0750 IMG 0752 Page: 1 / 2 : Author: Brian Snyder
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Page 5: Gym Floor Refinishing: Wooster Middle School · IMG 0753 IMG 0755 2020- 02 IMG 0754 IMG 0756 Page: 2/2 IMG 0749 IMG 0751 2020-04-02 IMG 0750 IMG 0752 Page: 1 / 2 : Author: Brian Snyder
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line
Brian
Line