GUYANA - Ministry of Finance...3 MINISTRY OF FINANCE 031 - Policy and Administration Guyana Revenue...

437

Transcript of GUYANA - Ministry of Finance...3 MINISTRY OF FINANCE 031 - Policy and Administration Guyana Revenue...

  • GUYANA

    CENTRAL GOVERNMENT DEVELOPMENT PROGRAMME

    CAPITAL PROJECT PROFILES

    For the year

    2014 as presented to

    THE NATIONAL ASSEMBLY

    VOLUME 3

  • SECTION 1

    CENTRAL GOVERNMENT CAPITAL PROJECT

    PROFILES BY AGENCY

  • TABLE OF CONTENTS

    SECTION 1- CENTRAL GOVERNMENT CAPITAL PROJECT

    PROFILES BY AGENCY

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    1 1Office and Residence of the PresidentOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 2Information Communication TechnologyOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 3Minor WorksOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 4Land TransportOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 5Purchase of EquipmentOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 6Civil Defence CommissionOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 7Guyana Office for InvestmentOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 8Government Information AgencyOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 9Guyana Energy AgencyOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 10National Communication NetworkOFFICE OF THE PRESIDENT 011 - Administrative Services

    1 11Institute of Applied Science and Technology - IAST

    OFFICE OF THE PRESIDENT 011 - Administrative Services

    2 12Minor WorksOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 13Land TransportOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 14Office Furniture and EquipmentOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 15Electrification ProgrammeOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 16Lethem Power CompanyOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 17Micro-Hydropower ProjectOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 18Power SupplyOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 19Power Utility Upgrade ProgrammeOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    2 20Sustainable Energy ProgrammeOFFICE OF THE PRIME MINISTER 021 - Prime Minister's Secretariat

    3 21BuildingsMINISTRY OF FINANCE 031 - Policy and Administration

    3 22Basic Needs Trust Fund (BNTF) - 6/7MINISTRY OF FINANCE 031 - Policy and Administration

    3 23Land TransportMINISTRY OF FINANCE 031 - Policy and Administration

    3 24Furniture and EquipmentMINISTRY OF FINANCE 031 - Policy and Administration

    3 25Rights CommissionMINISTRY OF FINANCE 031 - Policy and Administration

    3 26Statistical BureauMINISTRY OF FINANCE 031 - Policy and Administration

    3 27Low Carbon Development ProgrammesMINISTRY OF FINANCE 031 - Policy and Administration

    3 28Student Loan FundMINISTRY OF FINANCE 031 - Policy and Administration

    3 29Poverty ProgrammeMINISTRY OF FINANCE 031 - Policy and Administration

    3 30Institutional Strengthening - EquipmentMINISTRY OF FINANCE 031 - Policy and Administration

    3 31NGO/Private/Public Sector Support Programme

    MINISTRY OF FINANCE 031 - Policy and Administration

    3 32Guyana Revenue AuthorityMINISTRY OF FINANCE 031 - Policy and Administration

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    3 33Youth Initiative ProgrammeMINISTRY OF FINANCE 031 - Policy and Administration

    3 34Technical AssistanceMINISTRY OF FINANCE 031 - Policy and Administration

    3 35Land TransportMINISTRY OF FINANCE 032 - Public Financial Management

    3 36Furniture and EquipmentMINISTRY OF FINANCE 032 - Public Financial Management

    4 37Land TransportMINISTRY OF FOREIGN AFFAIRS 041 - Ministry Administration

    4 38Office Equipment and FurnitureMINISTRY OF FOREIGN AFFAIRS 041 - Ministry Administration

    4 39BuildingsMINISTRY OF FOREIGN AFFAIRS 042 - Foreign Relations

    4 40Land TransportMINISTRY OF FOREIGN AFFAIRS 042 - Foreign Relations

    4 41Office Equipment and FurnitureMINISTRY OF FOREIGN AFFAIRS 042 - Foreign Relations

    4 42Office Equipment and FurnitureMINISTRY OF FOREIGN AFFAIRS 043 - Development of Foreign Trade Policy

    7 43Buildings - Audit OfficePARLIAMENT OFFICE 071 - National Assembly

    7 44Office Equipment and Furniture - Audit Office

    PARLIAMENT OFFICE 071 - National Assembly

    7 45Land TransportPARLIAMENT OFFICE 071 - National Assembly

    7 46Office Furniture and EquipmentPARLIAMENT OFFICE 071 - National Assembly

    7 47Institutional Strengthening - Audit OfficePARLIAMENT OFFICE 071 - National Assembly

    9 48Public and Police Service CommissionPUBLIC AND POLICE SERVICE COMMISSION

    091 - Public and Police Service Commission

    10 49Teaching Service CommissionTEACHING SERVICE COMMISSION

    101 - Teaching Service Commission

    11 50Guyana Elections CommissionGUYANA ELECTIONS COMMISSION

    111 - Elections Commission

    13 51Land TransportMINISTRY OF LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT

    132 - Ministry Administration

    13 52Office Furniture and EquipmentMINISTRY OF LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT

    132 - Ministry Administration

    13 53Infrastructural DevelopmentMINISTRY OF LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT

    133 - Regional Development

    13 54Project Development and AssistanceMINISTRY OF LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT

    133 - Regional Development

    13 55Solid Waste Disposal ProgrammeMINISTRY OF LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT

    133 - Regional Development

    13 56National Clean-Up ProgrammeMINISTRY OF LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT

    133 - Regional Development

    14 57BuildingsPUBLIC SERVICE MINISTRY 141 - Public Service Management

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    14 58Office Furniture and EquipmentPUBLIC SERVICE MINISTRY 141 - Public Service Management

    16 59BuildingsMINISTRY OF AMERINDIAN AFFAIRS

    161 - Amerindian Development

    16 60Amerindian Development FundMINISTRY OF AMERINDIAN AFFAIRS

    161 - Amerindian Development

    16 61Water TransportMINISTRY OF AMERINDIAN AFFAIRS

    161 - Amerindian Development

    16 62Land TransportMINISTRY OF AMERINDIAN AFFAIRS

    161 - Amerindian Development

    16 63Office Furniture and EquipmentMINISTRY OF AMERINDIAN AFFAIRS

    161 - Amerindian Development

    21 64National Drainage and Irrigation AuthorityMINISTRY OF AGRICULTURE 211 - Ministry Administration

    21 65Drainage and IrrigationMINISTRY OF AGRICULTURE 211 - Ministry Administration

    21 66Drainage and Irrigation Support ProjectMINISTRY OF AGRICULTURE 211 - Ministry Administration

    21 67East Demerara Water ConservancyMINISTRY OF AGRICULTURE 211 - Ministry Administration

    21 68Disaster Risk Management ProjectMINISTRY OF AGRICULTURE 211 - Ministry Administration

    21 69Project Evaluation and EquipmentMINISTRY OF AGRICULTURE 211 - Ministry Administration

    21 70Agriculture Export Diversification ProjectMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 71Civil Works - MMAMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 72Mangrove ManagementMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 73Access Dams/Roads ImprovementMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 74Guyana School of AgricultureMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 75Agricultural Development - MMAMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 76Guyana Livestock Development AuthorityMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 77National Agricultural Research and Extension Institute

    MINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 78Pesticides and Toxic Chemicals Control Board

    MINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 79Rural Enterprise and Agricultural Development

    MINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 80New Guyana Marketing CorporationMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 81General Administration - MMAMINISTRY OF AGRICULTURE 212 - Crops & Livestock Support Services

    21 82Aquaculture DevelopmentMINISTRY OF AGRICULTURE 213 - Fisheries

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    21 83HydrometeorologyMINISTRY OF AGRICULTURE 214 - Hydro-meteorological Services

    23 84Guyana International Conference CentreMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    231 - Main Office

    23 85Tourism DevelopmentMINISTRY OF TOURISM 231 - Main Office

    23 86Bureau of StandardsMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    231 - Main Office

    23 87BuildingMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    232 - Ministry Administration

    23 88Land TransportMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    232 - Ministry Administration

    23 89Office EquipmentMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    232 - Ministry Administration

    23 90Competition and Consumer Protection Commission

    MINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    233 - Commerce, Tourism, Industry and Consumer Affairs

    23 91Industrial DevelopmentMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    233 - Commerce, Tourism, Industry and Consumer Affairs

    23 92Competitiveness ProgrammeMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    233 - Commerce, Tourism, Industry and Consumer Affairs

    23 93Rural Enterprise DevelopmentMINISTRY OF TOURISM, INDUSTRY AND COMMERCE

    233 - Commerce, Tourism, Industry and Consumer Affairs

    24 94Furniture and EquipmentMINISTRY OF NATURAL RESOURCES AND ENVIRONMENT

    241 - Ministry Administration

    24 95Lands and SurveysMINISTRY OF NATURAL RESOURCES AND ENVIRONMENT

    242 - Natural Resource Management

    24 96Environmental Protection AgencyMINISTRY OF NATURAL RESOURCES AND ENVIRONMENT

    243 - Environmental Management

    24 97National Parks CommissionMINISTRY OF NATURAL RESOURCES AND ENVIRONMENT

    243 - Environmental Management

    24 98Protected Areas CommissionMINISTRY OF NATURAL RESOURCES AND ENVIRONMENT

    243 - Environmental Management

    24 99Forest Carbon Partnership ProjectMINISTRY OF NATURAL RESOURCES AND ENVIRONMENT

    243 - Environmental Management

    31 100Government BuildingsMINISTRY OF PUBLIC WORKS 311 - Ministry Administration

    31 101Land and Water TransportMINISTRY OF PUBLIC WORKS 311 - Ministry Administration

    31 102Office EquipmentMINISTRY OF PUBLIC WORKS 311 - Ministry Administration

    31 103Furnishings - Government QuartersMINISTRY OF PUBLIC WORKS 311 - Ministry Administration

    31 104Demerara Harbour BridgeMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 105Infrastructural DevelopmentMINISTRY OF PUBLIC WORKS 312 - Public Works

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    31 106DredgingMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 107Bartica/Issano/Mahdia RoadMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 108BridgesMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 109Miscellaneous RoadsMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 110Urban Roads/DrainageMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 111Georgetown - Lethem RoadMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 112Road Improvement and Rehabilitation Programme

    MINISTRY OF PUBLIC WORKS 312 - Public Works

    31 113Highway Improvement East Bank DemeraraMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 114Highway Improvement East Coast DemeraraMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 115Amaila Access RoadMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 116Road Network and Expansion ProjectMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 117West Demerara HighwayMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 118Rehabilitation of Public and Main Access Roads

    MINISTRY OF PUBLIC WORKS 312 - Public Works

    31 119Guyana - Brazil Land Transport Link and Deep Water Port

    MINISTRY OF PUBLIC WORKS 312 - Public Works

    31 120Corentyne River Bridge Access RoadMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 121Hinterland RoadsMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 122Emergency WorksMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 123Sea DefencesMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 124StellingsMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 125Navigational AidsMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 126Reconditioning/Construction of ShipsMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 127Reconditioning of Ferry VesselsMINISTRY OF PUBLIC WORKS 312 - Public Works

    31 128Hinterland/Coastal AirstripMINISTRY OF PUBLIC WORKS 313 - Transport

    31 129Equipment - Civil AviationMINISTRY OF PUBLIC WORKS 313 - Transport

    31 130CJIA Modernisation ProjectMINISTRY OF PUBLIC WORKS 313 - Transport

    41 131Building - National LibraryMINISTRY OF EDUCATION 411 - Main Office

    41 132Land TransportMINISTRY OF EDUCATION 411 - Main Office

    41 133Other EquipmentMINISTRY OF EDUCATION 411 - Main Office

    41 134Land TransportMINISTRY OF EDUCATION 412 - National Education Policy

    41 135Other EquipmentMINISTRY OF EDUCATION 412 - National Education Policy

    41 136Land TransportMINISTRY OF EDUCATION 413 - Ministry Administration

    41 137Other EquipmentMINISTRY OF EDUCATION 413 - Ministry Administration

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    41 138Teachers' Training ComplexMINISTRY OF EDUCATION 414 - Training and Development

    41 139Land TransportMINISTRY OF EDUCATION 414 - Training and Development

    41 140Other EquipmentMINISTRY OF EDUCATION 414 - Training and Development

    41 141Resource Development CentreMINISTRY OF EDUCATION 414 - Training and Development

    41 142Nursery, Primary and Secondary SchoolsMINISTRY OF EDUCATION 415 - Education Delivery

    41 143President's CollegeMINISTRY OF EDUCATION 415 - Education Delivery

    41 144Craft Production and DesignMINISTRY OF EDUCATION 415 - Education Delivery

    41 145Kuru Kuru Co-op CollegeMINISTRY OF EDUCATION 415 - Education Delivery

    41 146University of Guyana - TurkeyenMINISTRY OF EDUCATION 415 - Education Delivery

    41 147University of Guyana - BerbiceMINISTRY OF EDUCATION 415 - Education Delivery

    41 148Land TransportMINISTRY OF EDUCATION 415 - Education Delivery

    41 149New Amsterdam Technical InstituteMINISTRY OF EDUCATION 415 - Education Delivery

    41 150Other EquipmentMINISTRY OF EDUCATION 415 - Education Delivery

    41 151Government Technical InstituteMINISTRY OF EDUCATION 415 - Education Delivery

    41 152Guyana Industrial Training CentreMINISTRY OF EDUCATION 415 - Education Delivery

    41 153Carnegie School of Home EconomicsMINISTRY OF EDUCATION 415 - Education Delivery

    41 154School Furniture and EquipmentMINISTRY OF EDUCATION 415 - Education Delivery

    41 155Technical/Vocational ProjectMINISTRY OF EDUCATION 415 - Education Delivery

    41 156UG - Science and Technology Support Project

    MINISTRY OF EDUCATION 415 - Education Delivery

    41 157Secondary Education Improvement ProjectMINISTRY OF EDUCATION 415 - Education Delivery

    41 158Technical/Vocational Project IIMINISTRY OF EDUCATION 415 - Education Delivery

    41 159Linden Technical InstituteMINISTRY OF EDUCATION 415 - Education Delivery

    41 160Teachers' Education ProjectMINISTRY OF EDUCATION 415 - Education Delivery

    44 161Building - Central MinistryMINISTRY OF CULTURE, YOUTH AND SPORT

    441 - Ministry Administration

    44 162Land TransportMINISTRY OF CULTURE, YOUTH AND SPORT

    441 - Ministry Administration

    44 163Office Equipment and FurnitureMINISTRY OF CULTURE, YOUTH AND SPORT

    441 - Ministry Administration

    44 164Building - Cultural CentreMINISTRY OF CULTURE, YOUTH AND SPORT

    442 - Culture

    44 165National School of DanceMINISTRY OF CULTURE, YOUTH AND SPORT

    442 - Culture

    44 166Museum DevelopmentMINISTRY OF CULTURE, YOUTH AND SPORT

    442 - Culture

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    44 167National TrustMINISTRY OF CULTURE, YOUTH AND SPORT

    442 - Culture

    44 168National ArchivesMINISTRY OF CULTURE, YOUTH AND SPORT

    442 - Culture

    44 169YouthMINISTRY OF CULTURE, YOUTH AND SPORT

    443 - Youth

    44 170National Sports CommissionMINISTRY OF CULTURE, YOUTH AND SPORT

    444 - Sports

    45 171Community Infrastructure Improvement Project

    MINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 172Community Roads Improvement ProjectMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 173Infrastructural Development and BuildingMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 174Furniture and EquipmentMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 175Water SupplyMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 176Coastal Water SupplyMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 177Linden Water SupplyMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 178Low Income Settlement Programme IIMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 179Georgetown Sanitation Improvement Programme

    MINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 180Water Supply Rehabilitation - LindenMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 181Urban Sewerage and WaterMINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    45 182Water Supply and Infrastructure Improvement Programme

    MINISTRY OF HOUSING AND WATER

    451 - Housing and Water

    46 183BuildingsGEORGETOWN PUBLIC HOSPITAL CORPORATION

    461 - Public Hospital

    46 184Land and Water TransportGEORGETOWN PUBLIC HOSPITAL CORPORATION

    461 - Public Hospital

    46 185EquipmentGEORGETOWN PUBLIC HOSPITAL CORPORATION

    461 - Public Hospital

    46 186Equipment - MedicalGEORGETOWN PUBLIC HOSPITAL CORPORATION

    461 - Public Hospital

    47 187Ministry of Health - BuildingsMINISTRY OF HEALTH 471 - Ministry Administration

    47 188Land and Water TransportMINISTRY OF HEALTH 471 - Ministry Administration

    47 189Office Furniture and EquipmentMINISTRY OF HEALTH 471 - Ministry Administration

    47 190Equipment - MedicalMINISTRY OF HEALTH 471 - Ministry Administration

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    47 191EquipmentMINISTRY OF HEALTH 471 - Ministry Administration

    47 192Ministry of Health - BuildingsMINISTRY OF HEALTH 472 - Disease Control

    47 193Land and Water TransportMINISTRY OF HEALTH 472 - Disease Control

    47 194Office Furniture and EquipmentMINISTRY OF HEALTH 472 - Disease Control

    47 195Equipment - MedicalMINISTRY OF HEALTH 472 - Disease Control

    47 196EquipmentMINISTRY OF HEALTH 472 - Disease Control

    47 197Office Furniture and EquipmentMINISTRY OF HEALTH 473 - Primary Health Care Services

    47 198Equipment - MedicalMINISTRY OF HEALTH 473 - Primary Health Care Services

    47 199EquipmentMINISTRY OF HEALTH 473 - Primary Health Care Services

    47 200Nutrition Programme - Phase IIMINISTRY OF HEALTH 473 - Primary Health Care Services

    47 201Ministry of Health - BuildingsMINISTRY OF HEALTH 474 - Regional and Clinical Services

    47 202Doctors' QuartersMINISTRY OF HEALTH 474 - Regional and Clinical Services

    47 203Specialty Hospital ProjectMINISTRY OF HEALTH 474 - Regional and Clinical Services

    47 204Land and Water TransportMINISTRY OF HEALTH 474 - Regional and Clinical Services

    47 205Office Furniture and EquipmentMINISTRY OF HEALTH 474 - Regional and Clinical Services

    47 206Equipment - MedicalMINISTRY OF HEALTH 474 - Regional and Clinical Services

    47 207EquipmentMINISTRY OF HEALTH 474 - Regional and Clinical Services

    47 208Ministry of Health - BuildingsMINISTRY OF HEALTH 475 - Health Sciences Education

    47 209Office Furniture and EquipmentMINISTRY OF HEALTH 475 - Health Sciences Education

    47 210EquipmentMINISTRY OF HEALTH 475 - Health Sciences Education

    47 211Office Furniture and EquipmentMINISTRY OF HEALTH 476 - Standards and Technical Services

    47 212Equipment - MedicalMINISTRY OF HEALTH 476 - Standards and Technical Services

    47 213EquipmentMINISTRY OF HEALTH 476 - Standards and Technical Services

    47 214Office Furniture and EquipmentMINISTRY OF HEALTH 477 - Rehabilitation Services

    47 215Equipment - MedicalMINISTRY OF HEALTH 477 - Rehabilitation Services

    47 216EquipmentMINISTRY OF HEALTH 477 - Rehabilitation Services

    48 217BuildingsMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    481 - Strategic Planning, Administration and Human Services

    48 218Office EquipmentMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    481 - Strategic Planning, Administration and Human Services

    48 219BuildingsMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    482 - Social Services

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    48 220Land TransportMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    482 - Social Services

    48 221Office EquipmentMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    482 - Social Services

    48 222EquipmentMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    482 - Social Services

    48 223BuildingsMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    483 - Labour Administration

    48 224Land TransportMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    483 - Labour Administration

    48 225Office EquipmentMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    483 - Labour Administration

    48 226Institutional StrengtheningMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    483 - Labour Administration

    48 227BuildingsMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    484 - Child Care and Protection Agency

    48 228Office EquipmentMINISTRY OF LABOUR, HUMAN SERVICES AND SOCIAL SECURITY

    484 - Child Care and Protection Agency

    51 229Citizen SecurityMINISTRY OF HOME AFFAIRS 511 - Secretarial Services

    51 230Citizen Security Programme IIMINISTRY OF HOME AFFAIRS 511 - Secretarial Services

    51 231Land Transport - Home AffairsMINISTRY OF HOME AFFAIRS 511 - Secretariat Services

    51 232Office Equipment and Furniture - Home Affairs

    MINISTRY OF HOME AFFAIRS 511 - Secretariat Services

    51 233Community PolicingMINISTRY OF HOME AFFAIRS 511 - Secretariat Services

    51 234Police Stations and BuildingsMINISTRY OF HOME AFFAIRS 512 - Guyana Police Force

    51 235Land and Water Transport - PoliceMINISTRY OF HOME AFFAIRS 512 - Guyana Police Force

    51 236Equipment and Furniture - PoliceMINISTRY OF HOME AFFAIRS 512 - Guyana Police Force

    51 237Equipment - PoliceMINISTRY OF HOME AFFAIRS 512 - Guyana Police Force

    51 238Buildings - PrisonsMINISTRY OF HOME AFFAIRS 513 - Guyana Prison Services

    51 239Land and Water Transport - PrisonsMINISTRY OF HOME AFFAIRS 513 - Guyana Prison Services

    51 240Other Equipment - PrisonsMINISTRY OF HOME AFFAIRS 513 - Guyana Prison Services

    51 241Agricultural Equipment - PrisonsMINISTRY OF HOME AFFAIRS 513 - Guyana Prison Services

    51 242Tools and Equipment - PrisonsMINISTRY OF HOME AFFAIRS 513 - Guyana Prison Services

    51 243Police Complaints AuthorityMINISTRY OF HOME AFFAIRS 514 - Police Complaints Authority

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    51 244Fire Ambulances and StationsMINISTRY OF HOME AFFAIRS 515 - Guyana Fire Service

    51 245Land and Water Transport - FireMINISTRY OF HOME AFFAIRS 515 - Guyana Fire Service

    51 246Communication Equipment - FireMINISTRY OF HOME AFFAIRS 515 - Guyana Fire Service

    51 247Tools and Equipment - FireMINISTRY OF HOME AFFAIRS 515 - Guyana Fire Service

    51 248Office Equipment and Furniture - FireMINISTRY OF HOME AFFAIRS 515 - Guyana Fire Service

    51 249General Registrar's OfficeMINISTRY OF HOME AFFAIRS 516 - General Register Office

    51 250Customs Anti Narcotics UnitMINISTRY OF HOME AFFAIRS 517 - Customs Anti Narcotics Unit

    52 251BuildingsMINISTRY OF LEGAL AFFAIRS 521 - Main Office

    52 252Land and Water TransportMINISTRY OF LEGAL AFFAIRS 522 - Ministry Administration

    52 253Furniture and EquipmentMINISTRY OF LEGAL AFFAIRS 522 - Ministry Administration

    52 254Furniture and EquipmentMINISTRY OF LEGAL AFFAIRS 524 - Office of the State Solicitor

    53 255Buildings - GDFGUYANA DEFENCE FORCE 531 - Defence & Security Support

    53 256Marine DevelopmentGUYANA DEFENCE FORCE 531 - Defence & Security Support

    53 257Air, Land and Water TransportGUYANA DEFENCE FORCE 531 - Defence & Security Support

    53 258Pure Water SupplyGUYANA DEFENCE FORCE 531 - Defence & Security Support

    53 259Agriculture DevelopmentGUYANA DEFENCE FORCE 531 - Defence & Security Support

    53 260InfrastructureGUYANA DEFENCE FORCE 531 - Defence & Security Support

    53 261EquipmentGUYANA DEFENCE FORCE 531 - Defence & Security Support

    53 262National Flagship - EssequiboGUYANA DEFENCE FORCE 531 - Defence & Security Support

    55 263BuildingsSUPREME COURT 551 - Supreme Court of Judicature

    55 264Land and Water TransportSUPREME COURT 551 - Supreme Court of Judicature

    55 265Furniture and EquipmentSUPREME COURT 551 - Supreme Court of Judicature

    55 266BuildingsSUPREME COURT 552 - Magistrates' Department

    55 267Furniture and EquipmentSUPREME COURT 552 - Magistrates' Department

    56 268Director of Public ProsecutionsDIRECTOR OF PUBLIC PROSECUTIONS

    561 - Public Prosecutions

    58 269Public Service Appellate TribunalPUBLIC SERVICE APPELLATE TRIBUNAL

    581 - Public Service Appellate Tribunal

    71 270Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    711 - Regional Administration & Finance

    71 271Agricultural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    711 - Regional Administration & Finance

    71 272Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    711 - Regional Administration & Finance

    71 273Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    711 - Regional Administration & Finance

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    71 274Furniture and Equipment - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    711 - Regional Administration & Finance

    71 275BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    712 - Public Works

    71 276RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    712 - Public Works

    71 277Infrastructural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    712 - Public Works

    71 278Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    712 - Public Works

    71 279Power SupplyREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    712 - Public Works

    71 280Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    713 - Education Delivery

    71 281Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    713 - Education Delivery

    71 282Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    713 - Education Delivery

    71 283Furniture and Equipment - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    713 - Education Delivery

    71 284Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    714 - Health Services

    71 285Infrastructural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    714 - Health Services

    71 286Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    714 - Health Services

    71 287Furniture and Equipment - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    714 - Health Services

    71 288Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    714 - Health Services

    71 289Power SupplyREGIONAL DEMOCRATIC COUNCIL - REGION NO. 1

    714 - Health Services

    72 290Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    721 - Regional Administration & Finance

    72 291Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    721 - Regional Administration & Finance

    72 292Miscellaneous Drainage and Irrigation Works

    REGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    722 - Agriculture

    72 293Other EquipmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    722 - Agriculture

    72 294BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    723 - Public Works

    72 295RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    723 - Public Works

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    72 296Land DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    723 - Public Works

    72 297BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    724 - Education Delivery

    72 298Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    724 - Education Delivery

    72 299Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    724 - Education Delivery

    72 300Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    724 - Education Delivery

    72 301BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    725 - Health Services

    72 302Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    725 - Health Services

    72 303Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    725 - Health Services

    72 304Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 2

    725 - Health Services

    73 305Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    731 - Regional Administration & Finance

    73 306Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    731 - Regional Administration & Finance

    73 307Agricultural Development - Drainage and Irrigation

    REGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    732 - Agriculture

    73 308BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    733 - Public Works

    73 309RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    733 - Public Works

    73 310Land DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    733 - Public Works

    73 311Infrastructural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    733 - Public Works

    73 312Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    734 - Education

    73 313Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    734 - Education

    73 314Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    735 - Health Services

    73 315Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    735 - Health Services

    73 316Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 3

    735 - Health Services

    74 317Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    741 - Regional Administration & Finance

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    74 318Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    741 - Regional Administration & Finance

    74 319Agricultural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    742 - Agriculture

    74 320BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    743 - Public Works

    74 321RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    743 - Public Works

    74 322Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    744 - Education Delivery

    74 323Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    744 - Education Delivery

    74 324Power SupplyREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    744 - Education Delivery

    74 325Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    745 - Health Services

    74 326Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    745 - Health Services

    74 327Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    745 - Health Services

    74 328Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 4

    745 - Health Services

    75 329Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    751 - Buildings Administration & Finance

    75 330Office Furniture and EquipmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    751 - Regional Administration & Finance

    75 331Drainage and IrrigationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    752 - Agriculture

    75 332Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    752 - Agriculture

    75 333BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    753 - Public Works

    75 334RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    753 - Public Works

    75 335Land DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    753 - Public Works

    75 336Infrastructure DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    753 - Public Works

    75 337Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    754 - Education Delivery

    75 338Furniture - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    754 - Education Delivery

    75 339Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    755 - Health Services

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    75 340Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    755 - Health Services

    75 341Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 5

    755 - Health Services

    76 342Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    761 - Regional Administration & Finance

    76 343Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    761 - Regional Administration & Finance

    76 344Drainage and IrrigationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    762 - Agriculture

    76 345Land TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    762 - Agriculture

    76 346BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    763 - Public Works

    76 347RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    763 - Public Works

    76 348Land DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    763 - Public Works

    76 349Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    764 - Education Delivery

    76 350Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    764 - Education Delivery

    76 351Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    765 - Health Services

    76 352Land TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    765 - Health Services

    76 353Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 6

    765 - Health Services

    77 354Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    771 - Regional Administration & Finance

    77 355Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    771 - Regional Administration & Finance

    77 356RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    772 - Public Works

    77 357BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    772 - Public Works

    77 358Sea and River DefenceREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    772 - Public Works

    77 359Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    773 - Education Delivery

    77 360Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    773 - Education Delivery

    77 361Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    773 - Education Delivery

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    77 362Furniture and Equipment - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    773 - Education Delivery

    77 363Other EquipmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    773 - Education Delivery

    77 364Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    774 - Health Services

    77 365Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    774 - Health Services

    77 366Furniture and Equipment - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    774 - Health Services

    77 367Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    774 - Health Services

    77 368Other EquipmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 7

    774 - Health Services

    78 369Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    781 - Regional Administration & Finance

    78 370Furniture and Equipment - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    781 - Regional Administration & Finance

    78 371Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    781 - Regional Administration & Finance

    78 372BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    782 - Public Works

    78 373RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    782 - Public Works

    78 374Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    782 - Public Works

    78 375Furniture and EquipmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    782 - Public Works

    78 376Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    783 - Education Delivery

    78 377Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    783 - Education Delivery

    78 378Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    784 - Health Services

    78 379Furniture and Equipment - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    784 - Health Services

    78 380Land and Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    784 - Health Services

    78 381Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 8

    784 - Health Services

    79 382Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    791 - Regional Administration & Finance

    79 383Land TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    791 - Regional Administration & Finance

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    79 384Water TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    791 - Regional Administration & Finance

    79 385Furniture - Staff QuartersREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    791 - Regional Administration & Finance

    79 386Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    791 - Regional Administration & Finance

    79 387Agricultural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    792 - Agriculture

    79 388BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    793 - Public Works

    79 389RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    793 - Public Works

    79 390Infrastructure DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    793 - Public Works

    79 391Land TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    793 - Public Works

    79 392Power ExtensionREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    793 - Public Works

    79 393Water SupplyREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    793 - Public Works

    79 394Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    794 - Education Delivery

    79 395Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    794 - Education Delivery

    79 396Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    795 - Health Services

    79 397Land TransportREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    795 - Health Services

    79 398Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 9

    795 - Health Services

    80 399Buildings - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    801 - Regional Administration & Finance

    80 400Furniture and Equipment - AdministrationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    801 - Regional Administration & Finance

    80 401BridgesREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    802 - Public Works

    80 402RoadsREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    802 - Public Works

    80 403Infrastructural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    802 - Public Works

    80 404Agricultural DevelopmentREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    802 - Public Works

    80 405Buildings - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    803 - Education Delivery

  • INDEX TO CENTRAL GOVERNMENT CAPITAL PROJECTS

    DIVISION AGENCY PROJECT TITLE REF. #PROGRAMME

    80 406Furniture and Equipment - EducationREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    803 - Education Delivery

    80 407Power SupplyREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    803 - Education Delivery

    80 408Buildings - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    804 - Health Services

    80 409Land and Water Transport - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    804 - Health Services

    80 410Furniture and Equipment - HealthREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    804 - Health Services

    80 411Power SupplyREGIONAL DEMOCRATIC COUNCIL - REGION NO. 10

    804 - Health Services

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 1

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER07

    SCORE164

    RANK333

    1. PROJECT TITLEOffice and Residence of the President

    2. CLASSIFICATIONOther

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails:1. Rehabilitation works - Office of the President and State House.2. Upgrading of electrical system - Office of the President.

    8. BENEFITS OF PROJECTImproved accommodation and operational efficiency.

    9. PROJECT FINANCING (G$ Million)

    50.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201450.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    50.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    50.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 2

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER08

    SCORE180

    RANK1

    1. PROJECT TITLEInformation Communication Technology

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSOn-going 01-Dec-09

    6. PLANNED DURATION

    31-Dec-15FromTo

    7. DESCRIPTION OF PROJECTThe project includes:1. Installation and commissioning of wireless and terrestrial networking system from Moleson Creek to Anna Regina.2. Continuation of the One Laptop per Family (OLPF) programme.3. Purchase of equipment.

    8. BENEFITS OF PROJECTImproved communication and technology.

    9. PROJECT FINANCING (G$ Million)

    13,826.6529.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    10,242.755 6,774.103 3,468.652TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 20143,463.901

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    10,240.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    3,345.901

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    3,586.652

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    118.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    2757.652PRE 2012 2012

    170.0002013541.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    CHINA - LOANCHINA - GRANT

    1,389.5480.000

    6,560.0003,680.000

    1,725.8691,634.099

    2,024.5870.000

    1,300.0002,045.901

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 3

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER17

    SCORE180

    RANK1

    1. PROJECT TITLEMinor Works

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails provision for developmental, humanitarian and other activities.

    8. BENEFITS OF PROJECTEnhanced national and regional development.

    9. PROJECT FINANCING (G$ Million)

    95.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201495.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    95.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    95.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 4

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER08

    SCORE180

    RANK1

    1. PROJECT TITLELand Transport

    2. CLASSIFICATIONCritical

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails purchase of vehicles.

    8. BENEFITS OF PROJECTImproved transportation.

    9. PROJECT FINANCING (G$ Million)

    50.5009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201450.500

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    50.500

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    50.500

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE0EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 0

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 5

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER17

    SCORE162

    RANK338

    1. PROJECT TITLEPurchase of Equipment

    2. CLASSIFICATIONOther

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project includes purchase of scanners, binding machines, fax machines, security cameras, plotter, safes, bookshelves, tables, chairs, shredders, photocopier, projectors and screens.

    8. BENEFITS OF PROJECTImproved operational efficiency.

    9. PROJECT FINANCING (G$ Million)

    25.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201425.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    25.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    25.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE0EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 0

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 6

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER14

    SCORE180

    RANK1

    1. PROJECT TITLECivil Defence Commission

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project includes:1. Purchase of equipment for Alternate Emergency Operation Centre including plotter, desks, chairs, air conditioning units, filing cabinets, photocopier, fax machine, printers, projector, tables, radios, UPS and generator. 2. Purchase of portable restrooms. 3. Provision for the strengthening of regional disaster risk management capacity.

    8. BENEFITS OF PROJECTImproved operational efficiency.

    9. PROJECT FINANCING (G$ Million)

    24.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201424.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    24.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    24.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 7

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER06

    SCORE158

    RANK347

    1. PROJECT TITLEGuyana Office for Investment

    2. CLASSIFICATIONOther

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project includes:1. Rehabilitation of building.2. Purchase of air conditioning units, filing cabinets, bookshelves, fax machine, table, projector, desks, fire extinguishers and camera.

    8. BENEFITS OF PROJECTImproved accommodation and operational efficiency.

    9. PROJECT FINANCING (G$ Million)

    10.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201410.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    10.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    10.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 8

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER08

    SCORE180

    RANK1

    1. PROJECT TITLEGovernment Information Agency

    2. CLASSIFICATIONCritical

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project includes:1. Construction of storage facility.2. Purchase of photocopier, DVD players, air conditioning units, cameras and accessories.

    8. BENEFITS OF PROJECTImproved operational efficiency.

    9. PROJECT FINANCING (G$ Million)

    8.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 20148.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    8.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    8.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 9

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER05

    SCORE158

    RANK347

    1. PROJECT TITLEGuyana Energy Agency

    2. CLASSIFICATIONOther

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails extension of building.

    8. BENEFITS OF PROJECTImproved accommodation.

    9. PROJECT FINANCING (G$ Million)

    10.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201410.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    10.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    10.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 10

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER08

    SCORE180

    RANK1

    1. PROJECT TITLENational Communication Network

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project includes:1. Construction of fence, gate and guard hut - Georgetown.2. Installation of generator - Onderneeming.3. Purchase of vehicle, recorders, cameras, server, microphones, traffic, satellite flyway, transmitter and editing systems.

    8. BENEFITS OF PROJECTImproved facilities, transportation and operational efficiency countrywide.

    9. PROJECT FINANCING (G$ Million)

    60.5009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201460.500

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    60.500

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    60.500

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 11

    AGENCY CODE NUMBER1

    SECTOR CODE NUMBER06

    SCORE180

    RANK1

    1. PROJECT TITLEInstitute of Applied Science and Technology - IAST

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRESIDENT

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails provision for research and pilot-scale testing in mercury-free recovery of gold, including purchase of heat exchanger, steam boiler, copra dryer, steam activation unit, granulators, automated sieves and dynamic analyser.

    8. BENEFITS OF PROJECTImproved research and technology.

    9. PROJECT FINANCING (G$ Million)

    50.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201450.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    50.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    50.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME011 - Administrative Services

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 12

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER17

    SCORE180

    RANK1

    1. PROJECT TITLEMinor Works

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails implementation of minor projects and programmes.

    8. BENEFITS OF PROJECTImproved living conditions of vulnerable groups.

    9. PROJECT FINANCING (G$ Million)

    7.5009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 20147.500

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    7.500

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    7.500

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME021 - Prime Minister's Secretariat

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 13

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER17

    SCORE164

    RANK333

    1. PROJECT TITLELand Transport

    2. CLASSIFICATIONOther

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails purchase of vehicles.

    8. BENEFITS OF PROJECTImproved transportation.

    9. PROJECT FINANCING (G$ Million)

    23.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201423.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    23.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    23.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE0EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 0

    PROGRAMME021 - Prime Minister's Secretariat

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 14

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER17

    SCORE137

    RANK393

    1. PROJECT TITLEOffice Furniture and Equipment

    2. CLASSIFICATIONOther

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project includes purchase of photocopier, scanner, chairs, water dispenser, air conditioning units, bookshelves and desks.

    8. BENEFITS OF PROJECTImproved operational efficiency.

    9. PROJECT FINANCING (G$ Million)

    2.5009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 20142.500

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    2.500

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    2.500

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE0EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 0

    PROGRAMME021 - Prime Minister's Secretariat

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 15

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER05

    SCORE180

    RANK1

    1. PROJECT TITLEElectrification Programme

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSOn-going 01-Jan-10

    6. PLANNED DURATION

    31-Dec-15FromTo

    7. DESCRIPTION OF PROJECTThe project entails:1. Expansion of the transmission and distribution system which includes: (a) Construction of five new sub-stations. (b) Expansion and upgrading of two existing sub-stations. (c) Installation of a Supervisory Control and Data Acquisition (SCADA) system.2. Loss reduction and energy conservation which includes: (a) Provision for capacity building. (b) Rehabilitation of low voltage distribution network.3. Provision for metering, transformers, structures, sub-stations, power plants and generating sets.

    8. BENEFITS OF PROJECT1. Improved living conditions.2. Improved efficiency in generation, transmission and distribution of electricity.

    9. PROJECT FINANCING (G$ Million)

    22,555.1009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    11,965.306 11,965.306 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 20143,850.212

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    22,452.600

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    3,850.212

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    102.500

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    0.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME021 - Prime Minister's Secretariat

    CHINAIDBOTHER

    4,679.3610.0000.000

    8,157.6001,025.00013,270.000

    1,281.56742.3320.000

    896.002296.044

    4,770.000

    1,158.825200.000

    2,491.387

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 16

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER05

    SCORE180

    RANK1

    1. PROJECT TITLELethem Power Company

    2. CLASSIFICATIONCritical

    3. REGION9Upper Takatu/Upper Essequibo

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSOn-going 01-Jan-12

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails:1. Completion of power station.2. Extension of power supply at Culvert City.3. Purchase of vehicle.

    8. BENEFITS OF PROJECTImproved operational efficiency and transportation.

    9. PROJECT FINANCING (G$ Million)

    210.5609.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    105.000 0.000 105.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 2014105.560

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    210.560

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    105.560

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    55.000201350.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME021 - Prime Minister's Secretariat

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 17

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER05

    SCORE180

    RANK1

    1. PROJECT TITLEMicro-Hydropower Project

    2. CLASSIFICATIONCritical

    3. REGION8Potaro/Siparuni

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSOn-going 01-Jan-12

    6. PLANNED DURATION

    31-Dec-17FromTo

    7. DESCRIPTION OF PROJECTThe project entails development of micro-hydropower system on the Chiung River, Kato.

    8. BENEFITS OF PROJECT1. Increased economic activities and quality of life.2. Increased access by rural (hinterland) community to affordable, renewable and sustainable energy.

    9. PROJECT FINANCING (G$ Million)

    843.8369.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    6.265 0.000 6.265TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201486.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    675.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    56.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    168.836

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    30.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    6.265

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME021 - Prime Minister's Secretariat

    EU 0.000675.000 0.000 0.000 56.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 18

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER05

    SCORE180

    RANK1

    1. PROJECT TITLEPower Supply

    2. CLASSIFICATIONCritical

    3. REGION1, 8 & 10National

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails provision for:1. Extension and upgrading of power supply in Mahdia, Matthew's Ridge and Linden.2. Administrative expenses.

    8. BENEFITS OF PROJECTImproved operational efficiency.

    9. PROJECT FINANCING (G$ Million)

    208.4039.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 2014208.403

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    208.403

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    208.403

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME021 - Prime Minister's Secretariat

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 19

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER05

    SCORE180

    RANK1

    1. PROJECT TITLEPower Utility Upgrade Programme

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-18FromTo

    7. DESCRIPTION OF PROJECTThe project includes:1. Reduction of electricity losses.2. Reconfiguration and upgrading of distribution networks.3. Upgrading/relocation of distribution transformers.4. Implementation of management software.5. Institutional strengthening.

    8. BENEFITS OF PROJECT1. Improved living conditions.2. Improved efficiency in generation, transmission and distribution of electricity.3. Improved operational efficiency and management capabilities.

    9. PROJECT FINANCING (G$ Million)

    10,961.6009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201450.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    10,961.600

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    50.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    0.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    0.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME021 - Prime Minister's Secretariat

    IDBEU

    0.0000.000

    5,480.8005,480.800

    0.0000.000

    0.0000.000

    25.00025.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 20

    AGENCY CODE NUMBER2

    SECTOR CODE NUMBER05

    SCORE180

    RANK1

    1. PROJECT TITLESustainable Energy Programme

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYOFFICE OF THE PRIME MINISTER

    5. STATUSNew 01-Jan-14

    6. PLANNED DURATION

    31-Dec-19FromTo

    7. DESCRIPTION OF PROJECTThe project entails:1. Strengthening of policy, institutional framework and capabilities to implement renewable energy technology.2. Implementation of renewable pilot projects such as wind energy, solar photovoltaic and small hydropower.

    8. BENEFITS OF PROJECT1. Improved operational efficiency.2. Improved quality energy access.

    9. PROJECT FINANCING (G$ Million)

    1,040.0009.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    0.000 0.000 0.000TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201450.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    1,040.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    50.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    0.000

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    0.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.0002013

    0.000

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME021 - Prime Minister's Secretariat

    IDB 0.0001,040.000 0.000 0.000 50.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 21

    AGENCY CODE NUMBER3

    SECTOR CODE NUMBER17

    SCORE180

    RANK1

    1. PROJECT TITLEBuildings

    2. CLASSIFICATIONCritical

    3. REGION4Demerara/Mahaica

    4. EXECUTING AGENCYMINISTRY OF FINANCE

    5. STATUSOn-going 01-Jan-13

    6. PLANNED DURATION

    31-Dec-14FromTo

    7. DESCRIPTION OF PROJECTThe project entails:1. Completion of building.2. Construction of fence and upgrading of electrical system.

    8. BENEFITS OF PROJECTImproved working environment.

    9. PROJECT FINANCING (G$ Million)

    36.4839.1. TOTAL PROJECT COST

    9.2. AMOUNT SPENT BEFORE 2014

    13.483 0.000 13.483TOTAL FOREIGN LOCAL

    9.3. AMOUNT BUDGETED

    FOR 201423.000

    9.4. TOTAL DIRECT

    0.000

    FOREIGN EXPENDITURE BY THE EXECUTING AGENCY

    9.5 2014 DIRECT FOREIGN

    0.000

    EXPENDITURE BY THE EXECUTING AGENCY

    9.6 TOTAL FINANCING

    0.000

    BY FOREIGN LOANSGRANTS

    9.7 2014 AMOUNT

    0.000

    TO BE FINANCED BYFOREIGN LOANS/GRANTS

    9.8. TOTAL AMOUNT TO BE

    36.483

    FINANCED BY CENTRALGOVERNMENT

    9.9. 2014 AMOUNT TO BE

    23.000

    FINANCED BY CENTRAL GOVERNMENT

    9.10. TOTAL AMOUNT TO

    0.000

    BE FINANCED BY OTHERLOCAL AGENCIES

    9.11. 2014 AMOUNT

    0.000

    TO BE FINANCED BYOTHER LOCAL AGENCIES

    SOURCE

    9.13. AMOUNT FINANCED BY CENTRAL GOVERNMENT

    0.000PRE 2012 2012

    0.000201313.483

    9.14. SOURCES OF LOCAL (NON GOVERNMENT)

    NilFINANCING IN 2013

    10. EMPLOYMENT IMPACT OF THE PROJECT

    10.1. NUMBER OF SKILLED WORKERS TO BE*EMPLOYED IN 2014

    10.2. NUMBER OF UNSKILLED WORKERS TO BE

    EMPLOYED IN 2014 *

    * Contract Work

    PROGRAMME031 - Policy and Administration

    Nil 0.0000.000 0.000 0.000 0.000

    9.12 SOURCE OF FOREIGN FINANCINGTOTAL PRE 2012 2012 2013 2014

  • GUYANA: PUBLIC SECTOR INVESTMENT PROGRAMME2014 BUDGET: CAPITAL PROJECT PROFILE

    REF: 22

    AGENCY CODE NUMBER3

    SECTOR CODE NUMBER19

    SCORE180

    RANK1

    1. PROJECT TITLEBasic Needs Trust Fund (BNTF) - 6/7

    2. CLASSIFICATIONCritical

    3. REGION1 - 10National

    4. EXECUTING AGENCYMINISTRY OF FINANCE

    5. STATUSOn-going 01-Jan-11

    6. PLANNED DURATION

    31-Dec-17FromTo

    7. DESCRIPTION OF PROJECTThe project includes:1. Completion of Ithaca, No. 77 village and Tuschen nursery schools, Matthew’s Ridge Teachers’ Quarters and construction and extension of Paramakatoi and Kako primary schools.2. Completion of roads and culverts in areas such as Henrietta, Affiance, Grove, Bath, Paradise and South Amelia's Ward.3. Completion of wells at Wakenaam, Goed Fortuin and upgrading of water supply systems in areas such as Mahdia, Kwatamang, Bina Hill, Great Fall, Santa Aratak, Mahaicony, Parika, Karasabai, Santa Rosa, Sarah Johanna and No. 58, Mabura.4. Completion of health facilities at Hiawa, Yarikita, Mahdia, Experiment, Kamarang, Yawong and Potarinau and rehabilitation of nurses’ hostel in Linden. 5. Construction of day care centre at Hururu.6. Provision for the vulnerable - Ptolemy Reid Rehabilitation Centre, Guyana Society for the Blind, Uncle Eddie’s Home, Palms and Cheshire Home7. Provision for skills training.8. Implementation of maintenance programme.9. Provision for BNTF 7.

    8. BENEFITS OF PROJECT1. Improved living conditions.2. Im