GULF ELITE GENERAL CONTRACTING CO.
Strictly Private and Confidential
Table of Contents
1) Introduction ……Page 32) Objective ……Page 53) Company Location ……Page 64) Business Overview
4.1) History of Business ……Page 74.2) Licenses and Certificates ……Page 74.3) Key Management Structure ……Page 74.4) Key Management Organization Chart ……Page 84.5) Employee Structure ……Page 84.6) Shareholder Structure ……Page 84.7) Specialty/Core Competence ……Page 94.8) Historical Clients ……Page 9
5) Organization Chart ……Page 106) Manpower ……Page 117) Construction Equipment and Tools ……Page 128) Company Vehicle’s List and Accommodation ……Page 139) Latest Project Description
9.1) Status of Existing Projects ……Page 14 10) Potential
10.1) Overview ……Page 1611) List of Projects
11.1) On Going Projects ……Page 1711.2) Completed Projects ……Page 19
12) Government Registration Documents ……Page 3813) ISO Certificate ……Page 4414) Awards ……Page 45
2
1) IntroductionGulf Elite General Contracting Co. (GEGC) is a pioneer in general contracting with more than thirty(30) years of experience in the construction industry, mainly with Saudi Aramco strengthened by itsacquisition of Jaffar M. Al Hamood Est.
GEGC goal is to be one of the major Organization serving the Construction Industry in the GulfRegion. Its mission is to deliver to the client a Quality Product on Time.
Since the acquisition of Jaffar M. Al Hamood Est., GEGC has been executing projects for SaudiAramco as a Main Contractor, as a Subcontractor or in joint venture with another Contractor asshown in the list of projects (see page 17 to 37).
Furthermore, GEGC has expanded its activities to the Private Sector whereas we have completed aHousing Project for EMAAR MIDDLE EAST LLC, in the Eastern Province of Saudi Arabia.
We have implemented major modifications to the Management and Project Staffs to facilitate amodern, healthy and strong organization in order for GEGC to cope up with the recent challenges ofthe Construction Industry.
GEGC with enhanced management and strategies, backed up by the numerous achievements (morethan $570 Million of completed and ongoing projects) in the past forty (40) years with Saudi Aramco,is progressing steadily towards its goal.
GEGC Net Assets (Vehicles, Equipment and Tools) as of December, 2017 was SR 1.134 Million.
3
1) Introduction – Continued
The number of GEGC Direct Employees is 342 including 43 Saudi Nationals. Labor Office status is“Green”.
Furthermore, GEGC other outstanding achievements are:
1. Quality Control, ISO 9001:2015 Certified with an in‐place QA/QC Department overseeingconstruction procurement, including third party inspection services locally and overseas.
2. Tremendous achievements in the Safety Field.3. Dedicated teamwork efforts contributed to timely achievement on most of the projects it has
undertaken.4. Executed projects on LSTK or Joint Venture basis including Design, Procurement and
Construction.5. Vast Experience with Saudi Aramco in the fields of:
• Building Construction• Hospital and Clinics• Laboratories, R & D and NDT• Industrial Facilities and Infrastructure• Inside Plant Construction Projects• Electrical Installations• Mechanical and HVAC Projects
6. First Prices winners in Safety, Quality and Achievement Awards.
4
2) Objective
Gulf Elite General Contracting Co. is a fully owned company by Mohammed Al‐Mojil Group (The Owner) which has created a niche for itself in the Civil Industrial and Commercial Industry. It is a company with dedicated and skilled manpower servicing SAUDI ARAMCO and International Contractors for the past 40 years.
The owner is undertaking a strategic realignment of its activities with a focus on its core activity in the construction business in order to meet increasing market demands.
5
3) Company Location
6
4) Business Overview
7
4.1) History of the Business
Gulf Elite was established in 1976 as Jaffar Al‐Hamood Est. was sold to group of 4 Businessmen in 2004 who in turn sold it to Mohammad Al‐Mojil Group in May 2011.
4.2) Licenses and Certificates
4.3) Key Management Structure
Note: Key Management Personnel have an average of 30 years experience in Saudi Arabia mostly with the Company as Gulf Elite or as Jaffar Al Hamood Est.
Licenses Reference Number Source Issuing Date Expiry Date
Commercial Registration 2050047126 Ministry of Commerce August 1, 2017 July 15, 2020Saudi Aramco Vendor 10031511 Saudi Aramco March 27, 2004 -Contractor Registration 054 B (04/2004) Saudi Electric Company April 30, 2005 -Vendor Qualification 504926 SABIC February 19, 2008 -Marafiq Vendor 2240 MARAFIQ February 21, 2006 -
Name Position Nationality Background University Years with Co. Basic Salary SAR'
Maurice Salim Matar General Manager Lebanese Bachelor of Science in Civil Engineer Louisiana Tech. University, Louisiana 13 yearsSamy Ahmed Abdul Fattah Finance Manager Egyptian Bachelor Degree in Commerce University of Cairo 11 yearsS. Kumar Dwivedi Procurement Manager Indian B. Tech / MBA Lucknow University, India 6 yearsMaher Mussiry Administration Manager Saudi - - 8 years
4) Business Overview – Continued
8
4.4) Key Management Structure Organization Chart
4.5) Employee Structure
Total 342 workforce as per the list of manpower at item no. 6 (page 11).
4.6) Shareholder Structure
The shareholder structure stated in the original article of association (April 2011) isshown in the table.
GEGC founding shareholders are MMG (99%), and Mohammed AlBahraini (1%).
Maurice S. MatarGeneral Manager
Shailendra Kumar DwivediProcurement Manager
Samy Abdul FattahFinance Manager
Maher MussiryAdmin Manager
4) Business Overview – Continued
9
4.7) Specialty / Core CompetenceGulf Elite specializes in civil industrial buildings projects such as Schools, Office buildings, Hospitals,Laboratories, Residential housing, In‐plant industrial buildings, In‐plant foundations and pipe racks.Gulf Elite has executed turnkey projects on the basis of:
Procure and construct for the vast majority of its projects
Joint venture, with Al‐Mabani for the construction of R&D Laboratory for SAUDI ARAMCO ContractNumber 44319
Design procure and construct, NDT facility for SAUDI ARAMCO contract 45983 and ShaybahIndustrial Support Facilities for SAUDI ARAMCO Contract Number 6600026865
Gulf Elite has established its presence in the civil construction industry by executing quality projectson time. Gulf Elite possesses an excellent record with SAUDI ARAMCO and all other clients.
4.8) Historical Clients
Being an approved contractor for SAUDI ARAMCO, the majority of Gulf Elite projects are either directlycontracted with SAUDI ARAMCO or with International Contractors who were awarded SAUDI ARAMCOprojects. Besides SAUDI ARAMCO, Gulf Elite has contracted with SKEC, Drake And Scull, ArabianBemco, Tecnicas Reunidas Ltd. and EMAAR.
COMPANY ORGANIZATIONAL CHART
5) Organization Chart
6) Manpower
11
ANALYSIS OF MANPOWER BY WORK CATEGORIESPosition No. of Heads
Administration:Manager 6 Accountant 6Staff 18
Project Sites:Project Manager 2Construction Manager 2Safety Managers 1Safety Supervisor 1Safety Officer 4QA/QC Manager 2QA/QC Supervisor 2QC Inspector 3Engineer 12Site Superintendent 6Site Supervisor 7Support Staff 28Craftsmen 104Foreman 42Leadsman 16Driver & Operator 20Assistant / Helper / Labor 60
TOTAL 342
7) Construction Equipment and Tools
12
EQUIPMENT CONSTRUCTION TOOLS
SN DESCRIPTION NUMBER OWNED SN DESCRIPTION NUMBER
OWNED
1 LOADER 3 1 POWER TRAWLER 18
2 CRANE, 50 TONS 2 2 PNEUMATIC JACKHAMMER 20
3 BACKHOE 3 3 ASPHALT CUTTER 20
4 SKID LOADER 2 4 CONCRETE MIXER 15
5 FORKLIFT 4 5 CONCRETE VIBRATOR 30
6 MANLIFT 3 6 CORE CUTTING MACHINE 10
7 POWER GENERATOR 15 7 HYDROSTATIC TEST PUMP 8
8 PORTABLE GENERATOR 30 8 THREADING MACHINE 15
9 WELDING MACHINE 15 9 TILE CUTTER w/ STAND 10
10 STUD WELDING MACHINE 3 10 HEAVY DUTY DRILL PRESS 15
11 AIR COMPRESSOR 15 11 POWER PLAINER 5
12 ROLLER COMPACTOR 15 12 WOOD SHAPING MACHINE 3
13 PLATE COMPACTOR 25
14 JUMPING COMPACTOR 25
8) Company Vehicle’s List and Accommodation
13
COMPANY VEHICLE’S LIST
SN DESCRIPTION NUMBER OWNED
1 BUS, 50 SEATER 5
2 MINI BUS 1
3 DUMP TRUCKS 2
4 TRAILERS 1
5 BOOM TRUCKS 2
6 WATER TANKERS 3
7 CHEVROLET 1
8 DYNA 3
9 SUV 5
10 PICK‐UP, DOUBLE CABIN 9
11 PICK‐UP, SINGLE CABIN 3
12 GMC VAN 1
13 GMC SAFARI 1
14 AMBULANCE 2
15 CAR, SEDAN 20
ACCOMMODATION
LOCATIONCOMPANY OWNED(YES/NO)
TYPE CAPACITY
AL KHOBAR YES PORTABLE CAMP 20
AL KHOBAR NO VILLA (3) 3
AL KHOBAR NO APARTMENT (2) 3
DAMMAM NO APARTMENT (3) 15
RIYADH NO BUILDING 250
9) Latest Project’s Description
14
9.1) Status of Existing Projects:
Fit‐Out Works in Elevated Stations in Line 4 of Riyadh Metro Project – Package 3A subcontract to Fast Consortium LLC under Subcontract No. CJV‐CNTR‐834.
Project Started: February 2017Completion Date: January 2020Percentage Completed: 88.63 %
Description: To perform all necessary design details, shop drawings, calculation with specifications and installation of architectural finishing work.
Fit‐Out Works in Two Shallow Underground Stations (4C2 & 4G1) in Line 4 of Riyadh Metro Project – Package 3A subcontract to Gulf Co‐Operation Symbols under Subcontract No. CJV‐CNTR‐902.
Project Started: December 2017Completion Date: March 2019Percentage Completed: 43.54 %
Description: To perform all necessary design details, shop drawings, calculation with specifications and installation of architectural finishing work.
9) Latest Project’s Description ‐ Continued
15
9.1) Status of Existing Projects:
Fit‐Out Works in Elevated Stations in 6F1 Station in Line 6 of Riyadh Metro Project – Package 3A subcontract to Fast Consortium LLC under Subcontract No. CJV‐CNTR‐1001.
Project Started: December 01, 2018Completion Date: February 29, 2020Percentage Completed: 42.01%
Description: To perform all necessary design details, shop drawings, calculation with specifications and installation of architectural finishing work.
Finishing Works for Emergency Exit Shaft (EES) at C&C 6‐1 Area in Line 6 of Riyadh Metro Project – Package 3A subcontract to Fast Consortium LLC under Subcontract No. CJV‐CNTR‐0994.
Project Started: February 2019Percentage Completed: 22.18%
10) Potential
16
10.1) Overview
Target Civil, Oil & Gas Projects.
Market is saturated with opportunity.
Target Saudi Aramco & International Contractors.
Competitors are KHODARI, NESMA, CCE, OSAIS & KAMCO.
Gulf Elite good record will facilitate invitations from Clients.
Competitive edge: Gulf Elite possesses a competitive edge on most oftendered projects due to:
The management and supervisory staff (Project Management, Estimation &Procurement) have an average of 20 years experience.
Gulf Elite possesses a regularly updated cost data bank in materials,manpower and equipment breakdown on all related construction activities.
11) List of Projects
17
11.1) Ongoing Projects
• Fit‐Out Works in Two Shallow Underground Stations (4C2 & 4G1) in Line 4 of Riyadh Metro Project – Package 3
• Contract Value: 36,380,515.57 SAR
11) List of Projects
18
11.1) Ongoing Projects – Continued
• Fit‐Out Works in Elevated Stations in Line 4 of Riyadh Metro Project – Package 3• Contract Value: 59,317,066.04 SAR
11) List of Projects – Continued11.2) Completed Projects
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
1CONTRACT NO. SSF‐SH‐SC‐2016‐004 RIC BLDG. 224 AT SHAYBAH SUPPORT FACILITIES TO CRUDE INCREMENT
APRIL 2016 OCT 2017 BRANCH OF SINOHYDROYUE FENG 65.919,025.59
2
PURCHASE ORDER NO. 6510742008. A MID‐FORM CONTRACT AT WASIT INDUSTRIAL SUPPORT FACILITIES FOR COMPLETION OF REMAINING WORKS.
SEPT 2015 DEC 2016 SAUDI ARABIAN OIL CO.YAHYA SULIMAN AL‐JUHANI 10,417,340.00
3CONTRACT NO. 6600026594SHAYBAH NGL RESIDENTIAL & INDUSTRIAL COMPLEX
APR 2011 OCT 2016SAUDI ARABIAN OIL CO.
MOHAMED S. AL‐HAKBANITEL 013 876 6330
380,000,585.00
4 CONTRACT NO. 6600026865SHAYBAH NGL INDUSTRIAL SUPPORT FACILITIES JUNE 2011 JULY 2016
SAUDI ARABIAN OIL CO.MOHAMED S. AL‐HAKBANI
TEL 013 876 6330256,855,410.00
5
CONTRACT NO. 6600024662KING ABDULLAH PETROLEUM STUDIES & RESEARCH CENTER (KAPSARC) COMMUNITY HOUSING PROJECT, RIYADH
SEPT 2011 JULY 2012
SK ENGINEERING & CONSTRUCTION
CONT NAME: MR. S. G. KIMCLIENT: SAUDI ARAMCO
22,208,400.00
6
CONTRACT NO. 6600025822KING ABDULLAH PETROLEUM STUDIES & RESEARCH CENTER (KAPSARC) SUPERSTRUCTURE PACKAGE, RIYADH
JAN 2011 JULY 2012DRAKE & SCULL INTERNATIONALCONT NAME: MR. HAITHAM ADI
CLIENT: SAUDI ARAMCO47,000,000.00
7
CONTRACT NO.6600024660KING ABDULLAH PETROLEUM STUDIES & RESEARCH CENTER (KAPSARC) SUBSTRUCTURE PACKAGE AT RIYADH
MAY 2010 JUNE 2012 SAUDI ARABIAN OIL CO.CONT NAME: MR. A. AL‐QAED 161,232,854.00
19
11) List of Projects – Continued
20
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
8 CONTRACT NO.6600021328REPLACE OFFICE BUILDING AT YANBU MAR 15, 2009 JAN 31, 2012 SAUDI ARABIAN OIL CO.
CONT NAME: MR. H.M. MILLIBARI 44,950,000.00
9CONTRACT NO. 6600020863 & 6600020902UPGRADE SECURITY GATEHOUSES AT YANBU, MEDINA & ABHA, JEDDAH
AUG 02, 2008 MAR 31, 2011
SAUDI ARABIAN OIL CO.CONT NAME: MR. FAROUK
SHALABITEL 02 427 0613
74,647,006.00
10AKL‐002AL‐KHOBAR LAKES DEVELOPMENTVILLAGE 1 PHASE C & VILLAGE 2 PHASE B
JULY 2008 ‐ EMAAR MIDDLE EAST LLCCONT. NAME : MR. A. AL‐KHULI 116,300,000
11
CONTRACT NO. BC‐098/2511SUBCONTRACT FOR CIVIL WORKS, EARTH WORKS AND SOIL IMPROVEMENT FOR UPGRADE JGP WASTE WATER AND SPENT CAUSTIC SYSTEM AT JUAYMAH GAS PLANT.
SAUDI ARAMCO CONTRACT NO. 6600018208
FEB. 2008 MARCH 2009
MAIN CONTRACTORARABIAN BEMCO CONTG. COCONT NAME: MR. FAROUK
GHAZIRITEL 02 669 5851
CLIENT: SAUDI ARAMCOMR. HAMAD M. AL SAADI
TEL 677 8743
13,600,000
12
CONTRACT NO. 8410‐ZA‐C04‐KSUBCONTRACT FOR CIVIL WORKS INCLUDING FOUNDATIONS, BUILDINGS, STRUCTURAL STEEL ERECTION AND UNDER GROUND UTILITIES AT HAWIYAH GAS PLANT.
S. ARAMCO CONTRACT NO. 6600015024
JUNE 2006 APRIL 2009
MAIN CONTRACTORTECNICAS REUNIDAS GULF CO.
CONTACT NAME:MR. MODESTO G. BETHENCOURT
TEL 857 5904CLIENT: SAUDI ARAMCO
MR. SAMIR I. AL DHAMEEN
153,700,000
11) List of Projects – Continued
21
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
13
CONTRACT NO. 8396‐ZA‐C04‐KSUBCONTRACT FOR CIVIL WORKS AND STRUCTURAL STEEL, ERECTION OF PIPE RACKS, SUPPLY AND ERECTION OF PRECAST SUBSTATION # 24 AND OME BUILDING AND INSTALLATION OF GRP PIPES AND FITTINGS AT JUAYMAH GAS PLANT.
S. ARAMCO CONTRACT NO. 6600012800
JAN. 2006 DEC. 2008
MAIN CONTRACTORTECNICAS REUNIDAS GULF CO.
CONTACT NAME:MR. CARLOS NAZAR
TEL 857 5904CLIENT: SAUDI ARAMCO
MR. IBRAHIM E. AL DOSSARYTEL 677 8774
64,800,000
14
CONTRACT NO. BC‐069PROCUREMENT OF MATERIAL AND CONSTRUCTION OF CIVIL WORKS FOR BULK PLANTS AT TABUK AND DUBA.
SAUDI ARAMCO CONTRACT NO. 6600012794
‐ DEC. 2006
MAIN CONTRACTORARABIAN BEMCO CONT. CO. LTD.
CONTACT NAME:MR. FAROUK GHAZIRITEL. 02‐667 0092
CLIENT: SAUDI ARAMCO
11,880,000
15
SUBCONTACT UNDER AL OSAIS FORPROCUREMENT AND CONSTRUCTION OF SECURITY GUARDHOUSE UPGRADE –RAS TANURA & TANAJIB.SAUDI ARAMCO CONTRACT # 6600011449
‐ APRIL 2005
MAIN CONTRACTORAL OSAIS
CONTACT NAMEMR. JAMIL KATRIB
CLIENT : SAUDI ARAMCOSAPD/SECUIRTY UPGRADE PROJSATTN : MR. IMAD ABU HIMAD
TEL : 8727542
11,587,000
11) List of Projects – Continued
22
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
16
CONTRACT NO.4363‐001SUBCONTRACT UNDER DUBAIB AND SULAIMCOMPANY PROCUREMENT AND CONSTRUCT HFRECEIVER FACILITY RELOCATION AT MANIFA & HALF MOON BAY. SAUDI ARAMCO CONTRACT NO.6600014112
‐ SEPT. 30, 2006
MAIN CONTRACTORDUBAIB AND SULAIM COMPANY
(DSCO)CONTACT NAME: MR. MAN SING
TEL: 858 1666CLIENT: SAUDI ARAMO
(SA/COMMS. PROJECT SUPPORT GROUP)
ATTN: MR. ABDULAZIZ AL KHALAFTEL: 872 0300
19,200,000
17
CONTRACT NO. 6600006783PROCUREMENT & CONSTRUCTION OF CFC PHASEOUT CHILLER REPLACEMENT PHASE ‐1, DHAHRAN, ABQAIQ, RAS TANURA, UDHAILIYAH
‐ JUNE 2005
SAUDI ARAMCOPD & CD/C&IPS/U & CPU
MR. PIERRE G. BECHARA DIBTEL: 862 5394
32,400,000
18
CONTRACT NO. 6400044729PROCUREMENT AND CONSTRUCTION OF NEW CONTROL, SERVICE AND GENERATOR BUILDINGS AT AIN DAR GOSP‐2,4 & 6
‐ ‐
SAUDI ARAMCOSAPD/S.A. PLANTS PRJ.DIVN.MR.ABDULLA A. AL MULLA
TEL. 03 574 4058
17,935,000
19CONTRACT NO. 6400053110PROCUREMENT AND CONSTRUCTION OF MULTIPURPOSE CENTER, DHAHRAN.
‐ FEB. 2004
SAUDI ARAMCOCOMM. & BLDG. MAINT. DEPT.
MR. YOUSEF AL ALITEL. 872 2753
20,390,000
11) List of Projects – Continued
23
11.2) Completed Projects – ContinuedSN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION
DATE CLIENT'S NAME VALUE OF PROJECT (SR)
20
CONTRACT NO. 6400044684PROCUREMENT AND CONSTRUCTION COMMUNICATIONS, INSTALLATION AND MAINTENANCE (I & M) BUILDING, RAS TANURA
‐ OCT. 2003
SAUDI ARAMCOCR/WR APD COMM. PROJ. DIV
MR. RICHAR LEIGHTONTEL. 862 2661
21,515,000
21CONTRACT NO. 6400044671PROCUREMENT AND CONSTRUCTION OF SURVEYING SERVICE BUILDING AT DHAHRAN
‐ MAY 2003
SAUDI ARAMCOPD & CD/C&IPS/U & CPUMR. ALI A. AL HAMDAN
TEL: 862 5474
20,522,500
22
CONTRACT NO. 44319/00PROCUREMENT AND CONSTRUCTION OF LAB. RESEARCH AND DEVELOPMENT (R & D) CENTER PHASE ‐ 1 ‐ DHAHRAN
‐ DEC. 2000
SAUDI ARAMCOPD & CD/C&IPS/U & CPUMR. FAISAL M. AL TURKI
TEL. 862‐5463
154,557,531
23
CONTRACT NO. 44374/00 & 44375/00ETHANE RECOVERY PLANT (BUILDING FACILITIES)A SUBCONTRACT UNDER AMEC BKW ARABIA LTD FOR CIVIL WORKS
‐ APRIL 2002
MAIN CONTRACTORAMEC BKW ARABIA LTD.
CONTACT NAME: MR. JOHN THOMAS
CLIENT: SAUDI ARAMCONAPD/BERRI NGL RECOVERY
DIVISION
45,000,000
24CONTRACT NO. 44330/00CONSTRUCTION OF SABG BOYS AND GIRLS ELEMENTARY SCHOOLS ‐ SAIHAT
‐ JULY 2000
SAUDI ARAMCOCAPD & CD/C&IPDMR. A.Y. HAMEEDTEL. 862‐5439
31,796,026
11) List of Projects – Continued
24
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE
COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
25CONTRACT NO. 44220/00PROCUREMENT AND CONSTRUCTION OF THE NEW HIGH FREQUENCY TRANSMITTER SITE IN DHAHRAN
‐ AUGUST 1998
SAUDI ARAMCO(CAPD & CD/COMM & INDUST'L
PROJECTS DIV.)MR. ABDULBARI H. MUSALLAM
Tel. 862 5462
21,245,500
26CONTRACT NO. 38747/00RENOVATION OF EAST & WEST ADMINISTRATION BUILDING CONSIST OF TWO FLOORS
‐ MAY 1998
SAUDI ARAMCOCOMMUNITY MAINTENANCE
DEPARTMENTMR. CHARLES W. HENNE
14,903,872
27CONTRACT NO. 45934/00PROCUREMENT AND CONSTRUCTION OF A SINGLE STOREY ONCOLOGY TREATMENT CENTER, DHAHRAN
‐ AUG 1998
SAUDI ARAMCOCAPD & CD/C & IPD
Mr. SAEED AL DABBOUSTel: 862 5456
22,905,032
28
CONTRACT NO. 45983/00DESIGN AND PROVIDE ALL PLANT, TOOLS AND EQUIPMENT, LABOUR SUPERVISION, TECHNICAL AND PROFESSIONAL SERVICES, MATERIALS, SUPPLIED AND ARTICLES AND SHALL PERFORM ALL OPERATIONS INCLUDING TESTING AND COMMISSIONING NECESSARY TO CONSTRUCT A NON‐ DESTRUCTIVE TESTING FACILITY AND RADIATION CONTAINMENT BUILDING AR DHAHRAN
‐ DEC. 1998
SAUDI ARAMCOCAPD & CD/C & IPD
THIS IS A CONSORTIUM PROJECT OF SCADO & JAFFAR M. AL
HAMOOD EST.
MR. KHALID AL GUNAIANTel: 862‐5457
25,127,613
29CONTRACT NO. 45871/00PROCUREMENT AND CONSTRUCTION OF COMMUNICATION BUILDING ‐ RIYADH REFINERY
‐ AUG 1997
SAUDI ARAMCOCAPD & CD/CPD
MR. RICHARD LEIGHTONTEL. 862 2661
9,601,291
11) List of Projects – Continued
25
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
30CONTRACT NO. 45571/00PROCUREMENT AND CONSTRUCTION OF BOYS AND GIRLS INTERMEDIATE SCHOOLS AT SAFWA
‐ OCT. 1997
SAUDI ARAMCOCAPD & CD/C & IPD
MR. HISHAM BUKHARITEL 862 5438
31,780,393
31
CONTRACT NO. 45008/00PROCUREMENT AND CONSTRUCTION OF NEW OFFICE SUPPORT FACILITY BUILDINGS AT ABQAIQ PRODUCING ORGANIZATION ‐ ABQAIQ LIP
‐ MAR 1997
SAUDI ARAMCOCAPD & CD/C & IPDMR. ALLAN WICKLINE
TEL 862 5467
24,912,685
32CONTRACT NO. 37769/00PROCUREMENT AND CONSTRUCTION OF BOYS AND GIRLS ELEMENTARY SCHOOLS AT HOFUF
‐ JAN. 1996
SAUDI ARAMCOCAPD & CD/C & IPD
MR. WALLACE H. COLLYTEL. 03 577 2583
23,650,000
33
CONTRACT NO. 37698/00PROCUREMENT AND CONSTRUCTION OF PERMANENT COMMUNICATION BUILDINGS ALONG EAST/WEST PIPELINE
‐ NOV. 1995SAUDI ARAMCOCAPD & CD/CPDMR. R.R. GALANG
14,500,000
34
CONTRACT NO. 37529/00 & 37530/00PROCUREMENT AND CONSTRUCTION OF BOYS AND GIRLS ELEMENTARY SCHOOLS AT NORTH DHAHRAN
‐ MARCH 1994SAUDI ARAMCOCAPD & CD/CPDMR. F.L. DINNEEN
32,992,280
35 CONTRACT NO. 37711/00COMMUNICATION BUILDING ‐WARIAH AUG 1995 MAY 14,1996
CLIENT: AL QAHTANI‐FISK(SAUDI ARAMCO CENTRAL AREA
PD & C DEPARTMENT)PROJECT ENGINEER: MR. SANJI
SONI
1,529,608
11) List of Projects – Continued
26
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
36PROCUREMENT & CONSTRUCTION OF WAREHOUSE BLDG AND WORKERS FACILITIES AT DAMMAM FIRST INDUSTRIAL AREA.
AUG 1994 APRIL 1995 CLIENT: HEMPEL PAINTS 3,000,000
37 CONTRACT NO.: 37863/00CLASSROOM ADDITIONS ‐ ABQAIQ AND RAHIMA JULY 1994 JULY 1995
SAUDI ARAMCO (CAPD & CD/CPD)MR. SAEED A. AL‐DABBOUS
Tel No. 862‐545611,750,000
38CONTRACT NO.: 37765/00 SABG BOYS ELEMENTARY & INTERMEDIATE SCHOOLS ‐ QATIF
DEC. 1993 JUNE 1995
CLIENT: AL‐KHODARI & SONS(SAUDI ARAMCO CAPD & CD/CPD)
PROJECT ENGINEER: MR. F. L. DINNEEN
6,534,000
39 CONTRACT NO.: 37744/00RECEIVING OFFICE BUILDING ‐ DHAHRAN APR 1994 APR 1995
SAUDI ARAMCO (CAPD & CD/CPD)MR. SALEH A. AL‐BALOOSHI
PROJECT ENGINEERTel. No. 8761537
3,580,000
40 CONTRACT NO.: 37652/00 DEC. 1993 SEP 1994
SAUDI ARAMCO (NAPD & CD/RT APD)
Mr. J.M. AL‐SAHWAN, PROJECT ENGINEER
Tel. No. 673‐3193
3,315,000
41 CONTRACT NO.: 37632/00SABG BOYS ELEMENTARY SCHOOL ‐ DAMMAM NOV. 1993 APR 1994
SAUDI ARAMCO (CAPD & CD/COMMUNITY PROJECTS
DIVISION)MR. ALI H. AL SAID,PROJECT
ENGINEERTel. No. 873‐8274
575,000
11) List of Projects – Continued
27
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
42 CONTRACT NO.: 37774/00CLASSROOM ADDITIONS – SAFWA AND DOHA DEC. 1994 JAN 1995
SAUDI ARAMCO (CAPD & CD/CPD)MR. TARIQ M. AL‐HAJRI
Tel. No. 873‐76009,444,000
43CONTRACT NO.: 37498/00PERMANENT COMMUNICATION BUILDING –UTHMANIYAH & SHEDGUM
JUN 1992 OCT 1993
SAUDI ARAMCO(CSPD/ COMMS. PD & C DIVISION)
MR. W.A. CONNER, Tel. No. 8274448
11,200,000
44 CONTRACT NO.: 37451/00SABG GIRLS SECONDARY SCHOOL ‐ QATIF MAR 1992 JAN 1994
SAUDI ARAMCO (CAPD & CD/COMMUNITY PROJECTS
DIVISION)MR. MOHAMED A. AL‐
ABDULKARIMPROJECT ENGINEERTel. No. 8765166
5,625,000
45 CONSTRUCTION OF NALCO LABORATORY BUILDING ‐ DAMMAM MAR 1992 OCT 1992
NALCO SAUDI CO. LTD. (PMT ‐ KING WILKINSON (S.A.)
LTD.)NALCO ‐ CONTACT NAME:MR. JOHN K. JACKSON
K.W (S.A) LTD. ‐ CONTACT NAME: MR. MICK PICTON
2,621,000
46CONTRACT NO.: 37478/00COMMUNICATION BUILDING ‐ RAS TANURA TERMINAL
MAR 1992 MAR 1993
SAUDI ARAMCO (CSPD/ COMMS. PD & C DIVISION)
MR, ROMEO R. GALANGTel. No. 8721365
3,980,000
11) List of Projects – Continued
28
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
47CONTRACT NO.: 37426/00SEWAGE LIFT STATION & WATER CHLORINATION FACILITY ‐ SAFWA
OCT 1991 AUG 1992
SAUDI ARAMCO (CAPD & CD/COMMUNITY & MEDICAL
PROJECTS DIVISION)Mr. S. A. AL‐DABBOUSTel. No. 876‐5114
5,012,000
48 CONTRACT NO.: 37402/00SEWAGE PUMP STATION ‐ ABQAIQ AUG 1991 JUN 1992
SAUDI ARAMCO (CAPD & CD/COMMUNITY PROJECTS
DIVISION)MR. KHALED AL‐SHEHAB
PROJECT ENGINEERTel. No. 874‐0125
3,445,000
49
CONTRACT NO.: 43099/00CONSTRUCTION OF NEW PASSENGER TERMINAL, GUARD HOUSE AND OBSERVATION TOWER AT TANAJIB AIRSTRIP.
JULY 1991 MAR1992
SAUDI ARAMCO (AVIATION DEPT / Ground SUPPORT OPERATION
DIVISION)MR. FAHAD AL‐BAADITel. No. (03) 8774717
2,867,000
50
CONTRACT NO.: 37285/00MAGNETIC RESONANCE IMAGER BUILDING (MRI) ‐ DHAHRAN OCT 1990 JULY 1991
SAUDI ARAMCO (CAPD & CD/IPD)Mr. A.A. AL‐GHAMDIPROJECT ENGINEERTel. No. (03) 876‐6036
4,200,000
51
CONTRACT NO.: 37243/00INFRASTRUCTURE SUPPORT FACILITES AND GOVERNMENT SECURITY POST BUILDINGS AT PUMP STATION NO. 5, 6, 7 & 8 @ EAST/WEST PIPELING.
MAY 1990 JAN 1992
AL‐KHODARI & SONS SAUDI ARAMCO (SAPD & C/IYEC
UNIT)PROJECT ENGINEER:
Mr. AHMED AL MOHSEN
17,399,400
11) List of Projects – Continued
29
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
52 CONTRACT NO.: 37268/00COMMUNICATION BUILDING ‐ PUMP STATION # 1
MAY 1990 JAN 1991
SAUDI ARAMCO (CSPD/TEL., OSP PROJS. DIV.)
PROJECT ENGINEER: MR. ROMEO GALANG
970,000
53
CONTRACT NO.: 37111/00 COMPLETION OF TWO GARDENS AND THREE PARKING LOTS AT WEST KHOBAR
NOVEMBER 1989 OCTOBER 1990
SAUDI ARAMCO CAPD & CD/CAPDPROJECT ENGINEER:
MR. ABDUL BARI MUSALLAM Tel. No. 8737824
2,509,000
54CONTRACT NO.: 37104/00SABG BOYS INTERMEDIATE SCHOOL ‐ DAMMAM OCTOBER 1989 OCTOBER 1990
AL‐OSAIS TRAD. & CONT.(SAUDI ARAMCO CAPD/
ABGS PROJS. DIV.) PROJECT ENGINEER:
M.A. AL‐ABDUL KARIMTel. No. 8765166
1,450,000
55CONTRACT NO.: 37197/00MODIFY LITHOTRIPSY ROOM ‐ DHAHRAN HEALTH CENTER
MAY 1989 AUGUST 1989
SAUDI ARAMCO , CAPD & CD/IPDPROJECT ENGINEER: Mr. A.A. AL‐GHAMDITel. No. 8766036
460,000
56CONTRACT NO.: 37174/00UPGRADE & RENOVATE NORTH ADMINISTRATION BUILDING AND BUILDING 510 ‐ DHAHRAN
MARCH 1989 MARCH 1990
SAUDI ARAMCO CSPD/TEL. OSP & FACILITIES PROJECTS DIVISION
PROJECT ENGINEER: Mr. S.M. AL‐GHAMDI
2,488,000
57 CONTRACT NO.: 29542/00SABG BOYS ELEMENTARY SCHOOL ‐ SAFWA JULY 1988 MARCH 1990
AL‐KHODARI & SONS(SAUDI ARAMCO CAPD & CD/CPD)ARAMCO PROJECT ENGINEER:
MR. K.S. AL‐BESHRI
3,930,000
11) List of Projects – Continued
30
11.2) Completed Projects – Continued
SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE COMPLETION DATE CLIENT'S NAME VALUE OF
PROJECT (SR)
58 CONTRACT NO.: 29543/00SABG BOYS ELEMENTARY SCHOOL – RAHIMA JULY 1988 MARCH 1990
AL‐OSAIS CONT. & TRADING EST.(SAUDI ARAMCO CAPD & CD/CPD)ARAMCO PROJECT ENGINEER:
MR. A.A. AL‐NAZER
1,000,000
59 CONTRACT NO.: 29541/00SABG BOYS SECONDARY SCHOOL ‐ DAMMAM JUNE 1988 DECEMBER 1989
AL‐KHODARI & SONS(SAUDI ARAMCO CAPD & CD/CPD) ARAMCO PROJECT ENGINEER: MR.
RASHEED AL KHALDITel. No. 8743964
7,328,000
60
CONTRACT NO.: 26350/00UPGRADE AND RENOVATE ENGINEERING BUILDING BASEMENT FOR TELECOMMUNICATION EQUIPMENT ‐ DHAHRAN
JANUARY 1988 JULY 1988
SAUDI ARAMCO NAPD/COMM & SCADA PROJECTS DIVISION
PROJECT ENGINEER: MR. RAFIQUE M. JAD
Tel. No. 8734164
1,174,000
61CONTRACT NO.: 29553/00SABG BOYS ELEMENTARY SCHOOL – NORTH DHAHRAN
MARCH 1988 AUGUST 1988
AL‐OSAIS CONT. & TRADING EST.(SAUDI ARAMCO CAPD/ABGSPD)ARAMCO PROJECT ENGINEER Mr.
H.I. AL‐HUSSAINTel. No. 8738195
980,000
62CONTRACT NO.: 37048/00SABG BOYS & GIRLS ELEMENTARY SCHOOL ‐RAHIMA
AUGUST 1988 JUNE 1989
AL‐OSAIS CONT. & TRADING EST.(SAUDI ARAMCO CAPD/ABGSPD)ARAMCO PROJECT ENGINEER: Mr.
A.A. Al‐NazerTel. No. 6736883
2,775,000
TOTAL COMPLETED PROJECTS VALUE: 2,075,254,326
11) List of Projects
31
11.2) Completed Projects – Continued
• Project’s Name: Shaybah NGL RIC Bldg. 224• Contract Value: 65,919,025.59 SAR
11) List of Projects – Continued
32
11.2) Completed Projects – Continued
• Project’s Name: A Mid‐Form Contract at Wasit Industrial Support Facilities under Purchase Order No. 6510742008. Contract Value is 4,417,340.08 SAR.
11) List of Projects – Continued
33
11.2) Completed Projects – Continued
• Project’s Name: Shaybah NGL Residential & Industrial Complex (RIC)• Contract Value: 380,000,585.00 SAR
11) List of Projects – Continued
34
11.2) Completed Projects – Continued
• Project’s Name: Shaybah NGL Industrial Support Facilities (ISF)• Contract Value: 256,855,410.00 SAR
11) List of Projects – Continued
35
11.2) Completed Projects – Continued
SPANISH TYPE
• Project’s Name : Al‐Khobar Lakes Development Village‐1 Phase C and Village‐2 Phase B• Contract Value: 116,300,000.00 SAR
ARABIC TYPE
11) List of Projects – Continued
36
11.2) Completed Projects – Continued
Project’s Name:• KAPSARC Substructure Project – Saudi Aramco under Contract No.6600024660. Project Value is 61,232,854.00 SAR
whereas Gulf Elite’s scope is construction and building the Substructure of the Research and Office Complex.• KAPSARC Superstructure Project – Subcontract at Drake and Scull (DSI) under Saudi Aramco Contract No. 6600025822.
Project Value is 47,000,000 SAR whereas Gulf Elite’s scope is construction of buildings structural concrete works.
11) List of Projects – Continued
37
11.2) Completed Projects – Continued
SAUDI ARAMCO R&D DHAHRANPROJECT UNDER JAFFAR AL‐HAMOOD
SAUDI ARAMCO BOYS & GIRLS ELEM. SCHOOLSAIHAT PROJECT UNDER JAFFAR AL‐HAMOOD
12) Government Registration Documents
38Commercial Registration (CR)
12) Government Registration Documents – Continued
39Chamber of Commerce
12) Government Registration Documents – Continued
40GOSISAUDIZATION CERTIFICATE
Zakat Certificate
12) Government Registration Documents – Continued
41
VAT Certificate
12) Government Registration Documents – Continued
42
12) Government Registration Documents – Continued
43
Municipality License
13) ISO Certificate
44
14) Awards:
45
14) Awards:
46
14) Awards:
47
14) Awards:
48
49
END