Guide Booklet FLOORING
-
Upload
devinder-sokhi -
Category
Documents
-
view
216 -
download
0
Transcript of Guide Booklet FLOORING
-
8/6/2019 Guide Booklet FLOORING
1/15
STANDARD
FLOORING DETAILSguide
-
8/6/2019 Guide Booklet FLOORING
2/15
FlorLine ooring system1/4" wide
1/4" deep
Sawcut terminationExisting concrete substrate
TypIcAL LEADING EDGE TERmINATION DETAIL
FOR mORTAR FLOORING SySTEmSN.T.S.
FlorLine ooring systemMin. 3"
1/2" deep sawcut
Sawcut terminationExisting concrete substrate
Chip concrete back
rom 1/4" depth over
3" or transition Exist. concrete oor
or other fnish
TypIcAL LEADING EDGE TERmINATION
DETAIL FOR SELF LEvELING AND LAmINATE
FLOORING SySTEmSN.T.S.
-
8/6/2019 Guide Booklet FLOORING
3/15
TypIcAL TERmINATION DETAIL FOR mORTAR
AT NOSE ANGLE IRON AT LOADING DOck OR
buILDING jOINT (FoR heAvy TRAFFic uSeS)N.T.S.
Embedded nosingangle iron
Min. 6"
FlorLine ooring systems1/2"sawcut
Existing concrete substrate
Chip concrete back
rom 1/4" depth over6" or transition
TypIcAL TERmINATION DETAIL FOR mORTAR
& LAmINATE AT cIRcuLAR FLOOR DRAINN.T.S.
Note: Chip concrete back rom deep at embedded drain
up to prepared surace over minimum o 3 to orm transition
FlorLine ooring system
1/2" deep
Cast-in-place
circular oor drain
Chip concrete back rom 1/2"
depth over 3" or transition
Min. 3"
1/2" deep sawcut
(laminate ooring*)
Existing concrete substrateThis same detail should be used or terminations o ooring
systems at steel plate embedded in concrete slabs.
*This same detail should be used or sel leveling and laminate
ooring systems except with sawcut to be 1/4" deep.
-
8/6/2019 Guide Booklet FLOORING
4/15
TypIcAL LAmINATE AND mORTAR FLOORING
DETAIL TREATmENT FOR bRIDGING muLTIpLE
hAIRLINE cRAckSN.T.S.
TypIcAL LAmINATE & mORTAR FLOORING DETAIL
TREATmENT FOR bRIDGE muLTIpLE hAIRLINE
cRAckSN.T.S.
Abrade or shotblast deeper (20-40 mils) 2 each side o isolated cracks,
prime and apply exible underlayment in this area and install ooring
system over this area.
FlorLine ooring system
2"
Fiberglass cloth reinorced
2"
FlorLine ooring systemFlexible underlayment
30-40 mils
Cracks Existing conrete substrate
Abrade or shotblast deeper (20-40 mils) 2" each side o isolated cracks,
prime and apply exible underlayment in this area and install ooring
system over area.
For ooring with isolated cracks where no evidence o crack move-
ment o settlement in oor occurs on either side o crack and where
oor not exposed to drastic thermal change.
Use 30-40 mils as exible underlayment to bridge hairline cracks in
oors where no evidence o settlement and where oor not exposed to
drastic thermal change.
Existing conrete substrate
-
8/6/2019 Guide Booklet FLOORING
5/15
TypIcAL LAmINATE AND mORTAR DETAIL
TREATmENT FOR mOvING cRAckSN.T.S.
FlorLine ooring system
1/8" deep sawcut
Chip concrete back rom 1/2"
depth over 3" total or transition
1 1/2"
1/2" deep
sawcut
1 1/2"
Treat cracks that are 1/16 wide or wider and cracks that show evidence
o movement (open) or dierential movement with this detail.
Existing conrete substrate
-
8/6/2019 Guide Booklet FLOORING
6/15
TypIcAL SEcTION EXISTING SAWcuT cONTROL
jOINT N.T.S.
Sawcut control joint
1/3" depth o slab
or 1 1/2" minimum
Existing conrete substrate
FlorLine mortar ooring system
Flexible joint sealant
mark joint location or
re-sawcutting
1/2" deep sawcut
Existing conrete substrate
For light vehicular trafc applications install oor over control joint,
allow to cure, then sawcut and fll with exible joint sealant.
A
ALTERNATE mEThODS OF TREATmENT
A, b OR c TypIcAL DETAIL TREATmENT FOR
cONTROL jOINTS N.T.S.
-
8/6/2019 Guide Booklet FLOORING
7/15
b Flexible joint sealant
1/2" deep sawcut
FlorLine nosing material
FlorLine mortar ooring system
Min. 1/2"
1/4" sawcut
Existing conrete substrate
c
For very light vehicular trafc applications or heavy oot trafc only, abrade or shotblast deeper on each side o joint (30-40 mils
deeper), install @ 30-40 mils and install ooring system. Tape reinorcing can be used as an option to increase tensile strength o
the oor system over the joint.
ALTERNATE mEThODS OF TREATmENT
A, b OR c TypIcAL DETAIL TREATmENT FOR
cONTROL jOINTSN.T.S.
For heavy vehicular trafc conditions, build nose detail by chipping concrete out to 1/2" depth at joint back 1 1/2" min. to 1/4"
deep sawcut on both sides o joint, install nosing material, install ooring system, resawcut joint 1/8" wide to 1/2" depth and fll
sawcut with exible joint sealant.
FlorLine mortar ooring system
1/4" deep sawcut
Filler as required
4" min.
Existing conrete substrate
-
8/6/2019 Guide Booklet FLOORING
8/15
-
8/6/2019 Guide Booklet FLOORING
9/15
ALTERNATE mEThODS OF TREATmENT
(cONTROL jOINT) A AND b TypIcAL DETAIL FOR
SELF LEvELING AND LAmINATED SySTEmSN.T.S.
b
For very light vehicular trafc applications or heavy oot trafc only, abrade or shotblast deeper on each
side o joint (30-40 mils deeper), install @ 30-40 mils and install ooring system. Tape reinorcing can be
used as an option to increase tensile strength o the oor system over the joint.
FlorLine ooring system
1/4" deep sawcut
Series 207
4" min.
Existing conrete substrate
Flexible joint sealant
-
8/6/2019 Guide Booklet FLOORING
10/15
Rebar Joint
Existing concrete substrate
TypIcAL EXISTING cONSTRucTION jOINTSN.T.S.
Joint
Existing concrete substrate
Alternate methods or treatment o construction joints should be the
same as control joints. Use methods A or B or consult with FlorLine
technical service or urther technical advice.
-
8/6/2019 Guide Booklet FLOORING
11/15
TypIcAL DETAIL TREATmENT FOR
mORTAR AT cONSTRucTION jOINTSN.T.S.
FlorLine ooring system
1/4" deep sawcut
Chip concrete back
rom 1/2" depth over3" total or transition
1 1/2" each side
1/2" deep sawcut
1 1/2"
1/8" deep sawcutto keep chase strait
RebarExisting
concrete
substrate
This same detail should be installed at isolation except where occur
between oor slabs and walls, curbs, equipment bases etc.
CL
-
8/6/2019 Guide Booklet FLOORING
12/15
FlorLine ooring system
Backer rod and
exible joint sealant
Existing concrete substrate
Concrete or
CMU wall, etc.
Existing isolation joint material
TypIcAL ISOLATION jOINT TREATmENT FOR
LAmINATE AND mORTAR AT WALL/FLOOR
juNcTION WhERE NO cOvE bASE REquIREDN.T.S.
-
8/6/2019 Guide Booklet FLOORING
13/15
FlorLine ooring system
Install joint board material
Existing concrete substrate
Concrete or
CMU wall, etc.
Existing isolation joint material
Install cant or cove*
rolled radius cove base
*Once cove base cured, cut jointboard o 1 below top o cove
base and install backer rod and
exible joint sealant.
FlorLine ooring system
Backer rod and
exible joint sealant
Existing concrete substrate
Concrete or
CMU wall, etc.
Existing isolation joint material
Joint board
Rolled radius cove base
TypIcAL ISOLATION jOINT TREATmENT FOR
LAmINATE AND mORTAR AT WALL/FLOOR
juNcTION WhERE cOvE bASE REquIREDN.T.S.
-
8/6/2019 Guide Booklet FLOORING
14/15
-
8/6/2019 Guide Booklet FLOORING
15/15
www.forline.com 1-800-452-2098