HSE PRESENTATION
ON
GTC/546/2012
Detailed Inspection & Overhauling of On Load Tap Changers(OLTC) Of MR Make
Presented by Al Hamad Trading Electro-Mechanical Division
![Page 3: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/3.jpg)
INTRODUCTION
Head Of HSE Department –Sam Femi
•B.Eng Electrical/Electronics Engineering•NEBOSH IGC Certified•OSHA Safety Specialist Certified•IOSH MS Certified•Fire Risk Management Certified by ALARP
Safety Engineer
![Page 4: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/4.jpg)
INTRODUCTION
Assisted by HSE Officer – Benjamin Imam-Datu
•NEBOSH IGC Certified•IOSH MS•IOSH WS•OSHA
![Page 5: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/5.jpg)
AL Hamad Trading is
ISO 9001
ISO 14001
OHSAS 18001
CERTIFIED
![Page 6: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/6.jpg)
ISO 9001:2008 CERTIFICATE
![Page 7: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/7.jpg)
ISO 14001:2004 CERTIFICATE
![Page 8: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/8.jpg)
OHSAS 18001:2007 CERTIFICATE
![Page 9: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/9.jpg)
Quality Management SystemISO 9001
We apply ISO 9001 for quality management so as to;
ensure that our products and services satisfy the customer's quality requirements
comply with any regulations applicable to those products or services.
enhance customer satisfaction, and achieve continual improvement of our
performance
![Page 10: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/10.jpg)
Environnemental Management System- ISO 14001
We apply ISO 14001:2004 for environmental management. That means:
We minimize harmful effects on the environment that could be caused by our activities,
We conform to applicable regulatory requirements, and
achieve continual improvement of our environmental performance.
![Page 11: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/11.jpg)
OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM-OHSAS 18001
We apply OHSAS 18001 to our OH&S management system in the following ways;
Using a proactive system approach Identify regulatory requirements –
compliance to local and national laws. Identify hazards and risks – pertinent to our
work activities Manage risks – introduce controls to manage
risks to as low as reasonably practicable (ALARP).
![Page 12: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/12.jpg)
OUR HSE POLICY
Al Hamad Trading is dedicated to the concept that all accidents are preventable and committed to a zero accident philosophy whilst fostering a culture of continuous improvement of our safety, health and environmental duties
![Page 13: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/13.jpg)
Adopted Laws And Regulations
Several relevant Laws and regulations, both local and international, will be considered and ensured that all workers are aware of, before entering into the substation. These laws include;
![Page 14: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/14.jpg)
Relevant National and International Laws applicable
to the project1. Part 10 of the Qatar Labour Law contains a range of
health and safety related obligations, requiring an employer to:
Provide employees with information concerning the precautionary measures that have been put in place to protect them from work-related injury or disease.
Inform employees at the start of their employment about any occupational hazards.
Provide employees with first aid facilities. That the workplace is safe for employees. That safe systems for work are in place.
![Page 15: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/15.jpg)
Relevant National and International Laws applicable to
the project
2. Section 17 of Qatar Foundation Mandatory standard on Health and Safety17.1 Health & Safety
Contractors shall adhere to the mandatory standards for Health, Safety, Security & Environment as stated in the QF Health, Safety, Security and Environmental (HSSE) Standards for Construction.
![Page 16: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/16.jpg)
3.The LawHealth and Safety at Work Act 1974
It shall be the duty of every employee while at work:-
A) To take reasonable care for the health and safety of himself and of other persons who may be affected by his acts or omissions at work; and
B) As regards any duty or requirement imposed on his employer or any other person by or under any of the relevant statutory provisions, to co-operate with him so far as is necessary to enable that duty or requirement to be performed or complied with.
![Page 17: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/17.jpg)
4. The Law Electricity at Work Regulations 1989
Regulation 16Persons to be competent to prevent danger
and injury
“No person shall be engaged in any work activity where technical knowledge or experience is necessary to prevent danger or, where appropriate, injury, unless he possesses such knowledge or experience, or is under such degree of supervision as may be appropriate having regard for the nature of the work.”
![Page 18: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/18.jpg)
5.General Safety Rules by Kahramaa
The Safety Rules shall be strictly followed by all persons working on KM electricity network and assets. Ignorance of these rules will not be accepted as an excuse for negligence of duty.
Safety Policy mandates the following:
(i) Comprehensive Safety Rules, Procedures and Code of Practice relating to particular activities are issued from time to time for implementation in KM network. These policy documents must be followed by all the staff and by the Contractor’s representative working at KM sites.
(ii) In designated areas of particular hazard, competent persons who have authorization will be required to satisfy themselves that all necessary safety precautions have been carried out before authorizing the commencement of work.
![Page 19: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/19.jpg)
6.Qatar Law of Environment Protection
Law No. (4) of 1983 concerning Exploitation and Protection of Aquatic Life in Qatar provides that any plant, laboratory and factory waste, sewage water, chemical and petroleum substances, ship oils, and any other liquids that may cause harm to aquatic life may not be discharged into fishing water or internal water without the written approval of the competent department
![Page 20: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/20.jpg)
Entering High Voltage Substations
Hence, the possible hazards and risks will be considered and made known to workers as follows;
Pre-task briefing and assessment will be done to ensure that only workers that have proven to be aware of all safety precautions and safe working methods are admitted to the substation; and
Tool box talk will be conducted before every activity
![Page 21: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/21.jpg)
Hazards and Risks in the Project
To effectively control the resulting risks from the hazards inherent in this project, a risk assessment form approved by KM has been prepared based on our method statement
![Page 22: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/22.jpg)
Risk Assessment is prepared following these points from our
method statement Preliminary Check Tap Changer diverter switch withdrawal Cleaning of Oil compartment Tap changer diverter switch Tap changer protective device Motor drive Driveshaft Final Check
![Page 23: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/23.jpg)
Risk Assessment FormSample
![Page 24: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/24.jpg)
Safety Measures to prevent Risks arising from the Project
![Page 25: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/25.jpg)
General Observation
Before work commences, it will be ensured that; The transformer is shut down (to be confirmed
by the responsible person) There is no live apparatus There is clear and unobstructed access to the
working area The surrounding of the transformer is well
secured There are no hanging cables, trenches or
uncovered openings
![Page 26: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/26.jpg)
Electrocution
Our works are mainly mechanical except while working on the motor drive. However, to prevent electrocution, we shall take the following measures
![Page 27: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/27.jpg)
Permit To Work (PTW)
![Page 28: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/28.jpg)
Prevention Of Electrocution
Lockout Tag out- LOTO
LOTO will be applied under the supervision of, and responsibility of KM before work commences to prevent unauthorized discharge of electrical energy
![Page 29: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/29.jpg)
Fall from Height
![Page 30: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/30.jpg)
Working at height
Suitable ladders will be used along with body harnesses hooked to the crane to prevent fall from height
![Page 31: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/31.jpg)
Working at height
The stability of the foundation for attaching body harness will be ensured before being used for harnessing.
![Page 32: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/32.jpg)
Working at height
![Page 33: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/33.jpg)
Working under direct sunlight
![Page 34: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/34.jpg)
The effects of working under direct sunlight will be prevented by providing a canopy
![Page 35: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/35.jpg)
Portable Water for hydration of workers
![Page 36: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/36.jpg)
Electrolytes
Electrolyte drinks will also be provided
![Page 37: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/37.jpg)
Additional Safety Measures
Only trained operators will use power-actuated tools
![Page 38: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/38.jpg)
No flaring, unprotected light or naked fire will be allowed on site
Additional Safety Measures
![Page 39: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/39.jpg)
Non Sparking (i.e. anti static) tools shall be used
Additional Safety Measures
![Page 40: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/40.jpg)
Cable connections on ground will be avoided as much as possible. Where it is inevitable, cable protectors will be used to prevent trip and fall.
Additional Safety Measures
![Page 41: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/41.jpg)
In case of day light shut off, adequate lighting will be made ready for proper illumination e.g. IP65 halogen light
Additional Safety Measures
![Page 42: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/42.jpg)
Our Dedicated Vehicle containing our Filtration Plant and Generator Set will be parked in the substation.
SPECIAL PURPOSE VEHICLE
![Page 43: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/43.jpg)
SPECIAL PURPOSE VEHICLE
The Vehicle will be parked in a location within the substation till the end of the project for the following reasons;
To prevent delay or time lost in moving to and from our workshop and substation
To avoid accidental damage to, or loss of the equipments and other materials to be kept in it
To avoid violating the traffic rule that stipulates specific movement period for heavy duty vehicles
Hence, it’s position will be marked out with warning tapes and signs for good visibility.
![Page 44: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/44.jpg)
Site Security
Access to the project will be restricted to employees of AHT and/or any other authorized Personnel
![Page 45: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/45.jpg)
Site Security
To prevent unauthorized entry, a gate pass, issued by KM will be used in admitting workers to the site
![Page 46: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/46.jpg)
Site Security
In addition, a passport is designed by Al Hamad Trading HSE department for identifying our workers and for other security issues
![Page 47: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/47.jpg)
Site Security
NOTE: In case of other contractor(s) present at the project site, we’ll ensure that there is a document from KM ensuring us that such contractor(s) has/have met the required safety standard to work safely and for cordiality in the substation.
![Page 48: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/48.jpg)
Emergency Response ProcedureAny emergency or dangerous occurrences and accidents on KM network shall be reportedimmediately to the System Control Engineer.Also, there is an emergency response procedure in place (especially in a situation where he can not be reached) for safe evacuation and protection of lives and propertyHere are few numbers to be contacted in such situations
![Page 49: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/49.jpg)
Emergency Response Procedure
EMERGENCY PHONE NUMBERS
POLICE
FIRE 911
AMBULANCE
KM Service Center 991 Hamad General Hospital 44394444 Al Hamad Trading HSE Dept
50411828, 30024481
NCC 9995
DGCC 9996
![Page 50: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/50.jpg)
Emergency Response ProcedureIn Addition to the plans, it will be
ensured that; The project site address is well
known by all team members A dedicated phone will be provided
for emergency cases only Also, our team memebers are trained
in basic life support and basic fire fighting to administer first aid in case of accident or fire emergency respectively, before help arrives.
![Page 51: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/51.jpg)
Emergency Response Procedure
Also, two members of the service team are designated as fire marshals. At least, one of them will be on site to coordinate the emergency response plans.
![Page 52: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/52.jpg)
Emergency Response Procedure
We will provide our fire extinguishers in addition to those provided by KM or in case they are not provided. They will be constantly checked to ensure they are in proper condition.
![Page 53: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/53.jpg)
PPEPersonal Protective Equipments will be used to prevent any other risks that could arise from hazards that cannot be eliminated.
![Page 54: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/54.jpg)
Hard hat
![Page 55: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/55.jpg)
Coverall
![Page 56: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/56.jpg)
Safety Hand Gloves
![Page 57: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/57.jpg)
Safety Shoes
![Page 58: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/58.jpg)
Safety Eye Glasses
![Page 59: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/59.jpg)
Signage's and Warnings
![Page 60: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/60.jpg)
Waste Management
Waste bags; for collecting the cotton wastes to ensure proper disposal.
![Page 61: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/61.jpg)
Waste Management
Spill kits will be made available to prevent oil spillage
![Page 62: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/62.jpg)
Waste Management
Also, oil drums will be used for collecting drained oils from the transformer and kept away from the work area. The drums will be returned to KM stores for proper disposal
![Page 63: GTC546 HSE PPT](https://reader036.fdocuments.us/reader036/viewer/2022081502/55b760d9bb61ebf20e8b47f2/html5/thumbnails/63.jpg)
Conclusion
This HSE presentation has be prepared following all applicable regulations and standards and it will be strictly followed from commencement till the end of this project. Hence, we can say that the project will be carried out safely as much as possible.