GTBD Forecasting
Using SCED to Produce Projections of Future LMPs
Floyd J. TrefnyFebruary 17, 2011
Topics
ERCOT System Load Examples Sunday, January 30, 2011 Thursday, February 3, 2011
GTBD Forecasting Methodology Analysis of Forecasting Errors Implementation in SCED Next Steps
-80
-60
-40
-20
0
20
40
60
80
20000
22000
24000
26000
28000
30000
32000
34000
36000
LoadJanuary 30, 2011
System Load Mw/MinAverage Mw Change in Mw/Min over 15-minute SCED interval
-75
-50
-25
0
25
50
75
420004400046000480005000052000540005600058000
LoadFebruary 3, 2011
System Load Mw/Min
Average Mw Change in Mw/Min over 15-minute SCED interval
GTBD Forecasting Methodology
GTBD (Generation To Be Dispatched) is the sum of the Base Points dispatched in SCED
Typically, calculated by summing up the current actual generation from all the Generation Resources that are going to be dispatched by SCED
SCED LMPs are based on this amount of total power A reasonable forecast of future GTBD can be calculated
from: System ramp rate sampled over the last fifteen minutes
Ramp rate may be positive or negative
Add: Real-Time SCED GTBD + (Ramp Rate*15) gives the “Forecasted GTBD”
System Load* Projection Error Analysis
Interval Average
GTBD
15 Minute Load Change
Mw/Min
15 - Min Load
Projection Error % Error
0 23,229 15 23,458 na na15 23,625 35 24,145 167 0.7%30 23,834 20 24,130 (311) -1.3%45 24,104 18 24,373 (27) -0.1%60 24,391 9 24,521 18 0.1%15 24,765 14 24,977 244 1.0%30 24,722 -3 24,679 (255) -1.0%45 24,960 16 25,199 282 1.1%60 25,262 20 25,563 63 0.2%15 25,815 36 26,362 251 1.0%30 26,200 26 26,585 (162) -0.6%45 26,602 27 27,005 17 0.1%60 26,817 14 27,031 (188) -0.7%
*- Load s tarting at 0600 on 1/30/2011
-80
-60
-40
-20
0
20
40
60
80
20000
22000
24000
26000
28000
30000
32000
34000
36000
LoadJanuary 30, 2011
System Load Mw/Min
System Load* Projection Error Analysis
Interval Average
GTBD
15 Minute Load Change
Mw/Min
15 - Min Load
Projection Error % Error
0 51,541 53 52,332 na na15 52,651 74 53,760 319 0.6%30 53,399 50 54,147 (362) -0.7%45 53,923 35 54,447 (224) -0.4%60 54,369 30 54,814 (79) -0.1%15 54,901 35 55,433 87 0.2%30 54,573 -22 54,246 (860) -1.6%45 54,276 -20 53,978 30 0.1%60 54,257 -1 54,239 280 0.5%15 54,260 0 54,262 21 0.0%30 54,335 5 54,410 73 0.1%45 54,426 6 54,518 16 0.0%60 54,632 14 54,837 114 0.2%
*- Load s tarting at 0600 on 2/3/2011
-75
-50
-25
0
25
50
75
420004400046000480005000052000540005600058000
LoadFebruary 3, 2011
System Load Mw/Min
Implementation in SCED In addition to the existing SCED, execute the same
SCED algorithm once at the top of each 15-Minute period, but using the Forecasted GTBD
Use same offer curves, Resource Limits and Status that were available to SCED for the actual dispatch of generation
Assume that the same transmission constraints that are active in real time SCED are also active in the Forecast SCED calculation
Provide via ICCP and post on MIS, the LPM’s generated for:
Resource Nodes Hubs Load Zones (LMPZ) Generation
Load
HUB
SUPERHUBHUB
HUB
HUB
Next Steps
Get Comments from ERCOT Staff Draft NPRR WMS Discussion Seek expedited implementation to support
Quick Start objectives and demand response
Discussion