GSI Unit Design Review Contacts -...
-
Upload
truongkiet -
Category
Documents
-
view
227 -
download
1
Transcript of GSI Unit Design Review Contacts -...
February 2018 1
GSI Unit Design Review Contacts All Green Stormwater Infrastructure or Environmental Restoration Group designs, once approved by PWD, must be submitted to the following agencies and groups for review. The PWD project manager must be copied on all submissions by Provider. GSI on water and sewer projects must also be reviewed by the agencies listed in the PWD Water & Sewer Design Manual. Depending on the project, review may be required by other agencies that are not listed. Unique partner and pilot projects may have additional review requirements. PWD project manager can provide guidance. All conflicts arising from reviews should be resolved prior to Plans, Specifications, and Estimate (PWD 90%) submission.
Reviewer Applies to Time of Submission
Submission Requirements
Submitted By
Contact Notes
Guaranteed Pavement Information System (GPIS)
Projects that impact public right-of-way
Project is given final approval (consultant design), Substantially Complete Design (in-house design)
None PWD N/A PWD submits project to GPIS.
Pennsylvania Department of Environmental Protection (PADEP) NPDES
Projects that disturb over 1 acre
PWD approves Substantially Complete Design
See requirements at: www.elibrary.dep.state.pa.us/dsweb/HomePage Start with email to PADEP requesting determination about applicability.
Provider
Attn: Christopher Smith Civil Engineer Manager Construction Permits Section PA Department of Environmental Protection 2 East Main Street Norristown, PA 19401 Phone: 484-250-5152 Fax: 484-250-5971 Email: [email protected]
PADEP may determine that PWD GSI projects are exempt from NPDES. Determination made on case-by-case basis by PADEP.
Note on Access Permits: For projects on Philadelphia Parks & Recreation, School District of Philadelphia, or SEPTA property, right-of-entry
authorization and permits are required for on-site access.
GSI Unit Design Review Contacts
February 2018 2
Reviewer Applies to Time of Submission
Submission Requirements
Submitted By
Contact Notes
Pennsylvania Department of Environmental Protection (PADEP) Chapter 105
Projects that include disturbance within the floodplain
PWD approves Substantially Complete Design
See requirements at: http://www.elibrary.dep.state.pa.us/dsweb/View/Collection-9531S Schedule a pre-application meeting at 30%
Provider
Attn: Domenic Rocco PA Department of Environmental Protection 2 East Main Street Norristown, PA 19401 Phone: 484-250-5160 Fax: 484-250-5971 Email: [email protected]
Review can take 93 days.
Pennsylvania Department of Environmental Protection (PADEP) Dam Safety
Dam removal projects
PWD approves Substantially Complete Design
See requirements at http://www.dep.pa.gov/Business/Water/Waterways/DamSafety/Pages/Guidelines.aspx
Provider
Attn: Josh Fair PA Department of Environmental Protection Rachel Carson State Office Building 400 Market Street Harrisburg, PA 17101 Phone: 717-772-5988 Email: [email protected]
Review can take 6 months.
Pennsylvania Department of Transportation (PennDOT) Engineering Division 6-0
Projects with work on state routes (except inlets/trench drains leading to off-street systems)
PWD approves Substantially Complete Design
Electronic copy of plan sheets relevant to affect State Route (including cover sheet and details) with work in the state route highlighted. If overflows are proposed to tie into sewers or otherwise discharge to state routes, submission must include complete calculations.
PWD N/A
Highway Occupancy Permit (HOP) application. PWD prepares submission.
GSI Unit Design Review Contacts
February 2018 3
Reviewer Applies to Time of Submission
Submission Requirements
Submitted By
Contact Notes
Pennsylvania Department of Transportation (PennDOT) ADA Ramps
Projects that include new or retrofit ADA ramps on state routes
As soon as ramp locations are established and designs are ready (varies by project)
Follow local and state requirements.
PWD N/A
PWD attaches ramp design to HOP application for the rest of project.
Pennsylvania Fish & Boat Commission
Stream projects requiring the drawdown of water
PWD approves Substantially Complete Design
Submit application: http://www.fishandboat.com/Resource/Documents/drawdown.pdf
Provider
Daniel Ryan PA Fish & Boat Commission Division of Environmental Services 450 Robinson Lane Bellefonte, PA 16823 Phone: 814-359-5140 Email: [email protected]
Philadelphia City Planning Commission
Projects that include disturbance within the floodplain
PWD approves Substantially Complete Design
HEC-RAS model output showing 100 year water surface elevation does not rise more than 0.1 feet
Provider
Attn: Sarah Chiu, AICP Senior Planner Philadelphia City Planning Commission One Parkway, 13th Floor 1515 Arch Street Philadelphia, PA 19102 Phone: 215-683-4626 Email: [email protected]
Obtain Floodplain Consistency Letter.
Philadelphia Streets Department ADA Ramps
Projects that include new or retrofit ADA ramp designs
As soon as ramp locations are established and designs are ready (varies by project)
Follow local and state requirements.
Provider
Attn: Sunil Gill, ADA Coordinator Philadelphia Streets Department Transportation Planning & Analysis Section 1401 J.F.K. Boulevard Philadelphia, PA 19102 Tel. 215-686-5511 Email: [email protected]
Review will examine ADA ramps designs for compliance with ADA Ramp Code. Requirements differ for local roads and State Routes. 2 week review time for first submission and 1 week for subsequent submissions.
GSI Unit Design Review Contacts
February 2018 4
Reviewer Applies to Time of Submission
Submission Requirements
Submitted By
Contact Notes
Philadelphia Streets Department Bridge Unit
Stream projects that impact bridge infrastructure or require scour protection
PWD approves Preliminary Design
One electronic copy of plan set.
PWD
Attn: Christopher Menna, PE Assistant Manager Structures Philadelphia Streets Department Engineering and Surveys Division 1401 JFK Boulevard, Room 830 Philadelphia, PA 19102 Phone: 215-686-5573 Email: [email protected]
Philadelphia Streets Department City Plans Unit
Projects that result in changes to the City Plan (curbline changes)
PWD approves Substantially Complete Design
See requirements at: www.philadelphiastreets.com/images/uploads/resource_library/City_Plan_Action_Request_Application.pdf
Provider
Attn: Frank Morelli, Tom Marro Philadelphia Streets Department City Plans Unit 1401 J.F.K. Boulevard Philadelphia, PA 19102 Email: [email protected] [email protected]
This is not a review, but a request to update Philadelphia City Plan to include any designed stormwater bumpouts or other curbline changes.
Philadelphia Streets Department Right of Way Unit
Projects that result in changes to the city plan (curbline changes)
PWD approves Preliminary Design. Resubmission when PWD approves Substantially Complete Design.
Three (3) full size hard copies of plans relevant to curbline changes, one (1) CD copy of plans relevant to curbline changes and Turning Analysis .PDF files, cover letter listing curbline change locations, and completed Plan Review Application (available at: http://www.philadelphiastreets.com/customer-service/downloads-and-links)
Provider
Attn: Patrick Iffrig Philadelphia Streets Department Highway Division, Right of Way Unit 1401 J.F.K. Boulevard, Room 830 Philadelphia, PA 19102 Tel. 215-686-5524 | Fax 215-686-5182 Email: [email protected]
Review of curbline changes only. TP&A will review other aspects of design.
GSI Unit Design Review Contacts
February 2018 5
Reviewer Applies to Time of Submission
Submission Requirements
Submitted By
Contact Notes
Philadelphia Streets Department Transportation Planning & Analysis Section (TP&A)
All projects that impact public right-of-way
PWD approves Preliminary Design. Resubmission when PWD approves Substantially Complete Design.
One cover letter listing proposed ADA ramp locations and one electronic copy of full plan set
Provider
Attn: Steve Mottershead Philadelphia Streets Department Transportation Planning & Analysis Section 1401 J.F.K. Boulevard, Room 830 Philadelphia, PA 19102 Tel. 215-686-5512 Email: [email protected]
Review will examine pavement, curb, and ramp restoration.
Philadelphia Parks and Recreation (For Park Projects)
Projects with work on PP&R property
PWD approves Substantially Complete Design
One full size hard copy of plan set
PWD Project Manager
Attn: Stephanie Craighead, Director Cc: Curtis Helm Cc: Tom Witmer (for ERG Projects) Philadelphia Parks and Recreation 1515 Arch St., 10th Floor Philadelphia, PA 19102 Email: [email protected] [email protected] [email protected]
More extensive review than street tree review. Review typically coordinated by the PWD project manager.
Philadelphia Parks and Recreation (Street Tree Management Division)
Projects with proposed street trees
PWD approves Substantially Complete Design
One full size and one half size hard copy of plan set. Memo with date of submittal, PWD project number, title of project and street names.
PWD Project Manager
Attn: Frances Piller Park District Manager Street Tree Management Division Philadelphia Parks & Recreation 1515 Arch St., 10th Floor Philadelphia, PA 19102 Phone: 215-685-4363 Fax: 215-685-4364 Email: [email protected]
Review of proposed tree locations and species selection. A date for requested review completion should be specified in the submission.
GSI Unit Design Review Contacts
February 2018 6
Reviewer Applies to Time of Submission
Submission Requirements
Submitted By
Contact Notes
Philadelphia School District
Projects around schools (both public and private schools)
After landscape plans have been finalized (reviewed and approved by PP&R)
One full size hard copy of final landscape or tree planting plans
Varies depending on project
Attn: Tom Schweiker Department of Capital Programs Philadelphia School District 440 N. Broad St., Room 371-374 Philadelphia, PA 19130
Plans are submitted to School District for their reference (no review/approval typically required for streets projects). Projects on School property have special review requirements that will be included in project specific scope.
PWD Collector Systems Unit
All projects (except stream projects located away from interceptor or manhole)
PWD approves Substantially Complete Design (also during Preliminary Design for GSI sewer and pilot projects)
One electronic copy of plan set
PWD Project Manager
Attn: Ben Jewell CC: Nicholas Maliha Collector Systems Unit Philadelphia Water Department 1101 Market St., 4th Floor Philadelphia, PA 19107 Email: [email protected] [email protected]
Review is coordinated internally by PWD. Review of future maintenance and performance. A 45-calendar day turnaround should be expected.
PWD Construction Unit
All PWD bid projects
PWD approves Substantially Complete Design
One electronic copy of plan set
PWD Project Manager
Attn: Blair Alegant, Jim Giffear, Pete Reilly, Jovan Como Email: [email protected], [email protected], [email protected], [email protected]
Review is coordinated internally by PWD. 30-calendar day turnaround expected. Specifications sent for review once they are developed.
PWD Green Stormwater Operations
All GSI projects
PWD approves Substantially Complete Design (also during Preliminary Design for GSI sewer and pilot projects)
One electronic copy of plan set. At Substantially Complete Design, also include the engineering estimate (.XLSX) and a table of vegetated area by SMP ID (.XLSX).
PWD Project Manager
Attn: Barbara Cushing CC: Gerald Bright, Supervisor GSI Maintenance Group Philadelphia Water Department 1101 Market St., 4th Floor Philadelphia, PA 19107 Email: [email protected] [email protected]
Review is coordinated internally by PWD. Review of future maintenance and performance and landscape selections. A 30-calendar day turnaround should be expected.
GSI Unit Design Review Contacts
February 2018 7
Reviewer Applies to Time of Submission
Submission Requirements
Submitted By
Contact Notes
PWD Stormwater Plan Review
Partner projects that trigger Philadelphia Stormwater Regulations (more than 5,000 sf earth disturbance proposed)
PWD approves Preliminary Design Submission (ERSA application) and Substantially Complete Design (PCSMP technical review)
See requirements at: www.pwdplanreview.org
Provider
Attn: Victoria Lenoci, Manager CC: Sara Anderson Stormwater Plan Review Philadelphia Water Department 1101 Market St., 4th Floor Philadelphia, PA 19107 Phone: 215-685-6387 Email: [email protected] [email protected] [email protected]
PWD Water/Sewer Design Branch
All GSI projects managed by GSI Design group
PWD approves Substantially Complete Design (also during Preliminary Design for GSI sewer projects)
One electronic copy of plan set
PWD Project Manager
Attn: Khadija Tadimi CC: Bill Dobbins Email: [email protected], [email protected]
Review is coordinated internally by PWD.
Utilities All projects
PWD approves Substantially Complete Design
Submission requirements will vary by utility
Provider
The Committee of Highway Supervisors contact list (below, recent changes in red) can be used for utility contacts.
Any and all utilities that are affected must review and approve plans.
United States Army Corps of Engineers (USACE)
404 Permit
Projects that include disturbance within the floodplain
PWD Substantially Complete Design (70%)
Schedule a pre-application meeting at 30%
Provider
Edward E. Bonner, PWS Chief, Regulatory Branch U.S. Army Corps of Engineers 100 Penn Square East Philadelphia, PA 19107 Phone: 215-656-6725, 215-873-9302 (cell) Email: [email protected]
General permit-related questions can be directed to the “Regulator of the Day" at 215-656-6728.
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/CellCity Planning Commission Sarah Chiu 1515 Arch Street, One Parkway, 13th Floor T: (215)-683-4626
Philadelphia, PA [email protected]
PennDOT Anthony Antonelli Blaine and Ruffner Streets T: (215) 225-1415County Permits Manager Philadelphia, PA 19140
Matthew Miele 7000 Geerdes Blvd T: (610) 205-6795District Permits Manager King of Prussia, PA 19406 F: (610) 205-6599
PIDC Edward Duffy 2600 Center Square West, 1500 Market StPhiladelphia, PA [email protected]
Philadelphia Department of Commerce Vincent Dougherty One Parkway, 1515 Arch Street, 12th FloorPhiladelphia, PA [email protected]
Police (Traffic Division) Captain Helker [email protected] T: (215) [email protected]
Lieutenant Anderson [email protected] T: (215) [email protected]
Public Property Francesco Cerrai T: (215) 683-44491515 Arch Street, 11th Floor [email protected]
Cable Franchise Manager Mark McLaughlin Room 632 City Hall T:(215) 686-9950Philadelphia, PA 19107 F:(215) [email protected]
City Departments/Agencies/Authorities
Committee Of Highway Supervisors Membership January 1, 2015 (more recent edits in red)
Master CHS Contact List.xlsx 1
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/Cell
City Departments/Agencies/Authorities
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Cable Franchise Manager James Napier Room 632 City Hall T:(215) 686-9946Phhiladelphia, PA 19107 F:(215) [email protected]
Capital Program Office Monique Vincent 1515 Arch Street, 11th Floor T:(215) 683-4440Philadelphia, PA 19107 F:(215) [email protected]
Redevelopment Authority Mike Maenner 1234 Market Street, 16th Floor T:(215) 209-8713Philadelphia, PA 19107 M:(215) [email protected]
Deputy Commissioner of Transportation Michael A. Carroll 1401 John F. Kenndey Boulevard, Room 900Philadelphia, PA [email protected]
Right-Of-Way Unit Patrick O'Donnell 1401 John F. Kennedy Blvd, Room 960 T:(215) 686-5621Right of Way Manager Philadelphia, PA 19102
patrick.o'[email protected]
T:(215) 686-5524Patrick Iffrig CHS Chairman
1401 John F. Kennedy Blvd, Room 960 Philadelphia, PA [email protected]
John Scanlon 1401 John F. Kennedy Blvd, Room 960 T:(215) 686-5525Permits Philadelphia, PA 19102 F: (215) 686-5062
Streets Department
Master CHS Contact List.xlsx 2
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/Cell
City Departments/Agencies/Authorities
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Street Lighting Kristin Del Rossi 840 Municipal Services Building T:(215) 686-55171401 John F. Kennedy [email protected]
Streets Design Unit Vadim Fleysh 1401 John F. Kennedy Blvd, Room 830 T:(215) 686-5574Chief Design Engineer Philadelphia, PA 19102
Chris Menna 1401 John F. Kennedy Blvd, Room 830 T:(215) 686-5573Bridge Design Philadelphia, PA 19102 F:(215) 686-5059
Smitha Mathew 1401 John F. Kennedy Blvd, Room 830 T:(215) 686-5514Transportation Design Philadelphia, PA 19102
Transportation, Planning and Analysis Nancy Sen 1401 John F. Kennedy Blvd, Room 940 T:(215) 686-5509Philadelphia, PA 19102 F:(215) [email protected]
Traffic Engineering Kasim Ali 980 Municipal Services Building T:(215) 686-55721401 John F. Kennedy [email protected]
Master CHS Contact List.xlsx 3
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/CellAbovenet Communications Jack Howells 170 Robbins Road T:(484) 696-3904 (now the Zayo Group) Downingtown, PA 19335 F:(484) 696-3910
[email protected] C:(610) 476-1634
Chris Ricciuti 170 Robbins Road T:(484) 696-3903Downingtown, PA 19335 F:(484) [email protected]
Cavalier Telephone Harry Sheppard 18 Shea Way T:(302) 224-7121Newark, Delaware [email protected]
Center City District Hal Welch 660 Chestnut Street T:(215) 440-5528Philadelphia, PA 19107 F:(215) [email protected]
Comcast Jack Clayton 4400 Wayne Avenue T:(215) 339-7912Philadelphia, PA 19140 F:(215) [email protected] C:(215) 920-2233
Alvin Munson 4400 Wayne AvenuePhiladelphia, PA [email protected]
Drexel University Paul Tobin Trades & Facilities Management T:(215) 895-6901330 Market Street - 16th Floor T:(215) 895-2822Philadelphia,PA [email protected]
FiberTech Networks Allan Lane [email protected] T:(215) [email protected] T:(215) 884-1651
C:(585) 255-0160
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Utility Members
File: Master CHS Contact List.xlsx 1
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/Cell
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Utility Members
Level 3 Communications Timothy Eskridge 3020 Market Street T: (610) 785-1469OSP Project Mgr. Philadelphia, PA 19104 F: (720) 567-3827
Adolfo Colon 3020 Market Street, 3rd FloorPhiladelphia, PA [email protected]
Guy Haslett 3020 Market Street, 3rd FloorPhiladelphia, PA [email protected]
Level 3 Communications Rocco Parise 3020 Market Street, 3rd FloorPhiladelphia, PA [email protected]
Lightower Fiber Networks Thomas Sprigle 196 Van Buren Street T:(443) 250-1873Sr. Fiber & Construction Mgr. Suite 250 C:(443) 250-1873
(Attn: Fiber Engineering & Construction Team) Mid-Atlantic Region Herndon, VA [email protected]
MCI Worldcom Donald Lugg 201 Centennial Avenue T:(610) 656-1252 (Verizon Enterpirse Solutions) Piscataway, NJ 08854
Tom Roberts 201 Centennial Avenue T:(732) 885-2417Piscataway, NJ 08854 C:(917) [email protected] T:(610) 656-1252
File: Master CHS Contact List.xlsx 2
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Telephone/Fax/Cell
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Utility Members
PECO Energy Lauryn Bell (main contact) T:(215) 731-3232F:(215) 731-3195
Address/Email830 S. Schyulkill Avenue Philadelphia, PA 19146 [email protected]
Jim Bezila 830 S. Schyulkill Avenue T:(215) 731-3095 (801)Philadelphia, PA 19146 C:(610) [email protected]
Lou Robinson T:(215) 731-3283F:(215) 731-3195
830 S. Schyulkill Avenue Philadelphia, PA [email protected]
Philadelphia Gas Works Monica Lyv (main contact) T:(215) 684-6116 800 W. Montgomery Avenue Philadelphia, PA 19122 [email protected]
T:(215) 684-6827
File: Master CHS Contact List.xlsx 3
Samantha Comerota (copy) 800 W. Montgomery Avenue Philadelphia, PA 19122 [email protected]
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/Cell
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Utility Members
Philadelphia Water DepartmentDesign Branch Mike Quinn 1101 Market St, Aramark Tower, 2nd Floor T:(215) 685-6309
Primary Contact Philadelphia, PA [email protected]
Frank Mawson 1101 Market St. Aramark Tower, 2nd Floor T:(215) 685-6279Secondary Contact Philadelphia, PA 19107
Erik Smith 1101 Market St, Aramark Tower, 2nd Floor T:(215) 685-6270Philadelphia, PA [email protected]
Construction Unit William Connors 1101 Market St, Aramark Tower, 2nd Floor T:(215) 685-6372Primary Contact Philadelphia, PA 19107 F:(215) 685-6211
[email protected] C:(215) 200-4413
Robert Rotermund 1101 Market Street, Aramark Tower, 2nd Floor T:(215) 685-6351 Philadelphia, PA [email protected]
Qwest Communications Corp George McElvain 1860 Lincoln Street, 2nd Floor T:(303) 837-3926Denver, Colorado 80295 F:(303) [email protected] C:(720) 260-2514
RCN Telecom SVCS Kevin Cochran 3 Raymond Drive T:(484) 461-6020RF/CAD Engineer Havertown, PA 19083-3153 F:(484) 461-6084
Kevin Cochran Northampton Office T:(610) 440 81135508 Nor Bath Blvd. C:(610) 636 1454Northampton, PA 18067 F:(610) 443 2832
SEPTA T:(215) 580-8255 1234 Market Street Philadelphia, PA 19107 [email protected]
File: Master CHS Contact List.xlsx
Lydia Grose
4
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/Cell
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Utility Members
Sunesys David Hayward 185 Titus Avenue T: (267) 927-2033Warrington, PA 18976 F: (267) [email protected]
Jason Wehn 185 Titus Avenue T: (267) 927-2040Warrington, PA [email protected]
Teleport Communications Group Mike Henderson [email protected] T:(732) 896-5449(AT&T Local Services)
University of Pennsylvania Richard Russell 3101 Walnut Street T: (215) 898-5835Philadelphia, PA 19104 F: (215) [email protected]
Veolia Energy North America Howard Sellers 2600 Christian Street T:(267) 350-5848Manager, Philadelphia, PA 19146 F:(267) 350-5849Distribution Engineering [email protected]
Reji Sreedharan 2600 Christian StreetPhiladelphia, PA [email protected]
Bill Lindquist 2600 Christian StreetPhiladelphia, PA [email protected]
Rich Deaver 2600 Christian StreetPhiladelphia, PA [email protected]
File: Master CHS Contact List.xlsx 5
DEPARTMENT OF STREETS RIGHT OF WAY UNIT
Company Contact Address/Email Telephone/Fax/Cell
Committee Of Highway Supervisors MembershipJanuary 1, 2015
Utility Members
Verizon Communications Brian M. Magee 900 Race Street, 6th Floor T:(215) 351-6051Manager, OSPE Philadelphia, PA 19107 C:(610) 368-7786
John Alessandrini 630 Clark Avenue T:(610) 337-6707Lead Specialist Engineer King of Pruswsia, PA 19406 C:(610) 517-8456Verizon Business [email protected] F:(610) 337-6720
Anthony Portolese 900 Race Street, 6th Floor T:(215) 351 6042OSP Engineering Philadelphia, PA 19107 F:(215) 351-8222
XO Communications Scott Dreiling 1220 Broadcasting Rd. T:(610) 288-5329Wyomissing, PA 19610 F:(610) [email protected] C:(610) 842-4323
Mike Harrison 1220 Broadcasting Rd. T:(610) 288-5644Wyomissing, PA 19610 F:(610) [email protected] C:(610) 842-0043
* acquired by Level 3Zayo Group Jack Howells 170 Robbins Road T:(484) 696-3904
(formerly Abovenet Communications) Downingtown, PA 19335 F:(484) [email protected] C:(610) 476-1634
Chris Ricciuti 170 Robbins Road T:(484) 696-3903Downingtown, PA 19335 F:(484) [email protected]
File: Master CHS Contact List.xlsx 6
21
3 Area EngineersZapata, Levan, LlanosZhao, OgdenZhao, Ogden
Field Operations
SUPERVISORS ENGINEERSJim Davin 215-787-4351Al Donaldson 215-787-3220Bill Wilcox 215-787-4823
Andrew Levan: 215-684-6053 [email protected] Llanos: 215-684-6420 [email protected] Ogden: 215-684-6785 [email protected]
Alejandro Zapata: 267-249-7476 [email protected] Zhao: 215-684-6504
Distribution Areas
Area SupervisorsDonaldsonDavinWilcox
123
0 1 2 3 4Miles