GS Nov Numbi Aux to Bravo Bridge
6
DOC ID © Chevron 2005 GS-November Numbi Aux to Bravo Bridge Revamp Prepared by: James Moore 29-March-2015
-
Upload
james-moore -
Category
Documents
-
view
109 -
download
2
Transcript of GS Nov Numbi Aux to Bravo Bridge
DOC ID © Chevron 2005
GS-November Numbi Aux to Bravo Bridge
Revamp
Prepared by: James Moore 29-March-2015
DOC ID © Chevron 2005 2
Numbi Aux to Bravo Bridge Pre Blast All sensitive equipment and pipework not to be blasted
was protected and checked on a daily basis
DOC ID © Chevron 2005 3
Numbi Aux to Bravo Bridge Blasted Surface Pipework and structural steel was blasted to SSPC SP 10 Near
white metal.
DOC ID © Chevron 2005 4
Numbi Aux to Bravo Bridge Interzone 954 & Interguard 251 Applied To Blasted Surface