7/25/2019 Grs Sg Cl c 010 a Cover
1/4
JOINT OPERATING BODY
PERTAMINA - TALISMAN JAMBI MERANG
DOCUMENT NO :
GRS-CL-C-013
CONSORTIUM
PT. SULUH ARDHI ENGINEERING
PT. MEGA PRATAMA UNGGUL
PROJECT NO :
4500001473
35 pa!"
JAMBI MERANG DE#ELOPMENT PROJECT
EPC GAS METERING AT GRISSI$
EMERGENCY DIESEL GENERATOR SHELTER
AND %OUNDATION DESIGN
0 10/01/2014 Issued for Implementation AI HC/BP MK
B 9/12/2013 Issued for Approval AI HC/BP MK
A 1/11/2013 Issued for !evie" AI HC/BP MK
-
7/25/2019 Grs Sg Cl c 010 a Cover
2/4
JAMBI MERANG DE#ELOPMENT PROJECT
EPC GAS METERING AT GRISSI$
D&'. N&:
GRS-CL-C-013
R!(: 0
EMERGENCY DIESEL GENERATOR SHELTER
AND %OUNDATION DESIGN
Da)! : 10*01*+014
Pa! + &, 35
R!(. Da)! D!"'p)&/
BY CH$D APPD APPD
CONTRACTOR CLIENT
RE#ISION TABLE
PAGERE#ISION PAGE RE#ISION ATTACHMENT RE#ISION
A B C 0 1 + 3 A B C 0 1 + 3 A B C 0 1 + 3
5 +
5 3
3
2 3
3
3
2
2
2
-
7/25/2019 Grs Sg Cl c 010 a Cover
3/4
JAMBI MERANG DE#ELOPMENT PROJECT
EPC GAS METERING AT GRISSI$
D&'. N&:
GRS-CL-C-013
R!(: 0
EMERGENCY DIESEL GENERATOR SHELTER
AND %OUNDATION DESIGN
Da)! : 10*01*+014
Pa! 3 &, 35
RECORD O% RE#ISION
-
7/25/2019 Grs Sg Cl c 010 a Cover
4/4
JAMBI MERANG DE#ELOPMENT PROJECT
EPC GAS METERING AT GRISSI$
D&'. N&:
GRS-CL-C-013
R!(: 0 EMERGENCY DIESEL GENERATOR SHELTER
AND %OUNDATION DESIGN
Da)! : 10*01*+014
Pa! 4 &, 35
R!
(
N& S!')&/
Pa
!
C&pa/
C&!/)
Ip!!/)
!6 Y*N8 E9pa/a)&/
B 1.3 5
Shall be
finalized by
using approved
borrow pit data.
YContractor follow, Soil density finalized
used soil 1!"5 #g$%3
B &ttach. '3 5"( )all YContractor follow, Soil Bearing Capacity )
all 1.*+ 5"( ".!- #g$%+
B &ttach. '-
ain /ater 0oad
$ lease consider
point$
concentrated live
load for wor#er
21""#g at
%id span to roof
installation$
%aintanances
4
Contractor clarify, rain water
load$Concentrated live load, already
included in live load, in accordance with the
section live load age &SC6 *'"5.
where all the %oving loads,
includingpersonel7s,tools,%iscellaneous,
e)uip%ent,%oveables partitions, cranes,hoists, post of dis%antled e)uip%ent and
stored %aterials.So live load !+.-- #4$%
will be applied.
"
3.1
0oading
8ata
9
Consistent Civil
8/: 1-
sagrod for purlin
and girt
YContractor follow co%pany7s co%%ent and
revised it
"1.5
ara%eter-
Shall be
finalized by
using approved
borrow pit data
YContractor follow, Soil density finalized
used soil 1*" #g$%3
" &ttach. '-
lease add a
s#etch to show
foundation to ;
' original soil
level
' Soil filling
th#$depth
' Botto% of
foundation level
fro% finish grade
level
YContractor follow co%pany7s co%%ent and
revised it
" &ttach. '-
lease considerconcentrated live
load for wor#er
21""#g at
%id span to roof
installation$
%aintanances
4
lease see CCC':S'C'"++ date
"9$1+$+"13 as below ;
Concentrated live load installation, alreadyincluded in live load, in accordance with the
section live load age &SC6 *'"5 and
Contractor infor%ed unifor% live load value
!+.-- #g$%+,if we transfered it to
concentrated load will be e)ual !+.--
.5 1.+ -. #g at %id span