    JOINT OPERATING BODY

    PERTAMINA - TALISMAN JAMBI MERANG

    DOCUMENT NO :

    GRS-CL-C-013

    CONSORTIUM

    PT. SULUH ARDHI ENGINEERING

    PT. MEGA PRATAMA UNGGUL

    PROJECT NO :

    4500001473

    35 pa!"

    JAMBI MERANG DE#ELOPMENT PROJECT

    EPC GAS METERING AT GRISSI$

    EMERGENCY DIESEL GENERATOR SHELTER

    AND %OUNDATION DESIGN

    0 10/01/2014 Issued for Implementation AI HC/BP MK

    B 9/12/2013 Issued for Approval AI HC/BP MK

    A 1/11/2013 Issued for !evie" AI HC/BP MK

  • 7/25/2019 Grs Sg Cl c 010 a Cover

    2/4

    JAMBI MERANG DE#ELOPMENT PROJECT

    EPC GAS METERING AT GRISSI$

    D&'. N&:

    GRS-CL-C-013

    R!(: 0

    EMERGENCY DIESEL GENERATOR SHELTER

    AND %OUNDATION DESIGN

    Da)! : 10*01*+014

    Pa! + &, 35

    R!(. Da)! D!"'p)&/

    BY CH$D APPD APPD

    CONTRACTOR CLIENT

    RE#ISION TABLE

    PAGERE#ISION PAGE RE#ISION ATTACHMENT RE#ISION

    A B C 0 1 + 3 A B C 0 1 + 3 A B C 0 1 + 3

    5 +

    5 3

    3

    2 3

    3

    3

    2

    2

    2

  • 7/25/2019 Grs Sg Cl c 010 a Cover

    3/4

    JAMBI MERANG DE#ELOPMENT PROJECT

    EPC GAS METERING AT GRISSI$

    D&'. N&:

    GRS-CL-C-013

    R!(: 0

    EMERGENCY DIESEL GENERATOR SHELTER

    AND %OUNDATION DESIGN

    Da)! : 10*01*+014

    Pa! 3 &, 35

    RECORD O% RE#ISION

  • 7/25/2019 Grs Sg Cl c 010 a Cover

    4/4

    JAMBI MERANG DE#ELOPMENT PROJECT

    EPC GAS METERING AT GRISSI$

    D&'. N&:

    GRS-CL-C-013

    R!(: 0 EMERGENCY DIESEL GENERATOR SHELTER

    AND %OUNDATION DESIGN

    Da)! : 10*01*+014

    Pa! 4 &, 35

    R!

    (

    N& S!')&/

    Pa

    !

    C&pa/

    C&!/)

    Ip!!/)

    !6 Y*N8 E9pa/a)&/

    B 1.3 5

    Shall be

    finalized by

    using approved

    borrow pit data.

    YContractor follow, Soil density finalized

    used soil 1!"5 #g$%3

    B &ttach. '3 5"( )all YContractor follow, Soil Bearing Capacity )

    all 1.*+ 5"( ".!- #g$%+

    B &ttach. '-

    ain /ater 0oad

    $ lease consider

    point$

    concentrated live

    load for wor#er

    21""#g at

    %id span to roof

    installation$

    %aintanances

    4

    Contractor clarify, rain water

    load$Concentrated live load, already

    included in live load, in accordance with the

    section live load age &SC6 *'"5.

    where all the %oving loads,

    includingpersonel7s,tools,%iscellaneous,

    e)uip%ent,%oveables partitions, cranes,hoists, post of dis%antled e)uip%ent and

    stored %aterials.So live load !+.-- #4$%

    will be applied.

    "

    3.1

    0oading

    8ata

    9

    Consistent Civil

    8/: 1-

    sagrod for purlin

    and girt

    YContractor follow co%pany7s co%%ent and

    revised it

    "1.5

    ara%eter-

    Shall be

    finalized by

    using approved

    borrow pit data

    YContractor follow, Soil density finalized

    used soil 1*" #g$%3

    " &ttach. '-

    lease add a

    s#etch to show

    foundation to ;

    ' original soil

    level

    ' Soil filling

    th#$depth

    ' Botto% of

    foundation level

    fro% finish grade

    level

    YContractor follow co%pany7s co%%ent and

    revised it

    " &ttach. '-

    lease considerconcentrated live

    load for wor#er

    21""#g at

    %id span to roof

    installation$

    %aintanances

    4

    lease see CCC':S'C'"++ date

    "9$1+$+"13 as below ;

    Concentrated live load installation, alreadyincluded in live load, in accordance with the

    section live load age &SC6 *'"5 and

    Contractor infor%ed unifor% live load value

    !+.-- #g$%+,if we transfered it to

    concentrated load will be e)ual !+.--

    .5 1.+ -. #g at %id span