Growing the Grid The Wind Farm to Market Highway
description
Transcript of Growing the Grid The Wind Farm to Market Highway
![Page 1: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/1.jpg)
Growing the GridThe Wind Farm to Market Highway
Nebraska Wind Power ConferenceNovember 16, 2011
Paul Malone
![Page 2: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/2.jpg)
Topics
• Transmission Planning on an Interregional or Interconnection -wide basis
• FERC Order 1000 directives
![Page 3: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/3.jpg)
3
150,000 MW
55,000 MW 750,000 MW 3
![Page 4: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/4.jpg)
4
![Page 5: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/5.jpg)
Interconnection-wide Transmission Studies
• Joint Coordinated System Plan (JCSP)– Sponsored by the Regional Transmission Organizations– Completed 2008
• Eastern Wind Integration and Transmission Study (EWITS) – Sponsored by the National Renewable Energy Lab– Report published 2010
• Eastern Interconnection Planning Collaborative (EIPC) – Sponsored by the Department of Energy– To be completed in 2012
![Page 6: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/6.jpg)
6
Eastern Wind Integration and
Transmission Study
![Page 7: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/7.jpg)
![Page 8: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/8.jpg)
![Page 9: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/9.jpg)
![Page 10: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/10.jpg)
![Page 11: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/11.jpg)
Seams Steering Committee• FERC Order 1000 pertaining to seams
– Interregional Planning– Interregional Cost Allocation
• SPP staff will review current seams agreements and JOAs
11
![Page 12: Growing the Grid The Wind Farm to Market Highway](https://reader035.fdocuments.us/reader035/viewer/2022062521/56816785550346895ddc99e0/html5/thumbnails/12.jpg)
Questions?