Group project

36
BA 711 Information Technology Group Project Presentation

description

IT Presentation

Transcript of Group project

Page 1: Group project

BA 711Information Technology

Group Project Presentation

Page 2: Group project

TEAM #2

Mr.Chaiyot Norkaew (Too)Miss Nipaporn Pirayawaraporn (Tarn)

Mr.Romain Lahoussine (Romain)Mr.Bingru Zhang (Ryan)

Miss Yang Zi (Mali)Miss Nilukshika Mendis Abeysekera (Nilu)

Page 3: Group project

The Organization

Page 4: Group project

Bumrungrad International Hospital

Page 5: Group project

- Founded in September 17th, 1980- Southeast Asia’s largest private medical center

- One of the world’s popular medical tourism destinations.

Page 6: Group project

“ Care for the people ”

Page 7: Group project

2002First hospital in Asia to be accredited by the American-based Joint

Commission International.

2004 and 2008,Asia Money magazine’s “Best Small Cap Company” award.

2008 The "Tourism Authority of Thailand" Award of Excellence

in the category of Health Tourism at the 7th Thailand Tourism Awards

“Thailand’s Most Innovative Company” by Chulalongkorn University’s School of Business.

Won 1st Place as “Best Website for International Medical Travel” at the 2008 Consumer Health World Awards event in the US capitol.

2011Reaccredited for a 3rd time by the US-based Joint Commission International

( JCI )

Achievements & Awards

Page 8: Group project

Information Technology in Place

Page 9: Group project

- Start from December 1999 - With many different systems

- Mainly from Microsoft

Page 10: Group project

1st Software - The hospital 2000 (H2000)

Now - Microsoft Amalga HIS

Page 11: Group project

Mr. Paul ClarkeIT Director of Bumrungrad International

Hospital

Page 12: Group project
Page 13: Group project

Next

Page 14: Group project
Page 15: Group project

Information System1st - The hospital 2000 (H2000)

Now - Microsoft Amalga HIS

Page 16: Group project

STRENGTH

- Its customized- Easy to use

and efficient for the

staff- Single data

base

Page 17: Group project

WEAKNESS

- Not specialize in doing ERP, or lab

system.

(ERP = Enterprise resource planning)

Page 18: Group project

Must be in a higher availability for 24/7 operations of hospital

Page 19: Group project

Evaluation from IT Director

IS makes satisfaction, but system can always be better.

Page 20: Group project

Maintenance & Upgrade

Page 21: Group project

2 times a year for upgrading

a SOFTWARE

Page 22: Group project

Every 5 years for upgrading

a HARDWARE

Page 23: Group project

Frequently updating can increase a downtime,

which can be disadvantages for a hospital.

Page 24: Group project

Security & Privacy

Page 25: Group project

IT Specialist is responsible for handle an Information System’s transaction in

hospital.

Page 26: Group project

Every staff has to read, understand and sign a policy of using Information System of the

hospital.

Page 27: Group project

How IS runs the hospital

Page 28: Group project

Support works of back office

in financial management

and human resource

Page 29: Group project

Support works of front office

in registration

and application

Page 30: Group project

Online communication for emergency case

Page 31: Group project

What we’ve learnt from this project

Page 32: Group project

We came across a lot of new and inspiring ways Information System helps the hospital

Bumrungrad and also the way it functions as a whole.

Page 33: Group project

IS must be good enough for 24/7 services

&IS can always be better

Page 34: Group project

Be (more) professional

Page 35: Group project

Teamwork

Page 36: Group project

Thank you for your participation