4/20/12
Group Members:Syeda Sana 8916Sidra Shahid 8989Suneel Emmanuel 9317
Sadiq Saleem 8605
ICE CREAM FACTORY
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 2/74
Click to edit Master subtitle style
4/20/12
Project Scope Management:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 3/74
Click to edit Master subtitle style
4/20/12
Project Scope Management:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 4/74
Click to edit Master subtitle style
4/20/12
•Stakeholder
Register:Main
1. Collecting Requirements:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 5/74
4/20/12
Requirements Documentation:
Requirements documentation describes
how individual requirements meet thebusiness need for the project.
Consumers require healthy, tasty withsome form Basically the governmentneeds income through taxes, employeeswants their due share, creditors wants the
return on money. So, proper functioning of factory will provide all of them their due
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 6/74
4/20/12
GAP: Current demand for ice cream isaround 160 million liters while its productionfrom documented sector is around 60 millionliters that means there is a huge marketavailable though their need is satisfied bysmall producers but with good brandawareness this market can be captured.With
these estimates and calculation we get Gapof around 100 million liters in Pakistan and60 million liters for Punjab.
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 7/74
Click to edit Master subtitle style
4/20/12
.
Expert
Judgement
2.Define Scope:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 8/74
4/20/12
ProjectScope
Statement:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 9/74
4/20/12
Project deliverablesincludes the types of
ice creamKulfa (2 lit)
Kulfa (1 lit)
Kulfa (cup)
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 10/74
Click to edit Master subtitle style
4/20/12
3. Create WBS:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 11/74
4/20/12
Tools & Techniques:
The Decomposition technique is used
for the purpose of having WBS.
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 12/74
4/20/12
WBS Diagram:
Starting upmanufacturi
ng
RawMaterialPurchase
TestingPhase
Machinery
Installation
Transportation
Packaging
Recruitment
- Tendernotice –quotationanalysis
- Finaldecision
BuyingMachinery
Constructionof factory
Availabilityof utilities
MarketAppraisal
Land buyingLicense formanufacturi
ng
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 13/74
Click to edit Master subtitle style
4/20/12
InspectionInspection includes activities such as
measuring, examining, and verifying todetermine whether work anddeliverables meet requirements andproduct acceptance criteria.
4. Verify Scope:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 14/74
4/20/12
Change Requests
Not only unbranded products
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 15/74
Click to edit Master subtitle style
4/20/12
Variancecontrol to
5. Control Scope:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 16/74
Click to edit Master subtitle style
4/20/12
PROJECT TIME MANAGEMENT
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 17/74
Click to edit Master subtitle style
4/20/12
The tool used is decomposition whichinvolves subdividing the work packagesinto smaller, manageable components
called activities.
1. Define Activities
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 18/74
4/20/12
Activity List & Activity Attributes:
The activities are as follows:•Market Appraisal:
The following analysis will be done regardingice cream`s:overview of industry especially local industry
market sizedemand and supply statusavailability of raw materialstrends of consumerssegments analysis
•License for manufacturing:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 19/74
4/20/12
•Constructing of a Factorystructure:
It involves the mapping,tender notice, analysis of quotations that is accepting& rejecting quotations.
•
Recruitment:Giving an add for hiring theengineers, technitian &other official staff.
•Buying machinery:Involves the tender process.Basically the following unitsare required which includes:
freezing units
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 20/74
4/20/12
•Install / deploy machinery:Involves the creation of foundation, setting up of
units and connection of units
• Testing phaseMajor phase which may consume time if there
came a problem in machine.
•Raw Material purchaseWill seek in for Lowest possible price with bestquality material.
Required raw materials are:1.Milk2.Butter3.Sugar
4.Eggs5.Dry Fruits
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 21/74
4/20/12
Manufacturing Process
Raw material delivery & storage
Blending the mixture
Pasteurizing
Homogenizing
Cooling
Adding flavor
Continuous Freezing
Adding extra Fruits and chunks
Packaging
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 22/74
4/20/12
Ice cream produce flow chart
Source:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 24/74
4/20/12
k. Transportation of final product.
Milestone List:
• To get the licence,•Avail resources,•Buying machinery•End product manufacturing.
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 25/74
Click to edit Master subtitle style
4/20/12
TOOLs & Technique: The tool used for network diagram
is Project Diagramming Method(PDM).
2. Sequence Activities:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 26/74
4/20/12
Activity Prior Activity
1 None
2 1
3 2
4 3
5 3
6 3
7 3
8 5
9 8
10 9
11 10
12 11
13 12
OUTPUT
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 28/74
4/20/12
Project deliverablesincludes the types of
ice creamKulfa (2 lit)
Kulfa (1 lit)
Kulfa (cup)
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 29/74
Click to edit Master subtitle style
4/20/12
PROJECT TIME MANAGEMENT
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 30/74
Click to edit Master subtitle style
4/20/12
The tool used is decomposition whichinvolves subdividing the work packagesinto smaller, manageable components
called activities.
1. Define Activities
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 32/74
4/20/12
•Constructing of a Factorystructure:
It involves the mapping,tender notice, analysis of quotations that is accepting& rejecting quotations.
•
Recruitment:Giving an add for hiring theengineers, technitian &other official staff.
•Buying machinery:Involves the tender process.Basically the following unitsare required which includes:
freezing units
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 33/74
4/20/12
•Install / deploy machinery:Involves the creation of foundation, setting up of
units and connection of units
• Testing phaseMajor phase which may consume time if there
came a problem in machine.
•Raw Material purchaseWill seek in for Lowest possible price with bestquality material.
Required raw materials are:1.Milk2.Butter3.Sugar4.Eggs5.Dry Fruits
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 34/74
4/20/12
Manufacturing Process
Raw material delivery & storageBlending the mixture
Pasteurizing
Homogenizing
Cooling
Adding flavor
Continuous Freezing
Adding extra Fruits and chunks
Packaging
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 35/74
4/20/12
Ice cream produce flow chart
Source:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 37/74
4/20/12
k. Transportation of final product.
Milestone List:
• To get the licence,•Avail resources,•Buying machinery•End product manufacturing.
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 38/74
Click to edit Master subtitle style
4/20/12
TOOLs & Technique: The tool used for network diagram
is Project Diagramming Method(PDM).
2. Sequence Activities:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 39/74
4/20/12
Activity Prior Activity
1 None
2 1
3 2
4 3
5 3
6 3
7 3
8 5
9 8
10 9
11 10
12 11
13 12
OUTPUT
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 40/74
4/20/12
4
2
6
7
9
1 1
1 3
3
1
5
8
1 0
1 2
PDM
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 41/74
4/20/12
3. Estimate Activity Resources
Tools & Technique:
We will use the tool of Expert judgement andalternative analysis.
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 42/74
4/20/12
Activity Resource Requirements:
Manpower Resource requirements can bebifurcated intoHRExecutive officialsEngineers
Technical staff Blue colar staff
Raw Material s required for initiatingproduction are as follows:•Milk•Sugar•
Butter•Fruit pulps•Dry fruitsProject Document Updates:
The documents are updated with theinformation contained in this section.
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 43/74
Click to edit Master subtitle style
4/20/12
• Tools & Techniques used:
Expert JudgementAnalogous Method
•15% probability of exceeding 1 month& 85 % probability of completion in thegiven time.
4. Estimate ActivityDuration:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 44/74
Click to edit Master subtitle style
4/20/12
Tools & Techniques:
Gantt chart
5. Develop Schedule:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 45/74
4/20/12
OUTPUT: GANTT CHART
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 46/74
Click to edit Master subtitle style
4/20/12
6. Control Schedule:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 47/74
4/20/12
Tools and techniques:
We basically focus on two tools:
Performance Reviews
Performance reviews will be done tomeasure, compare, and analyze scheduleperformance such as actual start and fi
nish dates, percent complete, andremaining duration for work in progress.
Variance Analysis
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 48/74
4/20/12
Work Performance measurements:
The values for SV and SPI will be
calculated.
Organizational Process Assets Updates
Organizational process assets that maybe updated includes the following:
• Causes of variances,
• Corrective action chosen and the
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 49/74
4/20/12
Plan quality Quality assurance Quality control• Raw materials delivery • Suitable and perfect
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 50/74
4/20/12
Raw materials delivery& storage
Suitable and perfectenvironment
• Mixing units• Storage units• Freezing units• Homogenizer• Brine tank • Surface cooler• Filling and Packaging
line• Blending • Milk eggs, sugar,
• Refrigerated tanker
trucks• Stainless steel blenders.
• 36°F (2°C)• 1,000 gal (3,7851)
stainless steel blende• Blended for eight to te
minutes.
• Pasteurizing • To kill the bacteria.• Pasteurization machine• Thin stainless steel
plates.
• 182°F (83°C) flows onthe one side of theplates
• 180°F (82°C) water tokill bacteria.
• Homogenizing • High-pressure pistonpumps;
• Breaks down the fatparticles
• Air pressure of 2,000pounds per square inc(141 kg per sq cm)
• Cooling • The process of homogenizing will be
• Cold water 34°F (1°C),• Mixture: 36°F (2° C)•
Plan quality Quality assurance Quality control
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 51/74
4/20/12
• Adding flavors • Flavorings are thenpiped into the vatsand will be blendedthoroughly
• 300 gal (1,136 1) of mixture
• Continuous freezing • Liquid ammonia will beusing as a freezingagent.
• Soft-serve ice cream.
• 700 gal (2,650 1) perhour.
• Temp insiderefrigerator: -40°F (-40°C),
• Adding extra fruitsand chunks
• Fruit feeder:strawberry or cookiechunks are evenlydistributed.
• Star wheel in pre-
measured amounts
• Packaging • Automatic fillingmachines
• Cardboard cartons• Lids• Expiration date• Production code• Plastic shrink
wrapping.
• Premeasured amountsof ice cream at therate of 70-90 cartonsper hour.
• Hardening • The cartons moveslowly back and forththrough the tunnel for
two to three hoursuntil the contents are
• -10°F (-23°C).
a qua y Qua y assu a ce Qua y co o
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 52/74
4/20/12
ESTIMATE COST
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 53/74
4/20/12
(Rs in (000)
SNO DESCRIPTION TOTAL COST
1 land 175235
2 building 57798
3 machinery local 570
4 machinery imported 44719.398
5 inland charges 20
6 erection & installation charges 200
7 contingencies 5000
8 furniture & fixture 5000
9 vehicles 12500
10 reproduction expenses 1000
11 interest during construction 27528
TOTAL FIXED COST 329570.398
INITIAL WORKING CAPITAL 50628
TOTAL COST OF PROJECT 380198.398
ESTIMATE COST
ESTIMATE BUDGET
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 54/74
4/20/12
DESCRIPTION VARIABLE COST FIXED COST TOTAL COST
raw material 572140 0 572140
labor 37194 0 37195.2
manufacturing
overheads
37406 171700 209106
depreciation 0 8315 8315
administration &
general expenses
0 3876 3876
selling expenses 28 0 28
interest 0 37534 37534
amortization of
preproduction
expenses
0 333 333
TOTAL 646769 221757 868526
sales value of
production
1114649
Breakeven point [221757 / 1114649 -
646769]
0.47
ESTIMATE BUDGET
CONTROL COSTS:
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 55/74
4/20/12
CONTROL COSTS:Set up time After the cleaning, pipes used for making closed-loopcleaning are disconnected andnozzles are installed back to theirplace
Product change over time change the running flavor by anotherflavor of Ice Cream.
size and replace it by the mold of anothersize
Holding cost holding one unit of product over a unit of time (oneweek in theselected case)
Inventory balance constraint inventory, forecast and production.Itsimply states that inventory level at the end of any given periodmust be equal to the inventory level atthe end of the previousperiod plus planned level of production less the forecasted salesduring this same given period.
No shortage constraint products should always be available to the
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 56/74
Click to edit Master subtitle style
4/20/12
Project HR management
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 57/74
4/20/12
Human Resource Plan
Environmental Factors
it need to be noted that hazardous factors should be not beneglected during the different phases of development andtechnological use
Society of the area should be timely informed regarding theconstruction
Organizational Process Assets
The different assets of the organization should be usedappropriately
Resource Requirement ResponsibilityInfrastructure Staff
Asset Management administration
equipment Administration manager
Food Administration
Project Office Administration
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 58/74
4/20/12
Roles and responsibilities The role and responsibilities of the projectcoordinator is to be accountable at every phase of development of the ice-cream factory
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 59/74
4/20/12
Acquire Project Team
T he project manager or project management teamshould effectively negotiate and influence others whoare in a position to provide the required humanresources for the project
hence an experienced person should be hired who has
worked on the pervious related project and should work asa leader to carry out the initiative
Environmental factors
I f the human resources are not available due toconstraints, economic factors, or previous assignmentsto other projects, the project manager or project teammay be required to assign alternative resources, perhapswith lower competencies, provided there is no violation
of legal, regulatory, mandatory, or other specific c
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 60/74
4/20/12
Develop Project Team
Teamwork is a critical factor for project success, and developingeffective project teams is one of the primary responsibilities of the project manager
Project managers should create an environment that facilitatesteamwork.
Project managers should continually motivate their team by
providing challenges and opportunities, by providing timelyfeedback and support as needed, and by recognizing andrewarding good performance
High team performance can be achieved by using open andeffective communication, developing trust among team
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 61/74
4/20/12
Manage Project Team
Managing the project team requires a variety of management skills for fostering teamwork andintegrating the efforts of team members to create high-performance team
Team management will involve emphasis on
Ø CommunicationØ conflict management
Ø negotiation
Ø and leadership
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 62/74
4/20/12
Project communication
Program Communication
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 63/74
4/20/12
Program Communicationand governance
Program Meetings•Program Kick Off Meeting – ProgramLead
•Bimonthly meeting( once in two months)
with the Program
Communication Frequency Audience
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 64/74
4/20/12
Communication Frequency Audience
Program Steering Committee
Meeting
Bi-monthly Sponsor, Key stakeholders,Program
Lead and Program Managers
Program Working group Monthly Program Lead, ProgramManagers,
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 65/74
4/20/12
PROJECT PROCUREMENT
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 66/74
4/20/12
The procurement process
Hydrogenated coconut oil, palm oilMilk Powder (Skimmed/Full Cream)
Ice Cream Stick
Emulsifier and Stabilizer
Food Colouring
Flavours
Glucose
Quar Gum
Chocolate Coating/filling
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 67/74
4/20/12
Procurement of machinery
Continuous Freezer 5Homogenizer (1000lt/hr) 1
Homogenizer (500lt/hr) 1
PHE Chiller (1000 lt/hr) 1
PHE Chiller (500 lt/hr) 1
Cold Room 2
Ammonia Compressors KC-21) 2
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 68/74
4/20/12
Contd..
Ammonia Compressors (5/5) 1Pasteurizer (1200Ltr) 1
Ageing Vat 5
Candy Making Machine 2
Pad Tanks 2
Ice Bank (30000Ltr) 1
Hot water generator 1
Automatic Cup /cone filling machine 1
Food Feeder 1
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 69/74
4/20/12
PROJECT RISK MANAGEMENT
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 70/74
4/20/12
Risk mananagement
.There are a couple of possible hazards,which could be associated with ice cream.Some of the basic bacteria according toHACCP in ice cream manufacturing are:
Bacillus cereus
Listeria monocytogenes
Salmonella
Allergen
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 71/74
4/20/12
Critical control points in risk
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 72/74
4/20/12
Critical control points in riskmanagementRaw materialsPasterization
Hardening, storage and transportation
aging
8/2/2019 Group D - Icecream Factory
http://slidepdf.com/reader/full/group-d-icecream-factory 73/74