Group 9_IIMl Mess.pptx

download Group 9_IIMl Mess.pptx

of 11

Transcript of Group 9_IIMl Mess.pptx

  • 8/10/2019 Group 9_IIMl Mess.pptx

    1/11

    STUDY OF IMPROVEMENT AREAS IN IIM LUCKNOMESS

    GROUP 9

  • 8/10/2019 Group 9_IIMl Mess.pptx

    2/11

    MESS

    Manager 1

    Mr Sakti

    VendorManagement

    (1 Senior, 1 Junior)

    Inventorymanagement,procurement,

    quotation handling

    IT(1 Senior, 1 Junior)

    Night mess portal,Live Counter portal,

    website

    Manager 2

    Mr Selva

    Night mess(1 Senior, 1 Junior)

    Menu, RoomDelivery

    Infrastructure(1 Senior, 1 Junior)

    Equipmentpurchase, tables,

    machines

    M

    Mr

    Human resource(2 Senior, 2 Junior, 7

    cooks)

    Employees salary,

    loan, medicalfacilities

  • 8/10/2019 Group 9_IIMl Mess.pptx

    3/11

    Training Facilities For Worker

    Arrangement of trainingfrom renowned cook from

    Lucknow

    Training based on specificmenu offered in mess

    Training on variousregional menus

    Description Of Expences moun

    Daily wage of renowned chef in

    Lucknow

    9000

    Transportation Expense 500

    Staying in Guest house for 2

    days ( Including Food)

    1200

    Total 10700

    Number of Students( IncludingFPM studetns)

    950

    Per head charges on student 11.263

    Per head extra charge on stude

  • 8/10/2019 Group 9_IIMl Mess.pptx

    4/11

    Value Chain System of Mess

    InboundLogistics

    Delivery ofvegetablesand fleshfrom outermarket

    InventoryManagement

    Storage ofraw materialsfor readinessof availability

    Production

    Cooking offood

    Distribution andServices

    Serving thecooked foodand utilities;homedelivery

    Messserver fortakingorders

    Messmanagerandworkers

    IntoSystem

    Intosystem

    Efficient

    transportation of

    raw material

    Long-term

    storage capacity

    Regional items

    and

    improvement in

    food quality

    Effective delivery

    system in night

    mess

    ScopeOfImprovem

    ent

  • 8/10/2019 Group 9_IIMl Mess.pptx

    5/11

    Data collection

    Secondary Research

    Online articles

    Books, research papers

    Primary Research

    Quantitative data

    Survey-Questionnaires tobe used for data collection

    Qualitative data

    Interviews of

    Panel discussicommittee m

    I t f k

  • 8/10/2019 Group 9_IIMl Mess.pptx

    6/11

    Improvement of workenvironment

    Work lifebalance

    Recognition ofhard work

    Strong teamspirit

    Safety ofemployees

    Strongcommunication

    Introduction of more shifts

    Variable bonus/ Reward syst

    Team bonding exercises

    Installation of modern applia

    Communication: Within teamWith Student Committee

    Problem Areas Broad Improvement Areas

  • 8/10/2019 Group 9_IIMl Mess.pptx

    7/11

    Overall improvement in mess

    Wastemanagement (

    EOI for dailylunch and

    diner;predetermined

    menu)

    Training facilityarrangement

    for cooks

    Improvedworking

    environment (soft music inkitchen etc.)

    Improvementin storage

    system andsupply chain ofraw materialsimprovement

    Cooling systemimprovement

    in mess

    Scope ofputting morelocal foods in

    menu

    Voluntacooking aservice frintereststudent

  • 8/10/2019 Group 9_IIMl Mess.pptx

    8/11

    Scope of improvement in Menu

    By estimating demand of various food items on different occasions:

    Cost can be reduced by forecasting

    Saved cost be used for fulfilling demand for expensive food items

    Some food items requested by students to be included in the menu are

    Sprouts

    Nuts

    Fruit salads

    Non-Veg Snacks (Occasional)

    Milk during snacks time

    Vendors for non-veg snacks can be contacted by getting requests through EOI and charg

    Recruit regional cooks if the demand for regional food is high

    Note: Formal survey to be conducted

  • 8/10/2019 Group 9_IIMl Mess.pptx

    9/11

    Cooling system improvement

    Problem:- Extreme hotness during summer and rainy season in the mess

    Suggestions:-

    I. Increase the number of ceiling fan instead of cooler

    II. Expanded metal ceiling

    III. we can put metal colored polythene around the mess wall and on the roof

    IV. Use renewable energy for cooling

  • 8/10/2019 Group 9_IIMl Mess.pptx

    10/11

    Survey Plan

  • 8/10/2019 Group 9_IIMl Mess.pptx

    11/11

    Thank you