• Kmax design Team Members– Peter Maclennan– Peter McKay– Jared Macinnis– Jake Kaupp
• Supervisor– Dr. Alex Kalamkarov
• Client – Kmax Designs
• Sponsorship – True Temper Sports
![Page 3: Group 12: Kmax Designs](https://reader035.fdocuments.us/reader035/viewer/2022062322/56814c7a550346895db99941/html5/thumbnails/3.jpg)
• The goal of our project is to build a full size mountain bike that folds into a much smaller size when you're finished using it.
• Typically these bikes are small and unable to provide the stability and comfort for off road applications.
![Page 4: Group 12: Kmax Designs](https://reader035.fdocuments.us/reader035/viewer/2022062322/56814c7a550346895db99941/html5/thumbnails/4.jpg)
![Page 5: Group 12: Kmax Designs](https://reader035.fdocuments.us/reader035/viewer/2022062322/56814c7a550346895db99941/html5/thumbnails/5.jpg)
• What do we want to provide in a design?
1. Innovative frame Design2. Rugged, Stable Frame3. Simplicity of folding Mechanism4. Portability of Design5. Aesthetic Appeal
![Page 6: Group 12: Kmax Designs](https://reader035.fdocuments.us/reader035/viewer/2022062322/56814c7a550346895db99941/html5/thumbnails/6.jpg)
![Page 7: Group 12: Kmax Designs](https://reader035.fdocuments.us/reader035/viewer/2022062322/56814c7a550346895db99941/html5/thumbnails/7.jpg)
![Page 8: Group 12: Kmax Designs](https://reader035.fdocuments.us/reader035/viewer/2022062322/56814c7a550346895db99941/html5/thumbnails/8.jpg)
![Page 9: Group 12: Kmax Designs](https://reader035.fdocuments.us/reader035/viewer/2022062322/56814c7a550346895db99941/html5/thumbnails/9.jpg)
• Analysis and Specifics Still need to be Completed
– Final dimensions of Frame Lengths– Finite Element Analysis– Safety Factor Determination– Finalize Construction Schedule
• Construction of the frame, to begin next term, providing all determining factors are go.