Ground Water Rule Minimal Treatment System...Ground Water Rule Substantial System Operating Period:...
Transcript of Ground Water Rule Minimal Treatment System...Ground Water Rule Substantial System Operating Period:...
CATAWBA SHORES M H COURT
2020 MONITORING SCHEDULE
OH6200412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CATAWBA SHORES M H COURT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CATAWBA SHORES M H COURT
2020 MONITORING SCHEDULE
OH6200412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CATAWBA SHORES MHPGround Water
6256887
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ELMORE VILLAGEOH6200712
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256889EP001
Facility Name: ELMORE VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
ELMORE VILLAGEOH6200712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ELMORE VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ELMORE VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 805 OHIO AVE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
ELMORE VILLAGEOH6200712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ELMORE VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 633 STATE ST
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ELMORE VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
GENOA VILLAGEOH6201003
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GENOA VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20203TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20203 2/1/2020 andSample(s) Required between 3/31/20203 3/1/2020 andSample(s) Required between 4/30/20203 4/1/2020 andSample(s) Required between 5/31/20203 5/1/2020 andSample(s) Required between 6/30/20203 6/1/2020 andSample(s) Required between 7/31/20203 7/1/2020 andSample(s) Required between 8/31/20203 8/1/2020 andSample(s) Required between 9/30/20203 9/1/2020 andSample(s) Required between 10/31/20203 10/1/2020 andSample(s) Required between 11/30/20203 11/1/2020 andSample(s) Required between 12/31/20203 12/1/2020 and
Sample(s) Required between 1/31/20203TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20203 2/1/2020 andSample(s) Required between 3/31/20203 3/1/2020 andSample(s) Required between 4/30/20203 4/1/2020 andSample(s) Required between 5/31/20203 5/1/2020 andSample(s) Required between 6/30/20203 6/1/2020 andSample(s) Required between 7/31/20203 7/1/2020 andSample(s) Required between 8/31/20203 8/1/2020 andSample(s) Required between 9/30/20203 9/1/2020 andSample(s) Required between 10/31/20203 10/1/2020 andSample(s) Required between 11/30/20203 11/1/2020 andSample(s) Required between 12/31/20203 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GENOA VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 3998 EDINBOURGH CT. GENOA
Dual Sample Required between 1/14/2020at: DS201DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2014/8/2020 andDual Sample Required between 7/14/2020at: DS2017/8/2020 andDual Sample Required between 10/14/2020at: DS20110/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
GENOA VILLAGEOH6201003
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GENOA VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 22038 W. ST. RT. 579 WILLISTON
Dual Sample Required between 1/14/2020at: DS202DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2024/8/2020 andDual Sample Required between 7/14/2020at: DS2027/8/2020 andDual Sample Required between 10/14/2020at: DS20210/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GENOA VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
GREEN VALLEY MOBILE HOME PARKOH6201212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256894EP001
Facility Name: GREEN VALLEY MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GREEN VALLEY MOBILE HOME PARKOH6201212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREEN VALLEY MHP DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREEN VALLEY MHP DISTRIBUTIONDS201 LOT #29 (2.0)
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
GREEN VALLEY MOBILE HOME PARKOH6201212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREEN VALLEY MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
GREENWOOD MOBILE HOME PKOH6201312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256895EP001
Facility Name: GREENWOOD MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GREENWOOD MOBILE HOME PKOH6201312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREENWOOD MOBILE HOME PK DISTRIBUTIODS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREENWOOD MOBILE HOME PK DISTRIBUTIODS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
GREENWOOD MOBILE HOME PKOH6201312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREENWOOD MOBILE HOME PK DISTRIBUTIOLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
LAKE ERIE UTILITIES COMP
2020 MONITORING SCHEDULE
OH6201911 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAKE ERIE UTILITIES COMP DISTRIBUTIONSurface Water Facility Class: CLASS 1
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 4 1/1/2020 and 1/31/2020
Sample(s) Required between4 2/1/2020 and 2/29/2020
Sample(s) Required between4 3/1/2020 and 3/31/2020
Sample(s) Required between4 4/1/2020 and 4/30/2020
Sample(s) Required between4 5/1/2020 and 5/31/2020
Sample(s) Required between4 6/1/2020 and 6/30/2020
Sample(s) Required between4 7/1/2020 and 7/31/2020
Sample(s) Required between4 8/1/2020 and 8/31/2020
Sample(s) Required between4 9/1/2020 and 9/30/2020
Sample(s) Required between4 10/1/2020 and 10/31/2020
Sample(s) Required between4 11/1/2020 and 11/30/2020
Sample(s) Required between4 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAKE ERIE UTILITIES COMP
2020 MONITORING SCHEDULE
OH6201911 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: LT2001 Facility Source:
Facility Name: LAKE ERIE UTILITIES CO 2Surface Water Facility Class: CLASS 3
6262096
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020
Sample(s) Required between1 1/12/2020 and 1/18/2020
Sample(s) Required between1 1/26/2020 and 2/1/2020
Sample(s) Required between1 2/9/2020 and 2/15/2020
Sample(s) Required between1 2/23/2020 and 2/29/2020
Sample(s) Required between1 3/8/2020 and 3/14/2020
Sample(s) Required between1 3/22/2020 and 3/28/2020
Sample(s) Required between1 4/5/2020 and 4/11/2020
Sample(s) Required between1 4/19/2020 and 4/25/2020
Sample(s) Required between1 5/3/2020 and 5/9/2020
Sample(s) Required between1 5/17/2020 and 5/23/2020
Sample(s) Required between1 5/31/2020 and 6/6/2020
Sample(s) Required between1 6/14/2020 and 6/20/2020
Sample(s) Required between1 6/28/2020 and 7/4/2020
Sample(s) Required between1 7/12/2020 and 7/18/2020
Sample(s) Required between1 7/26/2020 and 8/1/2020
Sample(s) Required between1 8/9/2020 and 8/15/2020
Sample(s) Required between1 8/23/2020 and 8/29/2020
Sample(s) Required between1 9/6/2020 and 9/12/2020
Sample(s) Required between1 9/20/2020 and 9/26/2020
Sample(s) Required between1 10/4/2020 and 10/10/2020
Sample(s) Required between1 10/18/2020 and 10/24/2020
Sample(s) Required between1 11/1/2020 and 11/7/2020
Sample(s) Required between1 11/15/2020 and 11/21/2020
Sample(s) Required between1 11/29/2020 and 12/5/2020
LAKE ERIE UTILITIES COMP
2020 MONITORING SCHEDULE
OH6201911 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: LT2001 Facility Source:
Facility Name: LAKE ERIE UTILITIES CO 2Surface Water Facility Class: CLASS 3
6262096
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/13/2020 and 12/19/2020
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 and must be collected at the sametime as the raw total microcystins sample. SAMPLES MUST BE SHIPPED OVERNIGHT ON ICE ON THE DAY OF COLLECTION AND ARRIVE ATOHIO EPA DIVISION OF ENVIRONMENTAL SERVICES (DES) BY NOON MONDAY THROUGH THURSDAY ONLY! If lab capacity is found to beadequate, cyanobacteria screening samples will no longer be analyzed, free of charge, by Ohio EPA DES beginning June 1, 2017.
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAKE ERIE UTILITIES COMP
2020 MONITORING SCHEDULE
OH6201911 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002/LT20 Facility Source:
Facility Name: LAKE ERIE UTILITIES CO 2Surface Water Facility Class: CLASS 3
6262096
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT200# and one finished water sample at EP00#. A week is defined asSunday through Saturday.
*Weekly sampling unless requirements for seasonal reduced monitoring are met (November through April). Biweekly raw seasonal reducedmonitoring must be conducted at the same time as cyanobacteria screening sample. Any microcystins detection during seasonal reducedmonitoring triggers collection of raw and finished samples within 24 hours and a return to weekly monitoring at both raw and finished samplepoints. For questions about seasonal reduced monitoring please contact your Ohio EPA District Office HAB Coordinator.
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAKE ERIE UTILITIES COMP
2020 MONITORING SCHEDULE
OH6201911 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: LAKE ERIE UTILITIES CO 2Surface Water Facility Class: CLASS 3
6262096
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
LAKE ERIE UTILITIES COMP
2020 MONITORING SCHEDULE
OH6201911 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: LAKE ERIE UTILITIES CO 2Surface Water Facility Class: CLASS 3
6262096
Sample(s) Required betweenNITRATE - 1040 1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MARBLEHEAD VILLAGEOH6202411
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256904EP001
Facility Name: MARBLEHEAD VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
MARBLEHEAD VILLAGEOH6202411
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256904EP001/LT2001
Facility Name: MARBLEHEAD VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
MARBLEHEAD VILLAGEOH6202411
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256904LT2001
Facility Name: MARBLEHEAD VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
MARBLEHEAD VILLAGEOH6202411
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MARBLEHEAD VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MARBLEHEAD VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 10269 E BAYSHORE RD
Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 andDual Sample Required between 11/7/2020at: DS20111/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
MARBLEHEAD VILLAGEOH6202411
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MARBLEHEAD VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 113 LAKE BREEZE CIRCLE
Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MARBLEHEAD VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
OAK HARBOR VILLAGEOH6202603
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAK HARBOR VILLAGE DISTRIBUTION SYSTE Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20205TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20205 2/1/2020 andSample(s) Required between 3/31/20205 3/1/2020 andSample(s) Required between 4/30/20205 4/1/2020 andSample(s) Required between 5/31/20205 5/1/2020 andSample(s) Required between 6/30/20205 6/1/2020 andSample(s) Required between 7/31/20205 7/1/2020 andSample(s) Required between 8/31/20205 8/1/2020 andSample(s) Required between 9/30/20205 9/1/2020 andSample(s) Required between 10/31/20205 10/1/2020 andSample(s) Required between 11/30/20205 11/1/2020 andSample(s) Required between 12/31/20205 12/1/2020 and
Sample(s) Required between 1/31/20205TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20205 2/1/2020 andSample(s) Required between 3/31/20205 3/1/2020 andSample(s) Required between 4/30/20205 4/1/2020 andSample(s) Required between 5/31/20205 5/1/2020 andSample(s) Required between 6/30/20205 6/1/2020 andSample(s) Required between 7/31/20205 7/1/2020 andSample(s) Required between 8/31/20205 8/1/2020 andSample(s) Required between 9/30/20205 9/1/2020 andSample(s) Required between 10/31/20205 10/1/2020 andSample(s) Required between 11/30/20205 11/1/2020 andSample(s) Required between 12/31/20205 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAK HARBOR VILLAGE DISTRIBUTION SYSTE Facility Class: CLASS 1DS201 9735 W. SR 163
Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and
OAK HARBOR VILLAGEOH6202603
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAK HARBOR VILLAGE DISTRIBUTION SYSTE Facility Class: CLASS 1DS201 9735 W. SR 163
Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAK HARBOR VILLAGE DISTRIBUTION SYSTE Facility Class: CLASS 1DS202 601 N. BENTON ST.
Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAK HARBOR VILLAGE DISTRIBUTION SYSTE Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
PORT CLINTON CITYOH6203211
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PORT CLINTON CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20207TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20207 2/1/2020 andSample(s) Required between 3/31/20207 3/1/2020 andSample(s) Required between 4/30/20207 4/1/2020 andSample(s) Required between 5/31/20207 5/1/2020 andSample(s) Required between 6/30/20207 6/1/2020 andSample(s) Required between 7/31/20207 7/1/2020 andSample(s) Required between 8/31/20207 8/1/2020 andSample(s) Required between 9/30/20207 9/1/2020 andSample(s) Required between 10/31/20207 10/1/2020 andSample(s) Required between 11/30/20207 11/1/2020 andSample(s) Required between 12/31/20207 12/1/2020 and
Sample(s) Required between 1/31/20207TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20207 2/1/2020 andSample(s) Required between 3/31/20207 3/1/2020 andSample(s) Required between 4/30/20207 4/1/2020 andSample(s) Required between 5/31/20207 5/1/2020 andSample(s) Required between 6/30/20207 6/1/2020 andSample(s) Required between 7/31/20207 7/1/2020 andSample(s) Required between 8/31/20207 8/1/2020 andSample(s) Required between 9/30/20207 9/1/2020 andSample(s) Required between 10/31/20207 10/1/2020 andSample(s) Required between 11/30/20207 11/1/2020 andSample(s) Required between 12/31/20207 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PORT CLINTON CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1DS201 1868 EAST PERRY ST
Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and
PORT CLINTON CITYOH6203211
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PORT CLINTON CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1DS201 1868 EAST PERRY ST
Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PORT CLINTON CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1DS202 716 W THIRD ST
Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PORT CLINTON CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
PUT-IN-BAY VILLAGEOH6203311
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256913EP001
Facility Name: PUT-IN-BAY VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
EP001
Sample(s) Required betweenBROMATE - 1011 1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
PUT-IN-BAY VILLAGEOH6203311
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256913EP001/LT2001
Facility Name: PUT-IN-BAY VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
PUT-IN-BAY VILLAGEOH6203311
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256913LT2001
Facility Name: PUT-IN-BAY VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
PUT-IN-BAY VILLAGEOH6203311
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PUT-IN-BAY VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PUT-IN-BAY VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 70 PARK
Dual Sample Required between 3/7/2020at: DS201DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2016/1/2020 andDual Sample Required between 9/7/2020at: DS2019/1/2020 andDual Sample Required between 12/7/2020at: DS20112/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
PUT-IN-BAY VILLAGEOH6203311
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PUT-IN-BAY VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 1550 PIB ROAD
Dual Sample Required between 3/7/2020at: DS202DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2026/1/2020 andDual Sample Required between 9/7/2020at: DS2029/1/2020 andDual Sample Required between 12/7/2020at: DS20212/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PUT-IN-BAY VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 6/30/202020LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/202020 7/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
OTTAWA COUNTY REGIONAL WATER DISTRICTOH6205011
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256925EP001
Facility Name: OTTAWA COUNTY REGIONAL WATER DISTRICT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 4/1/2020 and 6/30/2020
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
OTTAWA COUNTY REGIONAL WATER DISTRICTOH6205011
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256925EP001/LT2001
Facility Name: OTTAWA COUNTY REGIONAL WATER DISTRICT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
OTTAWA COUNTY REGIONAL WATER DISTRICTOH6205011
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256925LT2001
Facility Name: OTTAWA COUNTY REGIONAL WATER DISTRICT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
OTTAWA COUNTY REGIONAL WATER DISTRICTOH6205011
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTTAWA COUNTY REGIONAL DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/202020TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and
Sample(s) Required between 1/31/202020TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTTAWA COUNTY REGIONAL DISTRIBUTION Facility Class: CLASS 1DS201 DANBURY TOWER
Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 andDual Sample Required between 11/7/2020at: DS20111/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
OTTAWA COUNTY REGIONAL WATER DISTRICTOH6205011
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTTAWA COUNTY REGIONAL DISTRIBUTION Facility Class: CLASS 1DS202 CATAWBA TOWER
Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTTAWA COUNTY REGIONAL DISTRIBUTION Facility Class: CLASS 1DS203 STATE OF OHIO ST.RT. 2 REST AREA
Dual Sample Required between 2/7/2020at: DS203DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2035/1/2020 andDual Sample Required between 8/7/2020at: DS2038/1/2020 andDual Sample Required between 11/7/2020at: DS20311/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTTAWA COUNTY REGIONAL DISTRIBUTION Facility Class: CLASS 1DS204 9400 NORTH SHORE BLVD
Dual Sample Required between 2/7/2020at: DS204DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2045/1/2020 andDual Sample Required between 8/7/2020at: DS2048/1/2020 andDual Sample Required between 11/7/2020at: DS20411/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTTAWA COUNTY REGIONAL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
CARROLL WATER AND SEWEROH6205111
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256927EP001
Facility Name: CARROLL WATER AND SEWER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
EP001
Sample(s) Required betweenBROMATE - 1011 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 10/1/2020 and 12/31/2020
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020
CARROLL WATER AND SEWEROH6205111
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256927EP001
Facility Name: CARROLL WATER AND SEWER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
EP001
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
CARROLL WATER AND SEWEROH6205111
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256927EP001/LT2001
Facility Name: CARROLL WATER AND SEWER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
CARROLL WATER AND SEWEROH6205111
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256927LT2001
Facility Name: CARROLL WATER AND SEWER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
CARROLL WATER AND SEWEROH6205111
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CARROLL WATER AND SEWER DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CARROLL WATER AND SEWER DISTRIBUTION Facility Class: CLASS 1DS201 11861 W SALEM CARROLL RD
Dual Sample Required between 2/14/2020at: DS201DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2015/8/2020 andDual Sample Required between 8/14/2020at: DS2018/8/2020 andDual Sample Required between 11/14/2020at: DS20111/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
CARROLL WATER AND SEWEROH6205111
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CARROLL WATER AND SEWER DISTRIBUTION Facility Class: CLASS 1DS202 11080 W TOUSSAINT E RD
Dual Sample Required between 2/14/2020at: DS202DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2025/8/2020 andDual Sample Required between 8/14/2020at: DS2028/8/2020 andDual Sample Required between 11/14/2020at: DS20211/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CARROLL WATER AND SEWER DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
BENCHMORE FARMS AMLC 2
2020 MONITORING SCHEDULE
OH6230412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: BENCHMORE FARMS AMLC 2 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCHMORE FARMS AMLC 2
2020 MONITORING SCHEDULE
OH6230412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BENCHMORE FARMS AMLC 2 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 8/21/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCHMORE FARMS AMLC 2
2020 MONITORING SCHEDULE
OH6230412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
08/14/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BENCHMORE FARMS AMLC NO 2Ground Water
6256928
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BETHEL UNITED BRETHREN CHURCH
2020 MONITORING SCHEDULE
OH6230512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BETHEL UNITED BRETHREN C DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BETHEL UNITED BRETHREN CHURCH
2020 MONITORING SCHEDULE
OH6230512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BETHEL UNITED BRETHREN CHURCHGround Water
6256929
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BLACKBERRY CORNERS
2020 MONITORING SCHEDULE
OH6230612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BLACKBERRY CORNERS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BLACKBERRY CORNERS
2020 MONITORING SCHEDULE
OH6230612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BLACKBERRY CORNERSGround Water
6256930
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ERNESTOS RESTAURANT
2020 MONITORING SCHEDULE
OH6230912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ERNESTOS RESTAURANT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ERNESTOS RESTAURANT
2020 MONITORING SCHEDULE
OH6230912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ERNESTOS RESTAURANTGround Water
6256932
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COUNTRY KEG RESTAURANT
2020 MONITORING SCHEDULE
OH6232012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: COUNTRY KEG, LLC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COUNTRY KEG RESTAURANT
2020 MONITORING SCHEDULE
OH6232012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: COUNTRY KEG RESTAURANTGround Water
6256941
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HILLE/ROTHERT AMLC
2020 MONITORING SCHEDULE
OH6232612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: HILLE/ROTHERT AMLC DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HILLE/ROTHERT AMLC
2020 MONITORING SCHEDULE
OH6232612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HILLE/ROTHERT AMLC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/15/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HILLE/ROTHERT AMLC
2020 MONITORING SCHEDULE
OH6232612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HILLE/ROTHERT AMLCGround Water
6256944
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 4/1/2020 and 6/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TRI MOTOR SALES
2020 MONITORING SCHEDULE
OH6233212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TRI MOTOR SALES INC. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TRI MOTOR SALES
2020 MONITORING SCHEDULE
OH6233212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TRI MOTOR SALES INCGround Water
6256948
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRACE LUTHERAN CHURCH
2020 MONITORING SCHEDULE
OH6233512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GRACE LUTHERAN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRACE LUTHERAN CHURCH
2020 MONITORING SCHEDULE
OH6233512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GRACE LUTHERAN CHURCHGround Water
6256949
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NORTH POINT EDUCATION SERVICE CTR OTTAWAOH6233812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6256952EP001
Facility Name: NORTH POINT EDUCATION SERVICE CTR SCHOOL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
NORTH POINT EDUCATION SERVICE CTR OTTAWAOH6233812
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH POINT EDUCATION SERV DISTRIBUTIODS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH POINT EDUCATION SERV DISTRIBUTIODS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH POINT EDUCATION SERV DISTRIBUTIOLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
LUCKEY HOMESTEAD FARMS AMLC PWS
2020 MONITORING SCHEDULE
OH6234412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to8/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: LUCKEY HOMESTEAD FARM AM DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LUCKEY HOMESTEAD FARMS AMLC PWS
2020 MONITORING SCHEDULE
OH6234412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to8/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LUCKEY HOMESTEAD FARM AM DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LUCKEY HOMESTEAD FARMS AMLC PWS
2020 MONITORING SCHEDULE
OH6234412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to8/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LUCKEY HOMESTEAD FARMS AMLCGround Water
6256955
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KAISERS LIMESTONE TAVERN
2020 MONITORING SCHEDULE
OH6235212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LIMESTONE TAVERN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KAISERS LIMESTONE TAVERN
2020 MONITORING SCHEDULE
OH6235212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LIMESTONE TAVERNGround Water
6256956
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ROTHERT AMLC
2020 MONITORING SCHEDULE
OH6237012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ROTHERT AMLC DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ROTHERT AMLC
2020 MONITORING SCHEDULE
OH6237012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ROTHERT AMLC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/7/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ROTHERT AMLC
2020 MONITORING SCHEDULE
OH6237012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ROTHERT AMLCGround Water
6256965
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 4/1/2020 and 6/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST JOHN LUTHERAN CHURCH ROCKY RIDGE
2020 MONITORING SCHEDULE
OH6238012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST JOHN LUTHERAN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST JOHN LUTHERAN CHURCH ROCKY RIDGE
2020 MONITORING SCHEDULE
OH6238012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAINT JOHN LUTHERAN CHURCHGround Water
6256970
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST PETERS LUTHERAN CHURCH/PRESCHOOL
2020 MONITORING SCHEDULE
OH6238112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST PETERS LUTHERAN CHURCH & DAYCARE DISTGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST PETERS LUTHERAN CHURCH/PRESCHOOL
2020 MONITORING SCHEDULE
OH6238112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ST PETERS LUTHERAN CHURCH & DAYCAREGround Water
6256971
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CRAZY LADY SALOON
2020 MONITORING SCHEDULE
OH6238412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CRAZY LADY SALOON DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CRAZY LADY SALOON
2020 MONITORING SCHEDULE
OH6238412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CRAZY LADY SALOONGround Water
6256972
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH-SCHULTE FARMS AMLC PWS
2020 MONITORING SCHEDULE
OH6238812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: BENCH-SCHULTE FARMS AMLC DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH-SCHULTE FARMS AMLC PWS
2020 MONITORING SCHEDULE
OH6238812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BENCH-SCHULTE FARMS AMLC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH-SCHULTE FARMS AMLC PWS
2020 MONITORING SCHEDULE
OH6238812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SCHULTE AMLCGround Water
6256973
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CEDARLANE RV PARK
2020 MONITORING SCHEDULE
OH6240712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CEDARLANE RV PARK DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CEDARLANE RV PARK
2020 MONITORING SCHEDULE
OH6240712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CEDARLANE RV PARK DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/15/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CEDARLANE RV PARK
2020 MONITORING SCHEDULE
OH6240712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CEDARLANE CAMPGROUNDGround Water Facility Class: CLASS A
6256980
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CHIPPEWA GOLF CLUB
2020 MONITORING SCHEDULE
OH6241012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CHIPPEWA GOLF CLUB DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CHIPPEWA GOLF CLUB
2020 MONITORING SCHEDULE
OH6241012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
06/19/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CHIPPEWA GOLF CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CHIPPEWA GOLF CLUB
2020 MONITORING SCHEDULE
OH6241012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHIPPEWA GOLF CLUBGround Water
6256981
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN HIDEAWAY CAMPGROUND REAR WELL
2020 MONITORING SCHEDULE
OH6242112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: HANKS PLACE-WEST-WELL DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN HIDEAWAY CAMPGROUND REAR WELL
2020 MONITORING SCHEDULE
OH6242112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HANKS PLACE-WEST-WELL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/15/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN HIDEAWAY CAMPGROUND REAR WELL
2020 MONITORING SCHEDULE
OH6242112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HANKS PLACE WEST WELLGround Water
6256990
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN HIDEAWAY CAMPGROUND FRONT WELL
2020 MONITORING SCHEDULE
OH6242212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: HANKS PLACE-EAST WELL DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN HIDEAWAY CAMPGROUND FRONT WELL
2020 MONITORING SCHEDULE
OH6242212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HANKS PLACE-EAST WELL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/15/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN HIDEAWAY CAMPGROUND FRONT WELL
2020 MONITORING SCHEDULE
OH6242212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HANKS PLACE EAST WELLGround Water
6256991
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SHADE ACRES CAMPGROUND AND RV PARK
2020 MONITORING SCHEDULE
OH6245212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: SHADE ACRES CAMPGROUND & DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SHADE ACRES CAMPGROUND AND RV PARK
2020 MONITORING SCHEDULE
OH6245212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SHADE ACRES CAMPGROUND & DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/8/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/15/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SHADE ACRES CAMPGROUND AND RV PARK
2020 MONITORING SCHEDULE
OH6245212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SHADE ACRES CAMPGROUND & RV PKGround Water
6257010
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SUGAR CREEK GOLF CLUB
2020 MONITORING SCHEDULE
OH6246212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SUGAR CREEK GOLF CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SUGAR CREEK GOLF CLUB
2020 MONITORING SCHEDULE
OH6246212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SUGAR CREEK GOLF CLUBGround Water
6257015
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRAYMONT DOLIME (OH)OH6254112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
6257057EP001
Facility Name: GRAYMONT DOLIME OH INC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GRAYMONT DOLIME (OH)OH6254112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GRAYMONT DOLIME (OH) INC DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GRAYMONT DOLIME (OH) INC DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GRAYMONT DOLIME (OH) INC DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
BENCHMORE FARMS AMLC 1
2020 MONITORING SCHEDULE
OH6254712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: BENCHMORE FARMS AMLC 1 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCHMORE FARMS AMLC 1
2020 MONITORING SCHEDULE
OH6254712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BENCHMORE FARMS AMLC 1 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 8/21/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCHMORE FARMS AMLC 1
2020 MONITORING SCHEDULE
OH6254712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
08/14/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BENCHMORE FARMS AMLC NO 1Ground Water
6257063
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH-DICKINSON AMLC PWS
2020 MONITORING SCHEDULE
OH6256812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: BENCH-DICKINSON AMLC DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH-DICKINSON AMLC PWS
2020 MONITORING SCHEDULE
OH6256812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BENCH-DICKINSON AMLC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH-DICKINSON AMLC PWS
2020 MONITORING SCHEDULE
OH6256812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DICKINSON AMLCGround Water
6257079
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH, ROBERT AMLC PWS
2020 MONITORING SCHEDULE
OH6256912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: BENCH, ROBERT AMLC DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH, ROBERT AMLC PWS
2020 MONITORING SCHEDULE
OH6256912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BENCH, ROBERT AMLC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BENCH, ROBERT AMLC PWS
2020 MONITORING SCHEDULE
OH6256912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BENCH ROBERT AMLCGround Water
6257080
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST HAZARDS
2020 MONITORING SCHEDULE
OH6258112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ST. HAZARDS DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST HAZARDS
2020 MONITORING SCHEDULE
OH6258112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST. HAZARDS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/3/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST HAZARDS
2020 MONITORING SCHEDULE
OH6258112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ST HAZARDSGround Water Facility Class: CLASS A
6257089
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
J F WALLEYE
2020 MONITORING SCHEDULE
OH6258712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: J.F. WALLEYE MICRO-BREWE DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
J F WALLEYE
2020 MONITORING SCHEDULE
OH6258712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: J.F. WALLEYE MICRO-BREWE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/4/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
J F WALLEYE
2020 MONITORING SCHEDULE
OH6258712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: JF WALLEYE MICRO BREWERYGround Water Facility Class: CLASS A
6257094
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ELLISTON ZION UMC- GRAYTOWN
2020 MONITORING SCHEDULE
OH6259112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZION UNITED METHODIST CH GRAYTOWN DISTGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ELLISTON ZION UMC- GRAYTOWN
2020 MONITORING SCHEDULE
OH6259112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZION UNITED METHODIST CHURCH GRAYTOWNGround Water
6260732
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or