2017 2018 2019 Secured U.S. Army Corps of Engineers Record of Decision and 404 Permit Begin final dam design and secure FERC hydropower license amendment Final design engineering and test quarry 2020 2021-23 Site development, road improvements, continued test quarrying. Recreation access at Osprey Point and access on both sides of dam will be closed. Build dam foundation, application of Roller Compacted Concrete 2024 2025 Tree clearing, hydropower modification and spillway work Reservoir fills GROSS RESERVOIR EXPANSION PROJECT TIMELINE
Transcript of GROSS RESERVOIR EXPANSION PROJECT...
2017
2018
2019 Secured U.S. Army Corps of Engineers Record of Decision and 404 Permit
Begin final dam design and secure FERC hydropower license amendment
Final design engineering and test quarry
2020
2021-23
Site development, road improvements, continued test quarrying. Recreation access at Osprey Point and access on both sides of dam will be closed.
Build dam foundation, application of Roller Compacted Concrete
2024
2025
Tree clearing, hydropower modification andspillway work
Reservoir fills