2017 2018 2019 Secured U.S. Army Corps of Engineers Record of Decision and 404 Permit Begin final dam design and secure FERC hydropower license amendment Final design engineering and test quarry 2020 2021-23 Site development, road improvements, continued test quarrying. Recreation access at Osprey Point and access on both sides of dam will be closed. Build dam foundation, application of Roller Compacted Concrete 2024 2025 Tree clearing, hydropower modification and spillway work Reservoir fills GROSS RESERVOIR EXPANSION PROJECT TIMELINE

Transcript of GROSS RESERVOIR EXPANSION PROJECT...

Page 1: GROSS RESERVOIR EXPANSION PROJECT TIMELINEgrossreservoir.org/.../01/011918-Project-Timeline-48x36.pdf · 2019-03-28 · Final design engineering and test quarry 2020 2021-23 Site

2017

2018

2019 Secured U.S. Army Corps of Engineers Record of Decision and 404 Permit

Begin final dam design and secure FERC hydropower license amendment

Final design engineering and test quarry

2020

2021-23

Site development, road improvements, continued test quarrying. Recreation access at Osprey Point and access on both sides of dam will be closed.

Build dam foundation, application of Roller Compacted Concrete

2024

2025

Tree clearing, hydropower modification andspillway work

Reservoir fills