Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with...
-
Upload
mary-dutton -
Category
Documents
-
view
213 -
download
1
Transcript of Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with...
![Page 1: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/1.jpg)
Grid Environments
![Page 2: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/2.jpg)
Why Grid?
Enwork started with a “clean sheet of paper” and performed research with end users, designers and dealers in Silicon Valley on workstation environments for today’s workforce. Market validation of concepts was done across the country. Go-to-market was quick and decisive Here is our story…
2
![Page 3: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/3.jpg)
Grid Design Criteria• GREAT MODERNIST DESIGN
• FRAME AND TILE + POST AND BEAM HYBRID = FLEXIBILITY
• INCREDIBLE VALUE
• MODERN MATERIALS
• FLEXIBLE PLANNING• Plans like a panel system or bench• Off-modular
![Page 4: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/4.jpg)
Grid Design Criteria• IMPROVE AIR FLOW (HVAC)
• SUPPORT LEED DAYLIGHT CREDITS (provide visual topography)
• SUPPORT COLLABORATION (and multiple work modes)
• APPEAL TO MULTIPLE GENERATIONS (non cubicle)
• SHORT LEAD TIME
![Page 5: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/5.jpg)
GRIDPRODUCT DETAILS
5
![Page 6: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/6.jpg)
Frames
• Frames• Power above worksurface
(42”H to top of Frame) or below (36”H)
• Height dictated by legs
• Mini Frames• Power above worksurface
(34”H to top of Frame) or below (28”H)
• Height dictated by legs
6
![Page 7: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/7.jpg)
Tiles
• 2 Types• Upper (powered frame)• Full (non-powered frame)
• 6 Options• Fabric (tack and non-tack)• Acrylic• Laminate• Veneer• Whiteboard (magnetic and
non-magnetic)
![Page 8: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/8.jpg)
Screens and Modesty
• 12”H Acrylic Topper Screens
• Steel Modesty Panels
8
![Page 9: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/9.jpg)
Power and Data
• Standard: 5 Wire, 3 Circuit Power System• Optional: 8 Wire, 4 circuit with dedicated power• 2 duplex receptacles per user per Frame. • Configurations: 1-sided power, 2-side power, non-
powered or pass thru power.• Data per user: 2 openings in the middle of frame.• Infeeds: Floor based or power pole• NYC/SF/Chicago power is available• Cable trough available
9
![Page 10: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/10.jpg)
Worksurfaces and Supports
Worksurfaces and Cable Management Three worksurface
dimensional choices: No surface gap to Frame ½” surface gap to Frame 1” surface gap to Frame
Grommets and Scallops available
New: Transaction tops now available.
Tether Brackets Off-modular Can be shared Adjustable height (set screw)
Legs based on Impression tables platform – clear aluminum or painted
End Panels (new!)
10
![Page 11: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/11.jpg)
Storage
• Three Choices• 2-way Overhead Storage with Tackboard (acrylic doors optional)• 1-way Overhead Storage (in development)• Cubby Transaction
![Page 12: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/12.jpg)
Worktools and Divider Screens
• Worktools• Letter Tray, Pencil Cup,
Accessory Tray, Phone Holder, Folder Holder
• Divider Screens• Aluminum framed
fabric or acrylic• Fabric only• Pac-Man
12
![Page 13: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/13.jpg)
Space Planning
• 90 Degree connections• All-off module connection• Affects surface dimensions
• 120 Degree Connections• 3-way and 2-way junctions available
• Consult “Understanding Grid” in the front section of the Enwork Grid Price List for more detailed information.
13
![Page 14: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/14.jpg)
GRIDPLANNING
14
![Page 15: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/15.jpg)
Grid Planning
• Approach 1 Spine Based with Tethering Tops
• Approach 2 Mini Frames
• Approach 3 Freestanding Spine and Tables
• Approach 4 “Traditional” 90 and 120 planning
![Page 16: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/16.jpg)
Approach 1 – Spine Based Planning
16
![Page 17: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/17.jpg)
Approach 2 – Spine Based Planning with Mini Frames
17
![Page 18: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/18.jpg)
Approach 3 – Freestanding Grid
18
![Page 19: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/19.jpg)
Approach 4 – Traditional 90 and 120 Degree Planning
19
![Page 20: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/20.jpg)
APPLICATION EXAMPLES
CHOICES FOR ALL PRICE POINTS
20
![Page 21: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/21.jpg)
Grid Pricing FlexibilityLIST PRICES FOR SIX PACK
Typical 2A $12,123 Typical 4B $12,580 Typical 2B $13,303 Typical 3B $16,900 Typical 4D $17,310 Typical 4A $18,083 Typical 4F $18,781 Typical 4E $20,130 Typical 1A $20,584 Typical 3A $21,103 Typical 4C $25,446 Typical 5A $33,943 Typical 5B $43,536
21
![Page 22: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/22.jpg)
Typical 2A – Mini Frames
$12,123 List Per Six-Pack
Includes:• 34”H Mini Frame for
Power/Data (Mini Frames have no privacy tiles)
• Straight Legs with Tethered Worksurfaces
• Steel Disc Bases• No Storage
22
![Page 23: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/23.jpg)
Typical 4B – Benching
$12,580 List Per Six-Pack
Includes:• 42” H Frame,
Beltway above Worksurface
• Worktools• Tackable Fabric Tiles• Tethered
Worksurfaces• Storage: Fixed BBF
Pedestals
23
![Page 24: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/24.jpg)
Typical 2B – Mini Frames
$13,303 List Per Six-Pack
Includes:• Mini-Frame, Beltway
Above Worksurface• Acrylic Topper
Screens• Tethered
Worksurfaces• Mobile Ped with
Seat Cushion
24
![Page 25: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/25.jpg)
Typical 3B – 120 Degree
$16,900 List Per Six-Pack
Includes:• 120 Degree 42”H
Grid Frames (Beltway Above Worksurface
• Acrylic Tiles• Tethered
Worksurfaces• Storage: Fixed BBF
ped
25
![Page 26: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/26.jpg)
Typical 4D – Max Benching
$17,310 List Per Six-Pack
Includes:• 42”H Frame,
Beltway Above Worksurface
• Tethered Worksurfaces
• Tackable Fabric Tiles • End Panels• Aluminum Framed
Acrylic Dividers• Mobile Ped with
Seat Cushion
26
![Page 27: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/27.jpg)
Typical 4A – Group Work
$18,083 List Per Six-Pack
Includes:
42”H Grid with Acrylic Topper Screen for 54” Total Height (Beltway above worksurface)
Tethered Worksurfaces
Team Tables
Storage: 2 fixed pedestals per user (BBF/FF)
27
![Page 28: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/28.jpg)
Typical 4F – Spine Based Planning$18,781 List Per
Six-Pack
Includes:• 42”H Frame,
Beltway Above Worksurface
• Acrylic Privacy Screens
• Tethered Worksurfaces
• Tackable Fabric Tiles • Mobile Ped with
Seat Cushion• Worktools• 2 Mobile Tables
28
![Page 29: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/29.jpg)
Typical 4E – Spine w/Overheads
$20,130 List Per Six-Pack
Includes:• 42”H Frame,
Beltway Above Worksurface
• Tethered Worksurfaces
• Tackable Fabric Tiles • Overhead Storage
(Ying-Yang for full binder storage) with tackboard
• Mobile Ped with Seat Cushion
29
![Page 30: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/30.jpg)
Typical 1A – Freestanding Waves$20,584 List Per Six-
Pack
Includes:• 42” H Freestanding
Grid (54”H with Topper Screen) – Beltway above worksurface
• Freestanding Tables• Acrylic Topper
Screens and Modesty Panels for privacy
• 2 Extra Collaborative Tables
• Worktools• Tackable Fabric Tiles• Storage: mobile ped
with seat cushion
30
![Page 31: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/31.jpg)
Typical 3A – 120 Planning, Power
Below$21,103 List Per Six-
Pack
Includes:• 120 Degree 36”H
Grid Frames (Beltway BELOW Worksurface)
• Tackable Fabric Tiles• Tethered
Worksurfaces• Storage: Mobile BF
Ped with Seat Cushion
• Worktools
31
![Page 32: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/32.jpg)
Typical 4C- Sleek and Refined
$25,446 List Per Six-Pack
Includes:• 42”H Frame with
Acrylic Topper Screen for 54”H total height, Beltway Above Worksurface
• Tethered Worksurfaces
• Tackable Fabric Tiles• Worktools• Storage: Low Cubby
Storage with non-locking sliding acrylic doors
32
![Page 33: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/33.jpg)
Typical 5A – Max Power
$33,943 List Per Six-Pack
Includes:• 42”H Frame with
Acrylic Topper Screen for 54”H total height, Beltway Above Worksurface
• Power in all Frames• Tethered
Worksurfaces• Tackable Fabric Tiles
in Stations, Veneer Tiles and Steel Modesty in Aisles
• Worktools• Storage: Mobile Low
Cubby Storage with non-locking sliding acrylic doors
33
![Page 34: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/34.jpg)
Typical 5B – Max Power and Towers
$43,536 List Per Six-Pack
Includes:• 42”H Frame with
Acrylic Topper Screen for 54”H total height, Beltway Above Worksurface
• Tethered Worksurfaces
• Tackable Fabric Tiles in Stations, Veneer Tiles and Steel Modesty in Aisles
• Worktools• Storage: 54”H Tower
34
![Page 35: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/35.jpg)
GRIDCASE STUDIES
35
![Page 36: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/36.jpg)
Case Studies
1. Sony (San Francisco)
2. Trulia (Denver)
3. Enwork (Grand Rapids)
![Page 37: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/37.jpg)
Sony Workstation Environment
![Page 38: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/38.jpg)
Sony Workstation Environment
![Page 39: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/39.jpg)
Sony Workstation Environment
![Page 40: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/40.jpg)
Sony Workstation Environment
![Page 41: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/41.jpg)
Sony - Conferencing
![Page 42: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/42.jpg)
Trulia - Benching
![Page 43: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/43.jpg)
Trulia – Benching with Custom Dividers
![Page 44: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/44.jpg)
Benching with Whiteboard Dividers
![Page 45: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/45.jpg)
Enwork HeadquartersExecutive Open Plan
![Page 46: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/46.jpg)
Enwork HeadquartersCustomer Service
![Page 47: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/47.jpg)
Enwork HeadquartersCustomer Service
![Page 48: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/48.jpg)
Enwork HeadquartersCustomer Service
![Page 49: Grid Environments. Why Grid? Enwork started with a clean sheet of paper and performed research with end users, designers and dealers in Silicon Valley.](https://reader031.fdocuments.us/reader031/viewer/2022013100/55178cec5503463e368b552d/html5/thumbnails/49.jpg)
THANK YOU!!!