PHASE ONE

Page 3: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

3

E.ON GT

Fluxys

Svenska

Kraftnät

RWE TNG

National

GridIUK

Gas-link

WIN-GAS

OntrasGRT-gaz

Energinet.dk

Gasunie DT

DEPSwede

gasGRT-

gaz DTGTS BBL

(C1) Max technical capacity

in place

in place

 in place

in place

in place

in place

in place

in place

in place

in place in place in placein place

in place

in place

in place

(C2) Interruption in place

in place

 in place

in place

in place

 in place

in place

April 2009

in place

in place in place in placein place

in place

in place

(C3) Daily commercial firm and interruptible capacity

in place

in place

 in place

in place

in place

in place

in place

in place

in place

in place in place in placein place

in place

in place

in place

(F1) Daily flow / aggregated Allocation

in place

in place

 in place

in place

in place

in place

Oct 2009

April 2009

in place

March 2009

in place in placein place

in place

in place

May 2009

(F2) Daily prompt allocation information

in place

in place

in place

in place

in place

in place

in place

in place

in place

in place

in place in place in place  in place

in place

in place

(F3) Daily aggregate day-ahead nominations

in place

in place

in place

in place

in place

in place

in place

Oct 2009

April2009

July 2009

March 2009

Dec 2009

March 2009

 No date

in place

Dec 2009

(F4) Historic gas flow information database

in place

in place

 in place

in place

in place

in place

in place

April 2009

in place

in place in place in placein place

in place

in place

May 2009

Number of IPs 22 19 1 5 8 4 1 8 3 9 6 7 2 1 5 25 43 minus rule IPs 0 5 0 3 0 0 0 3 2 0 0 0 0 0 0 12 0

TSOs report published Specific date Less than three shippers   Not committed to dateNot applicable

Page 4: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

4

TSO ISSUE COMPLETION DATE

BBL IT issues delayed expected release date (F1, F4, F3)

May 2009 &Dec. 2009

DEP IT issues (F3) Dec 2009

Energienet.dk IT issues (F3) April 2009 (?)

Ontras New IT system, -3 shipper rule(C2, F1, F3, F4)

April 2009 (?)

GRTgaz Shipper consultation (F3) July 2009

Gasunie DT IT issues (F3) Dec 2009

WINGAS Shipper concerns (F1, F3) October 2009

GRTgaz DT Resource constraints (F3) (?)

OUTSTANDING ACTIONS

Page 5: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

5

PHASE TWO

Page 6: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

6

NETWORK USERS’ COMMON POSITION

Gas Quality Information

Information on Capacity

availability

Gas Flow Information

Balancing and Security of Supply

Information

THE PRIORITIES

Why these priorities?

EFET Eurogas IFIEC

GEODE eurelectric OGP

“common position on minimum transparency

requirements”

1. Harmonisation of existing informationTwo proposed workstreams 2. Incremental release of new information

Page 7: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

7

Network User Requirement

1.Daily aggregate demand forecast for each balancing zone D-1 at 08:00

Third Package Requirement

TSO to publish ex-ante and ex-post supply and demand information based on nominations, forecasts and realised flows

Market participants shall provide the TSO with the required information

DEMAND INFORMATION

BENEFIT SECURITY OF SUPPLY AND REDUCE SYSTEM BALANCING COSTS

Page 8: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

8

POSSIBLE INFORMATION?

(D1) Day-ahead aggregate demand forecast (D-1)

• Detail…

(D2) Actual aggregate system demand (D+1)

• Detail…

(D3) Historic system demand database

• Detail…

(D4) Annual average demand profile

• Detail…

Page 9: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

9

NATIONAL GRID: DEMAND INFORMATION

LDZ Cold Demand - Energy

Demand Actual LDZ D+1

National Cold Demand - Energy

Demand Forecast Error D-4

Demand Forecast NTS

LDZ Cold Demand - Volume

Demand Actual LDZ D+6

National Cold Demand - Volume

Demand Forecast Error D-3

Demand Forecast NTS

Hourly

LDZ SND - Energy

Demand Actual LDZ DM M+15

National SND - Energy

Demand Forecast Error D-2

Demand Actual NTS D+1

LDZ SND - Volume

Demand Actual LDZ NDM M+15

National SND - Volume

Demand Forecast NTS D-5

Demand Actual NTS D+6

LDZ Warm Demand - Energy

Demand Forecast NTS Cold

National Warm Demand - Energy

Demand Forecast NTS D-4

Demand Actual Historical

LDZ Warm Demand - Volume

Demand Forecast NTS SND

National Warm Demand - Volume

Demand Forecast NTS D-3

Demand Forecast LDZ

Demand Forecast NTS Warm

Demand Forecast Error D-5

Demand Forecast NTS D-2

*Source: National Grid data dictionary

Page 10: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

10

TSO QUESTIONNAIRE RESPONSE

GRI Country TSO

Daily aggregate demand forecasts for each balancing zone (D-1 at 08:00)

GRI Country TSO

Daily aggregate demand forecasts for each balancing zone (D-1 at 08:00)

SWEDENSwedegas No

GERMANY

DEP No

Svenska Kraftnät

No Gasunie DT No

E.ON GTNoIRELAND Gaslink Yes (in part) †

GREAT BRITAIN

National Grid Yes (fully) RWE TNG No

Interconnector NA WINGAS TRAN. No

DENMARK Energinet.dk No** Ontras No

NETHERLANDSGTS No GdF DT No

BBL NA FRANCE GRTgaz Yes (fully) ††

BELGIUM Fluxys No

Page 11: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

11

BALANCING INFORMATION

Network User Requirement

1. Real time information on imbalance charges

2. Linepack information (ex-ante, ex-post, historical)

3. Details of TSO balancing actions (nature, timing, volume and cost information)

Third Package Requirement

The TSO shall make public measures taken as well as costs incurred and revenue generated to balance the system

To enable network users to take timely corrective action, the TSO shall publish sufficient, well-timed and reliable information on the balancing status of network users

Page 12: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

12

POSSIBLE INFORMATION?

(B1) Physical balancing action report (D+1)

• Detail…

(B2) Market based balancing action report (D+1)

• Detail…

(B3) Physical balancing action alert (D–1)

• Detail…

(B4) Linepack information (D+1)

• Detail…

(B5) Real time information on imbalance charges

• Detail…

MINIMISE INDIVIDUAL SHIPPER AND TOTAL SYSTEM BALANCING COSTS

Page 13: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

13

TSO QUESTIONNAIRE RESPONSE

TSO P1 P1 P2Calculation method for imbalance quantity and charges (B1)

Imbalance charges per balancing period – real time (B2)

Linepack information

SWSwedegas NA NA NASvenska Kraftnät Yes (fully) †† NA†† NA††

IE Gaslink Yes (fully) Yes (fully) NA

GBNational Grid Yes (fully) Yes (fully) Yes (fully)Interconnector NA† NA† NA†

DK Energinet.dk Yes (fully) Yes (in part)* NA

NLGTS Yes (fully) Yes (fully) NABBL NA† NA† NA†

BE Fluxys Yes (fully) Yes (fully) NA

DE

DEP Yes (fully) Yes (in part)** NAGasunie DT Yes (fully) Yes (in part)** NAE.ON GT Yes (fully) Yes (in part)** NARWE TNG Yes (fully) Yes (in part)** NAWINGAS TRAN. Yes (fully) Yes (in part)** NAOntras Yes (fully) Yes (in part)** NAGdF DT Yes (fully) Yes (in part)** NA

FR GRTgaz Yes (fully) Yes (in part)*** NA

Page 14: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

14

GAS QUALITY INFORMATION

Network User Requirement

1. Full specification of gas quality parameters

2. Procedures for dealing with off-specification gas and costs

3. Daily actual measured values of key parameters (D+1)

Third Package Requirement

Publication of information on gas quality and pressure requirements

Page 15: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

15

TSO QUESTIONNAIRE RESPONSESTSO P3 P3 P3

Full specification of gas quality parameters (Q1)

Procedures for dealing with off-spec gas and conversion costs (Q2)

Daily actual measured values of key parameters at D+3 (Q3)

SWSwedegas Yes (in part) Yes (in part) Yes (in part)†

Svenska Kraftnät NA NA NAIE Gaslink Yes (fully) Yes (fully) Yes (in part)†

GBNational Grid Yes (fully) Yes (fully) Yes (fully)Interconnector Yes (fully) Yes (fully) Yes (in part)†

DK Energinet.dk Yes (fully) Yes (fully) Yes (in part)†

NL GTS Yes (fully) Yes (fully) Yes (in part)††

BEBBL Yes (in part)* Yes (in part)* NoFluxys Yes (fully) Yes (fully) Yes (in part)††

DE

DEP No** Yes (in part) NoGasunie DT No** Yes (in part) NoE.ON GT No** Yes (in part) NoRWE TNG No** Yes (in part) NoWINGAS TRAN. No** Yes (in part) NoOntras No** Yes (in part) NoGdF DT No** Yes (in part) No

FR GRTgaz Yes (fully) Yes (fully) Yes (in part)†††

Page 16: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

16

TRANSMISSION TRANSPARENCY MEETING31 MARCH

• TSO initial proposal1. Identify different balancing regimes2. Required information in each regime identified by NRA and network users3. TSO to commit to project plan to publish information

• No proposal on demand forecasts• No proposal on gas quality• Network User concern that proposal will not meet minimum

transparency requirements

No agreement on way forward

Page 17: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

17

GAS STORAGE TRANSPARENCY

Network User Requirement

1. Improved transparency

Third Package Requirement

Each storage system operator shall make public the amount of gas in each storage facility (…) inflows and outflows, and available storage capacity, including for those facilities exempted from third party access (…) at least every day

Page 18: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

18

STORAGE TRANSPARENCY MEETING20 APRIL

• GRI NW regulators, EFET, Eurogas, GSE, European Commission

• Project proposal• Daily publication information at hub level:

– Aggregated storage stocks– Aggregated storage inflows– Aggregated storage outflows

• Preliminary dates: 1 October 2009

30 November 2009SUPPORTED BY ALL PRESENT AT THE MEETING

Page 19: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

19

• Third package – proposed Gas Regulation amendments

TIMELINE

18 MONTHINTERIM PERIOD

Enter into force summer

2009

Legal requirement

2011

Agree deliverables

summer 2009

12 to 18 MONTHIMPLEMENTATION

Complete implementation

2011

• GRI NW – estimated project implementation timeline

Third package: the national regulatory authority shall ensure that all such information is made public

Page 20: GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.

20

CONCLUSION

• Programme board supported proposal to use GRI NW as platform for early and coordinated implementation of new third package requirements

• Implementation where there is a clear legal requirement, avoid policy issues like linepack

• Over to the TSOs to make a sensible recommendation– New third package requirements– Commissions proposed guidelines