greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light....

32
greenwood bracknell the smarter choice

Transcript of greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light....

Page 1: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

gre

en

wo

od

bra

ck

ne

ll

the

sm

art

er

ch

oic

e

Page 2: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 3: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Greenwood Bracknell is a stunning 71,000 sq ft headquarters offi ce building of outstanding quality, prominently located in Bracknell town centre.

g r e e n w o o d b r a c k n e l l 1

Page 4: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Smarter building.Comprehensively refurbished including new mechanical and electrical services throughout, Greenwood provides some of the best office space in Bracknell.

g r e e n w o o d b r a c k n e l l2

Page 5: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 6: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 7: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Smarter headquarters.Greenwood is a five storey, landmark office building remodelled to provide a contemporary new workplaceto meet the demands of the modern day occupier.

• Prominent 71,000 sq ft office within a landscaped setting

• Remodelled entrance

• Impressive double height reception

• Flexible floor plates with central core that allow for maximum natural light

• New M&E throughout providing occupational density of 1:8 sq m

• 249 secure car parking spaces, an excellent town centre ratio of 1:283 sq ft

g r e e n w o o d b r a c k n e l l 5

Page 8: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Smarter location. Greenwood, Bracknell is prominently situated on the A329 London Road, the principal arterial route into Bracknell town centre from the East. It is a short walk to the town’s central shopping area and the railway station.

g r e e n w o o d b r a c k n e l l6

By Car Distance (Miles) Time

M4 JUNCTION 10 5 8 MINS

M3 JUNCTION 3 7 13 MINS

READING 16 10 MINS

MAIDENHEAD 14 22 MINS

SLOUGH 18 24 MINS

HEATHROW 25 36 MINS

HIGH WYCOMBE 23 36 MINS

GATWICK 47 57 MINS

CENTRAL LONDON 39 67 MINS

By Rail Time

READING 22 MINS

STAINES 26 MINS

FELTHAM (FOR HEATHROW) 33 MINS

MAIDENHEAD 36 MINS

GUILDFORD 48 MINS

CLAPHAM JUNCTION 51 MINS

SLOUGH 50 MINS

LONDON WATERLOO 62 MINS

LONDON PADDINGTON 63 MINS

M4 M4

A329(M)

M1

M3

M40

Maidenhead

High Wycombe

Slough

Reading

Bracknell

Basingstoke

LondonHeathrow

Airport

Kingston

Epsom

GuildfordM25

M25

M2510

3

11

A40

A322

A3

A30A329

Page 9: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Victoria

Paddington

Waterloo

LondonBridge

Guildford

SloughMaidenhead

Staines

GatwickAirport

Reading

EastCroydon

ClaphamJunction

Feltham

RichmondTwickenham

22 36 50 63

71 62

51

89

75

4338

3326

66109

Bristol Swindon

Woking

87

SouthamptonCentral

117 Brighton

Source www.nationalrail.co.uk – travel times may vary

HeathrowAirport

Bracknell

65

48CROSSRAIL STATION (COMPLETION 2018)

AIRPORT LINK

NATIONAL RAIL

UNDERGROUND LONDON OVERGROUND

JOURNEY TIMES (MINS)

Victoria

Paddington

Waterloo

LondonBridge

Guildford

SloughMaidenhead

Staines

GatwickAirport

Reading

EastCroydon

ClaphamJunction

Feltham

RichmondTwickenham

22 36 50 63

71 62

51

89

75

4338

3326

66109

Bristol Swindon

Woking

87

SouthamptonCentral

117 Brighton

Source www.nationalrail.co.uk – travel times may vary

HeathrowAirport

Bracknell

65

48CROSSRAIL STATION (COMPLETION 2018)

AIRPORT LINK

NATIONAL RAIL

UNDERGROUND LONDON OVERGROUND

JOURNEY TIMES (MINS)

M4 M4

A329(M)

M1

M3

M40

Maidenhead

High Wycombe

Slough

Reading

Bracknell

Basingstoke

LondonHeathrow

Airport

Kingston

Epsom

GuildfordM25

M25

M2510

3

11

A40

A322

A3

A30A329

LONDON RD.

A328

LONDON RD.

A3095 WARFIELD RD.

A309

5

MILLENNIUM WAY

BINFIELD RD.

WOKINGHAM RD.

A329 BERKSHIRE WAY

A322 DOWNSHIRE WAY

A322 BAGSH

OT RD.

BAGSHOT RD.

A309

5 MILL

LANE

NEW

FOREST RIDE

Bracknell

BracknellShopping

Centre

MartinsHeron

5 mins

10 mins

M4 J10

M3 J3SAT NAV RG12 2UB

Page 10: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Bracknell Station The Peel Centre Retail Park

Princess Square Shopping Centre

High Street

5 minutes walk

New Town Centre(on site - completion 2017)

Page 11: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

g r e e n w o o d b r a c k n e l l 9

Smarter town.Bracknell is undergoing a major transformation to deliver a vibrant mixed use centre, with a wide range of shopping and leisure activities.

The works are well underway and the construction of the new town

centre is due to complete in early 2017.

The £750 million scheme has already attracted M&S for an 80,000

sq ft store, as well as Fenwick, H&M, Primark, Cineworld and a

new Waitrose.

Occupiers at Greenwood will be only a short walk from the new

town centre.

Page 12: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Smarter neighbours. Bracknell is home to a number of high profile blue chip companies, who have chosen to locate their national or regional headquarters in the town.

g r e e n w o o d b r a c k n e l l10

1 10

2 11

3 12

4 13

5 14

14 6

15 7

16 8

17 9

Page 13: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

A329

A329

A329

A322

A3095

A3095

A329

MartinsHeronTo M4

Junction 10

To M25Junction 13

& M3

To M3Junction 3

Warfield R

oad

Harvest Ride

Park Road

B3018

London Road

Wokingham Road

Broad Lane

DOWNSHIRE W

AY

L ONDON ROAD

Bracknell

Bracknell TownCentre

greenwoodbrackne l l

1

10 2

11

3

12

4

13

5

14

6

15

16 8

7

17

9

Page 14: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 15: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

The building

Page 16: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

g r e e n w o o d b r a c k n e l l14

AccommodationFLOOR SQ FT SQ M

FOURTH 4,073 378

THIRD 16,230 1,507.8

SECOND 17,305 1,607.7

FIRST 16,365 1,520.4

GROUND 16,177 1,502.9

RECEPTION 1,601 148.7

TOTAL 71,751 6,665.9

CAR PARKING SPACES 249

Smarter space.

Page 17: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

BasementCar Park

Car ParkEntrance

To TownCentre

Page 18: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Ground floor plan 16,177 sq ft (1,503 sq m)

For indicative purposes only

(not to scale).

g r e e n w o o d b r a c k n e l l16

Page 19: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Typical upper floor plan 17,305 Sq ft (1,608 sq m)

Basement

For indicative purposes only

(not to scale).

New shower and changing facilities are located around the main core, providing direct lift and stair

access to reception and the office floors.

Located next to the changing facilities is a new dedicated and secure cycle store with 58 cycle racks.

Page 20: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Cos

t per

wor

ksta

tion

Smarter proposition.Greenwood offers exceptional value when compared to surrounding centres.

g r e e n w o o d b r a c k n e l l18

The building design and new M&E services allow for an occupational density

of up to 1 desk per 8 sq m. The flexible floor plates provide for a highly

efficient fit out lowering the cost per workstation.

A work station at Greenwood is between 48% and 91% cheaper than typical

office buildings in competing towns occupied at 1 person per 10 sq m.

Windsor

Maidenhead

Staines

Reading

Uxbridge

Stockley P

ark

Weybridge

Woking

Marlow

High W

ycombe

Slough

Greenw

ood

£5,000

£4,500

£4,000

£3,500

£3,000

£2,500

Page 21: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

First floor planOccupancy ratio 1:8 sq ft

Second floor planOccupancy ratio 1:10 sq ft

For indicative purposes only

(not to scale).

First floor summary

OFFICES 9

WORK STATIONS 173

MEETING ROOMS 6

AREA 16,365 sq ft

OCCUPANCY RATIO 1:8 sq ft

Second floor summary

OFFICES 9

WORK STATIONS 130

MEETING ROOMS 6

AREA 17,305 sq ft

OCCUPANCY RATIO 1:10 sq ft

Page 22: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Smarter finish. Greenwood offers high quality office space that is finished to an exceptionally high standard and provides occupiers with an impressive and enjoyable office environment allowing businesses to thrive.

g r e e n w o o d b r a c k n e l l20

Page 23: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 24: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Smarter specification.

OccupancyCooling/Heating 1 person/8m2Lifts 1 person/10m2Means of escape 1 person/ 6m2Sanitary provision: 1 person/10m2(60% Male, 60% Female)

Divisibility Design2 tenancies per floor.

Floor LoadingsExisting office floors 4+1 kN/m2Atrium floor 10 kN/m2Existing roof 7.5 kN/m2Atrium roof 0.6 kN/m2

Floor HeightsExisting floor to floor 3,970mm (average)Raised floor zone 150mm overallFloor to ceiling 2,700mm

Lifts2 no. thirteen person lifts serving ground to 4th floors1 no. thirteen person lift – in rear core - serving basementto 4th floor.

Mechanical InstallationsOffice areas to be heated and cooled by a new VRF system.Energy Efficiency Measures• On/off PIR sensors to taps.• Automatic lighting control to offices and cores.

Facilities58 Cycle racks.Male and female changing facilities in basement.

SecurityCCTV surveillance will be provided to the following areas:

• External perimeter plus entry and access points to car park• Points of entry to the individual office buildings• Reception area around lift lobbies

Access control will be provided to the following areas:

• Reception entrance• Car park entrance• Reception pass doors• Base of escape staircase• Lifts enabled for future card control

Car Parking249 secure car parking spaces.

EXTERNAL FINISHES

Existing ElevationsRed facing brick generally with blue base courses, powder coated thermally broken aluminium windows / curtain walling. New revolving entrance door with frameless side pass doors.

RoofNewly tiled with hidden area of Plant on flat asphalt roof with concrete paviors and shingle.

Atrium RoofHigh performance double glazed roof light.

INTERNAL FINISHES

Reception Area

WallsCurtain walling with existing bronze coloured anodised aluminium frames and caps. Semitransparent privacy film to ground level.Clear glazing to upper levels.

FloorsDomus natural finish porcelain stone tile with variegatedcoursing. Carpeted seating area. Full width entrance matting.

CeilingsPainted plasterboard soffits and bulkheads with sound absorbing seamless ceiling above entrance.

LightingFeature lighting by specialist lighting designer.

Entrance doorsInsulated double glazed manually operated revolving door with glass walls and anodized lid. Side doors frameless double glazed.

SecurityKey fob operated security system.

Office Areas

WallsPainted plaster finish.

Floors600 x 600mm fully accessible encapsulated steel raisedaccess floor system. Carpet tile floor covering.

Page 25: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

g r e e n w o o d b r a c k n e l l 23

Ceilings600 x 600mm clip in metal ceiling tiles with concealed grid and plasterboard perimeter margins. 600 x 600mm air grilles and linear slot diffusers.

LightingLG7 compliant 600 x 600mm recessed fluorescent fittings.Compact fluorescent down lights in plasterboard margin.

DoorsFull height high gloss laminate with vision panels and stainless steel ironmongery.

Toilets

WallsPainted plaster finish. Natural finish mosaic feature wall tiles: Domus Phenomenon Air Mosaic Fango.

FloorsNatural finish porcelain stone tile: Domus Cumbria range.

CeilingsPainted plasterboard.

LightingLED spotlights.

DoorsFull height compact grade high gloss laminate with stainless steel ironmongery.

BasinsBespoke solid surface wash trough. PIR operated chromed steel taps. Colour back glass splashback. Concealed paper towel dispensers.

MirrorsTo wall above vanity.

CubiclesFull-height proprietary cubicle system with high gloss laminate finish, door stops and coat hooks. Fully accessible laminated IPS panels. Twyfords WC pans & urinals.

Basement Change / Showers

WallsPolished wall tile finish: Domus Terranova.

FloorsNatural finish ceramic floor tiles: Domus Terranova.

CeilingsMoisture resistant plasterboard.

LightingLED spotlights. Compact fluorescent lights.

DoorsFull height painted with stainless steel ironmongery.

WCsTwyfords WC pans & urinals.

Showers6 no: 3 Male & 3 Female. Ceramic shower tray. Chromedsteel shower rail, hose and head. Recessed control.Frosted glass shower cubicle doors with tiled walls.

AccessoriesFull height wall mirrors. Satin stainless steel coat hooks. Amwell 2-tier lockers and changing benches. Stainless steel hand dryers.

Lifts Area

WallsFeature glass reinforced fibre reinforced gypsumseamless wall panelling with ‘wave ridge’pattern, spray painted to high gloss finish.

FloorsNatural finish porcelain stone tile as continuationof Atrium to Ground Floor. High quality carpettile to upper levels Lift landing areas.

CeilingsPainted suspended MF Plasterboard with recessedperimeter lighting trough and colour change lighting.

DoorsHigh gloss laminated finishLifts – Internal Finishes

WallsColour back glass cladding to side walls. Mirrored rear wall.

FloorsNatural finish porcelain stone tile to match Atrium floor.

CeilingsPainted metal panels with concealed perimeter lighting trough.

Page 26: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 27: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 28: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 29: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured
Page 30: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Smarter team. Viewing strictly through the joint letting agents.

g r e e n w o o d b r a c k n e l l28

Terms upon application.

Olivia Wood

[email protected]

020 7409 8038

Johnny Bray

[email protected]

020 3328 9098

Jonathan Gardiner

[email protected]

020 7409 8828

Simon Glenn

[email protected]

020 3328 9094

Misrepresentation Act 1967 - Whilst all the information in these particulars is believed to be correct, neither the agents nor their clients guarantee its accuracy nor is it intended to form any part of any contract. All areas quoted are approximate. May 2016. D

esig

ned

& P

rodu

ced

by CO

RMAC

K 02

0 76

20 1

205

ww

w.c

orm

acka

dver

tisin

g.co

m

Page 31: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

Des

igne

d &

Pro

duce

d by

CORM

ACK

020

7620

120

5 w

ww

.cor

mac

kadv

ertis

ing.

com

Page 32: greenwood the smarter choice - Canmoor · 2016-07-09 · High performance double glazed roof light. INTERNAL FINISHES Reception Area Walls Curtain walling with existing bronze coloured

gre

en

wo

od

ww

w.g

ree

nw

oo

db

rac

kn

ell

.co

m

Gre

en

wo

od

, L

on

do

n R

d,

Bra

ck

ne

ll,

RG

12

2U

B