Greenstar i System ErP Frost Protection (including Zoned ...
Transcript of Greenstar i System ErP Frost Protection (including Zoned ...
Greenstar i System ErP1H-R-E-FZ
All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations. Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.
WG I-S-1H-R-E-FZ a (2016/12)
Frost Protection (including Zoned Pipework)
L LIVE N NEUTRAL EARTHE
The following labels and those like them are used to denote generic connections (such as the live supply to components) in order to simplify the diagram:
Programmer
~E
Room Thermostat
ExternalFrost Thermostat
C DReturn
Pipe Thermostat
C D
CH D
E
HeatingZone Valve
NC D
NL
L N
N
L
Legend:LzNzLsNsLRECSDMCH DHW D
= Pump Live= Pump Neutral= Live Supply= Neutral Supply= Live Return= Earth= Common= Satisfied= Demand= Motor= Central Heating Demand= Hot Water Demand
L
1 2 3 4 5 7 8 9 106
We recommend that the Frost Thermostat is installed at the coldest location. Frost Thermostat to be set on at 5°C and the Pipe Thermostat to be off at 15°C.
230V MainsVoltage
Double PoleFused Spur
Wiring Terminals Inside Boiler
LN
E
Programmer
~E
~E
Room Thermostat
Zone 1
CH1 D CH2 D
E
HeatingZone 2 Valve
HeatingZone 1 Valve
1 2 3 4 5 7 8 9 106
NC D
NL
NL
L N
N
L
Legend:LzNzLsNsLRECSDMCH DHW D
= Pump Live= Pump Neutral= Live Supply= Neutral Supply= Live Return= Earth= Common= Satisfied= Demand= Motor= Central Heating Demand= Hot Water Demand
Room Thermostat
Zone 2
NC D
230V MainsVoltage
Double PoleFused Spur
Wiring Terminals Inside Boiler
LN
E
Greenstar i System ErP2H-R-E
All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations. Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.
WG I-S-2H-R-E a (2016/12)
2 Heating Zones
L LIVE N NEUTRAL EARTHE
The following labels and those like them are used to denote generic connections (such as the live supply to components) in order to simplify the diagram:
Wiring Centre
Legend:LNLRFR FS ECSDMCH DHW D
= Live Supply= Neutral Supply= Live Return= Frost Return= Frost Supply = Earth= Common= Satisfied= Demand= Motor= Central Heating Demand= Hot Water Demand
Greenstar i System ErP------FB
All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations. Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.
WG I-S-------FB a (2016/12)
Frost Protection (to System Bypass)
L LIVE N NEUTRAL EARTHE
The following labels and those like them are used to denote generic connections (such as the live supply to components) in order to simplify the diagram:
230V MainsVoltage
Double PoleFused Spur
ExternalFrost Thermostat
C D
ReturnPipe Thermostat
C D
We recommend that the Frost Thermostat is installed at the coldest location. Frost Thermostat to be set on at 5°C and the Pipe Thermostat to be off at 15°C.
Wiring Terminals Inside Boiler
L
Legend:LNLRFR FS ECSDMCH DHW D
= Live Supply= Neutral Supply= Live Return= Frost Return= Frost Supply = Earth= Common= Satisfied= Demand= Motor= Central Heating Demand= Hot Water Demand
Greenstar i System ErP------LLH
All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations. Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.
WG I-S-------LLH a (2016/12)
Cascade Boilers with Low Loss Header
L LIVE N NEUTRAL EARTHE
The following labels and those like them are used to denote generic connections (such as the live supply to components) in order to simplify the diagram:
230V MainsVoltage
Double PoleFused Spur
C
NC
Header Limit Thermostat
230V ACDouble Pole Relay
IMPORTANT NOTE:
The Relay should be mountedwithin a suitable electrically safehousing.
C C
NO NC
Coil Neutral
NONC
Coil Live
Example relay shown is a doublePole Mains Voltage Relay. Thisdisables the boilers electrically incase of a fault condition.
Junction Box / Wiring CentreDL N E
Wiring From Zone/s Controls
C C
LN
E
L N E
N
Wiring Terminals Inside Boiler
LN
E
Wiring Terminals Inside Boiler
LN
E
Wiring Centre
Greenstar i System ErPP-R-E
All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations. Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.
WG I-S-P-R-E a (2016/12)
S Plan Plus
L LIVE N NEUTRAL EARTHE
The following labels and those like them are used to denote generic connections (such as the live supply to components) in order to simplify the diagram:
~E
~E
Room Thermostat
Zone 1C
S D
CylinderThermostat
Programmer 3 Channel
CH1 D HW D
E
Cylinder Zone Valve
HeatingZone 1 Valve
1 2 3 4 5 7 8 9 106
NC D
NL
NL
L N
N
L
Legend:LzNzLsNsLRECSDMCH DHW D
= Pump Live= Pump Neutral= Live Supply= Neutral Supply= Live Return= Earth= Common= Satisfied= Demand= Motor= Central Heating Demand= Hot Water Demand
~E
HeatingZone 2 Valve
NL
Room Thermostat
Zone 2
NC D
CH2 D
230V MainsVoltage
Double PoleFused Spur
Wiring Terminals Inside Boiler
LN
E
Greenstar i System ErPP-U-E
All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations. Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.
WG I-S-P-U-E a (2016/12)
S Plan Plus (Underfloor Heating)
L LIVE N NEUTRAL EARTHE
The following labels and those like them are used to denote generic connections (such as the live supply to components) in order to simplify the diagram:
Wiring Centre
Programmer
~E
~E
Room Thermostat
C
S D
CylinderThermostat
CH D HW D
E
Cylinder Zone Valve
HeatingZone Valve
1 2 3 4 5 7 8 9 106
NC D
NL
NL
L N
N
L
Legend:LzNzLsNsLRECSDMCH DHW D
= Pump Live= Pump Neutral= Live Supply= Neutral Supply= Live Return= Earth= Common= Satisfied= Demand= Motor= Central Heating Demand= Hot Water Demand
~
UFHZone Valve
EN
L
Underfloor Wiring Centre
L N E TimerDemand
EL N
230V MainsVoltage
Double PoleFused Spur
Wiring Terminals Inside Boiler
LN
E
Wiring Centre
Greenstar i System ErPY-R-E
All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations. Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions. Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.
WG I-S-Y-R-E a (2016/12)
Y Plan (Mid Position Valve)
L LIVE N NEUTRAL EARTHE
The following labels and those like them are used to denote generic connections (such as the live supply to components) in order to simplify the diagram:
Programmer
Room Thermostat
C
S D
CylinderThermostat
CH D HW D
E
1 2 3 4 5 7 8 9 106
NC D
L N
N
L
Legend:LzNzLsNsLRECSDMCH DHW DHW O
= Pump Live= Pump Neutral= Live Supply= Neutral Supply= Live Return= Earth= Common= Satisfied= Demand= Motor= Central Heating Demand= Hot Water Demand= Hot Water Off Mid Position
Valve
NE
HW O
Orange = DGrey = SWhite = CH D
230V MainsVoltage
Double PoleFused Spur
Wiring Terminals Inside Boiler
LN
E