Corporate Office: Plot No 1367, Road No. 45, Jubilee Hills, Hyderabad-500 033, Telangana. Ph:+91 (40) 40301000 CC: Ministry of Environment, Forest & Climate Change (MoEF&CC), New Delhi along with annexures Budhil Hydro Power Private Limited I' Yours faithfully Thanking you Kindly acknowledge the receipt of the same. With reference to above cited letter, we are pleased to submit the "Six Monthly Progress Report" of 70 MW Budhil Hydro Electric Project for the period ending Sep, 2017. Dear Sir Ref: Ministry of Environment, Forests & Climate Change Letter No: J-12011/4/2006-IA.I dated: 28.02.2006. Sub: Submission of Six Monthly Compliance Report (Half Yearly Compliance Report) on environmental stipulations for the period ending Sep,17 (April to Sep 2017) - as per MOEF&CC, Environmental Clearance of Budhil (70 MW) in Himachal Pradesh. The Additional Chief Conservator of Forests (C), Ministry of Environment, forests and Climate Change, Regional Office (NCZ), 25, Subhash Road, Dehradun, Dehradun-248001. Uttarakhand To Date: 08-12-2017 Ref: GBHPPL/MoEF8tCC/HYR/20171208 Greenk.'.) Greenko Budhil Hydro Power Private Limited (CIN: U40109TG2002PTC038683)

Transcript of Greenk.'.)budhilhydro.com/docs/Six_Monthly_Report_ending_Sep_2017.pdfby expert Doctors of Rotory...

Corporate Office: Plot No 1367, Road No. 45, Jubilee Hills, Hyderabad-500 033, Telangana. Ph:+91 (40) 40301000

CC: Ministry of Environment, Forest & Climate Change (MoEF&CC), New Delhi

along with annexures

Budhil Hydro Power Private Limited I'

Yours faithfully

Thanking you

Kindly acknowledge the receipt of the same.

With reference to above cited letter, we are pleased to submit the "Six Monthly Progress Report" of 70 MW Budhil Hydro Electric Project for the period ending Sep, 2017.

Dear Sir

Ref: Ministry of Environment, Forests & Climate Change Letter No: J-12011/4/2006-IA.I

dated: 28.02.2006.

Sub: Submission of Six Monthly Compliance Report (Half Yearly Compliance Report) on environmental stipulations for the period ending Sep,17 (April to Sep 2017) - as per MOEF&CC, Environmental Clearance of Budhil (70 MW) in Himachal Pradesh.

The Additional Chief Conservator of Forests (C), Ministry of Environment, forests and Climate Change,

Regional Office (NCZ), 25, Subhash Road, Dehradun,

Dehradun-248001. Uttarakhand

To

Date: 08-12-2017 Ref: GBHPPL/MoEF8tCC/HYR/20171208

Greenk.'.) Greenko Budhil Hydro Power Private Limited (CIN: U40109TG2002PTC038683)

Budhil Hydro Electric Power Project (70 MW)

Greenko Budhil Hydro Power Pvt. Ltd Six Monthly Report on EMP 0

Six Monthly Compliance Reportof

Environmental ClearanceBudhil Hydro Electric Project (70 MW)

Chamba dist, Himachal Pradesh

Submitted to:

Regional Office, North-Central Zone, DehraduneMinistry of Environment, Forest & Climate Change

(MoEF&CC) & MoEF&CC, New Delhiby

Submitted By:M/s Greenko Budhil Hydro Power Private Limited

Corporate Office: Plot No 1367, Road No-45, Jubilee Hills, Hyderabad-500 033

Period: “April 2017 to September 2017”

Budhil Hydro Electric Power Project (70 MW)

Greenko Budhil Hydro Power Pvt. Ltd Six Monthly Report on EMP 1

Brief details of the Project

S.no. Required details Informatio

n1 Name of the Project Greenko Budhil Hydro Power Pvt. Ltd.

2 Type of the Project River Valley Hydro Electric Project (Run offthe River)

3 Clearance Letter(s) OM No. & Datea) Environment Clearanceb) Forest Clearance

J-12011/4/2006-IA-I dated 28.02.2006i. 9-HPC617/2005-CHA/1700 dated 19.04.2006ii. 9-HPC617/2005-CHA/360 dated 19.04.2006

4 Locationsa) Districtb) Statec) Latituded) Longitude

ChambaHimachal Pradesh270 28’ N760 50’ E

5 Address for correspondence:

a) Address of concernedProject Chief (with Pin code andtelephone/fax nos)

Suresh Chand KalsiBudhil HEP,Vill Kharamukh, PO GarolaBharmour -176309Chamba, Himachal PradeshContact No- +91-88943-02056,

+91-98055-128426 b) Address of concerned Project

Head at Corporate Office Chief(with Pin code andtelephone/fax nos)

Prasada Raju J.V.S.DAuthorized signatoryGreenko Budhil Hydro Power Private Ltd.Plot No:1367, Road no:45, Jubilee Hills,Hyderabad-33.Ph: (040) 4030 1000

7 Forest land requirements Statusof approval for diversion offorestland for non-forestry use

27.9358 (for project)34.4142 (for transmission line)

8 Details of Site Visita) By Regional Officeb) By Monitoring Committee

PCB Officer-Chamba/MoEF&CC Dehradunvisited the site in the month of Nov. 2017

9 Construction activities and statusof Implementation of EMP

The project is in Operation stage from29.05.2012

10 Brief note on the status ofcompliance of the conditionsstipulated by MoEF

Status of compliance of the conditions asstipulated by MOEF are enclosed as Annexure-I

Budhil Hydro Electric Power Project (70 MW)

Greenko Budhil Hydro Power Pvt. Ltd Six Monthly Report 2[Type here ] [Type here ] [Type here ]

Annexure-I“Six Monthly Progress Report” for the period ending Oct 2017”

S.No. Conditions Status

Part-A: Specific conditions

i) CAT plan as has been proposed for 756Ha. Degraded area should be completedin four years.

Project is in operation stage, we had alreadydeposited the CAT Plan amount to theCAMPA fund.

ii) Condition stipulated by StateGovernment while forwarding theproposal should be followed in toto.

Complied, Project is in operation stage.

iii) For the uplifting of socioeconomic life oflocal people, priority should be given injobs accordingly to their Qualification.

We have already provided theEmployment to the local people (as pertheir educational qualification and ourrequirement).

iv) Soil analysis report should be submittedwit h in three months from the date ofissue of this letter.

We had already submitted the Soilparameter test Report as done by M/s.SGS.

v) NOC from National commission ofSeismic D e s i g n P a r a m e t e r s ( NCSDP)of CWC should be obtained and submittedto this Ministry.

Complied, we have submitted the sameduring construction stage.

PART-B: General Conditionsi) Adequate free fuel arrangement should

be made for the labor force engaged inthe construction work at project cost sothat indiscriminate felling of trees isprevented.

Noted, Project is in operation stage, LPG isbeing provided/using at Kitchen.

ii) Fuel depot may be opened at the siteto provide the fuel (Kerosene/wood/LPG). Medical facilities as well asrecreational facilities should also beprovided to the labourers.

Noted, project is in operation stage, beingprocured as and when required from thelocal market.

iii) All the laborers to be engaged forconstruction works should also bethoroughly examined by health personneland adequately treated before issuingthem work permit.

Project is in Operation stage; very minimumconstruction activities will be involved atsite during Operation stage. Pre-Employment medical Health Checkups &Health monitoring are being carried out atall the Project Sites before deployment.

Budhil Hydro Electric Power Project (70 MW)

Greenko Budhil Hydro Power Pvt. Ltd Six Monthly Report 3[Type here ] [Type here ] [Type here ]

S.No.

Conditions Status

iv) Restoration of construction areaincluding dumping area with levelling,filling up of burrow pits, landscapingetc. area should be properly treatedwith suitable plantation.

The restoration of dumping areas has beencompleted.

In all dumping yard areas, leveling &filling works of the project area is beingdone & duly protected by way of Cratewalls, the tree plantation in and along theproject area & road are being done.

v) Financial measure shall be made in thetotal budget for safeguard measures

Separate budget for execution ofsafeguard measures is provided

vi) A multidisciplinary c o m m i t t e e shouldbe constituted with representativesfrom various disciplines of forestry,Ecology, wildlife, soil conservation,NGO etc. to oversee the effectiveimplementation of the suggestedsafeguard measures.

The project is in operation stage, duringconstruction, the committee hasalready constituted by Govt. of HimachalPradesh wide letter no: HPSEB(SECTT)/CE (PSP)/401(H)/2007/Pvt. Vol-53/07-126-27 dated 17.4.2007.

vii) Six monthly monitoring reports shouldbe submitted to the Ministry and itsRegional Office, Chandigarh for review

Noted and being Complied

4. Officials from Regional Office MoEF,Chandigarh who would be monitoringthe implementation of environmentalsafeguards should be given fullcooperation, facilities and documents/data by the project proponents duringtheir inspection.

Noted and being Complied

5. The responsibility of implementation ofenvironmental safeguards rests fullyWith the M/s Greenko Budhil HydroPower Private Limited & Governmentof Himachal Pradesh.

Noted

6. Project require fresh appraisal in case ofchange in the scope of the project Noted

7.

Ministry reserve right to add additionalsafe guards and to ensure effectiveimplementation of suggestedsafeguard in time bound andsatisfactory manner

Noted

8.Valid for 05 years from date of issue ofthis letter for commencement ofConstruction work.

Project is in Operation from 29.05.2012

Budhil Hydro Electric Power Project (70 MW)

Greenko Budhil Hydro Power Pvt. Ltd Six Monthly Report 4[Type here ] [Type here ] [Type here ]

S.No.

Conditions Status

9.

A copy of letter needs to mark toconcerned panchayat, Local NGO andthose from whom any suggestion/representation has been received.

Complied

10.

SPCB shall display a copy of clearanceletter to regional office, DistrictIndustries Center and Collector’soffice/Tahsildar office for 30 days

Complied

11.

Within seven days Project Proponentshall advertise in two local Newspapercirculated in vernacular language of thelocality concerned

Complied

CSR Activities:

Medical Checkup Eye Camp organized in 2017. More than 408 local residents were examinedby expert Doctors of Rotory Club Eye Hospital Maranda (Palampur). 53 were advised forCATRACT Surgery and 30 got operated/Treated. Brief note on the same is attached asAnnexure-II.

0

REPORT ON THEFREE DST EYE CAMP

ATGREENKO BUDHIL HYDRO POWER PRIVATE LIMITED,

CHAMBA, HIMACHAL PRADESH

In association with:Mela Mal Sood Rotary Eye Hospital, Palampur, Kangra,

Himachal Pradesh

gopikrushna.n
Typewritten text
Annexure-II

1

DIAGNOSTIC SCREENING AND TREATMENT EYE CAMPGREENKO BUDHIL HYDRO POWER PRIVATE LIMITED,

CHAMBA, HIMACHAL PRADESH

Under the health related CSR activities, a free Diagnostic Screening and Treatment (DST) EyeCamp was conducted by Greenko for the neighbouring community of its Greenko BudhilHydro Electric Project (70 MW) in Bharmour Tehsil, Chamba District, Himachal Pradesh. Themain objective of the camp was to provide medical eye care service to the local communityunreached with these services and provide surgical eye care service to the patientsdiagnosed with cataract and other refractive errors to eliminate avoidable blindness. Theeye camp covered the residents of nearby 15 to 20 villages falling under project Panchayats.

The Eye Camp was organized in association with Mela Mal Sood Rotary Eye Hospital,Maranda, Palampur. This hospital is the largest and well-equipped eye care service centre inHimachal Pradesh rendering its manifold ophthalmic services to cure and prevent theavoidable blindness and bring a transformation for the betterment of the society.

Screening Camp

The screening camp was conducted on 21st May 2017 at Greenko Office, Thalla Village,Bharmaour Tehsil, Chamba District, Himachal Pradesh. A seven-member professional teamincluding 2 eye specialists namely Dr Rohit Garg and Dr Siddharth accompanied with 4efficient technical staff have provided their services at the Eye Camp. All the medicalequipment for screening and examination of the patients was brought by the HospitalTeam.

Prior to the camp, advance information was given to the local’s through banners that weredisplayed at the strategic locations of the neighbouring villages, announcements throughmegaphone were made and pamphlets were distributed among the local people. At thevenue display of signs showing the directions to the patient registration; doctor room;technician room and others were made. Arrangements for sufficient number of vehicle weremade to pick up and drop the patients from their respective villages.

The diagnostic and screening camp commenced at 9:30 a.m. with incoming patientsregistered at a registration desk where their details, along with name, age and other werenoted. They were then directed to the Doctors room for screening of the eyes using thenecessary equipment’s. After the initial screening, the patients diagnosed with refractiveerrors were directed to the designated technician room for vision test. The patientsdiagnosed for cataract & other eye surgeries were examined in detail by other technician forgeneral health condition including Blood Sugar (Diabetes), Blood Pressure (Hypertension)etc. Other patients requiring minor treatment were given specific medicines such as eyedrops free of charge for ophthalmic diseases.

2

A total of 408 people (198 Male, 168 Female, 49 Children) availed the services of the abovecamp. A large number of the patients have come from neighbouring villages of Panjsei, Seri,Fanar, Lahal, Dhurenka, Ghared, Luni, Khani and Bharmour town. The Doctors’ teamscreened and checked the eyes of all the 408 members using the medical equipment’s theybrought. Out of 408 people screened, 53 members (31 Male + 22Female) were selected forcataract & other eye surgeries. The surgeries will be undertaken at Rotary Hospital,Palampur.

The authorized representative of Greenko issued relevant letter for patients diagnosed foreye operation at the Rotary Hospital. The patients are given a month time i.e up to June 30th

2017 to avail the services at the Hospital. Greenko is bearing all the costs of Surgery, post-operative Medicines for the patients and Hospital authorities are providing accommodationand others at the Hospital free of charge. Post-operative follow up activity will be organizedfor the needy patients by the Hospital authorities.

The camp ended at 3.00 Pm and during the camp, drinking water, tea and biscuits wereprovided to all patients and their attendants at waiting area. Village level representativessuch as Pradhan from the neighbouring Panchayats were also present in the Camp. The localprint media covered the event.

The above screening camp was successfully completed with the support of around 35Greenko employee’s representing the Budhil Plant and other proposed projects who havevolunteered to provide their services in organizing the camp. They played a significant rolein the success of the camp specifically the care and assistance they provided to the elderlyand the hospitality that was extended to all the patients was deeply appreciated.

The coordination of the camp activities was undertaken by the cluster and site level HRTeam. The overall guidance and supervision for effectively organizing the camp wasprovided by Plant In-charge along with the participation and inputs from the representativesof the Corporate CSR Division.

As part of the post camp feedback in the local villages it was noted that the local communitymembers, public representatives, local health administration appreciated the efforts of theGreenko Group in providing the eye care services to the local people. They also requestedthe local site authorities for organizing such specialized health services camps as they arenot available at local health facility. The overall feedback suggested that the above initiativehas spread a positive message about Greenko Group.

3

Surgery Camp

The surgery camp was conducted at Mela Mal Sood Rotary Eye Hospital, Palampur, KangraDistrict, Himachal Pradesh. Rotary Eye Hospital is providing quality and affordable eye careto the poorest section of the society with the latest equipment’s and technologies by theapt surgeons. It provides advanced level of diagnostic and therapeutic services in the field ofeye related diseases to the mankind to survive and sustain.

Prior to the surgery camp, advance information was given to the patients to preparethemselves for the surgery at Palampur. At the Rotary Hospital all the necessaryarrangements for stay and food for the patients was made by the Hospital authorities. Ofthe total patients identified 24 underwent Cataract Surgery i.e Cataract Extraction with IOLimplantation, 04 underwent Pteryging Excision with Conjunctival Autograft 01 of themunderwent Dacryocystorhinostomy (DCR). A professional team of dedicated doctors andtechnicians under the leadership of senior Ophthalmic Surgeon Dr Rohit Garg haveconducted the necessary cataract and other surgery for the identified patients. The teamsuccessfully conducted the operative procedures and managing the medical supportactivities at Rotary Eye Hospital.

All the operated patients were given black spectacles with necessary medicines free ofcharge. They were given instruction and counselling about medicines and post operativecare to be taken for protecting the eyes. There were no post-operative complications and allpatients were provided discharge cards. Greenko is bearing all the costs of Surgery, postoperative Medicines, Glasses etc for all the patients who underwent surgery. Post operativefollow up activity is organized for the needy patients by the Hospital authorities.

At time of discharge of patients Greenko authorities also counselled the patients for the eyecare and other general precautions to be taken to protect the eyes. The surgery camp wassuccessfully completed with the assistance and overall supervision and monitoring ofGreenko’s Budhil Site Management and volunteers. The Doctor’s team, the technicians, thenursing staff and hospital management of Rotary Eye Hospital with their eye care servicesand cooperation played a major role in overall success of the surgery camp.

Greenko’s above free DST Eye camp has got an overwhelming response from surroundingvillages of its Hydel Plant. This camp achieved a 100% success rate with no post-operativecomplications. This camp not only provided opportunity for specialized eye care services forthe locals but also supported people with other needful surgeries in screened out patientswith cataract and other refractive errors to eliminate avoidable blindness.

4

DST Eye Camp at a Glance

Display of Banners atStrategic Locations

Registration ofPatients

5

Patientswaiting forDoctorsScreening

Patientswaiting forVision Test

Patientsidentifiedwith cataractwaiting fordetailedexamination

6

DoctorsScreening

DoctorsScreening

DoctorsScreening

7

PatientsundergoingVision Test

Patientsundergoingdetailedexamination

8

Separate desk for the identified patients for surgery

Plant Management overseeing the camp activity

9

Patients undergoingsurgery and postoperative care at theRotary Hospital ,Palampur

Pre discharge DoctorsCounselling