Greening the Grid (GTG) Program
A Partnership between USAID/India and Government of India
Greening the Grid-Renewable Integration &
Sustainable Energy Initiative
Pilot: Flexible Operations of Coal Based Plants
Knowledge Dissemination Workshop on Coal Generation Flexing Practices to Support VRE Integration
February 18 -19, 2019
Gujarat Energy Training & Research Institute (GETRI), Vadodara (Gujarat)
2 2
Greening the Grid - U.S.-India Joint Partnership Goal: Enhance efforts to manage large-scale RE grid integration
Robust analysis of challenges and solutions
Integration pilots to validate scalable reforms
Sharing of knowledge and best practices
3 3
Greening the Grid – Key Highlights
4 4
18-02-2019 4
Grid Integration Pilots
5 5
Renewable Integration and Sustainable Energy (RISE)
6 6
Coal Based Flexible Power Generation with NTPC
and GSECL
• GTG-RISE has completed the due diligence studies at the sites of NTPC and GSECL and have
submitted its recommendations on flexible operations
• Under the USAID GTG program, (US India System Operators Partnership),
Flexibility Bootcamps were organized at POSOCO (6-7th Mar 2018) & NTPC (8th Mar 2018)
• Knowledge dissemination workshop held at NTPC PMI on 27-28th August 2018 was attended by
CERC, CEA, POSOCO, NTPC plants and other state utilities
• Study Tour to U.S utilities under Utilities Exchange Program was conducted on 26th-30th Mar
2018 and 28th Jan-1st Feb 2019. Attended by executives from POSOCO, SLDCs, NTPC, GSECL,
etc.
• GTG-RISE is now assisting NTPC and GSECL in developing the regulatory and investment case
scenarios for flexible operations
• In the next two (2) years, GTG-RISE shall assist NTPC and GSECL in preparing fleet wide
strategies and support in implementation of identified interventions in select units
• The implementation support shall be assisted by a parallel monitoring and evaluation exercise to
ensure the overall objective of meeting the results framework under GTG-RISE
18-02-2019 7
Key Activities under GTG on Coal Flexibility
8
Thank You