Transcript of Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze...
![Page 1: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/1.jpg)
Green Village Electricity Project Nigeria: Operational Report
Ifeanyi B. Orajaka & Chuka P. Eze
[email protected] www.gve-group.com
IEEE Smart Village Workshop, GHTC 2015, Seattle. 8th October 2015.
An Initiative of GVE Projects LimitedRC1071222
![Page 2: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/2.jpg)
2
The Business Summary
![Page 3: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/3.jpg)
3
Executed Pilot Projects
Pilot (III)
Capacity: 9kWp
Cost: USD 60,000.00
Location: Egbeke – Etche, Rivers State, Nigeria
Year of Completion: March, 2015
Impact(s):720people, 36 jobs, 136MT of CO2,
45% ($12) reduction in HH energy expenditure
Pilot (IV)
Capacity: 34kWp
Cost: USD 220,000.00
Location: Bisanti – Katcha, Niger State, Nigeria
Year of Completion: September, 2015
Impact(s):1,600people, 90 jobs, 517MT of CO2,
45% ($12) reduction in HH energy expenditure
Pilot (I)
Capacity: 6kWp
Cost: USD 75,000.00
Location: Egbeke – Etche, Rivers State, Nigeria
Year of Completion: September 2013
Impact(s): 480people, 20 jobs, 91.3MT of CO2,
45% ($12) reduction in HH energy expenditure
Pilot (II)
Capacity: 9kWp
Cost: USD60,000.00
Location: Egbeke – Etche, Rivers State, Nigeria
Year of Completion: March, 2015
Impact(s):720people, 36 jobs, 136MT of CO2,
45% ($12) reduction in HH energy expenditure
![Page 4: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/4.jpg)
Base Infrastructure
Revenue Streams
Service Offering per Site
GVE
Mini-grid
(240 Clients)
One-time Connection Fee:
$20.00
Modular Site of 34kWp Each
P.A.Y.G Utility Fee:0.45/kWh (off-peak)
$0.75/kWh (peak)
AIPU:
$690.76
Ave. Monthly ARPU:
$11.25
Site Setup Cost (Equipment Only): $165,782.25
Revenue Model
Legend: AIPU: Average Investment Per User ARPU: Average Revenue Per User
4
![Page 5: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/5.jpg)
• US$1.4million raised and committed to six pilot projects till date
• Rated by USAID and GIZ as the ideal model for advancing energy access in Nigeria
• Listed among Sankalp Forum’s top-60 promising Sub Saharan Africa SMEs 2015
• Model is Scalable to Meet Specific Community Needs
• Model has Directly Measurable Environ-Socio-Economic Impact
5
Awards:•Finalist; West African Forum for Clean Energy Financing Business Plan Competition, Sept. 2015•Finalist; City Mart/ City of Lagos Off-Grid Power Solution Challenge, June 2014.•Winner; GE Africa/ USADF, Power Africa Off-Grid Energy Access Challenge, Nov. 2013.•Winner; UNDP/ Bank of Industry –Nigeria, Access to Renewable Project Nigeria, Dec. 2012.•Winner; IEEE Presidents’ Change the World Project Challenge 2009.•The Project has been awarded 5 years pioneer status incentive
Project Heritage
![Page 6: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/6.jpg)
6
Pilot Projects in Photos
![Page 7: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/7.jpg)
Pre-Implementation Scenario
Night view of the community’s major pathway
before the project
![Page 8: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/8.jpg)
• 460 Mini-grid Households (3,240 people)
• 110 Street lighting points along the main street of the four beneficiary
Communities.
• Enhanced security at night
• Extended business operating hours
• 41 PBK Clients now has clean Electricity/ Cell Phone Charging.
• Children gather around the street lighting points to study/ play at night.
• 182 Jobs Created during and after implementation
• $29,000 Created in Wealth in the four pilot communities during implementation.
• Knowledge transfer to locals
• 40% reduction in Energy related expenditure
• Cumulative annual reduction of CO2 emission by 880.32 MTs
Project Impacts
![Page 9: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/9.jpg)
Night view of the community’s major pathway now.
Project Impacts Cont’d
![Page 10: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/10.jpg)
![Page 11: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/11.jpg)
Management Team (All under 30)
Wale Bakare
E.D. Marketing
Chinedu Azodoh
C.F.O.
Ifeanyi Orajaka
MD/CEO
Chuka Eze
C.T.O.
• B.Eng. Elect/Elect. Engineering, FUTO Nigeria
• Certified Project Manager• Experience with
ExxonMobil, Shell and NIIT• GIS Rural Electrification
Planning Expert (7-Years)• Member Global Shapers• Management Trainings
• Executive Masters Project Management; CUPE, UK.
• B.Eng. Elect/Elect. Engineering, FUTO Nigeria
• Experience with Shell, Interswitch, Nigerian Breweries and Airtel Nigeria
• GIS Rural Electrification Planning Expert (7-Years)
• Master of Finance, MIT Sloan, Boston
• B. Eng Illinois Institute of Technology,
• Experience with Barclays Capital, Goldman Sachs, MediaBridge Capital Advisers LLC. and BGL Capital Nigeria
• President of NSBE, IIT
• LL.B, & Chartered Arbitrator• Lagos Business School
Alumnus• Trade Sales Manager;
Nigerite Ltd. (Annual sales portfolio of $30.8m)
• Channel Marketing Exec.; Vlisco Netherland BV (Annual sales portfolio of $6.15m)
• Pioneer Company Secretary11
![Page 12: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/12.jpg)
Our Corporate Team
Wale Bakare
E.D. Marketing
Chinedu Azodoh
C.F.O. (MIT- Sloan)
Ifeanyi Orajaka
MD/CEO
Chuka Eze
C.T.O.
Ikechukwu Onyekwelu
E.D. Corp. Strategy
Prof. Gloria Chukwudebe
Board Chairman
Kalada Apiafi
Non-Exec. Director
Godwin Orajaka
Non-Exec. Director
Michael DeSa
Advisory: Finance12
![Page 13: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/13.jpg)
– Complex Equipment Import documentation & Cost
– Delays between order, shipping, clearance & final delivery
– Lengthy & expensive customs clearances
– initial FOB prices
– Seasonality of final transport from POE to deployment site.
– Data Capturing and recording
– Absence of replacement parts for critical equipment
– Proper use of equipment by customer
– Operator education & adherence to business model.
- Financial Constraint (Fund raising) for scaling the model
Challenges
![Page 14: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/14.jpg)
Lessons Learnt
• Demand still very huge and increasing• Locals demand more energy for productive use and refrigeration (Tier 2
Energy Service level 200 – 800 Wh/d).• More Co-ordinated Procurement and Equipment Logistics process• Need to have handy replacement for critical equipment• More customers are inclined to the prepaid metering & mini grid• Need for a more robust field support mechanism• Need for adequate funding for implementation , administration and
operational overheads
![Page 15: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/15.jpg)
• Ongoing analyses of pilot project outcomes and cash flow• Implementation of Phases 2 & 3 of BOI Funded Project• Continued Field Testing of Standardized procurement procedure• Continued Field Testing of Standardized shipping and delivery
procedure• Continued R&D in Power station design & implementation
process• Continued Optimization of cost and revenue collection • Standardizing field support mechanism through effective
collaboration with CSI & manufacturers• Reinforcing corporate relationship with stakeholders• Developing ties with relevant manufacturers• Sourcing of capital investment for expansion (grants, angel
investments, single digit debt financing)• Introduction of Community Shared Ownership (CSO) model• Extension of mini-grid power delivery to rural SMEs • Implementation of Expansion Phase I (16 New sites).
Current & Future Plans
![Page 16: Green Village Electricity Project Nigeria: Operational Report Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com IEEE Smart Village.](https://reader033.fdocuments.us/reader033/viewer/2022061605/5697bfab1a28abf838c9ace5/html5/thumbnails/16.jpg)
Thank you!!!
[email protected] www.gve-group.com
Twitter: @GreenVillageEle
Please do not hesitate to contact us for further inquiries and/or requests.
16