Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites- progress 5th PP...

18
Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites- progress 5th PP meeting Lakatamia, 10-15 June 2014 Veronika Valentar

Transcript of Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites- progress 5th PP...

Green Partnerships Local Partnerships for Greener Cities and

Regions

Pilot sites- progress

5th PP meeting

Lakatamia, 10-15 June 2014

Veronika Valentar

Green Partnerships Local Partnerships for Greener Cities and

Regions MARIBOR

KOPRIVNICA-KRIŽEVCI

RHETYMNO

LAKATAMIA

PODGORICA

LA SPEZIAVERDON,MEAILLES

GRANOLLERS

ALENTEJO

- ENERGY EFFICIENCY BUILDINGS

- ENERGY SAVING- WOOD BIOMASS- SOLAR ENERGY- BIOGASS- WATER ENERGY- FEASIBILITY

STUDIES- FINANCING- PUBLIC LIGHTNING- BIOCLIMATIC

AREAS- WATER PUMPING

SARAJEVO

INNOVATIVE APPROACH, CONCRETE RESULTS, FUTURE INVESTMENTS!

WHAT ARE WE DOING?

MANZA

Lakatamia, 10-15 June 20143

PILOTS 1-2- MARIBOR

MARIBOR 1:

Biomass heating boilers for public buildings:- 2 municipalities ( 1 new, 1 optimised)- The main obstacle: european, national, local elections, no

funding

MARIBOR 2:Energy efficiency in cultural heritage building:- Energy identity card in progress - Development of scenarios not in progres yet

The main obstacle: communication between stakeholders

Lakatamia, 10-15 June 20144

ALBANIA

- Problem: Waste management, water scarcity, pollution

- Focus: young generations

- Actions: Training courses:- How many training courses?- Any training materials developed?- Center for environmental and Green Energy?

PILOT 3- MANZA

Lakatamia, 10-15 June 20145

BOSNIA AND HERCEGOVINA

SARAJEVO 1: CO2 emmisionsActions: QuestionnairesResult: Feasibility studyQ1: how useful are project materials: e.g. funding, awareness etc.

SARAJEVO 2: Eco schoolsActions: awarenessQ2: any materials in your national language?

PILOTS 4-5: SARAJEVO

Lakatamia, 10-15 June 20146

LAKATAMIA:

Action: - Investment to the biomass boiler- Feasibility study about biomass supply

Obstacle: modification of the project; Q1: biomass supply?

PILOT 6- LAKATAMIA

Lakatamia, 10-15 June 20147

1. PARC NATURAL REGIONAL DU VERDONAction: - Territorial biogas projectQ1: Is this project realizable in the period 2014- 2020?

2. HYDROPOWER PLANT ON AN IRRIGATION CHANEL

Q2: How far are you?

PILOTS 7-8- FRANCE

Lakatamia, 10-15 June 20148

FEASIBILITY STUDIES

1. PUBLIC LIGHTNING2. WATER TREATEMENT AND PUMPING3. BIOCLIMATIC DESIGN OF OPEN SPACE

Q1: Have you already selected, suimulated and designed target places in old town of Rhetymno? Which criteria did you use by selection of target?

PILOTS 9-11- GREECE

Lakatamia, 10-15 June 20149

FEASIBILITY STUDIES

1. Possibilities for biogas and biomass producers: technical solutions and investment proposals

Q1: Funding possibilities since CRO is a member of EU?

2. Photovoltaic panels at the public buildingQ2: Development of a GIS model for data analysis and monitoring RES and energy efficiency?

3. Energy efficiency in public school building- technical solution and investment proposal

PILOTS 12-15 CROATIA

Lakatamia, 10-15 June 201410

The largest network of decision makers1. Strengtheening local public –private partnerships

supporting energy efficiency2. Raising awareness and implementing energy efficiency upgrading in schools3. Mobilisation funds for investment in sustainable energy at local level4. Training civil society organizations in energy certification

Q1: Nr. Of concrete locations (feasibility studies, energy audits, emission inventories) involved?Q2: Environmental and energy centre?Q3: Web platform tool for training course?

PILOTS 16-19- ITALY

Lakatamia, 10-15 June 201411

Feasibility studies about the use of hydro power

Case: Jezerstica

Q1: Nr. Of events? Any new obstacles identified?

PILOT 20-MONTE NEGRO

Lakatamia, 10-15 June 201412

1. Starting up of a “Championship for energy saving” in public buildings

2. Installation of remote control systems for energy management in public buildings participating in “championship”

3. Technical and economic feasibility study on the installation of trigeneration in the form of selfconsumption and provision of energy services to Granollers

Q1: does remote controll enable feedback on

PILOTS 21-23 CATALONIA

Lakatamia, 10-15 June 201413

1. Personalised trainings for SME-s2. Public lightning energy efficiency3. Network for electricity efficiency4. LEDs for traffic lights5. Zero emmisions communities

Q:The progress of work, investments?

PILOTS 24-29 PORTUGAL

Lakatamia, 10-15 June 201414

1st slide- Title of the Pilot case, which technical-non technical thematic area- LAG related to the specific pilot case (members) - Photo representative to the pilot project/areaIn addition, we propose a graphic sign for the country flag+partner’s logo- Start-End date of pilot case implementation  

 2nd slide

Starting point – which was the identified need - reasons for change that led to the

specific pilot actionSolution  proposed

Cooperation established?Targets set (i.e. energy savings, people

reached, investments challenged, new jobs etc)

Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise

awareness/improve habits, capacity building)                                                                                                                                 

                    3rd slide

Main barriers identified during the implementation of the projectBenefits for the community

Lessons learnt 

4th slide 

which are the next steps by the end of the project so that you will achieve the aim of the

pilot case as described in the Application Form (e.g. investment realized, investment

proposal prepared, technical solution prepared etc.)

 

POSTERS

Lakatamia, 10-15 June 201415

2nd slide- Starting point – which was the identified need - reasons for change that led to the specific pilot action- Solution  proposed - Cooperation established?- Targets set (i.e. energy savings, people reached, investments challenged, new jobs etc) - Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise awareness/improve habits, capacity

Lakatamia, 10-15 June 201416

3rd slide- Main barriers identified during the implementation of the project- Benefits for the community- Lessons learnt 

Lakatamia, 10-15 June 201417

4th slide 

which are the next steps by the end of the project so that you will achieve the aim of the

pilot case as described in the Application Form (e.g. investment realized, investment

proposal prepared, technical solution prepared etc.)

Lakatamia, 10-15 June 201418

If you can‘t explain simply, you don‘t understand it well enough! (Albert Einstein)